The document provides design details for a barrage including maximum and minimum discharges of 300,000 and 12,000 cubic feet per second respectively. The barrage will have 3 canals and be designed for both overflow and undersluice conditions. Calculations show the crest level should be 592.03 feet to pass the maximum discharge safely and undersluice crest should be 589.03 feet. Downstream floor levels and lengths are determined using Crump's method for different discharges.
The document provides design details for a barrage including maximum and minimum discharges of 300,000 and 12,000 cubic feet per second respectively. The barrage will have 3 canals and be designed for both overflow and undersluice conditions. Calculations show the crest level should be 592.03 feet to pass the maximum discharge safely and undersluice crest should be 589.03 feet. Downstream floor levels and lengths are determined using Crump's method for different discharges.
The document provides design details for a barrage including maximum and minimum discharges of 300,000 and 12,000 cubic feet per second respectively. The barrage will have 3 canals and be designed for both overflow and undersluice conditions. Calculations show the crest level should be 592.03 feet to pass the maximum discharge safely and undersluice crest should be 589.03 feet. Downstream floor levels and lengths are determined using Crump's method for different discharges.
The document provides design details for a barrage including maximum and minimum discharges of 300,000 and 12,000 cubic feet per second respectively. The barrage will have 3 canals and be designed for both overflow and undersluice conditions. Calculations show the crest level should be 592.03 feet to pass the maximum discharge safely and undersluice crest should be 589.03 feet. Downstream floor levels and lengths are determined using Crump's method for different discharges.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 22
DESIGN OF BARRAGE
Maximum Discharge Qmax = 300000 Cusecs
Minimum Discharge Qmin = 12000 Cusecs River Bed Level RBL = 582 Ft Highest Flood Level HFL = 600 Ft Lowest Water Level LWL = 587 Ft Minimum Pond Level = 598 No of Canals on Right Bank = 2 No of Canal on Left Bank = 1 Maximum Discharge For 1 Canal = 3500 Cusecs Slope of River = 1 Ft/mile
DESIGN OF BARRAGE PROFILE FOR OVERFLOW CONDITION 1.Minimum stable Wetted Perimeter Wetted Parameter Pw = 2.666(sqrt(300000)) = 1460 Ft
Using Lacy Looseness Coeffient LCC = 1.8 Width b/w Abutment Wa = 1.8 x 1460 2628 Ft
Try:,
40 bays @ 60 = 2400 Ft 25 Piers @ 7 = 175 Ft 1 Fish Ladder = 20 Ft 2 Divide Walls = 35 Ft
Fix Crest Level of undersluices 3 ft below the main weir.
Crest Level of Undersluices = 592.03-3 = 589.03 ft
Assume 5 Bays acts as Undersluices on both sides b 1 = 5 x 60 = 300 Ft
Assuming,
Discharge of Undersluices q us = 120% of main weir. = 1.2 x 125 = 150 Cfs Maximum Scour Depth R = 0.9 x (150 2 /1.94) 1/3
= 20.37 Ft
D 0 = 20.37 Ft
Velocity Head V 0 = 150/20.37 = 7.36 Ft/sec
H 0 = 7.36 2 /(2 x 32.2) 0.84 Ft
Maximum USEL = 603.00 + 0.84 603.84 Ft
E 0 = 603.84 589.03 = 14.81 Ft
h
= 14.81-3 = 11.81 Ft
h/E 0 = 11.81/14.81 = 0.79
C/C = 0.80
Assume C = 3.5
C = 3.5 x 0.80 = 2.8
Q 1 & Q 3 = 2.8 x (300 x 2) x 14.81 3/2
= 95750.70 Cfs
Q main weir = 3.325 x (2400-600) x 11.67 3/2
238600.00 Cfs
Total Discharge Q Total = 95750.70 + 238600.00 = 334350.7 Cfs
Q Total > Q max (300,000) OK
Now %age Water Passing through Undersluices = [95750.70/300000] x 100 = 32 %
The Undersluices are fixed at Crest = 589.03 ft
Number of Bays on each side = 5
5. Determination of Water Level and Energy Level.
We shall determine the water level and energy levels of the barrage for three states of the river i.e a) Retrogressed State b) Normal State c) Accreted State The Curve of the three states of the river are obtained by the actual stage-discharge relationship at the barrage site.
5.1 Check for Main Weir Check for Normal State Check for Retrogressed State Check for Accreted State
FOR UNDERSLUICES:- 6. Fixation of d/s floor level and length of d/s glacis and d/s floor.
