Data Centre Powergate, London Flexible, advanced and efficient by design.

TelecityGroup Unit 1 + 2 Powergate Business Park Volt Avenue London NW10 6PW United Kingdom Tel: +44 (0)20 7001 0101 info@telecity.com www.telecitygroup.com

02 / TelecityGroup

Data Centre, Powergate

An advanced data centre. Built to deliver maximum resilience, flexibility and choice.
Phase 2 of the Powergate complex is now underway, adding more power, capacity and flexibility to its existing highly resilient infrastructure, superb power availability, and choice of networks.
Many of the worlds leading organisations have come to rely on Powergate, including financial institutions, cloud operators, content companies, healthcare corporations, energy firms, and mobile businesses. Each organisation places its trust in our onsite engineers to provide responsive, expert and hands-on support round the clock. Over the coming months, we are expanding the data centres capacity to meet growing customer demand, adding: 21 megawatts (MW) of customer power, delivering a total customer load of 29MW. Two floors; 12 zones, making a total of 20 zones; and an extra 10,000 square metres, taking the overall size to around 15,000 square metres. Flexible deployment options from 420 kilowatts (kW) of customer power per rack. Leading the data centre industry Our expansion plans will enhance one of the most advanced and energy-efficient data centres in the UK. As multiple award winners for data centre design, we are drawing on the knowledge and experience gained from building and operating data centres across Europe that lead the industry for resilience, connectivity, reliability and performance. Additionally, Powergate data centre incorporates many new technologies and designs that place the facility at the forefront of environmental efficiency.

Central London location


M25

Powergate
Acton Westminster

City
M25

Docklands

03 / TelecityGroup

Data Centre, Powergate

Front cover image Architectural image of expansion capacity This page Customer data centre tour

29MW
Powergate is being expanded, bringing the total customer capacity up to 29MW.

04 / TelecityGroup

Data Centre, Powergate

A proven data centre. Expertise you can trust.


Committing to excellence Our data centres are certified to the following international standards:

Powergate provides your business with a wide range of benefits.


Performance from a proven data centre Initially constructed from an investment of 60 million, the enhanced facility is receiving a further 120 million investment to ensure it sets the standard in data centres. While zones one to eight within Powergate remain fully operational, the project will see us building on this proven success and applying our specialist focus to the development of the new zones 920. Flexibility to scale to your needs The data centres flexible and modular design means its infrastructure can adapt exactly to your organisations requirements. A density of 20kW of power per rack across the floor plan providing, on average, 2kW per square metre can be achieved without the use of proprietary in-row cooling solutions through the deployment of passive air flow management.This enables the data centre to manage even the most demanding infrastructure, such as highdensity blade technologies. Highest levels of resilience and redundancy Powergate has been designed as a Tier 3 data centre, delivering high levels of resiliency and redundancy to ensure your critical systems are always available. Saving energy and reducing costs The data centres energy-efficient design and use of innovative technologies help you to meet your sustainability targets and reduce the costs to your business. As energy-efficiency is built into every aspect of the building, this leads to lower costs for our customers. Unrivalled connectivity choices Powergate already offers a leading choice of carriers with resilient network access and POPs onsite. The choice includes over 400 carriers from other TelecityGroup sites, helping you reduce communication costs and enhance performance. Prime location Situated close to the centre of London within zone 2 and near the city's many transport links, Powergate is easily accessible and delivers superb availability of power and networks. Giving your business room to grow Delivering an additional 10,000 m of capacity and 21MW of customer power. We are expanding Powergate in planned stages ahead of demand to ensure your business has the capacity it needs to grow.

ISO 27001:2005 Information Security Management.

ISO 9001:2008 Quality Management Systems.

ISO 14001:2004 Environmental Management Systems.

OHSAS 18001:2007 Occupational Health and Safety Management.

DSS
COMPLIANT

Payment card industry data security standards

EU Code of Conduct for data centres Corporate Status Benchmarks for data centre efficiency and best practice.

Carbon Trust Standard Recognises our commitment to cutting carbon emissions.

05 / TelecityGroup

Data Centre, Powergate

Daily equipment checks

20kW
Flexible, scalable power densities deliver up to 20kW per rack.

06 / TelecityGroup

Data Centre, Powergate

Inside the generator enclosure

Resilient and redundant. A data centre you can rely on.


Designed and built by engineering experts, Powergate is a standard-setting data centre that ensures your critical systems are always available.

Power Powergate provides robust and reliable power with flexible densities and configuration between 4kW and 20kW per rack. 29MW of UPS conditioned power at 2N. Redundant 66kV HV power system diversely-fed from the grid with a dedicated onsite step-down substation. Back-up diesel generation at N+1 to support site load in the case of HV failure. Maximum diversity and separation of UPS system and power distribution through dedicated A & B supplies.

Cooling A robust HVAC system delivers stable air flow, temperature and humidity for efficient equipment operation. Designed to Tier 3, the HVAC system provides a minimum of N+1 redundancy and all CRAC units and pumps have dedicated back-up UPS systems. Our design and investment in cooling systems will ensure the data centre achieves a class-leading PUE of 1.35. Minimum N+1 redundancy on chilled water cooling system. Fully concurrently maintainable, dual path secondary chilled water distribution. Close Control Units (CCUs) provide conditioned air to the data floor, at a minimum N+2 redundancy. Cooling towers enhance efficiency and maximise the use of free cooling. Centrifugal chillers with variable speed compressor drives enable excellent full and part-load operation.

07 / TelecityGroup

Data Centre, Powergate

Fire detection and suppression Linked to our Building Management Systems (BMS) and monitored continuously from the network operations centre, our fire detection and suppression systems minimise the risk, and suppress quickly to localise and prevent problems spreading. High sensitivity smoke detection systems. Fully addressable two-stage fire detection system that monitors the underfloor, room and ceiling void space (smoke and heat). State-of-the-art water mist fire suppression system. Network-monitored and fully integrated fire-protection system.

