AN INTRODUCTION

TOPM SURYAGHAR-MUFT BIJILI YOJANA

DRAFT GUIDELINES

A presentation
by State Nodal Officer, RTS, Arunachal Pradesh
Department of Power
ITANAGAR
ABOUT PM SURYAGHAR-MUFT BIJILI YOJANA

APPROVED ON OUTLAY: RS 75021 CR


29/02/2024
TO INCREASE SOLAR ROOFTOP CAPACITY TO BE IMPLEMENT TILL 22026-27

TO EMPOWER 1 CR HOUSEHOLDS TO PHASE II GRID CONNECTED ROOFTOP SOLAR


GENERATE THEIR OWN ELECTRICITY (2025-26) TO CONTINUE TILL PM SURYAGHAR
BUDGET OPERATIONALISE & SUBSEQUENTLY
GET SUSUMED WITH IT

FOR GRID CONNECTED RESIDENTIAL GUIDELINES PERTAINS TO CENTRAL


HOUSEHOLDS ONLY FINANCIAL ASSISTANCE (CFA) COMPONENT
OF THE SCHEME. ONGOING PROJECT UNDER
PH II TO CONTINUE UNDER PH II GUIDELINES
ALREADY ISSUED.
OBJECTIV
ES
1 CR RTS SYSTEM IN RESIDENTIAL SECTOR TO DEVELOP THE REQUIRED ENABLING ECHO
SYSTEM FOR SOLAR PROJECTS, REGULATORY
SUPPORT, MANUFACTURING, SUPPLY CHAIN,
LOW COST/FREE ELECTRICITY UP-TO 300 VENDOR NETWORK, O&M ETC
UNITS PER MONTH TO EACH HOUSEHOLDS

PRODUCE 1 BL UNITS OF CLEAN ENERGY ACHIEVE INDIA’S COMMITMENT TO GREEN


EQU. TO 720 ML TON OF CO2 EMISSION IN CLIMATE THROUGH ITS NATIONAL DETERMINED
25 YRS CONTRIBUTION AT UN FRAME WORK
CONVENTION ON CLIMATE CHANGE BY
BOOST LOCAL ECONOMY AND EMPLOYMENT
INSTALLING 30 GW SOLAR BY 2026-27
GENERATION ALONG WITH ENERGY
SECURITY
STRATEGY OF IMPLEMENTATION

TO BE IMPLEMENTED THROUGH NATIONAL PORTAL (NP) www.pmsuryaghar.gov.in

VENDORS TO REGISTER ON NP & UPLOAD DETAILS OF PRICE POINTS, SYS. DESIGN, SPECS & KEY
PERSONNELS ETC

TO PREVENT OVERCHARGING BENCHMARK PRICE TO BE PUBLISHED BY MNRE ANNUALLY ON NP

MINIMUM TEC SPEC FOR RTS SYSTEM TO QUALIFY FOR CFA

BENIFICIARY TO APPLY ON NP, SELECT A VENDOR & MUTUALLY DECIDE SUBJECT TO MIN TEC SPEC

DISCOM TO CONDUCT PHYSICAL INSPECTION & SIGN NET METER AGREEMENT WITH THE CONSUMER

CFA TRANSFERRED TO BENIFIERY ACCOUNT OR THE LOAN ACCOUNT IF BENIFICIARY OPT FOR LOAN FOR
RTS SYSTEM
IMPLEMENTING AGENCIES &
PROGRAM MONITORING