6.1 Fixation of d/s floor levels for normal weir section using Crumps method and determination of floor length.
a) Discharge Q = 300000 Cfs Maximum DSWL = 603 Ft USWL = 604 Ft USEL = 604.5 Ft RBL = 582 Ft Crest Level = 592.03 Ft DSFL = 576 Ft Dpool = 603-576 = 27 Ft d/s velocity V = 300000/(27 x 2630) = 4.23 Ft/sec d/s velocity head h 0 = 4.23 2 /(2 x 32.2) = 0.28 Ft DSEL = 603+0.28 = 603.28 Ft K = 604.5-592.03 = 12.47 Ft L = 604.5-603.28 = 1.22 Ft q = 300000/2400 = 125 Cfs/ft Critical Depth C = [125/32.2] 1/3
= 7.86 Ft L/C = 1.22/7.86 = 0.15
(K+F)/C = 1.92 (From Crumps Curve)
F = 1.92 x 7.86 12.47 = 2.62
Level of Interaction of jump with glacis = Crest level F = 592.03-2.62 = 589.41 Ft
E2 = 603.28 589.41 = 13.87 Ft
Submergency of Jump = 589.41 576 = 13.41 Ft
Length of glacis d/s of jump = 3 x 13.41 = 40.23 Ft
Length of silting pool = 4.5 x 13.87 = 62.42 Ft
Length of d/s floor = 62.42 - 40.23 = 23 say = 25 Ft
b) Discharge Q = 300000 Cfs Minimum DSWL = 593 Ft USWL = 598 Ft USEL = 598.95 Ft RBL = 582 Ft Crest Level = 592.03 Ft DSFL = 576 Ft Dpool = 593-576 = 17 Ft d/s velocity V = 300000/(17 x 2630) = 6.71 Ft/sec d/s velocity head h 0 = 6.71 2 /(2 x 32.2) = 0.70 Ft DSEL = 593+0.7 = 593.7 Ft K = 598.95-592.03 = 6.92 Ft L = 598.95-593.7 = 5.25 Ft q = 300000/2400 = 125 Cfs/ft Critical Depth C = [125/32.2] 1/3
= 7.86 Ft L/C = 5.25/7.86 = 0.67
(K+F)/C = 2.52 (From Crumps Curve)
F = 2.52 x 7.86 6.92 = 12.89
Level of Interaction of jump with glacis = Crest level F = 592.03-12.89 = 579.14 Ft
E2 = 593.7 579.14 = 14.56 Ft
Submergence of Jump = 579.14 576 = 3.14 Ft
Length of glacis d/s of jump = 3 x 3.14 = 9.42 Ft
Length of silting pool = 4.5 x 14.56 = 65.52 Ft
Length of d/s floor = 65.52- 9.42 = 56 say = 60 Ft
Hence we shall provide d/s floor 60 ft long.
6.1 Fixation of d/s floor levels for undersluices section using Crumps method and determination of floor length 95750.70 a) Discharge Q = 114900 Cfs Maximum DSWL = 603.5 Ft USWL = 604.5 Ft USEL = 605.19 Ft RBL = 582 Ft Crest Level = 589.03 Ft DSFL = 573 Ft Dpool = 603.5-573 = 30.5 Ft d/s velocity V = 114900/(30.5 x 600) = 6.28 Ft/sec d/s velocity head h 0 = 6.28 2 /(2 x 32.2) = 0.61 Ft DSEL = 603.5+0.61 = 604.11 Ft K = 605.19-589.03 = 16.16 Ft L = 605.19-604.11 = 1.08 Ft q = 114900/600 = 191.5 Cfs/ft Critical Depth C = [191.5 2 /32.2] 1/3
= 10.44 Ft L/C = 1.08/10.44 = 0.10
(K+F)/C = 1.97 (From Crumps Curve)
F = 1.97x 10.44 16.16 = 4.40
Level of Interaction of jump with glacis = Crest level F = 589.03-4.4 = 584.63 Ft
E2 = 604.11 584.63 = 19.48 Ft
Submergence of Jump = 584.63 573 = 11.63 Ft
Length of glacis d/s of jump = 3 x 11.63 = 34.89 Ft
Length of silting pool = 4.5 x19.48 = 87.66 Ft
Length of d/s floor = 87.66 34.89 = 53 say = 55 Ft
b) Discharge Q = 114900 Cfs Minimum DSWL = 598 Ft USWL = 603 Ft USEL = 603.79 Ft RBL = 582 Ft Crest Level = 589.03 Ft DSFL = 573 Ft Dpool = 598-573 = 25 Ft d/s velocity V = 114900/(25 x 600) = 7.66 Ft/sec d/s velocity head h 0 = 7.66 2 /(2 x 32.2) = 0.91 Ft DSEL = 598+0.91 = 598.91 Ft K = 603.79-589.03 = 14.76 Ft L = 603.79-598.91 = 13.88 Ft q = 114900/600 = 191.5 Cfs/ft Critical Depth C = [191.5 2 /32.2] 1/3
= 10.44 Ft L/C = 13.88/10.44 = 1.33
(K+F)/C = 2.9 (From Crumps Curve)
F = 2.9 x 10.44 14.76 = 15.5
Level of Interaction of jump with glacis = Crest level F = 589.03-15.5 = 573.53 Ft
E2 = 598.91 573.53 = 25.38 Ft
Submergence of Jump = 573.53 573 = 0.53 Ft
Length of glacis d/s of jump = 3 x 0.53 = 1.59 Ft
Length of silting pool = 4.5 x 25.38 = 114.21 Ft
Length of d/s floor = 114.21-1.59 = 113 say = 115 Ft
Hence we shall provide d/s floor 115 ft long.
