Inspection/ Pump out Ports see notes 3-5

3" [8] MIN Vent see note 2 6" [15] Inspection Port/Vent see notes 2-5 Joints must be watertight

NOTES 1. Airline piping to FAST may not exceed 100 FT [30m] total length and have a maximum of 4 elbows in the piping system. For distances greater than 100 FT [30m] consult factory. Blower must be located above flood levels on a concrete base 26" X 20" X 2" [65 X 50 X 5cm] min. 2. Vent to desired location and cover opening with a vent grate with at least 7 sq in.[45 sq. cm] open surface area. Secure with stainless steel screws. Vent piping must not allow condensate build up or create back pressure. Vent must be above finished grade or higher (see sheet 4 of 4). 3. All appurtenances to FAST (e.g. tanks, access ports, electrical, etc.) must conform to all applicable country, state, province, and local plumbing and electrical codes. Pump out access shall be adequate to thoroughly clean out both zones. 4. All inspection, viewing and pump out ports must be secured to prevent accidental or unauthorized access. 5. Tank, piping, conduit, etc. are provided by others. Blower control system by Bio-Microbics, Inc. See Installation Manual.

2" [5] MIN Blower Piping see note 1


6" 4" 15.2 10.2

4" [10] FAST treated effluent see note 7

15 1/8"1/8" 38.40.3

15 1/8" MIN 38 MIN 41 1/4" MIN 104.6 MIN Influent waste see note 8 24" MIN 61 MIN

6. If less than the specified minimum is considered necessary, consult factory for guidance. 7. All piping and ancillary equipment installed after FAST must not impede or restrict free flow of effluent. 8. The tank(s) shall be designed to prevent air passage between the settling zone/tank and the treatment zone and preventing an air lock. Examples include a baffle wall sealed to the lid or treatment zone inlet line with a pipe cap. Consult factory for guidance. 9. Installations using a FAST system lid are capable of withstanding AASHTO H-10 equivalent loads. Any installation in which a FAST lid is buried deeper than 3 feet, or where additional loading conditions may occur, a professional engineer should be consulted. FAST with feet option should be considered. Refer to Installation Manual for more details.

connection between zones Settling Zone 500 Gallon MIN [1900L MIN] Treatment Zone 750 Gallon MIN [2800L MIN]

6 3/8" MIN 16.2 MIN Seen Note 6

54" MIN 137.2 MIN

59" MIN 150 MIN

49" 124.5 C L 54 1/2" MIN 138.4 MIN

10. Specialized treatment levels may require specific features to be incorporated into the design. Consult factory for guidance.

54" 137.2 2 1/2" MIN 6.4 MIN border for sealing and securing the lid and liner to tank

DO NOT SCALE UNLESS NOTED DIMENSIONS ARE IN INCHES [CENTIMETERS] TOLERANCES 0.02 IN/IN [ 0.05 CM/CM]
WEIGHT lb
SIZE NAME DATE DRAWN CTC 12/18/2006

Opening for FAST module to sit on tank

67 1/2" MIN 171.5 MIN

HighStrengthFAST 1.00 FAST Unit


DRAWING NUMBER

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF BIO-MICROBICS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF BIO-MICROBICS INC. IS PROHIBITED. DESIGN AND INVENTION RIGHTS ARE RESERVED. IN THE INTEREST OF TECHNOLOGICAL ADVANCEMENT, ALL PRODUCTS ARE SUBJECT TO DESIGN AND OR MATERIAL CHANGE WITHOUT NOTICE.

BIO-MICROBICS 2014

HSFAST 1.0 with lid


REVISED 10/8/2013 REV.

