LSAP 40 / 42.3 / 44.3 / 45 / 46.2-4 POLE: Low Voltage Alternators - 4 Pole Installation and Maintenance
LSAP 40 / 42.3 / 44.3 / 45 / 46.2-4 POLE: Low Voltage Alternators - 4 Pole Installation and Maintenance
LSAP 40 / 42.3 / 44.3 / 45 / 46.2-4 POLE: Low Voltage Alternators - 4 Pole Installation and Maintenance
2-4 POLE
TM
Electric Power Generation INSTALLATION AND MAINTENANCE
9 - WARRANTY CLAUSE.......................................22
4 - AVR
TM
1
Electric Power Generation INSTALLATION AND MAINTENANCE
This manual Corresponds to the AC Generator We wish to draw your attention to the contents
which you have just purchased. of this maintenance manual. By following certain
important points during installation, and servicing
of your AC Generator, you can look forward to
The latest addition to a whole new generation many years of trouble-free operation.
of AC Generator, this range benefits from the
experience of the leading manufacturer worldwide,
using advanced technology and incorporating
strict quality control.
WARNING SYMBOLS
SAFETY MEASURES
Locations at which warning symbols shoud be
Before using your machine for the first time, it is positioned is shown in the sketch below. User may
important to read completelly this installation install these for safety purposes. (the stickers of
and maintenance manual. symbols are generally not supplied with the
machine).
All necessary operation and instructions on this
machine must be performed by a qualified
technician.
Our technical support service will be pleased to
provide any additional information you may require.
WARNING
TM
2
Electric Power Generation INSTALLATION AND MAINTENANCE
TM
TM
3
Electric Power Generation INSTALLATION AND MAINTENANCE
2 - TECHNICAL CHARACTERISTICS
R-120
STATOR : 2 wires (U N)
R121
2.1.1 Options
- Stator temperature detection probes. Two-bearing with SAE flange and standard
- Space heaters. cylindrical shaft extension.
- Machine, self-cooled
2.2 Mechanical Characteristics - Degree of protection; IP 23
- Steel frame 2.3 Options
- End shields in cast iron
- Protection against harsh environment.
- Greased ball bearings
- Air input filter, air output labyrinth cowling.
- Mounting arrangement
Alternators fitted with air inlet filters should be
Md35;
derated by 5% (power)
Single bearing with standard feet and SAE - To prevent excessive temperature rise caused by
flages/coupling discs. clogged filters, it is advisable to fit the stator winding
B34 with thermal sensors (PTC or PT 100).
TM
4
Electric Power Generation INSTALLATION AND MAINTENANCE
5+ 6-
SERIES
Connection
T1 T2 T3
5+ 6- T4 T5 T6
SERIES
Connection
TM
5
Electric Power Generation INSTALLATION AND MAINTENANCE
TM
6
Electric Power Generation INSTALLATION AND MAINTENANCE
Note: Prolonged standstill: In our order to avoid these 3.3 Terminal Connection diagrams
problems, we recommend the use of space heaters, as
well as turning over the machine from time to time. To modify the connection, change the position of
Space heaters are only effective if they are working the terminal cables, Consult the factory for this.
Before starting the machine for the first time, check that:
- the fixing bolts onthe feet are tight
- the cooling air is drawn in freely
- the protective louvres and housing are correctly in place
- the standard direction of rotation is clockwise as seen Any intervention on the ac generators terminals
from the shaft and (Phase rotation in order 1 - 2 - 3). durin reconnection or checks should be performed,
For anticlockwise rotation, swap 2 and 3. with the machine stopped.
- the winding connection corresponds to the
site operation voltage.