7. Scour Protection.
Assume 20% concentration, q = 125 x 1.2 = 150 Cfs
R = 0.9 x [(150 2 )/1.94] = 20.37 ft
7.1 D/S Scour Protection.
Safety Factor = 1.75 for d/s floor critical condition.
= 1.75 x 20.37 = 35.65 Ft
Minimum D/S Water = 593 Ft Level for 0.3 million discharge.
D/s Apron Level = 576 Ft
Depth of Water on Apron = 593 576 = 17 Ft
Add 0.5 ft increase in depth for concentration. D = Depth of Water with concentration.
= 17.5 Ft
R D = 35.65 17.5 = 18.15 Ft
Length of Apron to cover a surface of scour at 1:3 slope = Sq.rt (3 2 + 1 2 ) x (18.15) 57.40 Ft
Therefore the length of D/S stone apron in horizontal position = 57.40 x {1.25t/1.75t] 41 Ft
7.2 U/S Scour Protection.
Safety Factor = 1.25 for U/S Floor
R = 1.25 x 20.37 = 25.46 Ft
Minimum U/S Water Level for Discharge of 0.3 million cfs. = 598 Ft
U/S Apron Level = 582 Ft
Depth of Water on Apron = 598 582 = 16 Ft
Add 0.5 ft increase in depth for concentration. D = Depth of Water with concentration.
= 16.5 Ft
R D = 25.46 16.5 = 8.96 Ft
Length of Apron to cover a surface of scour at 1:3 slope = Sq.rt (3 2 + 1 2 ) x (8.96) = 28.32 ft = 30 (Say)
Therefore the length of U/S stone apron in horizontal position = 30 x {1.25t/1.75t] = 21.45 ft
7.3 Thickness of Aprons.
The Basic Idea in determining the thickness is that there should be sufficient volume of stones when launching that it fully covers the surface of scour at maximum possible slope (1:3).Now t for medium sand and a slope of 12/mile is 34.
Thickness of Stone Apron in Horizontal position = 1.75 x (34/12) = 5 Ft
While the size of the concrete blocks over the filter will be 4 x 4 x 4 , the thickness of the stone apron shall be 5 ft.
Summary,
Total Length of D/S Stone Apron = 41 Ft
4 thick block Apron = 13 (1/3 of Total Length) Ft
5 thick block Apron = 28 Ft
Total Length of U/S Stone Apron = 21.45 Ft
4 thick block Apron = 7 (Block Size 4 x 4x 4) Ft
5 thick block Apron = 14.45 Ft
7.4 Scour Protection For Undersluices.
Proceeding on similar lines above, the length and thickness for the U/S & D/s loose stone aprons may be calculated for the undersluices portion. In this case since the discharge intensity will be higher, the maximum scour will be more than that in previous case & consequently the length will be greater as compared to those for the normal weir section. Assume 20% concentration, q = 159.58 x 1.2 = 191.5 Cfs
R = 0.9 x [(191.5 2 )/1.94] 1/3
= 23.97 ft
7.4.1 D/S Scour Protection.
Safety Factor = 1.75 for d/s floor critical condition.
= 1.75 x 23.97 = 41.96 Ft
Minimum D/S Water Level for 0.3 million discharge. = 593 Ft
D/s Apron Level = 576 Ft
Depth of Water on Apron = 593 576 = 17 Ft
Add 0.5 ft increase in depth for concentration. D = Depth of Water with concentration.
= 17.5 Ft
R D = 41.96 17.5 = 24.46 Ft
Length of Apron to cover a surface of scour at 1:3 slope = Sq.rt (3 2 + 1 2 ) x (24.46) = 77.35 Ft
Therefore the length of D/S stone apron in horizontal position = 77.35 x {1.25t/1.75t] = 55.25 Ft
7.4.2 U/S Scour Protection.
Safety Factor = 1.25 for U/S Floor
R = 1.25 x 23.97 = 29.96 Ft
Minimum U/S Water Level for Discharge of 0.3 million cfs. = 598 Ft
U/S Apron Level = 582 Ft
Depth of Water on Apron = 598 582 = 16 Ft
Add 0.5 ft increase in depth for concentration. D = Depth of Water with concentration.
