Honeywell Protect Ore Lay r8184g Oil Burner Control Installation Instructionsl
Honeywell Protect Ore Lay r8184g Oil Burner Control Installation Instructionsl
Honeywell Protect Ore Lay r8184g Oil Burner Control Installation Instructionsl
(cad) Celi Flame Detector. and an apprpriat,e thermostat. The Protectorclay operates on line voltage power and includes a transformer to supply 24 Volt power for h control circuit; the oil primary operates equally well when cycled from a line voltage controller. It mounts directly t a 4 x 4 junction box or similar blirner housing. This control provides a constant ignition cycle.
All wiring must, conform to iocal codes. Leave enough slack in the wires to permit easy access to wires in the junction box. SYSTEM - With the relay temporarily clipped t an edge of the junction box, connect the three line voltage leads (range, white and black) to the appropriate system wire leads. Refer to fig. 2 and 3 for proper connections. Use solderless connectors ;;;plice ieads. Do noi exceed ratings of the cons LOAD RELAY CONTACT RATINGS
B
JUNCTION
PI
BOX MOUNTING CAUTION PLUS: IGNITION RATIhIG: 360 va
Mount the junction box in any convenient position on the furnace, or nearby wall. Ambient temperature at this location shoilid not exceed 115P. The relay may be temporarily supported by the junction box during wiring by slipping the shear tab on the back of the controi over nc edge of the junction box. After the wiring is completed, secure the control to the junction box with tw mounting screws. Fig. 2 - Typical hookup for the R8184G using a 24V low voitage controller
Fig. 1 -Mounting
the Protectoreiay
to junction
box.
Fig. 3 using
Typical a line
hookup voltage
CAUTION: Dixonneci power suppiy netting wiring to prevent, eiectrical equipment damage. Trademark
CAD CELL - Run the y&low leadwires from the cad ceil (usually installed by the burner manufac. turer a to the low volhge tenninai st,rip using one of the foilowing methods, t,hen connect to the F~F terminals.
Form Nllmber
1. Route the yellow cad cell leads into the junction box, thread them through the opening in the base, and connect to the F~F terminals. After making these connections, mount the relay to the junction box,
OR
CAUTION: ONLY TRAINED AND EXPERIENCED SERVICEMEN SHOULD ATTEMPT THE CHECKOUT PROCEDURE GIVEN ON THE INSERT.
2. Route the cad ceii leads directly minais from outside the junction relay to the junction box.
TO MANUALLY
To
24V THERMOSTAT/CONTROLLER
Run
wires
from the low voltage thermostat or controller directly to the terminal strip and connect to the T-T terminals (fig. 2). Make sure the heat anticipator in the thermostat is set at 0.2 amps.
assure burner shutdown while the system is being serviced, the safety switch ma,y be manually tripped. Push the wire hook towards the transformer until the safety switch reset button pops out. System is locked out. REMEMBER: Power supply has not been disconnected. Electric shock is still a possibility. To restart when service is compiete, the safety switch must be manually reset <push in).
LINE VOLTAGE CONTROLLER - Connect the line voltage controller in series with the black lead of the relay (fig. 3) and INSERT JUMPER ACROSS TUT.
combustion
chamber
is free
1. Push red reset (safety) button in and release. 2. Open hand valve in oil sup ply line. 3. Set limit control and thnrn nostat to call for heat. 4. Close line switch, and burn er starts. 5. Under normal conditions, burner operates until
thermostat is satisfied.
resorting to the manual trip lever, run through the starting procedure, omitting Step 2. The switch will trip out on safety in approximately 30 seconds, or the timing specified on the case of the particular model involved.
to verify Protector&y
1. Flame failure - shut off oil supply hand valve while burner is firing. Monitor burner operation until flame~out occurs. Approximately 30 seconds after flame-out, depending on model, safety switch locks out, ignition stops, motor stops, and oil valve closes. This condition requires resetting the safety switch. 2. Ignition failure-following the preceding test (oil valve still shut off, fuel supply line to burner empty) wait at least 5 minutes for the safety switch to cool, reset the safety switch, run through the starting procedure and safety switch should lock out as in flame failure test. 3. Power failure - turn off power supply burner is on. When burner goes out, restore and burner will restart. while power
SERVICE
The R8184 Protector&y Controls are set at the factory and require no adjustment or periodic mainenance. The contacts on the load relay may be cleaned by spraying with Honeywell Contact Cleaner (no. 132569) if checkout indicates that the relay contacts are not conducting.
DEFINITIONS
CONSTANT IGNITION
AND
INTERMITTENT
4. If operation is not as described, check wiring and installation first, If trouble still persists, follow the complete procedure for checking out the relay and cad ceil printed on the cover insert.
burner
is an
Gz
s Ontario
MONTAGE
360 VA
ii
CABLAGE ATTENTION - couper ie courant avant de brancher ,ES MS, pour eviier tout accident 0 domma~e.
Marque d.eposee
THERMOSTAT TENSION SECTEUR -~rancher le t&r. mcstat tension secteur en serie avec ie fil noir cl re,ais (IiT figure 3). Pie pas oumer de poser Sautoir pour COrt-CirCiter T-T.
HONEYWELL
* Ontario