BIM For Heritage Technical Guidance - Exchange Information Requirements

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 20

BIM for heritage technical guidance –

HBIM information requirements template suite (HIRS)

Exchange Information
Requirements (EIR) –
Heritage (HIR_EIR_V1)
Information requirements for structured data sets and the
application of digital data management and Building
Information Modelling (BIM) for heritage asset management

Project name: Click or tap here to enter text.


Project code: Click or tap here to enter text.

Created in collaboration with:


BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

Exchange Information Requirements – Heritage


How to use this document
This document provides a framework and guidance for developing project-specific exchange
information requirements (EIR) specifically for application in a heritage context, and for heritage asset
management. The guidance should be applied to all projects to ensure consistent data management
across the organisation.

This document is intended to be generic, for use by the whole heritage sector, and to be modified to
meet the specific requirements of individual projects or organisations.

This document template provides a framework for completing your own EIR. It includes a full range of
potential EIR but should be modified to suit specific organisational or project requirements. The EIR
should be concise as possible and if sections of this document are not applicable to your organisation
or project, they should be deleted.

Guidance for completing each section is indicated with italic red text and should be removed once
you have completed your document. All non-italic red text should be reviewed, overwritten, edited or
removed according to individual needs.

Before using this document BIM for Heritage: Developing an Asset Information Model (Historic
England 2019) should be read.

A glossary of Building Information Modelling (BIM) abbreviations and terminology is provided at the
back of this template document.

Exchange information requirements defined


Exchange Information Requirements (EIR) – information requirements in relation to an appointment.
(ISO 19650-1:2018)

1
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

Contents

1 Scope.............................................................................................................................................4
1.0 Document purpose................................................................................................................4
1.1 Responding to this document................................................................................................4
1.2 BIM vision and objectives.......................................................................................................5
2 BIM Information Requirements......................................................................................................6
2.0 Information exchanges and project deliverables...................................................................6
2.1 Information delivery plan.......................................................................................................6
2.2 Level of information need......................................................................................................6
2.3 Health and safety and construction (design and management).............................................7
3 Management..................................................................................................................................8
3.0 Standards..............................................................................................................................8
3.1 Roles and responsibilities......................................................................................................8
3.2 Collaboration process............................................................................................................8
3.3 Modelling process and data segregation................................................................................9
Model management.......................................................................................................................9
Volumes, zones and areas...............................................................................................................9
Naming conventions.......................................................................................................................9
Publishing processes...................................................................................................................10
3.4 Security................................................................................................................................10
3.5 Coordination and clash detection process...........................................................................10
3.6 Compliance plan..................................................................................................................11
3.7 Delivery strategy for asset information.................................................................................11
3.8 Master information delivery plan and project plan...............................................................12
3.9 Training................................................................................................................................12
4 Technical.....................................................................................................................................13
4.0 Software platforms...............................................................................................................13
4.1 System performance............................................................................................................13
4.2 Data exchange format..........................................................................................................13
4.3 Co-ordinates........................................................................................................................14
5 Commercial.................................................................................................................................15
5.0 BIM execution plan...............................................................................................................15

2
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

5.1 BIM-specific competence requirements...............................................................................15


5.2 Confirmation of BIM toolset.................................................................................................15
5.3 Details of BIM workload and resourcing...............................................................................15
5.4 Principal supply chain..........................................................................................................16
6 Glossary.......................................................................................................................................17

3
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

Exchange Information Requirements – Heritage


1 Scope
1.0 Document purpose
1.0.1 This document confirms the exchange information requirements (EIR) as a sub-set of the
Appointing Party’s requirements or equivalent contract documentation, and introduces
information requirements, reasons and purpose to the project team or Appointed Party,
along with technical and commercial particulars that need to be addressed to support the
implementation of building information modelling (BIM) to heritage projects and heritage
asset management.

1.0.2 The EIR are an important element of a project’s BIM implementation, as they are used to set
out clearly to the project team or Appointed Party what information (models, documents and
structured data) is required, both in general and at each project stage, possibly via a stage-
based information delivery plan (IDP).