= 16.5 Ft
R D = 29.96 16.5 = 13.46 Ft
Length of Apron to cover a surface of scour at 1:3 slope = Sq.rt (3 2 + 1 2 ) x (13.46) = 42.57 ft = 45 (Say)
Therefore the length of U/S stone apron in horizontal position = 45 x {1.25t/1.75t] = 32.15 ft
7.4.3 Thickness of Aprons.
The Basic Idea in determining the thickness is that there should be sufficient volume of stones when launching that it fully covers the surface of scour at maximum possible slope (1:3).Now t for medium sand and a slope of 12/mile is 34.
Thickness of Stone Apron in Horizontal position = 1.75 x (34/12) = 5 Ft
While the size of the concrete blocks over the filter will be 4 x 4 x 4 , the thickness of the stone apron shall be 5 ft.
Summary,
Total Length of D/S Stone Apron = 55.25 Ft
4 thick block Apron = 18 (1/3 of Total Length) Ft
5 thick block Apron = 37.25 Ft
Total Length of U/S Stone Apron = 32.15 Ft
4 thick block Apron = 10 (Block Size 4 x 4x 4) Ft
5 thick block Apron = 22.15 Ft
8. Inverted Filter Design.
Extensive experiments have shown that it is not necessary for a filter to restrain all the particles of the soil. Instead it may restrain 15% coarser or the D 85 of the soil. These voids will create smaller openings to trap finer soil particles. Therefore the diameter of the openings of the filter must be less then D85 of the soil. Since Effective pore diameter is about 1/5D 15 .
Therefore: D 85 (Filter) > 5D 85 (Soil)
If Filter provide free drainage than it much more pervious than the soil and in such case the criterion is.
D 15 (Filter) > 5 D 15 (Soil)
The Concrete Block of 4 x 4 x 4 will be placed over 2ft thick inverted filter which consists of a 9 layer of Single (3-6) over 9 layer of coarse shingle (3/4 -3) over 6 layer of fine shingle (3/16 ).there are 2 inches wide spacings on the sides of the blocks which are filled with fine shingle to provide free seepage flow.
9. Design of Guide Bank.
1) Length of each guide bank measured in a straight line along the barrage U/S is
L U/S = 1.5 x 2630 = 3945 ft
2) Length of Guide bank D/s of Barrage
L D/S = 0.2 x 2630 = 526 Ft
3) For the nose of the S/S guide bank & the full length of D/S guide bank use Laceys depth. = 1.75 x 20.37 = 15.28 Ft
For remaining U/s guide bank Laceys depth = 1.25 x 20.37 = 25.46 Ft
4) Possible Slope of Scour = 1 : 3
5) Free Board U/S = 7 (Above HFL Level) Ft
Free Board D/S = 6 (Above HFL Level) ft
These Free board also contains allowance for Accretion.
6) Top of Guide Bank Width = 40 Ft
7) Side Slope of Guide Bank = 1 : 2
8) Minimum Apron Thickness = 4 Ft
Length of Barrage = 2630 Ft
Length of U/S Guide Bank = 3945 ft
Length of D/S Guide Bank = 526 ft
Radius of U/S Curved Part = 600 Ft
Radius of D/s Curved Path = 400 Ft
Maximum U/S Angle Protected = 140 0
Maximum D/S Angle Protected = 57 0 -80 0
9.1 Determination Levels of Guide Bank.
L = [d 1 -d 2 }/S +D(1/S C 2 /g) x [(d 1/ D) (d 2 /D)]
Normal Depth of Flow Without Weir (Assuming a wide rectangular channel) = D
Depth Flow U/S Side of Weir = d 1
Depth of Water At Distance L U/S = d 2
Chezys Coefficient C = 71 (Maximum For Earthen Channel)
g = 32.2 Ft/sec 2
Bed Slope S = 1/5000
Function Which has been Calculated By Bresse For Various Values of d 1 /D = (d 1 /D)
Using the Above Formulas
Bed Level = 582.00 Ft
D/S High Flood Level With Accretion = 603.00 Ft
D = 603.00 582.00 = 18 Ft
U/S High Flood Level = 604.00 Ft
d 1 = 604 - 582 = 19 Ft
S = 1/5000
Assume d 2 At the nose of the guide Bank & Calculate l. If the assumed value is correct, the L will come out to be equal to the Length of the Guide Bank. Assume, d 2 = 18.8 Ft
d 1 /D = 19 / 18 = 1.056 ft
( d 1 /D) = 0.8568 = From Bresse Back Water Function Table.