T3 T1 I I
U
T2 I I
V
T1 T4 T3 I I
W
T6
T5
T4
I I
T5 N
T6
T2
TM
7
Electric Power Generation INSTALLATION AND MAINTENANCE
L3(W)
T4 N
T3
T5 L2(V)
R201/ voltage sensing:
T6 T2
T3 T2 U=>(T1) / V=>(T2) L1(U)
N =>N T1
L3(W) L2(V)
R203/ voltage sensing:
0=>(T1) / 200V=>N
L1(U)
Winding 50 Hz 60 Hz
F 240
6 220-240 L3(W)
Single-phase
T3T5
T6 T1 L2(V)
T2 T4
L1(U)
T3 T4
T1 T6
R201/203 voltage sensing:
T5 T2 0 => (T3) / 220 V => (T2)
L3(W) L2(V) Operating phases :L2(V), L3 (W) single phase
130°C
103
Ph1 Blue
101
150°C
Ph2
102 Black
Ph3 180°C
104 Red/white
TM
8
Electric Power Generation INSTALLATION AND MAINTENANCE
3.4 Commissioning
TM
9
Electric Power Generation INSTALLATION AND MAINTENANCE
ROTOR ST ATOR
R - 120
WARRANTY VOID
IF BREAK OPEN
TO LOAD
OPEN FOR 60Hz
UF S V
Note : For 1 Phase connection connect, between U & N Put short link between N & N1
Characteristics
SL. NO. PARAMETER R - 120
- Voltage regulation: ± 1 %
1 Voltage adjustment
- Supply range/voltage detection 230V (50HZ)
2 Stability adjustment - Response time (1sec.) for a transient voltage
3 Under frequency roll off variation amplitude of ± 20%
adjustment - Voltage setting: V
4 Remote voltage adjustment - Stability setting : Sealed
TM
10
Electric Power Generation INSTALLATION AND MAINTENANCE
f
4
.
5
U V N F+ F
81 12.5
103 6 51
TM
11
Electric Power Generation INSTALLATION AND MAINTENANCE
ROTATING RECTIFIER
EXCITER ROTOR
EXCITER STATOR
N
TYPIC MAIN STATOR
W U
TYPIC MAIN STATOR
U V
F+ F - N V U 1 200V
F+ F - N V U 1 2 400V
2 200V 3
3
R201 4
400V R201 4 50/60Hz
50/60Hz 5 HAND TRIMMER (OPTIONAL)
5 6
6 HAND TRIMMER (OPTIONAL) REMOVE LINK R1-R2 BEFORE CONNECTING
REMOVE LINK R1-R2 BEFORE CONNECTING 7
7 UES TOW-CORE TWISTED-PAIR SCREENED
UES TOW-CORE TWISTED-PAIR SCREENED VR CABLE(RETED 250VAC/1A)
VR CABLE(RETED 250VAC/1A)
Connect a jumper from 4 to the 5 terminal for 50Hz operation, or leave the two terminals unconnected
for 60Hz operation. To reset the frequency roll-off, proceed as follow :
1. Startup engine and build voltage
2. Adjust the prime mover RPM to the desired frequency compensation (corner frequency roll-off ) point.
3. Adjust the front panel FREQ control until the output voltage low about 5V than nominal voltage.
( For 50Hz application, the frequency “roll-off” is factory preset to 47Hz, for 60Hz operation, the frequency
is 57hZ).
1. Adjust the front panel VOLT to vary the generator nominal voltage.
2. If used, a 1kW 1watt potentiometer may be connected to terminals VR and VR, refer to Figure4,5.
4.3.4(c)-Stability Adjustment
TM
12
Electric Power Generation INSTALLATION AND MAINTENANCE
These instructions apply to the alternator of which you have just taken possession. We would
like to draw your attention to the contents of this maintenance manual.
All operations this interventions to be carried B) Do not allow children under the age of
out to operate this machine will be carried 14 to be approached by air outlets A sticker
out by qualified personnel. sheet of the various safety instruction is
attached to this mai ntenance man ual.