SHEET 1 OF 4

CHECKED PF 10/8/2013

INI-03-T

Inspection/ Pump out Ports see notes 3-5 3" [8] MIN Vent see note 2

All plumbing and venting must use water tight gaskets see notes 2-5 4" [10] Pipe clamp FAST treated see note 9 Effluent see note 7

NOTES 1. Airline piping to FAST may not exceed 100 FT [30m] total length and have a maximum of 4 elbows in the piping system. For distances greater than 100 FT [30m] consult factory. Blower must be located above flood levels on a concrete base 26" X 20" X 2" [65 X 50 X 5cm] min. 2. Vent to desired location and cover opening with a vent grate with at least 7 sq in.[45 sq. cm] open surface area. Secure with stainless steel screws. Vent piping must not allow condensate build up or create back pressure. Vent must be above finished grade or higher (see sheet 4 of 4). 3. All appurtenances to FAST (e.g. tanks, access ports, electrical, etc.) must conform to all applicable country, state, province, and local plumbing and electrical codes. Pump out access shall be adequate to thoroughly clean out both zones. 4. All inspection, viewing and pump out ports must be secured to prevent accidental or unauthorized access. 5. Tank, piping, conduit, etc. are provided by others. Blower control system by Bio-Microbics, Inc. See Installation Manual.

2" [5] MIN Blower Piping see note 1


6" 4" 15 10

16 3/8" MIN see note 11 41.6 MIN

15 1/8" MIN 38 MIN

34 7/8"1/8" 88.60.3 41 1/4" MIN 104.8 MIN

6. If less than the specified minimum is considered necessary, consult factory for guidance. 7. All piping and ancillary equipment installed after FAST must not impede or restrict free flow of effluent. 8. The tank(s) shall be designed to prevent air passage between the settling zone/tank and the treatment zone and preventing an air lock. Examples include a baffle wall sealed to the lid or treatment zone inlet line with a pipe cap. Consult factory for guidance. 9. The air supply line into the FAST unit must be secured to prevent vibration induced damage. The air supply line should be secured with a non-corrosive clamp every 2' min [60 cm]. See alternate air supply option on sheet 4 of 4. 10. Specialized treatment levels may require specific features to be incorporated into the design. Consult factory for guidance.

Influent waste see note 8

24" MIN 61 MIN

connection between zones Settling Zone 500 Gallon MIN[1900L MIN] Treatment Zone 750 Gallon MIN [2800L MIN]

6 3/8" MIN 16.2 MIN see note 12

53 1/4" MIN 135.3 MIN

26 5/8"1/4" 67.60.6

29 3/4"1/4" 75.60.6

54 1/2" MIN 138.4 MIN

11. Min. height may be reduced, consult factor and reference "Low Profile Module Procedure.pdf" 12. Refer to sheet 4 of 4 for leg extensions requirements.

C L DO NOT SCALE 59" MIN 149.9 MIN 67 1/2" MIN 171.5 MIN 12" MIN 30.5 MIN UNLESS NOTED DIMENSIONS ARE IN INCHES [CENTIMETERS] TOLERANCES 0.02 IN/IN [ 0.05 CM/CM]
WEIGHT lb
SIZE NAME DATE DRAWN CTC 12/18/2006

Opening for FAST module to sit in tank

HighStrengthFAST 1.00 FAST Unit


DRAWING NUMBER

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF BIO-MICROBICS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF BIO-MICROBICS INC. IS PROHIBITED. DESIGN AND INVENTION RIGHTS ARE RESERVED. IN THE INTEREST OF TECHNOLOGICAL ADVANCEMENT, ALL PRODUCTS ARE SUBJECT TO DESIGN AND OR MATERIAL CHANGE WITHOUT NOTICE.

BIO-MICROBICS 2014

HSFAST 1.0 with feet


REVISED 10/8/2013 REV.

