Sowa Company Profile PDF
Sowa Company Profile PDF
Sowa Company Profile PDF
GROUP OF COMPANIES
SOWA
CONSTRUCTION
OBJECTIVE
If not say appreciation to lower personnel, will not move. a saying from
General Isoroku Yamamoto. (tactual ranslation to Eng lish)
Instead of complaining, it is rather important to teach the personnel with
appreciation. A good management with a good future for the company
should always uphold development as a challenge and be prepared to
face them.
A companys continuous development is the key to Customers satisfaction
and Employees gratification.
SOWA
CONSTRUCTION
MISSION
*We always consider maintaining the best technical aspects, as trusted by our valued customers
for our maximum services, in order to realize a long-term development of the companys
management.
*We always consider to get the maximum result through our daily performances and to polish
our personnel and to endeavor trust as the basic consideration inside and outside the
company.
*We carefully pay special attention on the requirements of our customers, who provide us
projects in this business, and through mutual and credible actions we acquire the customers
appreciations.
*We always consider ways to improve productivity in our daily performances and committed to
deliver our products and services on time and with an assurance of quality.
*We carefully pay respect on reliability and safety in all actions, notwithstanding the various
personal and business concerns.
*We strongly hold on to our responsibility with much pride, not avoiding unknown works
therefore contacting, setting up discussions with the upper personnel to resolve the
problems.
*We are committed to established good, friendly relationship with our valued customers and
employees, to widen business contacts, and to share equal profits among people connected
in the business, therefore daily developing our society.
VISION
*
The company envisions to become globally known and patronized as a first class,
Japanese-quality standard Construction Company specialized in Interior and Exterior
Finishing Works, to invade the foreign market by establishing branch offices first in Asian
countries then in the other continents of the world.
INSPIRED BY: Mr. TOSHIO MURAYAMA
HEAD OFFICE
In Philippines
SOWA CONSTRUCTION
INCORPORATED
OFFICE ADDRESS :
: +632-890-1982
: info@sowagrp.com
A199610754
DATE REGISTERED : December 2, 1996
BUSINESS PERMIT :
GENERAL MANAGER :
BRANCHES
SOWA VIETNAM
CONSTRUCTION CO.,LTD
In Hanoi
OFFICE ADDRESS :
: 011043000040.
: November 11, 2006
: 0102067733
: November 14, 2006
Executive DIRECTOR
: Mr. KEITA CHIBA
DIRECTOR
: Ms. JULAINE TULAYBA
SOWA
CONSTRUCTION
SOWA VIETNAM
CONSTRUCTION Co. Ltd
In Ho Chi Minh
M-17 Hanh Thong Tay, Quang Trung, Phuong 11Quan Go Vap TP, Ho
Chi Minh, Vietnam
Telephone No
: +84(8)9210780
Fax No
: +84(8)9210776
EMAIL ADDRESS
: vninfo@sowagrp.com
BUSINESS PERMIT : 41112000037
DATE REGISTERED : 03 OCTOBER 2008
COMPANY TAX CODE
: 0102067733-001
DATE REGISTERED : 21 NOVEMBER 2008
SOWA
CONSTRUCTION
:
:
:
:
185171
+971-4-229 2644
+971-4-229 2665
+971-4-298-6278
SOWA
CONSTRUCTION
PT SOWA CONSTRUCTION
INDO
In Jakarta
OFFICE ADDRESS :
WISMA BAJUAJI Suite, Unit 1.06A JI, Gandaria Tengah III
No.44 Kebayoran Baru, Jakarta Selatan 12130, Indonesia
TRUNKLINE
FAX NUMBER
SOWA
CONSTRUCTION
PRODUCTS
SOWA
CONSTRUCTION
1, Masonry Works
2, Metal Works
SOWA
CONSTRUCTION
OFFICE RENOVATION
TRAIN STATIONS
EXITS, COUNCOURSE,GEN.
HOUSE
HOSPITAL FINSIHING
SOWA
we specialize in:
CONSTRUCTION
CARPET TILE
CEILING FINISH
PAINTING
SOWA
CLIENTS
CONSTRUCTION
SUPPLIERS
SOWA
CONSTRUCTION
PHILIPPINES
CMS SASH & IRON WORKS
CRESAR ENTERPRISE
FEDERAL HARDWARE
G.S. GO BROTHERS
GOZON PAINTS & HARDWARE
HANS INFINITE TOOLS
HILTI TOOLS
HOME DEPOT
KEN-TOOL CORP.
