PROJECT : DATE :

1W09 2x10MIG RCC WATER TANKS & PUMPING STATION AT AL ZAWARA -AJMAN 02.06.2011

Transformer Sizing Calculation


Transformer-1 Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Source LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel Destination VFD Control Panel-1 VFD Control Panel-2 VFD Control Panel-3 VFD Control Panel-4 Hoist DB Sump Pump MV Motors Auxil. & Space Heater Control PLC Control System (Via-Control-UPS) MOV Valve Control Centre -DB Air Compressor Control Panel HVAC Panel Spare-Future Spare-Future UPS Battery Charger Transformer- 1 Total Load Transformer-2 Sr. No. 1 2 3 4 5 6 7 8 9 10 11 Source LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel LV Panel Destination SMDB Rolling Shutter-1 Rolling Shutter-2 VFD Control Panel-1-Future VFD Control Panel-2-Future VFD Control Panel-3-Future VFD Control Panel-4-Future Spare-Future Load in kW 220.2 3.0 3.0 8.0 8.0 8.0 8.0 65.0 Remarks Load in kW 8.0 8.0 8.0 8.0 15.0 30.0 6.0 10.0 7.5 20.0 200.0 15.0 15.0 15.65 366.15 kW Remarks

( Tank's Load) ( MOV's Load)

( SMDB Load)

Transformer- 2 Total Load

323.20

kW 689.35 kW

Total Connected Load (Transformer -1 + Transformer -2) 30% Spare of TCL for future Load Total Connected Load Including 30% spare 206.805 kW 896.16 kW

A 1500 kVA with 80% Efficiency can supply a load of 960 kW, and thus above calculated connected load is within this limit.

Selected Size of Transformer 1 ( Considering 80 % efficiency ) - 1500 kVA Selected Size of Transformer 2 ( Considering 80 % efficiency) - 1500 kVA