Our technical support service is at your disposal
for all the information you need. They will be positioned according to the
drawing and when the machine is completely
The various operations described in this manual installed
are accompanied by recommendations or
symbols to make the user aware of the risks of WARNING
accidents. It is imperative that you understand
The alternators shall not be put into service
and respect the various
until the machinery in which they are to be
incorporated has been declared in conformity
ATTENTION with the EC Directives and any other applicable
di rectives. The se ins truc tion s mus t be
Safety note for an intervention that can damage
transmitted to the end user the range of
or destroy the machine or the surrounding
equipment. electrical alternators and related products
manufactured by us or on our behalf comply
with the technical requirements of the Customs
Union (EAC) Directives.
SECURITY INSTRUCTIONS
We would like to draw your attention to the
following 2 safety measures:
TM
13
Electric Power Generation INSTALLATION AND MAINTENANCE
Voltage Check the drive The speed is corrected. - Check the AVR connections
too low speed (possible AVR failure
- Field windings short-circuited
- Rotating diodes burn out.
- Main field winding short
circuited - check the resistance
- Increase the drive speed
Voltage Adjust AVR voltage Speed too low (Do not touch the AVR voltage pot.
too High potentiometer (P2) before running
Ineffective adjustments. at the correct speed.)
Faulty AVR
Voltage Adjust AVR stability If not effect, try normal - Check the speed : Possibility of
oscillations potentiometer fast recovery modes (St2) cyclic irregularity
- Loose connections
- Faulty AVR
(*) Warning : During single-phase operation, check that the sensing wires from the AVR are connected to the
correct output terminals.
Check the AVR. The voltage does not return - Exciter winding open circuit
Voltage
surge suppressor, to the rated value. - Faulty exciter armature
disappear
rotating diodes and - Faulty AVR
during
replace any defective - Main field open circuit or
operation
components. short-circuited
TM
14
Electric Power Generation INSTALLATION AND MAINTENANCE
WARNING
TM
15
Electric Power Generation INSTALLATION AND MAINTENANCE
6.3.1 Dismantling
- Remove the terminal box cover
- Remove the air intake louver
- Unscrew the fixing clamps on the power output
cables, disconnect E+, E-on the exciter
- Remove the 4 nuts on the studs
- Remove the NDE bracket using an extractor.
- Remove the surge suppressor
- Remove the 4 fixing screws from the diode bridges
on the armature.
- Disconnect the diodes.
- Check the 6 diodes using either an ohmmeter or a
battery lamp
6.1 Tools required
6.3.2 Reassembly
- 1 ratchet spanner + extension - Replace the diodes, respecting the polarity
- 1 torque wrench - Replace the surge suppressor
- Insert a new O ring in the bearing housing.
- 17 mm flat spanner
- Refit the NDE shield and pass the bundle of
-18 mm flat spanner wire between the top bars of the flange.
-110 mm flat spanner - Refit the air intake louvre
- Refit the terminal box cover
-112 mm flat spanner
-18 mm socket
-110 mm socket
-113 mm socket
-15 mm Allen key
-16 mm Allen key
-1 puller
TM
16
Electric Power Generation INSTALLATION AND MAINTENANCE
6.4.1 Dismantling
6.4.2 Reassembly
the corresponding diameter on the shaft end or an
- Heat the inner slipring of a new bearing by induction support made according the following bellow.
or in a drying oven at800c (do not use an oil bath) and
fit it to the machine. - Rest the rotor on one of its poles, then slide it out,
Use the tube as a lever arm to assist dismantling.
- Place the preloading wavy washer in the flang - After extraction, be careful with the fan. It is necessary
and fit a new O ring seal. to replace the fan in case of disassembling.
- Replace the NDE bracket
NOTE: If intervention is required on the main field
(rewinding, replacement of components), the rotor
6.5 Replacing the DE bearing on a two bearing assembly must be rebalanced.
machine
6.6.2 Reassembly
6.5.1 Dismantling - Follow the dismantling procedure in reverse order.
- Uncouple the alternator from the prime mover. Take care not to knock the windings when refitting
- Remove the 8 assembly screws. the rotor in the stator.
- Remove the DE flange.
