PROJECT: VILLA/BUILDING/............. DETAILS OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA:............... .......

PLANNED COMPLETION DATE:.............. OWNER:......................................... PLOT No.:....................

LVP/MDB/SMDB........(......OF......) CONSULTANT:.................................... LOCATION OF LVP/MDB:.............


CABLE SIZE, TYPE TOTAL MAX.
CONN- DEMAND/
ACB/ AND CONNECTED LOAD ECTED/ OPERAT- PROPOSED TYPE &
MCCB/ LENTH IONAL No. OF
NO. OF CORES ECC
CIRCUIT/ SP/ ISOLAT
FAULT OF (KW) INSTALLED LOAD kWh METERS
FEEDER TP OR SIZE LOAD REMARKS
RATING CABLE (TCL) (MDL) * LV/
SMDB/ NO. OF TYPE 1C,
(AMPS) DUTY CORES XLPE/ (Mtrs.) R-PH Y-PH B-PH * KW 1-PH 3-PH HV
DB NO. SIZE (2) CT
kA 1C/2C/ PVC/ mm2 KW KW KW KW (1)
4C SWA (3)
INCOMER
OUT GOING:

MDB CONNECTED TO:DEWA LV DB/Transformer TOTAL CONNECTED LOAD PER


SMDB CONNECTED TO: MDB....…………………. PHASE: TOTAL

DEMAND FACTOR ………………….. MAX. DEMAND ………….…………………KW * OVERALL TOTAL CONNECTED/INSTALLED LOAD (TCL)...…………………..KW Total Build-up area………………

CONSULTANT/CONTRACTOR:........................................... TEL:......................... FAX:............................


* TCL – shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Up to 60A (2) Up to 125A (3) LV CT..../...A /HV CT ..../..A (* 200/5Amps CT Metering)
(1 Phase) (3 Phase)