1.0.3 This document forms part of the H-BIM information requirements template suite (HIRs)
produced by Historic England and adopted and amended by xxxxxxxxxxxxxxxxxxxxxxxxx to
define the standards and specifications for the use of BIM.

Insert the Appointing Party or Organisation where indicated.


1.1 Responding to this document
1.1.1 The EIR should be responded to by the Appointed Party by including a BIM execution plan
(BEP) within the tender submission. This should directly respond to the EIR, using the same
layout and reference numbers.

The Appointing Party may request only certain parts of the EIR to be responded to which must
be made clear in the pre-contract BEP.

1.1.2 The BEP (pre- and post-contract) should include the following.

 Specific responses to the EIR with cross-referencing.


 Specific responses to the IDP, including confirmation of ability to deliver the information
requirements, in the requested format and to the specified level of information need, or,
where delivery is impractical, alternative delivery proposals.
 Project goals for collaboration and information modelling and management.
 Major project milestones consistent with the project programme and IDP.

1.1.3 A compliant BEP in support of a project tender will demonstrate how each section of the EIR
and IDP will be met. The BEP and its response to the EIR will form part of the tender scoring
process and subsequent supplier selection.

4
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

1.2 BIM vision and objectives


1.2.1 Our BIM vision on project work is to receive the required information deliverables (models,
documents and structured data) at the right time and in the required format in order to:
 engage with appropriate stakeholders
 drive project delivery and efficiency
 make the right project gateway decisions
 supply the appropriate information and structured data at project handover, to add
to and update the AIM for on-going heritage asset management
 provide the data once and ensure it is available to multiple users thereafter.
The Appointing Party should amend or update the list of items above to reflect its own BIM
visions.
1.2.2 Our key objective is to use BIM methodologies to ensure the right information is received and
correct workflows are followed to develop conservation proposals, deliver high-quality
conservation projects and facilitate on-going heritage asset management in accordance with
our organisational requirements.
The Appointing Party should amend or update the key objective (or list of objectives) in
accordance with its own BIM objectives.
In a heritage context this is a good chance to consider in full the reasons for using BIM and to
document this. Suggested objectives include:
 accurate 3D digital documentation of heritage assets
 a comprehensive, digital record of conservation intervention
 structured data sets at project completion to be used for on-going heritage asset
management.
1.2.3 xxxxxxxxxxxxxxxx have defined their organisational information requirements (OIR) and asset
information requirements (AIR) in the following documents: xxxxxxx and xxxxxxx.
Insert the name of the Appointing Party and the names of the OIR and AIR documents where
indicated.

5
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

2 BIM Information Requirements


2.0 Information exchanges and project deliverables
2.0.1 This section communicates the timing and content of information exchanges between
Appointed Party and the Appointing Party. It defines how information exchanges are aligned
to project work stages. It confirms that information may flow both ways.
2.0.2 xxxxxxxxxxxxxxx work to the xxxxxxxxxxxxx work stages.
Insert the name of your organisation and its chosen plan of works, such as RIBA Plan of Work
2013 (https://www.ribaplanofwork.com/PlanOfWork.aspx), or an internal project management
system/plan of works. These should be aligned with the Construction Industry Council (CIC)
stages (http://cic.org.uk/admin/resources/cic-scope-of-services-fqa.pdf).
2.0.3 While information may be exchanged at any time during the course of a stage, formal
published information exchanges should take place prior to the end of a stage to advise
gateway decisions.
2.0.4 The frequency of required information exchanges is defined within the IDP.
2.0.5 Information deliverables required at each information exchange are defined within the IDP.
2.0.6 Information deliverables may include:
 3D models in native discipline (unfederated) and/or open format federated (IFC)
 drawings (extracted from models where models exist) in PDF and DWG format
 documents (reports, surveys, O&M manuals) in PDF and native format
 structured data in an agreed format, such as COBie for BIM Level 2 or alternative
information and data exchange templates in XLS format.
Structured data may involve manual entry in the case of a Heritage BIM workflow and
procurement for the development of an AIM, or automatic entry from data models.
2.1 Information delivery plan
2.1.1 A project-specific IDP has been produced and is appended to this EIR: xxxxxxxxxx
Insert the document names where indicated

