Estimating Costing V
Estimating Costing V
Estimating Costing V
Checklist
Charotar Publishing House Pvt. Ltd. Opposite Amul Dairy, Civil Court Road, Post Box No. 65, ANAND 388 001 India
Telephone: (02692) 256237, Fax: (02692) 240089, e-mail: charotar@cphbooks.com, Website: www.cphbooks.com
ESTIMATING, COSTING AND VALUATION
DETAILED CONTENTS
PART I : ELEMENTS OF ESTIMATING AND COSTING
Chapter 1 APPROXIMATE METHODS OF COSTING
1-1. General
1-2. Estimate and estimating
1-3. Types of estimates
1-3-1. Detailed estimate
1-3-2. Approximate estimate
1-3-3. Quantity estimate
1-3-4. Revised estimate
1-3-5. Supplementary estimate
1-3-6. Revised estimate and supple-mentary estimate due to
reduction of cost (following P.W.D. manual)
1-3-7. Complete estimate
1-3-8. Annual maintenance and repair estimate
Practical Questions 1
Questions 1
Chapter 2 SPECIFICATIONS
2-1. General
2-2. Definition
2-3. Objects of specifications
2-4. Importance of specifications
2-5. Use of specifications
2-6. Types of specifications
2-6-1. Brief specifications
2-6-2. Detailed specifications
2-7. Classification of specifications
2-8. Design of specifications
2-9. Important aspects of the design of a specification
2-10. Principles of specification writing
2-11. Sources of information
2-12. Typical specifications
2-13. Specifications in outlines
Chapter 3 CONTRACTS AND TENDERS
3-1. Definition of the term contract
3-2. Essential requirements or elements of a valid contract
3-3. Trade usages
3-4. Methods for execution of work done in P.W.D.
3-5. Difference between departmental execution and contract
system
3-6. Selection of mode of execution
3-7. Forms of contract
3-8. Termination of contracts
3-9. Types of contracts
3-10. Responsibilities of different agencies
3-11. Contract between owner and engineer
3-12. Earnest money and security deposit
3-13. Mobilization fund
3-14. Tenders
3-14-1. Meaning of tender
3-14-2. Classification of tenders
3-14-3. Opening of tenders
3-14-4. Scrutiny of tenders
3-14-5. Acceptance of tender
3-14-6. Revocation of tender
3-14-7. Work executed without a contract
3-14-8. Tender form
3-14-9. Unbalanced tender
3-15. Liquidated damages
3-16. Advertisement
3-17. Contract documents
3-18. Qualification of contractors
3-19. Direct and indirect costs
3-20. Basic price contracts
Practical Questions 3
Questions 3
Chapter 4 CONDITIONS OF CONTRACT
4-1. Definition
4-2. Object
4-3. Importance
4-4. Peculiarities
4-5. General provisions
4-6. Typical clauses of the conditions of contract
4-7. Conditions of contract in outlines
Practical Questions 4
Questions 4
Chapter 5 ARBITRATION
5-1. General
5-2. Definition
5-3. Arbitrator and referee
5-4. Matters for reference to arbitration
5-5. Kinds of arbitration
5-6. Arbitrator
5-7. Sole arbitrator, joint arbitrators and umpires
5-8. Powers of an arbitrator
5-9. Scope of umpires authority
5-10. Disabilities of an arbitrator
5-11. Arbitration agreement
5-12. Revocation of arbitration agreement
5-13. Power of court to appoint arbitrator or umpire
5-14. Process of arbitration
5-15. Award by an arbitrator
5-16. Conditions favourable for arbitration
5-17. Advantages of arbitration
5-18. QDR methodology
Practical Questions 5
Questions 5
Chapter 6 ACCOUNTS
6-1. General
6-2. Stores
6-3. Issue notes
6-4. Vouchers
6-5. Hand receipts
6-6. Unstamped receipts
6-7. Receipt of money
6-8. Work-abstract
6-9. Register of works
6-10. Appropriation and re-appropriation
6-11. Materials at site accounts
6-12. Capital works and repair works
6-13. Administrative approval and technical sanction
6-14. Measurement book
6-15. Muster roll
6-16. Completion report
6-17. Imprest
6-18. Daily report
6-19. Deposit works
6-20. Advance payments
6-21. Work-charged establishment
6-22. Revised and supplementary estimates
6-23. Annual repair estimate
6-24. Inventory
6-25. Work-slip and work-abstract
Practical questions 6
Questions 6
Chapter 7 CONSTRUCTION MANAGEMENT AND PLANNING
7-1. General
7-2. Need for construction management
7-3. Scope of construction management
7-4. Factors affecting construction management and planning
Charotar Publishing House Pvt. Ltd. Opposite Amul Dairy, Civil Court Road, Post Box No. 65, ANAND 388 001 India