NATIONAL LEVEL MONITORING


REC SHALL BE NATIONAL PROJECT GROUP OF MINISTERS (GoM) WILL PROVIDE
IMPLEMENTING AGENCY (NPIA). MNRE, OVERALL GUIDANCE & COORDINATION WITH
HOWEVER, WILL HAVE THE DOSCRETION TO STATES/UTS
DESIGNATE ANY OTHER AGENCY AS NPIA AS ANY MONITORING BY STEERING COMMITTEE UNDER
EXIGENCY CHAIRMANSHIP OF CABINET SECRETARY &
SECRETARIES OF MNRE, MoP, DEPTT OF
FINANCIAL SERVICES, MINISTRY OF HOUSING &
URBAN AFFAIR & MINISTRY OF RD
OVERSEEN BY THE MISSION DIRECTORATEMIN
MNRE TO BE HEADE BY A ADDL.JNT SECRETARY
STATE LEVEL INCHARGE OF RTS
STATE TO CONSTITUTE STATE LEVEL
DISCOM SHALL BE THE STATE COORDINATION COMMITTEE TO BE HEADE BY THE
IMPLEMENTINGAGENCY (SIA). STATE CHIEF SECRETARY
STATE TO CONSTITUTE DISTRICT
GOVERNMENT MAY ALSO NOTIFY ANY OTHER
LEVELCOMMITTEE TO BE HEADED BY DM/DC
AGENCY AS SIA
ELLIGIBILITY CRITERIA FOR
CFA
RESIDENTIAL RTS GRID CONNECTED WITH THE LOCAL DISCOM ON ROOF, TERRACE, BALCONY OR
ELEVATED STRUCTURES

CFA WILL BE IRRESPECTIVE OF INVERTER SIZE. IT WILL BE AS PER RATED DC CAP OF SOLAR MODULE

MUST SATISFY DOMESTIC CONTENT REQUIREMENT OF THE SOLAR MODULE I.E. DOMESTICALLY
MANUFACTURED MODULES FROM DOMESTICALLY MANUFACTURED CELLS

ADDITIONAL CAPACITY ELLIGIBLE FOR CFA ONLY FOR REMAINING CAPACITY OF 3KW OF OVERALL RTS
PLANT

CFA ELLIGIBLE ONCE AFTER INSTALLATION. NOT FOR RELOCATION AND SHIFTING

NO CFA FOR NON RESIDENTIAL SEGMENT


FINANCING THE SCHEME

CAPEX MODE RESCO MODE

CENTRAL SUBSIDY AS CENTRAL FINANCIAL CENTRAL SUBSIDY AS CENTRAL FINANCIAL


ASSISTANCE (CFA) ANCFA ASSISTANCE (CFA)
OWN FINANCE CAPITAL INVESTMENT BY A THIRD PARTY
RENEWABLE SERVICE COMPANY (RESCO)

ASSISTANCE OF BANK LOAN ASSET OWN BY RESCO, ROOFTOP OWNER


COMPENSATED SUITABLY FOR USE OF ROOF
STATE/UT MAY GIVE ADDITIONAL SUBSIDY TO RESCO SELLS ENERGY TO DISCOM OR
SUPPLEMENT CFA & TO PROCESSED THROUGH & HOUSEHOLDS UNDER A LONG TERM PPA NOT
INTEGRATED TO THE NP LESS THAN 10 YEARS
ELLIGIBLE CFA/STATE SUBSIDY TO DIRECTLY CFA/STATE SUBSIDY AS CAPITAL SUBSIDY TO
CREDIT TO BENEFICIARY/LOAN ACCOUNT ( RESCO
ILLUSTRATION)
NPIA SHALL APPROVE RELEASE AFTER VALID SUBSIDY CALCULATION SHALL BE DONE ON
DOCUMENT UPLOAD DISCOM INSPECTION BY AN HOUSEHOLD BASIS 7 TO RELEASED AFTER
E TOKEN TO BE REDEEMED IN THE NP COMPLETION
VENDOR REGISTRATION
REGISTRATION OF VENDORS SHALL BE DONE RVENDORS TO SPECIFY THEIR STATES AND
ON THE NATIONAL PORTAL DISTRICTS OF OPERATION

BANK GAURANTEE (ENTRY LEVEL)