The design team or Appointed Party should review this plan and confirm its ability to provide
the information using appropriate resources, in the appropriate formats and at the
appropriate stage decision gates.
2.1.2 It is intended that the Appointing Party’s IDP should be used to develop the Appointed Party’s
master information delivery plan (MIDP) for preparation and submission of information to the
Appointing Party at the appropriate stages.
2.1.3 Any proposed variation from or addition to the IDP should be made clear to the Appointing
Party within the Appointed Party’s pre-contract BEP.
2.2 Level of information need
2.2.1 The level of information need defines the level of maturity required for a particular
information deliverable at a particular plan of work stage. It provides a framework that defines
the extent and granularity of information and helps to prevent the delivery of too much
information.
2.2.2 xxxxxxxx have selected the following level of information needs standards for this project:
xxxxxxxx

6
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

xxxxxxxx

Insert references to the level of information needs standards where indicated.


Standards that may be used include:
2018 Level of Development (LOD) Specification Part I and Commentary For Building Information
Models, and Part II (BIMForum 2019a, b)
https://bimforum.org/wp-content/uploads/2018/09/BIMForum-LOD-2018_Spec-Part-
1_and_Guide_2018-09.pdf
BIM for Heritage: Developing a Historic Building Information Model (Historic England 2019b)
that includes suggestions for levels of detail developed specifically for historic buildings.
2.3 Health and safety and construction (design and management)
2.3.1 Information deliverables in respect of health and safety (H&S),construction design and
management (CDM) are detailed in the IDP. The Appointed Party should confirm how these
will be used to meet its obligations under the Construction (Design & Management)
Regulations 2015 within their pre-contract BEP. Refer to PAS 1192-6:2018.

7
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

3 Management
3.0 Standards
3.0.1 This section defines the BIM standards that are incorporated into the information
requirements.
3.0.2 The core documents that are to be used on this project are:
 ISO 19650-1:2018
 ISO 19650-2:2018
 PAS 1192-3:2014
 PAS 1192-4:2014
 PAS 1192-5:2015
 PAS 1192-6:2018
 BS 1192:2007
 PAS 55-1:2008
Supplementary guidance providing heritage-specific standards will also be used:
 BIM for Heritage: Developing a historic building information model (Historic England
2017)
 BIM for Heritage: Developing the asset information model (Historic England 2019b)
 BIM for heritage technical guidance: HBIM information requirements template suite
(HIRs) (Historic England 2019a, c)
3.1 Roles and responsibilities
3.1.1 This section should bring to the attention of the project team the allocated roles associated
with information management.
3.1.2 The roles themselves are addressed in the specific appointments.
3.1.3 The roles to be taken on directly by the Appointed Party include:
xxxxxxx
Insert the roles where indicated.
Refer to ISO 19650-2:2018 Annex A for an information management assignment matrix
3.1.4 Roles to be taken on directly by the Appointing Party include:
xxxxxxx
Insert the roles where indicated.
Refer to ISO 19650-2:2018 Annex A for an information management assignment matrix
3.2 Collaboration process
3.2.1 This section defines how, where and when project information will be shared.
3.2.2 The project team or Appointed Party is expected to manage the project’s CDE at each stage of
the project. The management and systems providing this service may change with the
appointment of different project teams or suppliers for different stages or phases. However,
there will only be one project CDE in operation at any one time to avoid duplication of
information and to ensure one single source of truth.
3.2.3 Details of the collaboration process sufficient to demonstrate competence and capability
shall be provided in the pre-contract BEP, with full details provided in the post-contract BEP.