Security and access Powergate adopts a layered approach to security and access, operating from the outer perimeter and inwards to the building. Our robust access control procedures allow you and your nominated staff and contractors, easy access to enter the facility at all times throughout the year. Integrated digital video camera surveillance throughout the exterior and interior. Unified security-breach alarm with access monitoring. Secure monitored single-person entry. Independent client card and biometric identification access system. 24/7/365 manned security. Secure managed delivery and loading bays.

Building Management Systems (BMS) Our sophisticated BMS manages and monitors the core aspects of the data centres mechanical and electrical infrastructure, from power supply, temperature and humidity to fire detection and suppression, and access and security. 24/7/365 monitoring by onsite personnel. Audio and visual alarms. Monitoring and managing critical parameters. System performance and facility data generation. PMS (Power Monitoring System)

08 / TelecityGroup

Data Centre, Powergate

09 / TelecityGroup

Data Centre, Powergate

Powergate data centre. Giving you the flexibility to grow.


Powergate delivers the capacity, power, resilience, redundancy and flexibility required to support your business.
Powergate Facilities Powergate Data Rooms Powergate provides 15,000m2 of customer capacity in 20 zones over 2 floors. On-site water and diesel storage 48 hours Secure plant corridor Dedicated loading bays Existing TelecityGroup data centre in operation. Zones 18 Powergate Zones 920 First floor Zones 1520 16 15 18 17 20 19
08 07 04

Powergate Zones 18 First floor Zones 58

06 05

10 9

12 11

14 13
01 02 03

On-site parking Dedicated primary power substation Uniform modular designs of plant modules

Well-appointed offices Secure, monitored single site entry

Ground floor Zones 914

Ground floor Zones 13

10 / TelecityGroup

Data Centre, Powergate

Inside the pump room

Designed to maximise energy efficiency. Delivered to reduce costs.


Powergate has been designed to deliver exceptional energy efficiency that helps reduce environmental impact and data centre operational costs.
Power Usage Effectiveness (PUE) and transparency Energy efficiency is central to our transparent approach to power charging. Powergate is designed to achieve an industry-leading annual average PUE of 1.35 at full design load and we pass the benefit (and lower power costs) derived from this efficiency directly on to our customers. Energy-efficient technologies Powergate features many processes and technologies that increase efficiency and reduce costs: Maximising the use of free cooling from the chilled water system. Energy efficient cooling towers and UPS technology. Use of waste heat from the data centre to heat office space. Chillers with excellent turn-down characteristics to match capacity with load. Hot and cold air segregation. Motion-activated light controllers that reduce energy consumption and heat load. Sustainability The architectural design of Powergate incorporates many sustainable features, including: Rainwater harvesting Canal water cooling Waste management High recycling levels Sustainable landscaping Reusing waste heat Use of sustainable materials Setting the standards in energy efficiency We continue to set new industry standards and lead the market in environmental initiatives. Our data centres are certified to the following international standards: ISO 14001 an internationallyrecognised accreditation for organisations that demonstrate superior environmental management. EU Code of Conduct for data centres Corporate Status. Each of our data centres has been audited and is operated to the Codes best practices for maximising energy efficiency. Carbon Trust Standard recognising our commitment to reducing our impact on climate change by cutting carbon emissions.

11 / TelecityGroup

Data Centre, Powergate

Patch panel

Unrivalled connectivity. Unparalleled choice.


As a network-independent data centre Powergate provides you with an unparalleled choice of connectivity options.

We deliver direct access to the widest possible selection of international and local fixed lines, broadband and mobile networks, internet exchange points, content distribution networks, financial services companies, and cloud hubs. This wide choice of connectivity options allows your business to connect quickly and cost effectively. It also enables you to link easily with other enterprises, helping your organisation profit from new business opportunities. Connectivity Direct connectivity to a wide range of onsite carriers: Abovenet BT Cable & Wireless China Telecom Europe Ltd Cogent Communications Colt Telecommunications euNetworks Exponential-e Geo Level 3 Qwest Communications SSE (Scottish and Southern Energy) Verizon Business Virgin Media Our DWDM network service also provides access to over 400 additional connectivity providers through our European data centre network.

Managed connectivity service with multiple carriers You can connect directly to our IP Multihome service, which allows you to distribute content through multiple Tier 1 carriers and IXPs, without the complexity of maintaining multiple contractual and peering relationships. Pan-European connectivity across our data centre network We deliver seamless connections to all other TelecityGroup data centres. A DWDM network, supporting ethernet over MPLS and FC services, connects our Docklands, City and Powergate data centres, and extends to our European sites. Global peering and connectivity Connectivity with LINX, the London Internet Exchange is available onsite, bringing you global peering and connectivity options. Flexible and resilient connectivity infrastructure 'Meet me' rooms on each floor adjacent to the data halls offer diverse network connectivity, enabling you to connect quickly and easily with partners and providers through cross-connects. Diverse fibre entry points into the building.

Visit Powergate. Take the tour.


Powergate is an expanding facility thats primed to give your organisation the space and flexibility it needs to grow. With Powergates expansion already progressing, nows the time to see how this leading data centre in central London can meet your current and future requirements. To meet our team and take a guided tour of Powergate, contact us on: +44(0)20 7001 0101 or email: uk.info@telecity.com For a digital walkthrough of Powergate data centre, visit: www.telecitygroup.com/powergate
Close Control CRAC units

Outstanding data centres. Expertise you can trust. Europes leading provider of premium network-independent data centres. www.telecitygroup.com