Jindal India Thermal Power Limited Integrated Management System
Jindal India Thermal Power Limited Integrated Management System
Jindal India Thermal Power Limited Integrated Management System
Page 1 of 9
: MAINTENANCE OF ACW
2. SCOPE
: ACW
3. REFERENCE
JITPL/SMP/Mech/001
Prepared By:
Checked By:
Reviewed By:
Approved By:
NAME:
NAME:
NAME:
NAME:
DESIGNATION:
DESIGNATION:
DESIGNATION:
DESIGNATION:
SIGNATURE:
SIGNATURE:
SIGNATURE:
SIGNATURE:
Page 2 of 9
AMENDMENT HISTORY
Sl
no.
1
Amendment Description
a. Inclusion of new hazard controls
b. Version change
Current Ver.
No.
00
Current
Rev.No
00
Issue Date
17.05.2014
Page 3 of 9
Page 4 of 9
(NROU-3.1, 3.2)
Open the coupling bolt & Decouple the motor & pump
Loosen the impeller check nut & remove the impeller from its position.
3. QUALITY CHECKS:
4. RE-COMMISSIONING PROCEDURE:
Return PTW.
1.0 RESPONSIBILITY
Mechanical Engineers
Keep the fire extinguishers ready within reachable limit for any exigency.
Page 5 of 9
Page 6 of 9
Ceramic hand gloves to be used while handling thrust collar / hot surface.
(OHSAS)
Ensure use of periodically tested proper lifting tools & tackles.
Use of earplug is mandatory along with other general PPEs.
Ensure good housekeeping of maintenance bay.(EMS)
Put barricade tapes around the equipment under maintenance.
SPECIFICATION
QUANTITY
Hammering Spanner
41 mm
4 Nos
Hammer
4lb
2 Nos
Screw driver
2 Nos
Chisel
2 Nos
Gasket Cutter
--
1 Nos
Retch Spanner
19~21
1 Nos
Retch Spanner
21~23
1 Nos
Ring ID
--
--
Chain Block
2T
2 Nos
Page 7 of 9
Page 8 of 9
SL. NO.
QUANTITY
Tri-pod
1 Nos
Bucket
--
Plastic bin
2 Nos
Hose pipe-1
30mtr
Scaffolding plate
8nos
Water gasket
2 Nos
10
04tubes
11
Embay paper-400
8 Nos
12
WP-40
2 Nos
13
Diesel
2litter
14
Wire bush
1 Nos
15
Jub clamp
1 16nos
16
Hand globes
08nos
17
Cotton west
2kg
RE-COMMISSIONING PROCEDURE:
Return PTW.
Page 9 of 9