8
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

3.2.4 The BEP shall include:


 the process and format of information exchanges at project work stages
 the frequency of collaboration and information exchange
 proposals to manage restrictions around the sharing of data and information in
connection with the Appointing Party’s security requirements
 details of how the requirements of the IDP will be met and tracked
 the extent and form of model coordination and federation
 details of model review workshops and other collaborative working practices, eg use
of model federation and coordination at design and/or site meetings.
3.3 Modelling process and data segregation
3.3.1 The purpose of this section is to set out requirements for the bidder’s proposals for the
management of the modelling process.
3.3.2 Information should be managed in accordance with the processes described in ISO 19650-
1:2018, ISO 19650-2:2018 and PAS 1192-5:2015.
3.3.3 The IDP confirms the information delivery, information packaging and information exchange
requirements for models, documents and data. All published transmittals shall be
accompanied by a COBie spreadsheet (or agreed alternative information and data exchange
template) confirming the included exchange files.
3.4.4 Where the Appointing Party has specific requirements for work management, including
security aspects, the requirement and request for proposals is identified on a project-specific
basis or as part of the IDP.
3.4.5 The following are required and should be confirmed in the BEP.
Model management
 Details of the management and quality-assurance processes coordinated by the
information manager.
Volumes, zones and areas
 Definitions of zones and the management of adjacency within the discipline models,
 Confirmation of the definition of the project volume structure.
 Confirmation of the volume- or space-naming convention to be adopted.
 Requirements in connection with the use of separate project volumes for sensitive
assets and systems.
Naming conventions
In order to comply with the requirements of the OIR and AIR standards, consistent adoption
of the xxxxxxxxxxxxx naming convention will be confirmed and applied from the outset, where
each site, building asset, floor, space, system and component will be identified, classified and
categorised in accordance with the required standard.
Insert the name of the convention to be used where indicated.

There will be an agreed and consistent space-naming convention for space type, and project-
specific nomenclature.
The file classification and naming convention approved by xxxxxxxxxxxxx shall be adopted for
all projects, irrespective of size, value or complexity.
Insert the name of the approver where indicated.

9
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

The file naming convention shall be used for all document types uploaded to a CDE, in line
with IEC 82045-1 and BS 1192:2007(A2) 2016, as below:

 xxxxxxxxx
 xxxxxxxxx
Insert the details of the organisation-specific file-naming conventions, with examples.
Publishing processes
The use of the following procedures should be confirmed in the pre-contract BEP. Any
deviation from these procedures should be expressly stated with reasons for the change.

 The contents of stage information exchanges are defined in the IDP and expanded
upon in the corresponding MIDP.
 These will be published by the Appointed Party’s information manager from the
appropriate CDE to complete the particular delivery stage.
 Data delivered at key work stages will be accompanied by a COBie file (or alternative
agreed information and data exchange template), which will be used to validate the
delivery.
 The Appointed Party’s information manager will notify the appointing party’s
information manager once all required data deliverables have been uploaded to the
CDE.
 The Appointing Party’s information manager will validate the data and produce a red,
amber, green (RAG) acceptance report to the appointed party’s information manager.
 Green packages will be published into the appointing party’s CDE published file area
and the COBie data (or alternative information and data) and file linkages published
into the Appointing Party’s CDE data area for onward use.
 Amber or red packages should be remedied by the appointed party.
 Acceptance of failure and resubmission of deliverables in accordance with the IDP is
unlikely to cause a variation/compensation event.
The Appointing Party should review the suggested publishing process above and amend or
rewrite in accordance with its own requirements.
3.4 Security
3.4.1 The purpose of this section is to communicate client-specific security measures in order to
secure the data.
3.4.2 For all built assets, specific security measures related to information exchange will be
identified on a project-specific basis and communicated to the supply chain accordingly.
Specific requirements will be noted in the IDP.
3.4.3 The tender submission should demonstrate the Appointed Party’s compliance with any
mandated security requirements. The BIM execution plan will set out compliance processes
and the means by which compliance is monitored and managed to delivery against these
security requirements.
3.4.4 Enter specific security requirements and instructions here
3.5 Coordination and clash detection process
3.5.1 The purpose of this section is to ask the supplier to define its coordination process, in order to
meet Appointing Party requirements for quality control.
3.5.2 The following details of the coordination and clash detection process should be detailed in
the pre-contract BEP and may include the following:

