EASTERN RAILWAY-LILUAH
INSPECTION CUM COMPUTATION SHEET Issued On :
A/T in NOS
TOTAL A/T IN
SN OPERATION (FOR EACH TROLLEY) M-HRS ATTEND REMARKS
NOS M-HRS
per ED
bogie
1 Secondary Vertical Damper Stripping & Fitting 2 3.2
2 Control Arm Bottom Stripping & Fitting 4 4.9
3 Strip & Fit Installation Lever and adjustment 2 3.8
Strip & Fit Reaction Rod from Gear Box Housing ( MC Bogie
4 2 9.2
only)
5 Strip & Fit Air Spring Secondary Suspension Assembly 2 15.7
6 Strip & Fit ‘O’ Ring Air Spring Secondary Suspension Assembly 4 8.1
7 Strip & Fit Foot-step from DTC Bogie(Driver Cab End only) 2 2
8 Lift Stop Pin Strip & Fit 4 2.6
9 Primary Vertical Damper Strip & Fit 4 6.7
Control Arm Closing Plate Stripping, Cleaning, Greasing &
10 16 10.8
Fitting
11 Control Arm Top Strip & Fit 4 6.5
Remove Primary Suspension Assembly (Helical Spring, Spring
12 4 2.8
Pad(upper & lower),Shims)
13 Lift Stop in Primary Suspension Unit Strip & Fit 4 1.8
14 Stabilizer Link Strip & Fit and length adjustment 2 14.8
15 Stabilizer Assembly Strip & Fit 1 4.8
16 Centre Pin Cover Plate Strip & Fit from Traction Centre 1 1.8
17 Lateral Damper Strip & Fit 2 5.8
18 Traction Rod Strip & Fit 2 5.9
19 Cleaning of Control Arm(Top & Bottom)& Greasing 4 1.7
Placing of Primary Suspension Assembly(Helical Spring, Spring
20 4 1.4
Pads(upper & lower),Shims)
21 Primary Bump Stop Strip & Fit 4 1.9
22 Cleaning, Checking & Re-greasing of Traction Center Bush 1 0.9
23 Strip & Fit Traction Centre 1 3.2
25 Lateral Bump Stop Remove & Fit 2 2.8
26 Wire Rope Assembly Strip & Fit 4 4.6
27 Cleaning & Inspection of All Bolts, Pins, Screws etc ----- 2.8
Inspection of Fitting Elements(mainly casting & Fabricated
28 ----- 5.2
portion Silent Block Fitting area items)
29 Replacement of Installation Lever Bracket 2 3.8
30 Heating and setting the Installation Lever Bracket 2 1.8
Strip & Fit Safety Catch of Gear Box Assembly of Motor Coach
31 2 9.8
(MC)
Strip & Fit Safety Catch of Traction Motor Assembly of Motor
32 2 10.4
Coach (MC)
33 Torqueing of Antennas Bracket for DTC Bogie(Driver cab) 2 7.8
34 Replacement of Antennas Bracket for DTC Bogie(Driver Cab) 2 9.2
35 Torqueing of Antennas Bracket for DTC Bogie(Non-Driver cab) 1 3.9
36 Replacement of Antennas Bracket for DTC Bogie(Non-Driver Cab) 1 4.6
4. Strip & Fit Reaction Rod from Gear Box Housing ( MC Bogie 02
only)
5. Strip & Fit Air Spring Secondary Suspension Assembly 02 𝟏𝟓. 𝟕𝟔
7. Strip & Fit Foot-step from DTC Bogie(Driver Cab End only) 02 𝟐. 𝟎𝟎
16. Centre Pin Cover Plate Stripping from Traction Lever 01 𝟎. 𝟔𝟕𝟓
23. Control Arm Fixation Ball Joint Cleaning, Greasing & Fitting 16 𝟓. 𝟕𝟑𝟓
34. Cleaning & Inspection of All Bolts, Pins, Screws etc ----- 𝟐. 𝟏𝟗
39. Strip & Fit Safety Catch on Gear Box Assembly of Motor 02
Coach (MC)
40. Strip & Fit Safety Catch on Traction Motor Assembly of 02
Motor Coach (MC)
41. Checking of Antennas Bracket for DTC Bogie(Driver Cab) 02