SHEET 2 OF 4

CHECKED PF 10/8/2013

INI-03-T

Specifications for HighStrengthFAST 1.0 Wastewater Treatment System 1. GENERAL The contractor shall furnish and install (1) HighStrengthFAST 1.0 treatment system as manufactured by Bio-Microbics, Inc. The treatment system shall be complete with all needed equipment as shown on the drawings and specified herein. The principal items of equipment shall include FAST system insert, leg extensions, or lid, blower assembly, blower controls and alarms. All other items will be provided by others. The HighStrength 1.0 unit shall be situated within a 750 Gallon[2800L] minimum compartment as shown on the drawings. Suggested maximum settling zone is (1X) the daily flow. Tank must conform to local, state, and all other applicable codes. The contractor shall provide coordination between the FAST system and tank supplier with regard to fabrication of the tank, installation of the FAST unit and delivery to the job site. 2. OPERATING CONDITIONS The HighStrengthFAST 1.0 treatment system shall be capable of treating the wastewater produced by non-residential or commercial facilities provided the waste contains nothing that will interfere with biological treatment. The FAST system is a biological treatment system not meant for non-biodegradable or industrial wastewater. Consult factory for proper sizing and usage. 3. MEDIA The FAST media shall be manufactured of rigid PVC, polyethylene, or polypropylene and it shall be supported by the polyethylene insert. The media shall be fixed in position and contain no moving or wearing parts and shall not corrode. The media shall be designed and installed to ensure that sloughed solids descend through the media to the bottom of the septic tank. 4. BLOWER The HighStrength 1.0 unit shall come equipped with a regenerative type blower capable of delivering 20-45 CFM [38-85 m3/hr]. The blower assembly shall include an inlet filter with metal filter element. 5. REMOTE MOUNTED BLOWER The blower must not set in standing water and its elevation must be higher than the normal flood level. A two-piece, rectangular housing shall be provided. The discharge air line from the blower to the HighStrength System, shall be provided and installed by the contractor. 6. ELECTRICAL The electrical source should be within 150 feet [45 meters] of the blower, consult local codes for longer wiring distances. All wiring must conform to all applicable codes(IEC, NEC, etc.). Wiring distances must prevent significant voltage loss. Input power on 60Hz electrical system is 110/220 VAC, single phase, 4.6/2.3 FLA. Actual power consumption varies with site conditions. Three phase 50 & 60 Hz options are also available. All conduit and wiring shall be supplied by contractor. 7. CONTROLS The control panel provides power to the blower with an alarm system consisting of a visual and audible alarm capable of signaling blower circuit failure and high water conditions. The control panel is equipped with SFR (Sequencing Fixed Reactor) timed control feature. A manual silence button is included. 8. INSTALLATION AND OPERATING INSTRUCTIONS All work must be done in accordance with local codes and regulations. Installation of the FAST 1.0 shall be done in accordance with the written instructions provided by the manufacturer. Manuals shall be furnished, which will include a description of system installation, operation, and maintenance procedures. 9. FLOW AND DOSING FAST systems have been successfully designed, tested and certified receiving gravity, demand-based influent flow. Consult factory for guidance when influent flow is controlled by pump or other means to help with highly variable flow conditions. Multiple dosing events should be used to maximize performance. 10.WARRANTY
Bio-Microbics, Inc. warrants all new commercial FAST models (HighStrengthFAST 1.0, 1.5, 3.0, 4.5 and 9.0) against defects in materials and workmanship for a period of one year after installation or eighteen months from date of shipment, whichever occurs first. All are subject to the following terms and conditions below: During the warranty period, if any part is defective or fails to perform as specified when operating at design conditions, and if the equipment has been installed and is being operated and maintained in accordance with the written instructions provided by BioMicrobics, Inc., Bio-Microbics, Inc. will repair or replace at its discretion such defective parts free of charge. Defective parts must be returned by owner to Bio-Microbics, Inc.s factory postage paid, if so requested. The cost of labor and all other expenses resulting from replacement of the defective parts and from installation of parts furnished under this warranty and regular maintenance items such as filters or bulbs shall be borne by the owner. This warranty does not cover general system misuse, aerator components which have been damaged by flooding or any components that have been disassembled by unauthorized persons, improperly installed or damaged due to altered or improper wiring or overload protection. This warranty applies only to the treatment plant and does not include any of the structure wiring, plumbing, drainage, septic tank or disposal system. Bio-Microbics, Inc. reserves the right to revise, change or modify the construction and/or design of the FAST system, or any component part or parts thereof, without incurring any obligation DO NOT SCALE to make such changes or modifications in present equipment. Bio-Microbics, Inc. is not responsible for consequential or incidental damages of any nature resulting from such things as, but not limited to, defect in design, material, or workmanship, or delays in delivery, replacements or repairs. THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED. BIO-MICROBICS SPECIFICALLY DISCLAIMS ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. NO REPRESENTATIVE OR PERSON IS AUTHORIZED TO GIVE ANY OTHER WARRANTY OR TO ASSUME FOR BIO-MICROBICS, INC., ANY OTHER LIABILITY IN CONNECTION WITH THE SALE OF ITS PRODUCTS. Contact your local distributor for parts and service.