10
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

 associated software
 process overview
 responsibilities
 outputs
 proposed workflow and systems for verifying generated and received project data
 proposed workflow and systems for validating generated and received project data
 tolerance strategy
 clash resolution process
 verifying technical queries to the Appointed Party (files and data in place), validating
suitability of data content with Appointed Party
 proposal for quality assurance and liaison with the Appointing Party/end-users when
incorporating project information model (PIM) data into an AIM (for facility
management operations and other heritage asset management purposes)
 how this process will align with the Appointing Party’s contractual and process
requirements, such as on-going/periodic technical review.
The Appointing Party should consider the suggested list of co-ordination and clash detection
processes and amend or re-write to meet their own project or organisational requirements.
3.6 Compliance plan
3.6.1 The purpose of this section is to enable the Appointed Party to communicate how the
integrity, and hence quality, of the model and other data sources will be maintained.
3.6.2 All published information exchanges will be validated using the included COBie (or other
information and data exchange template) file against the IDP for the stage information
exchange. Only compliant exchanges will be accepted.
3.6.3 The Appointed Party should confirm its own internal model file and data standards and
compliance procedures, including references to standards and compliance software in the
BEP.
3.6.4 This should refer to:

 quality assurance/control procedures


 associated software
 period of aftercare (the number of years that the model should be managed for)
 security and information assurance requirements.
3.6.5 The Appointing Party or Appointing Party’s project or information manager should be given
reasonable access to the appointed party’s CDE to enable compliance monitoring and audits.
3.6.6 The Appointed Party shall confirm its quality assurance processes for data, models and
documents.
3.7 Delivery strategy for asset information
3.7.1 This section defines the information exchange standard for asset information, and enables
the Appointing Party to obtain proposals with regard to asset information delivery into the
Appointing Party’s facility or asset management environment.
3.7.2 The information exchange format for provision to the AIM will be as defined in the Information
Delivery plan transmitted and contained in the published information exchange COBie file (or
bespoke information and data exchange template) together with associated exchange
information files.

11
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

3.7.3 xxxxxxxxxx uses the following systems/databases/information formats. The Appointed Party
should demonstrate its ability to provide the information requirements for these systems:
xxxxxxxxx
xxxxxxxxx
Insert the name of your organisation and the names of the systems, databases and information
formats used by your organisation where indicated.
3.7.4 Where practicable, a COBie excel sheet data structure (or another bespoke information and
data exchange structure in XLS format) shall be used as the default exchange format for all
project-related information, whether 3D modelling is involved or otherwise.
3.8 Master information delivery plan and project plan
3.8.1 The following approach should be used by the Appointed Party to ensure information
coordination and consistency.
3.8.2A MIDP, should be prepared by the supplier in response to the IDP and should follow a similar
or related format.
.8.3 A project plan (PP), which will be provided to the Appointed Party to allow an appreciation of
the strategic programme intended for the project and to enable the development of the
Appointed Party’s programme proposal.
3.8.4 In the absence of a Project Plan, the IDP will be used by all team members to manage and
monitor progress and information delivery for the duration of the project.
3.9 Training
3.9.1 The purpose of this section is to provide bidders with details of training that will be provided
in connection with project systems, or training requirements that the bidder will be required
to deliver as part of its appointment/contract.
3.9.2 The Appointed Party shall confirm the training that it will provide for its tools and systems
that the Appointing Party and others will be expected to use.
3.9.3 The Appointed Party will be responsible for maintaining and delivering appropriate
information handling and access training to all interfacing parties, including any Appointing
Party staff, for operation of and access to the Appointed Party’s CDE.
3.9.4 Training for access and operation to the Appointing Party’s CDE will be provided by the
Appointing Party to interfacing Appointed Party staff as required. If proprietary model viewing
software is proposed in variance to that shown as held by the Appointing Party in this
document, then reasonable access and training is to be provided by the Appointed Party at
no cost.
3.9.5 Any general security awareness and induction requirements, as well as any role-based
security requirements, will be highlighted to the Appointed Party on a project specific basis,
and set out in the Appointing Party’s built asset security management plan (BASMP).
3.9.6 Information should be progressively shared and published from the supplier CDE to the
employer CDE so that in normal circumstances the employer will not need access to the
supplier CDE other than for compliance purposes.
This section should be reviewed and amended by the Appointing Party to reflect the training
requirements of the specific project.