Telephone: (02692) 256237, Fax: (02692) 240089, e-mail: charotar@cphbooks.com, Website: www.cphbooks.com
7-5. Methods for planning construction activity
7-5-1. Gantt bar charts
7-5-2. Network technique
7-5-3. Time-grid diagram
7-5-4. Milestone charts
7-6. Resources planning
7-7. Resource allocation
7-8. Resource levelling
7-9. Job layout of construction Site
7-10. Storage of materials
7-11. Stock control
7-12. Stages of material management
7-13. Inventory control
7-14. Disposal of surplus materials
Practical Questions 7
Questions 7
PART II : ESTIMATING AND COSTING IN PRACTICE
Chapter 8 RATE ANALYSIS
8-1. Definition
8-2. Purposes of rate analysis
8-3. Factors affecting the rate analysis
8-4. Importance of rate analysis
8-5. Essentials of rate analysis
8-6. Schedule of rates
8-7. Standard costing
8-8. Task work per day
8-9. Rates of materials and labour
8-10. Rate analyses of typical items
Practical Questions 8
Questions 8
Chapter 9 TAKING OUT QUANTITIES
9-1. General
9-2. Meaning of the term
9-3. Essentials of an estimator
9-4. Requirements of an estimator
9-5. Methods of taking out quantities
9-6. Units of measurements
9-7. Modes and units of measurement for different types of trades
9-8. General rules for measurements
9-9. Degree of accuracy
9-10. Rates for some typical items
9-11. Quantity survey
9-12. Spot items
9-13. Prime cost and provisional sums
9-14. Provisional quantities
9-15. Daywork
9-16. Accompaniments of an estimate
9-17. Financial implications
9-18. Cost planning
9-19. Uses of an estimate
Practical Questions 9
Questions 9
Chapter 10 ESTIMATES OF VARIOUS TYPES OF BUILDINGS
10-1. General
10-2. Estimate of simple steps
10-3. Estimate of corner steps
10-4. Estimate of a shop
10-5. Estimate of a servants quarter
10-6. Estimate of a sanitary block for a factory building
10-7. Estimate of a single storeyed residential building: (with Drawing
room, Dining room, Bed room, Kitchen and a Toilet)
10-8. Estimate of a single storeyed residential building: (with
drawing room, Bed room and a Kitchen)
10-9. Estimate of a single storeyed residential building: (with
Two bed rooms, Drawing room, Kitchen, Bath-w.c. and
a Verandah)
10-10. Estimate of a residential building: (with Drawing room,
Bed room, Dining cum Living room, Kitchen, Passage,
Bath-w.c., Stair and A Stair-cabin, Verandah)
10-11. Estimate of a childrens library
10-12. Estimate of a compound wall
10-13. Estimate of a ginning factory
Practical Questions 10
Chapter 11 ESTIMATES OF DIFFERENT R.C.C. STRUCTURES
AND THEIR FORMWORK
11-1. General
11-2. Estimate of R.C.C. column and its footing in proportion
(1:1.5:3)
11-3. Estimate of R.C.C. beam in proportion (1:1.5:3)
11-4. Estimate of R.C.C. beam in proportion (1:1.5:3)
11-5. Estimate of R.C.C. Weathershed with lintel for 1.20 m
wide window in proportion (1:1.5:3)
11-6. Estimate of R.C.C. Slab in proportion (1:1.5:3)
11-7. Estimate of R.C.C. Floor in proportion (1:1.5:3)
11-8. Estimate of formwork for R.C.C. works
11-10. Estimate of R.C.C. retaining wall
11-11. Estimate of a shed for cycles
Practical Questions 11
Chapter 12 ESTIMATES OF DIFFERENT TYPES OF ROOFS
AND STEEL STRUCTURES
12-1. General
12-2. Estimate of a roof with corrugated galvanized iron
sheets
12-3. Estimate of a welded steel roof truss
12-4. Estimate of a steel stanchion with grillage foundation
Chapter 13 ESTIMATES OF WATER SUPPLY AND SANITARY
WORKS
13-1. General
13-2. Estimate of an underground storage tank (Only in bricks)
13-3. Estimate of brick cum R.C.C. type underground
water storage tank
13-4. Estimate of an overhead R.C.C. water storage tank
13-5. Septic tanks
13-6. Design of a septik tank and a soak well
13-7. Estimate of a septic tank with soak well
13-8. Estimate of a Septik tank
13-9. Estimate of a septik tank with three compartments
Practical Questions 13
Chapter 14 ESTIMATES OF BRIDGES, CULVERTS AND PIERS
14-1. General
14-2. Estimate of a pier
14-3. Estimate of a railway culvert
14-4. Estimate of a hume pipe culvert
14-5. Estimate of a hume Pipe culvert
14-6. Estimate of a pipe culvert
14-7. Estimate of a slab culvert
14-8. Estimate of a road bridge