KURES INTERNATIONAL
LSM STEEL INC.
NEW WELL-WORTH SUPPLY
NIPPON PAINTS
NISHIN METAL CO.
OCM STEEL CORPORATION
PIONEER SPECIALTY BUILDING
POLYMER PRODUCTS
(WATERPROOFING CHEMICALS)
SIKA PHILIPPINES INC.
TECHNO DEVELOPMENT
TRADE BAY, INC.
UPTOWN INDUSTRIAL
JAPAN
ABC SHOKAI CO., LTD.
AR CENTER CO., LTD.
ASAHI CHEMICAL INDUSTRY CO.
BRIDGESTONE CO., LTD
CHICHIBU COLOR CONCRETE
INDUSTRY CO., LTD.
DAI NIPPON TOKYO CO., LTD.
DAIKEN CORPORATION
DAIYU PAINT CO., LTD.
ISHIKAWA CO,LTD
KANSAI PAINT CO., LTD.
KASHO CO., LTD.
KONISHI CO., LTD.
MIZUTANI PAINT CO.,LTD
NIHON KASEI CO., LTD.
NIHON POLYMER CO., LTD.
NIPPON LIGHT METAL CO., LTD.
OZEKI CHEMICAL CO.,LTD
SANGETSU CO., LTD.
SANKI-SHOKO CO., LTD.
SHINETSU CHEMICAL CO., LTD.
SHOWA HIGH POLYMER CO., LTD.
TYOTA TSUSHO CORP.
TACHIKAWA BLIND
YABUHARA CO., LTD.
SUPPLIERS
SOWA
CONSTRUCTION
OTHER COUNTRIES
PROJECTS REFERENCES
SOWA
PROJECT;NAIA TERMINAL 3
CONSTRUCTION
LOCATION
: 2003
WORKS
PAINTING WORKS
WATERPROOFING WORKS
PLASTERING WORKS
SEALANT WORKS
SOWA
PROJECT;BACOLOD AIRPORT
CONSTRUCTION
LOCATION
: BACOLOD, PHILIPPINES
CLIENT NAME
PERIOD
: 2006
WORKS
SOWA
PROJECT;ILOILO AIRPORT
CONSTRUCTION
LOCATION
CLIENT NAME
PERIOD
: 2005-2006
WORKS
PAINTING WORKS
WATERPROOFING WORKS
PLASTERING WORKS
SEALANT WORKS
GRANITE FINISHING
SOWA
CONSTRUCTION
LOCATION
: MAKATI, PHILIPPINES
: 2008
WORKS
OFFICE FITTINGS
SOWA
CONSTRUCTION
LOCATION
JEDIC PHILIPPINES
BATANGAS
: BATANGAS, PHILIPPINES
: 2010
WORKS
GRANITE WORKS
EPOXY PAINT
WATERPROOFING WORK
SOWA
CONSTRUCTION
LOCATION
PROJECT;BENGUET
HOSPITAL
: BENGUET, PHILIPPINES
: 2012
WORKS
SOWA
PROJECT;DUBAI METRO
CONSTRUCTION
LOCATION
: 2008-present
WORKS
DRYWALL WORKS
PAINTING WORKS
REDLINE STATION
GREENLINE STATION
SOWA
PROJECT;HOYA FACTORY
CONSTRUCTION
LOCATION
: 2008
WORKS
SOWA
CONSTRUCTION
LOCATION
PROJECT;DJIBOUTI
KENPINSKI HOTEL
: DJIBOUTI
: 2008
WORKS
SOWA
CONSTRUCTION
SAFETY POLICY
Safety and health for all our personnel are the primary concerns of our
management for we believe that it is one of the essentials towards the companys
growth and success. Therefore, Sowa Construction, recognizes and supports all
activities leading to correct and proper safety and health programs.
In order to ensure the safety and health of all personnel concerned, all levels of
hierarchy of management shall comply with the codes of conduct for safety stated as
follows:
Every manager and employee has a duty and responsibility for safety.
Enhance safety consciousness and acknowledge through continuous
education&training
Encourage and propagate safety policy among co-personnel
Establish safety regulations and abide by it.
Ensure a hazard-free and clean work environment.