12
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

4 Technical
4.0 Software platforms
4.0.1 The purpose of this section is to communicate the software platforms and versions where
they are known and where they might influence the preparation of a bid.
4.0.2 Platforms and versions used by the Appointing Party include:

 CDE
 model authoring software
 model federation and viewing software
 xxxxxxx.
Insert the name of the Appointing Party and list the details of the CDE, model authoring
software, model federation and viewing software and any other software platforms deemed
necessary, where indicated.
4.0.3 The ability of the bidder to work with these platforms should be made clear in the response.
4.0.4 Designers and constructors should align their model attribute data with the data exchange
format indicated by PAS 1192-4:2014.
If a specific data exchange format is required (such as the heritage information and data
exchange template), this should be noted.
4.0.5 The BEP should confirm the process of data compilation between the model and COBie (or
other data exchange format as defined).
4.0.6 The Appointing Party should confirm how data and information from its BIM-authoring tools
will be prepared and published so that it can be used within the software platforms outlined
above.
4.1 System performance
4.1.1 This section communicates constraints in the Appointing Party’s information technology (IT)
systems and/or any specific IT requirements that may need additional resources or non-
standard solutions.
4.1.2 IT system restrictions and requirements should be taken into consideration when completing
the BEP.
4.1.3 The following Appointing Party’s restrictions and requirements should be considered:

 model size
Insert any model size restrictions where indicated.

 software uses
Insert any software details where indicated, such as IFC-federated model visualisation can be
viewed in the Appointing Party CDE.
Insert any security issues where indicated.
 security issues

13
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

4.2 Data exchange format


4.2.1 This section defines the formats used for delivery information/data exchanges. Information
will be required in a format as specified in the IDP and may include any of the following:

 native, 3D discipline model files for all design and analysis models (individual and
unfederated), xxxxxxxxxx
 common file format, such as IFC, xxxxxxxxxx
 COBie or other bespoke information and data exchange template, xxxxxxxxxx
 PDF files, xxxxxxxxxx.
Insert any requirements and software versions where indicated.
4.3 Co-ordinates
4.3.1 It is encouraged that a common co-ordinate system is adopted for all BIM data. This section
defines the requirements for a common co-ordinate system to be applied to all BIM data.
4.3.2 The minimum requirement is spatial co-ordination, to be stated as follows:

 intersection of grids XX and YY, xxxxxx.xxxE and xxxxxx.xxxN


 intersection of grids AA and BB, xxxxxx.xxxE and xxxxxx.xxxN
 ground floor FFL, xxx.xxx.
Insert the requirements where indicated.
4.3.3 Other co-ordination standards defined in the BEP should include:

 origin rotation
 offsets
 datum information
 units to be used.
4.3.4 3D geolocation co-ordinates to be shown to no less accurate than 10mm (0.01m) in all
directions.
The above section provides an outline of suggested co-ordinate requirements. These should be
updated, amended, removed, to suit the specific requirements of your project or organisation.

14
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

5 Commercial
5.0 BIM execution plan
5.0.1 The Appointed Party shall prepare, deliver and maintain a BEP for the project that responds
directly to these EIR using correlating section references.
5.0.2 The Appointed Party shall review its BEP regularly and additionally when there is any change
to its contract.
5.0.3 Pre- and post-BEPs are to be provided in response to the EIR identifying the Appointed Party
proposals clause by clause. The pre-contract BEP will be scored as part of the tender
submission.
5.1 BIM-specific competence requirements
5.1.1 This section details the information that a bidder/Appointed Party should provide as part of a
tender submission in order to demonstrate BIM capacity and experience.
5.1.2 Responses should describe the BIM maturity and capabilities of the bidding organisation,
including specific examples and with reference to the standards stated in this EIR.
5.1.3 Tenderers should include the following details:
 organisational BIM culture and approach
 organisational and personnel BIM experience, skill and competency
 BIM capability including examples of previous BIM experience in accordance with the
standards stated in this EIR
 security understanding, capability, competence and experience
 details of any out-sourced BIM-related roles.
The Appointing Party should amend the list above and add any further specific requirements as
necessary.
5.2 Confirmation of BIM toolset
5.2.1 Responses will describe the processes and procedures that make up the bidder’s BIM and
information management toolkit, specifically where this is in accordance with the standards
stated in this EIR.
5.2.2 Tenderers should include detail on procedures aligned with the core project stages as
follows:

 ISO 19650-1:2018
 ISO 19650-2:2018
 PAS 1192-3:2014 (where applicable)
 BS 1192-4:2014 (or other bespoke processes).
The Appointing Party should amend the section above to suit project- or organisation-specific
requirements.
5.3 Details of BIM workload and resourcing
5.3.1 Responses should describe the resources (and levels) that are available to the project.
5.3.2 Tenderers should include the following detail:

 resource matrix with level, number and utilisation


 outsourcing details or services.

