Method Statement For UPS
Method Statement For UPS
Method Statement For UPS
CONTENTS:
1. Scope of works
2. Project organization for Health & Safety Control
3. Health & Safety Risk and Control
4. Access / Egress
5. Lighting
6. Plant & Equipment
7. Personnel Training Certificate
8. Hazardous Materials & Substances
9. Waste Management
10. Special Control Measures
11. Appendixes
Appendixes
Appendix 1: Checklist for Lightning Protection System
Appendix 2: Project Organization for Health & Safety control
Appendix 3: Risk Assessment
Appendix 4: Personnel Training Certificate
Appendix 5: MSDS for UPS Battery
1. Scope of Works
I.
Scope of Activities
II.
Site Procedure
Site mobilization shall be done with real time monitoring the conditions & progress of
builder works. Before commencement of the work, carry out examination of the
physical condition of the area. Photographs should be taken where necessary, prior
to commencement and during works.
Method Statement
III.
Preparation stage
a. The delivery vehicle will be parked in the loading area; the equipment will be
unpacked removed from vehicle using the tail lift.
b. Verify compliance between type label on reverse side and system ordered.
c. Check input and output voltage.
d. Copy the type label data to label copy below for easy identification of the
system.
e. Use a fork lift or pallet to transport the system to installation site.
f. Open UPS doors and unscrew metal straps mounted on front cover of UPS.
g. The UPS equipment will then be moved into position using scoots and pallet
trucks.
h. The batteries and stand will be moved into the UPS room using pallet trucks
IV.
Installation Stage
UPS
a. All parts are accessible from front or top of UPS.
b. Identify and check against delivery note all batteries, links and cables are
sufficient and correct.
c. Study the installation guide and layout drawings supplied by the
manufacture.
d. Attach incoming and out-going cables to terminals.
e. Always keep AC, DC and communication able separate.
f. Follow the installation guide for power and communication cable entry.
g. Use commercially available approved solderless lugs for the wire size
h.
i.
j.
k.
required for your application. Connect wire to the lug using appropriate tool.
Input, output and DC cables are routed in separate conduits.
Verify all power connections are tight.
Verify all control wire connections are tight.
Verify all power wires connections have proper spacing between exposed
a.
b.
c.
d.
e.
f.
g.
h.
i.
V.
Preferred Brands
UPS
4. Access / Egress
The person in charge of the work will ensure that he and all operatives under his
supervision are familiar with the correct access and procedures to the place of
work.
The correct access and egress procedure will be adhered to at all times .
5. Lighting
Adequate temporary/task lighting shall be provided if work to be carried at night
or at dark places.
Description
Hand Tools
Power Tools (if required)
Electrical drill (only for surface installation works)
Diagonal-Cutting Pliers
Unit
1 lot
1 lot
1 lot
1 lot
1 lot
Side-Cutting Pliers
1 lot
1 lot
1lot
1lot
10
1lot
11
1lot
12
1lot
13
1 lot
14
*The above machinery & Equipment used quantity will be varied depending on site conditions
and production rate.
Approved work method statement and risk assessment will be made available to site. All
workers doing the work shall be briefed on this method statement and risk
assessment.
11. Appendix
ANNEX 1:
Inspection Checklist
UPS
Installation
ANNEX 2:
Project Organisation
for Health & Safety
Control
ANNEX 3:
Risk Assessment
ANNEX 4:
Personnel Training
Certificate
ANNEX 5:
MSDS for UPS
Battery