14-9. Estimate of a splayed wing wall
Practical Questions 14
Chapter 15 ESTIMATES OF IRRIGATION WORKS
15-1. General
15-2. Estimate of a cushion type fall
15-3. Estimate of a canal fall
15-4. Estimate of a hume pipe head regulator
15-5. Estimate of an earthen dam
Practical Questions 15
ESTIMATING, COSTING AND VALUATION
DETAILED CONTENTS
Charotar Publishing House Pvt. Ltd. Opposite Amul Dairy, Civil Court Road, Post Box No. 65, ANAND 388 001 India
Telephone: (02692) 256237, Fax: (02692) 240089, e-mail: charotar@cphbooks.com, Website: www.cphbooks.com
Chapter 16 ESTIMATES OF ROAD WORKS
16-1. General
16-2. Estimate of Earthwork of a road in cutting
16-3. Estimate of Earthwork of a road partly in cutting and
partly in embankment
16-4. Estimate of Earthwork of a road in plain
16-5. Estimate of earthwork for a road using mid-sectional
area method
16-6. Estimate of earthwork for a road using mid-sectional
area and mean sectional area method
16-7. Estimate of earthwork for a road using mid-sectional
area method
16-8. Estimate of earthwork for a road using prismoidal formula
16-9. Estimate of earthwork for a road using trapezoidal
formula
16-10. Estimate of earthwork for a small pond
16-11. Estimate of earthwork for a road partly in cutting and
partly in filling
16-12. Estimate of earthwork of a road in embankment
16-13. Estimate of earthwork of a curved road in embankment
Practical Question 16
PART III : VALUATION
Chapter 17 VALUE
17-1. General
17-2. Doctrine of estate
17-3. Cost, price and value
17-4. Cost
17-5. Price
17-6. Value
17-7. Concept of the term value
17-8. Purposes of valuation
17-9. Different forms of value
17-10. Occupation value and investment value
17-11. Factors affecting changes in market value
17-12. Role of the valuer
17-13. New horizons of valuation
Questions 17
Chapter 18 INVESTMENT IN REAL PROPERTY
18-1. Characteristics of land
18-2. Investment
18-3. Investment opportunities
18-4. Characteristics of ideal investment
18-5. Interest on capital
18-6. Nature of real property
18-7. Estate brokers
Questions 18
Chapter 19 INTERESTS IN REAL PROPERTY
19-1. Types of interests
19-2. Freehold interests
19-3. Leasehold interests
19-4. Lease and license
19-5. Mortgage
19-6. Equitable mortgage and legal mortgage
Questions 19
Chapter 20 METHODS OF VALUATION
20-1. Methods of valuation
20-2. Methods of valuation for open lands
20-3. Methods of valuation for lands with buildings
Questions 20
Chapter 21 OUTGOINGS
21-1. Definition
21-2. Usual types of outgoings
21-3. Gross income and net income
Questions 21
Chapter 22 DEPRECIATION
22-1. Meaning of the term
22-2. Depreciation as cost in operation
22-3. Depreciation as decrease in worth
22-4. Physical conditions
22-5. Functional obsolescence
22-6. Economic obsolescence
22-7. Methods for estimating cost depreciation
22-8. Cost depreciation and value depreciation
22-9. Reproduction cost and replacement cost
22-10. Depreciation and depletion
22-11. Conclusion
Questions 22
Chapter 23 VALUATION TABLES
23-1. Valuation tables
Chapter 24 MISCELLANEOUS TOPICS
24-1. General
24-2. Accommodation land and accommodation works
24-3. Amortization
24-4. Annuity
24-5. Capitalized value
24-6. Cost inflation index
24-7. Deferred or reversionary land value
24-8. Dilapidations
24-9. Discounted cash flow
24-10. Encumbrance factor
24-11. Floating F.S.I.
24-12. Life of structures
24-13. Mesne profit
24-14. Mobilization fund
24-15. Rate of interest
24-16. Rating
24-17. Records of rights
24-18. Rent fixation
24-19. Years purchase.
Practical Questions 24
Questions 24
Chapter 25 EASEMENTS
25-1. General
25-2. Definition
25-3. Essential characteristics of easements
25-4. Creation of easements
25-5. Extinguishment of easements
25-6. Easements and natural rights
25-7. Effect on valuation due to easement
Practical Questions 25
Questions 25
Appendix
Appendix I MODE OF MEASUREMENT OF BUILDING
WORK (BASED ON IS:1200 REVISED)
Appendix II TASK WORK PER DAY
Appendix III LOAD CARRYING CAPACITY OF TRUCK AND
CALCULATION OF MATERIALS
Appendix IV QUANTITY OF STEEL REQUIRED FOR R.C.C.
ITEMS
Appendix V TYPICAL PROJECT
ESTIMATING, COSTING AND VALUATION
DETAILED CONTENTS