15
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

The Appointing Party should review and amend according to the detail they wish to receive from
tenderers.
5.4 Principal supply chain
5.4.1 Responses will describe the supply chain’s ability to link into the process and how this will be
assessed.
5.4.2 Tenderers should/might include the following detail:

 key supply chain partners


 expected outputs
 assessment process.
The Appointing Party should review and amend the list to include whatever detail they
require the tenderer to provide

16
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

6 Glossary

AIR Asset Information Requirements, define the data


and information required throughout the asset
lifecycle

Appointed Party Provider of information concerning works, goods


or services

Appointing Party Receiver of information concerning works, goods


or services from a lead Appointed Party

BAS Building Automation System

BASMP Built Asset Security Management Plan

BEP BIM Execution Plan defines the strategy for


project delivery using BIM

Bidder Company or organisation wishing to provide


information concerning works, goods or
services. Bidding to become the Appointed Party

CDE Common Data Environment, the framework


used to support interdisciplinary collaboration
through BIM that specifies a single source of
information for the project, used to collect,
manage and disseminate project information
through strictly controlled processes

CDM The Construction (Design & Management)


Regulations (CDM 2015) are the main set of
regulations for managing the health, safety and
welfare of construction projects

CIC Construction Industry Council, the


representative forum for the professional bodies,
research organisations and specialist business
associations in the construction industry

COBie Construction Operations Building information


exchange, a data-exchange format that supports
the exchange of information about new and
existing buildings and infrastructure throughout
their life cycle

Constructor A person or company that builds assets

Designer A person or company that designs assets

17
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

DWG Proprietary binary file format used by Autodesk®


for storing two- and three- dimensional design
data and metadata

EIR Exchange Information Requirements, pre-tender


document setting out the information
requirements in relation to an appointment

Employer The person or organisation responsible for


initiating a project /Appointing Party

End-user The person or organisation that will use the


supplied information

Gateway decision A key decision point in a design and construction


project

Granularity of information The level of detail considered in a model or


decision making process

H&S Health & Safety, the laws, rules, and principles


intended to keep people safe from injury or
disease at work and in public places

IDP Information Delivery Process

IFC Industry Foundation Class, an object-based


open standard for the exchange of BIM
information between different software.
Developed by ‘buildingSMART’, a global alliance
specialising in open standards for BIM, IFC is an
official standard, BS ISO 16739, and contains
geometric as well as other data

IT Information Technology

MIDP Master Information Delivery Plan

O&M Operation and maintenance, the daily activities


and services needed to ensure an asset performs
to its intended function

OIR Organisational Information Requirements


establish and categorise the information
requirements to meet the needs of an
organisations asset management system

Organisation An organised group of people with a particular


purpose, such as a business, government
department or charity e.g. a heritage trust

18
BIM for Heritage Technical Guidance – HBIM Information Requirements Template Suite (HIRs)

PIM Project Information Model developed during the


design and construction phase of a project
which often forms the basis of the asset
information model

RAG Red Amber Green

Single source of truth The practice of structuring information models


and associated data into a master, single source
so that data is only edited in one place

Stage decision gates A point in a design and construction project


stage at which a key decision is required in order
to progress – a gateway decision

Supplier Company or organisation wishing to provide


information, goods or services. Bidding to
become the Appointed Party. See also, Bidder
and Tenderer.

Tenderer Company or organisation wishing to provide


information concerning works, goods or
services. Bidding to become the Appointed
Party. See also, Bidder.

XLS Proprietary file format created by Microsoft® for


storing spreadsheet information

19