Ensure the welfare and safety of our people by securing a valid Workmens
Compensation Insurance
Provide all safety tools and gadgets necessary for each worker & site project.
Provide the necessary medicines for emergency cases in the FIRST AID KIT.
Assign & orient people at the site to take responsibility on the injured employee.
Create interest & enthusiasm in safety efforts through recognition of safety
performance
Reduce every possibility of accidents by foreseeing the danger and taking
precautionary measures to prevent such incidents.
By : Mr. TAKESHI MURAYAMA PRESIDENT & CEO
SOWA
CONSTRUCTION
PART 1 LEADERSHIP
COMPONENTS
1. SAFETY ORGANIZATION
SOWA
CONSTRUCTION
SOWA
CONSTRUCTION
PART 2 ADMINISTRATIVE
HEALTH PROGRAM
PHYSICAL EXAMINATION
Every employee must undergo a General check up prior to employment. The hospital or clinic is
preferably a contact
medical company of Sowa for easy and immediate accommodation of our applicants.
The employees check up result must indicate PHYSICALLY FIT TO WORK before they will be
hired or assigned for a project.
FIRST AID
An adequately equipped First Aid Kit will be provided for every site / project with the following
items:
Medicines ( paracetamol, loperamide for LBM, expectorant for cough)
Sterile gauze, bandages, band aid, cottons, Beta dyne solutions, Alcohol Spirit of ammonia
SOWA
CONSTRUCTION
2,EMERGENCY MANAGEMENT
PROJECT SITE
INJURED PERSON
SITE CLINIC
AMBULANCE OR
ANY CO.VEHICLE
HOSPITAL or CLINIC
-An area @ the site provided for all injured & uninjured workers
when accidents occur All workers shall be accounted for through
their daily attendance sheets and checked for possible wounds /
injury.
SOWA
CONSTRUCTION
3,SAFETY
TRAINING/ORIENTATION
No
DESCRIPTION
GENERAL
ORIENTATION
TOOLBOX
MEETING
SAFETY
MEETING
INSPECTION
SAFETY
TRAINING
REVIEW
DAILY
WEEKLY
MONTHLY
REMARKS
To be conducted prior
to assumption of duty
Depending on the
schedule availability
of the trainer
OBJECTIVES
To locate and report existing potential hazards having the
capacity to cause accidents in a workplace. Thus improve
operation and increase efficiency , effectiveness and
profitability.
Preparing for Inspection
Must not interrupt normal operation/Review and evaluate all
accidents/Review and evaluate previous inspection
report/Awareness of any potential hazards/Wearing of PPE(s)
Formulate checklist
SOWA
CONSTRUCTION
4,SAFETY INSPECTION
Objectives
To locate and report existing potential hazards
having the capacity to cause accidents in a
workplace. Thus improve operation and increase
efficiency, effectiveness and profitability.
Preparing for Inspection
Must not interrupt normal operation/ Review and
evaluate all accidents/ Review and evaluate
previous inspection report/ Awareness of any
potential hazards/ Wearing of PPE (s)Formulate
checklist
Safety Items for Inspection
A. General Workplace condition
- Floor, Aisles, Passages, Platforms, scaffolds,
Ladders, Stairs,
- Exits Egress, Roadways, Ventilation
B. Facilities
- Lightings, Noise Exposure, Ergonomic
Factors
C. Materials
- Stocking & Storage, Chemical & Fuels, Compressed
Air, Waste
Disposal
D. Equipment
- Equipment 1.a. Pneumatic; 1.b. Hydraulic
- Machine (tools) & Guarding
- Mobile Equipment, Lifting Equipment, Conveyors,
Pressure,
Pressure Vessels
E. Hazard Controls
- Lock-out/ Tag-out, Signs & Tags, Color Coding,
Material
Labelling, Warning Signs/System
F. Emergency Systems
- Fire Protection, Eye Bath / Shower, First Aid Kits /
Station,
Reserve equipment, PPE (regularly)
SOWA
CONSTRUCTION
QUALITY ASURANCE
OBJECTIVES
POLICY
1. We carefully study every detail & minutes of the
project prior to mobilization.
2. We deploy professionally experienced, welloriented, highly- skilled STAFF and WORKERS, in
accordance with the works specified in the
project.
3. We are confident that all our materials, local and
imported, meet the required specifications as per
the clients approval.