DOCUMENTS FOR
STATE BASED VENDOR RS 2.5 LAKH PER STATE/UT
REGISTRATION:
NATIONAL LEVEL VENDOR RS 25 LAKH FOR ALL
1. PAN
STATES/UTs
2. KEY CONTACT PERSONNEL
3. DOCS OF
INCORPORATION/PROPRIETORS BANK GAURANTEE INDEXED TO CAPACITY
HIP/PARTNERSHIP (FOR VENDORS HAVING INSTALLED SIGNIFICANT
4. KEY MANAGEMENT & TRAINING CAPACITY THROUGH NP)
CREDENTIALS 0-200 KW ENTRY LEVEL
5. DECLARATION AS SERVICE 200-1000 KW RS 15 LAKH
PROVIDER BY VENDOR 1000-5000 KW RS 50 LAKH
6. BANK GUARANTEE > 5000 KW RS 1 CR

REGISTERED VENDORS SHALL PROVIDE REPAIR/MAINTENANCE OF RTS PLANT FREE OF COST FOR 5
YEARS THROUGH A COMPREHENSIVE MAINTENANCE CONTRACT
APPLICATION FOR RTS SYSTEM

DISCOM SHALL ASSIST PORTAL WILL ASIGN A UNIQUE


BENIFICIERIES TO REGISTER
THE CONSUMER IN APPLICATION ID
FIRST ON THE NATIONAL PORTAL
AND UPLOAD THE APPLICATION APPLYING ON THE NP
ON www.pmsuryaghar.gov.in APPLICANT SHALL BE FREE TO
WITH A UNIQUE VALID CHOOSE ANY OF RTS VENDORS AT
ELECTRICITY CONSUMER A MUTUALLY DISCOVERED RATE
DISCOM TO SETUP
ACCOUNT NUMBER
DESIGNATED HELPDESK AT
FIELD LEVEL THERE SHALL BE NO TENDERINR
OR RATE DISCOVERY BY THE
DISCOM

DISCOM SITE INSPECTION AND GENERATE DISCOM REPORT (DR) ON NP DIGITALLY

BENIFICIARY BANK ACCOUNT INFROMATION (CANCELLED CHECK/BANK STATEMENT/PASSBOOK) SCAN OR


OTHER VALID E DOCUMENTS MUST BE UPLOADED IN NP BY THE CONSUMER
IN CASE THE BENIFICIARY HAS OPTED FOR LOAN, CONSUMER DETAILS SHALL INCLUDE LOAN ACCOUNT
DETAILS
NET METERING AGGREEMENT WITH THE CFA TO BE PROCESSED WITHIN 15 DAYS
DISCOM
MINIMUM TEC SPEC

RTS SYSTEM SHALL VENDOR TO ENSURE: MNRE TO NOTIFY


CONSIST OF: 1. COMPLIANCE APPROVED LIST OF
1. MODULES TOMINIMUM TEC SPEC MODULES AND INVERTERS
2. INVERTER PRESCRIBED BY MNRE WHICH SHALL BE
3. MOUNTING 2. COMPLY SERC ELLIGIBLE FOR CFA FROM
STRUCTURES REGULATIONS TIME TO TIME
4. JUNCTION BOXES 3. NO SHORTCOMING OR VENDORS MUST USE ONE
5. AC/DC DISTN BOXES NEGLIGENCE/MALPRACTI OF THESE MODULES &
6. EARTHING & LIGHTNING CES INVERTERS IN ALL THE
7. SURGE ARRESTORS 4. NON COMPLIANCE LEADS PROJECTS BEING
8. CABLES TO LIQUIDATION OF INSTALLED UNDER THE
9. ENERGY METERS BANK GAURANTEE, SCHEME
10. DRAWING & MANUALS DEACTIVATION OF
11. ANY OTHER PROFILE & BLACK
COMPONENT BASED ON LISTING
SITE. 5. DCR (DOMESTIC
CONTENT
REQUIREMENT)
COMPLIANCE ON SOLAR
MODULE
MANUFACTURED FROM
DOMESTIC CELLS
QUALITY ASSURANCE

NPIA & SIA ALONG WITH OTHER DESIGNATED SIA TO ESTABLISH ADEQUATE MECHANISM TO
AGENCIES TO CONDUCT REGULAR ENSURE INDEPENDENT 3RD PARTY ASSESMENT
INSPECTION AT & POST COMMISSIONING TIME OF POST INSTALLATION INSPECTION OF
ATLEAST 5% OF RTS SYSTEM