UNLESS NOTED DIMENSIONS ARE IN INCHES [CENTIMETERS] TOLERANCES 0.02 IN/IN [ 0.05 CM/CM]
lb
NAME DATE

HighStrengthFAST 1.00 FAST Unit


SIZE DRAWING NUMBER

WEIGHT THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF BIO-MICROBICS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF BIO-MICROBICS INC. IS PROHIBITED. DESIGN AND INVENTION RIGHTS ARE RESERVED. IN THE INTEREST OF TECHNOLOGICAL ADVANCEMENT, ALL PRODUCTS ARE SUBJECT TO DESIGN AND OR MATERIAL CHANGE WITHOUT NOTICE.

BIO-MICROBICS 2014

12/18/2006 DRAWN CHECKED PF 10/8/2013

HSFAST1.0 Specification
REVISED 10/8/2013 REV.

SHEET 3 OF 4

Minimum leg extension assembly see note 1-4

2 screws per side included

Alternate Air Supply Option FAST Lid Vent Option NDS 6" Grate MIN 7 SQ in [45 SQ cm] of open surface area Riser Non-corrosive clamp every 2 feet 2" Air Supply Line

FAST Air Lift 12" MIN 30.5 MIN Fasten with noncorrosive screws

6 1/8" 15.4

Gasket

Riser

Non-corrosive clamp every 2 feet [0.6m] DETAIL B SCALE 1 : 4 FAST Air Lift

2" Air Supply Line 2" PVC Coupling

DETAIL A SCALE 1 : 5

Notes 1. Secure leg extension to the FAST unit by placing two screws on each side of the leg extension (4 screws per foot are included). 2. Cut 4" schd. 40 PVC pipe (not included) to obtain the desired height. Minimum pipe length of 6 1/8" [15.56cm] will provide minimum clearance of 6 3/8 inches [16.2 cm]. For heights greater then 18" [45.7cm] use schd. 80 PVC pipe (not included). Consult factory for extending leg beyond 36"[9cm]. 3. Anchor the leg extensions to the tank with non-corrosive hardware (not included) at the provided mounting points . 4. If less than the minimum of 6 3/8 inches [16.2 cm] is used between the lowest point of the insert and the base of the tank, consult factory for guidance. 5. The air supply line into the FAST unit must be secured to prevent vibration induced damage. The air supply line should be secured with a non-corrosive clamp every 2ft [0.6m] minimum. 6. Tank, anchors, piping conduit, blower, housing pad and vents are provided by others.
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF BIO-MICROBICS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF BIO-MICROBICS INC. IS PROHIBITED. DESIGN AND INVENTION RIGHTS ARE RESERVED. IN THE INTEREST OF TECHNOLOGICAL ADVANCEMENT, ALL PRODUCTS ARE SUBJECT TO DESIGN AND OR MATERIAL CHANGE WITHOUT NOTICE.

DO NOT SCALE UNLESS NOTED DIMENSIONS ARE IN INCHES [CENTIMETERS] TOLERANCES 0.02 IN/IN [ 0.05 CM/CM]
WEIGHT lb
SIZE NAME DATE DRAWN CTC 12/18/2006

HighStrengthFAST 1.00 FAST Unit


DRAWING NUMBER

BIO-MICROBICS 2014

HSFAST 1.0 Details


REVISED 10/8/2013 REV.

SHEET 4 OF 4

CHECKED PF 10/8/2013

INI-07-O

You might also like