4. We accomplish every scope of works and area
within the given time frame and adopt every
possible means to cope up in case of revision on
schedules and take preventive measures on
factors that may cause delays.
5. We carefully give special attention and priority to
the clients instructions and/ or revisions without
hesitation.
6. We provide Warranty for our materials and services
(e.g. waterproofing, painting, ceiling & wall
finishing).
7. We are always available on call and immediately
respond for any of our clients requirements,
demands, and/ or complaints.
The Project Quality Plan aims to assist in providing a
quality assured product that will satisfy the
requirements of the Employers / Clients.
SOWA
QUALITY PLAN
CONSTRUCTION
Project Engineer
Act as assistant to the Project Manager
- Coordinates with Foreman/ Lead man assigned per
area/work
- Coordinates with Quantity Surveyor for updating of
material delivery, project
developments, additional works, actual measurements of
scope of works
- Prepare daily project accomplishment report
* Import Japanese Supervisor
for some special works that use imported materials,
the company imports a Japanese Supervisor who is
very much familiar with the materials and highly
skilled to ensure the quality of the application and/or
installation of our products.
*Adequate number of skilled workers and laborers to carry
out the required activities per area per day.
1 FOREMAN per type of WORK
1 LEADMAN per 10 WORKERS or PER AREA max. of
300sq.m.
* On time delivery and sufficiency of materials as required
reliable and in good working condition construction tools &
equipments.
* Proper application/installation of materials, especially for
imported and special-fabricated ones.
*Perform the construction activities within the budget
allocations.
* To perform the following BEFORE & AFTER CLIENTS
INSPECTION
* PRE and POST INSPECTION to be performed by the
Quality Construction
*Manager together with the Project Manager and
Engineers)
* PUNCHLIST
* Re-touching and/ or repair works of disapproved and/ or
rejected area
It is the responsibility of each Project Manager and Project
Supervisor to ensure that this policy is implemented
and maintained at all levels of the project throughout
its execution period.
SOWA
CONSTRUCTION
ACTIVITIES
PERSON(s) IN
CHARGE
RESPONSIBILITIES
DOCUMENTS/
FORMS
INSPECTION
- Project Manager
- Engineer
- Quantity Surveyor
ORIENTATION
-Project specifications
-Final Approved Quotation
-Specs. of works
-List of Manpower
-List of Matls. & Tools
-Brochures of special
materials
MOBILIZATION
And
ACTUAL WORKS
1.Quality Control
Manager
2. Project Manager
3. Engineer
4. Foreman
5. Lead-man
6. Workers
7. Timekeeper
8. Warehouseman
9. Safety Officer
FINALIZE
Works
-checklist of accomplished
area and its actual
condition
INSPECTION
(internal & w/
Client)
PUNCHLIST
-perform repair/retouch of
areas not approved by the
client/owner
FINAL Turn
Over
- Quality Control
Manager
- Project Manager
- Engineer
WARRANTY
-Dept. Head of
-Warranty Certificate
Project Manager
Engineer(s)
Quantity Surveyor
Warehouseman
Foreman
Purchasing Rep.
Engineer
Repair and/ or
Maintenance
-Quality Control
Manager
-Dept. Head of
Engineer
-supervisor & workers
SOWA CONSTRUCTION
GROUP OF COMPANIES
http://www.sowagrp.com/
HEAD OFFICE(PHILIPPINES)
SOWA CONSTRUCTION,INC.
OFFICE ADDRESS : 101-ITCBuilding,#337Sen.Gil Puyat Makati City, 1210 PHILIPPINES
TRUNKLINE : +632-897-8423 FAX : +632-890-1982 EMAIL: info@sowagrp.com
HANOI
SOWA-VIETNAM CONSTRUCTION,CO.LTD.
OFFICE ADDRESS : #22-N7A Trung Hoa Nanh Chinh Urban Area, Thanh Xuan District, Hanoi,Vietnam
HO CHI MINH
SOWA-VIETNAM CONSTRUCTION,CO.LTD.
OFFICE ADDRESS : M-17 Hanh Thong Tay, Quang Trung, Phuong 11Quan Go Vap TP, Ho Chi Minh,Vietnam
TRUNKLINE : +84(8)9210780 FAX : +84(8)9210776 EMAIL: vninfo@sowagrp.com
JAKARTA
DUBAI