NPIA TO ESTABLISH ADEQUATE MECHANISM ALL VENDORS SHALL BE RATED BASED ON


TO ENSURE INDEPENDENT 3RD PARTY SIZE & SCALE OF INSTALLATIONS, CONSUMER
ASSESSMENT ATLEAST 1% AT & POST FEEDBACK, REPORTING OF DATA,
COMMISSIONING WORKMANSHIP ETC AS PER SEPARATE
GUIDELINES BY MNRE AND POSTED ON THE
NP
GRIEVANCE REDRESSAL

THE BENEFICIARY OR VENDOR CAN RAISE GRIEVANCES THROUGH THE NATIONAL PORTAL, NATIONAL
CALL CENTRE, STATE/UT DISCOM, OR PORTAL APP

A UNIQUE TRACKING ID WILL BE CREATED BY THE BENEFICIARY AND THE VENDOR WILL
THE NPIA FOR THE CONSUMER AND GRIEVANCES GET REGULAR UPDATE OF THE STATUS OF
SHALL BE CHANNELED TO SIA THROUGH A 2 RESOLUTION OF THE GRIEVANCE THROUGH
TIER MATRIX TO BE RESPLVED AS A SET TIME SMSes, EMAIL BESIDE TRACKING ONLINE
LINE
IF NOT RESOLVED IT GETS ESCALATED TO NPIA WHO SHALL RESOLVE THE GRIEVANCE WITHIN 30
DAYS
RTS SYSTEM ON GOVERNMENT BUILDING

ALL GOVERNMENT BUILDING OF CENTRAL GOVERNMENT TO BE SATURATED WITH rts


SYSTEM BY 2025
AVAILABLE ROOFTOP TO USED THROUGH RESCO OR CAPEX MODELS

CENTRAL GOVERNMENT WILL ENCOURAGE ALL STATEs/Uts TO UNDERTAKE SIMILAR


EXERCISE
SATLEZ JAL VIDYUT NIGAM LIMITED (SJVNL) HAS BEEN FOR THE PURPOSE TO
ARUNCHAL PRADESH
MNRE WILL MONITOR AND TRACK INSTALLATIONS IN THE GOVERNMENT SECTOR
STAKE HOLDERS & THEIR ROLES
MNRE, GOI NPIA (REC) SIA (AR P) CPSE (SJVNL FOR AP)

1. POLICY & 1. OVERALL 1. ADHERENCE TO 1. NOT DEFINED


REGULATION IMPLEMENTATION GUIDELINES FOR RESIDENTIAL
DEVELOPMENT,
SUPPORT 2.
2. REGULATION RTS SYSTEM
OPERATION &
2. TECHNICAL MANAGEMENT OF 3. SERVICE 2. ASIGNED FOR
ASSISTANCE NP TIMELINE RTS SYSTEM ON
3. FINANCIAL 3. DEVELOPMENT & 4. ADDITIONAL GOVERNMENT
SUPPORT IMPLEMENTATION SUBSIDY BUILDING FOR
4. DEV & OF IEC 5. IEC ACTIVITIES WHICH SEPARATE
MANAGEMENT OF SAMPLE
4.
6. COORDINATION GUIDELINES WILL
EXAMINATION OF
NATIONAL CFA CLAIM WITH NPIA BE ISSUED
PORTAL 5. COORDINATION & 7. MONITORING
COLLABORATION OF 8. IT INTEGRETION
STAKE HOLDERS 9. VENDOR
6. PERIODIC REGISTRATION
WORKSHOPS 10. DECLARATION OF
7. SET MECHANISM
FOR 3RD PARTY TARGET
AUDITS ETC 11. FORMATION OF
RTS CELL
REQUIREMENT TO SIGN MOU

SIGNING OF MEMORANDUM OF UNDERSTANDING (MoU)


BETWEEN THE MNRE & STATES/UTs

SIGNING OF MEMORANDUM OF UNDERSTANDING (MoU)


BETWEEN THE REC (NPIA) & STATES/Uts
To be signed by 3 PM of 10/05/2025