- Remove the NDE shield. If you replace the fan, respect the assembly guide
- Remove both bearings using a puller. according the following bellow. Use a tube and a
screw.
6.5.2 Reassembly
- Fit new bearings after heating them by induction
or in a drying oven at 800C (do not use an oil bath).
- Check that both the preloading wavy washer and
new O ring seal have been fitted on the NDE shield
Replace the DE flange, and tighten the fixing screws.
- Check that the whole machine is correctly assembled
and that all screws are fully tightened.
Follow the procedure for reassembling the bearings
6.6 Accessing the main field and stator
6.6.1Dismantling
Follow the procedure for dismantling bearings.
- Remove the coupling dies (Single-breaing machine)
or the DE flange (two-bearing machine) and insert a
tube of After final adjustments, the access panels
or cover should be refitted
TM
17
Electric Power Generation INSTALLATION AND MAINTENANCE
7 - SPARE PARTS
Description Qty.
Surge suppressor 1
3 LSAP 42.3 6306 2RS C3 1 3 LSAP 44.3 6308 2RS C3 6314 2RS C3 2
4 LSAP 43.2 6307 2RS C3 1 4 LSAP 46.2 6315 2RS C3 6316 2RS C3 2
TM
18
Electric Power Generation INSTALLATION AND MAINTENANCE
Service Support
Our network of international service of more than 80 instllations is at
yourdisposal. This local presence guarantees fast, efficient tracking,
support and maintenance services
Trust the power generation experts for the maintenance and support of
your alternator. Our field staff is qualifed and perfectly trained to work
in most environments and on all types of machines.
Design
• Tips & Specifications
• Maintenance contracts
Optimization Exploitation
• Surveillance • Original spare
• System audit parts
• Repair
Services
To Contact us:
Americas: +1 (507) 625 4011
Europe & International: +33 238 609 908
Asia-Pacific: +65 6250 8488
China: +86 591 88373036
India: +91 80 6726 4867
Scan the code or go to the page:
service.epg@leroy-somer.com www.lrsm.co/support
TM
19
Electric Power Generation INSTALLATION AND MAINTENANCE
Disposal and recycling instructions All the materials listed above must suitably
We are committed to limiting the processed to separate the waste from the
environm ental impact of our business. recoverable materials and must be entrusted
We constantly monitor our production to the valorization companies.
processes, our raw material supplies and The oil and grease used for bearing
the design of our products to improve the lubrication must be considered as
ability to recycle them and reduce our hazardous waste and treated in accordance
carbon footprint These instructions are with local legislation
provided for information purposes only.
It is the user’s responsibility to comply with
local waste disposal and recycling legislation
Recyclable Materials
TM
20
Electric Power Generation INSTALLATION AND MAINTENANCE
TM
21
Electric Power Generation INSTALLATION AND MAINTENANCE
The period of warranty is for TWELVE calendar months from the date of commissioning or
EIGHTEEN calendar months from the date of dispatch whichever is earlier.
TM
22
Electric Power Generation INSTALLATION AND MAINTENANCE
TM
23
Electric Power Generation INSTALLATION AND MAINTENANCE
TM
24
Electric Power Generation INSTALLATION AND MAINTENANCE
Space heaters are recommended in areas of high humidity. Condensation will form on all surfaces
which are cooler than ambient temperature. To avoid this, anti-condensation heaters can be fitted
which will ensure the winding temperature remains a few degrees above the ambient temperature
and hence no condensation will form. Note that the anti-condensation heaters should be on only
when the D.G Set is OFF, and they should be switched off while the D.G set is in use.
2) Air Filters
Under site conditions where the air may be heavily laden with fine dust or sand we strongly
recommend the fitting of inlet air filter. The sizing of these is important to avoid airflow
restrictions and advice should be sought from the works.
TM
25
TM
www.leroy-somer.in
twitter.com/Leroy-SomerIndia
linkedin.com/Leroy-SomerIndia
5884 en - 2020.01 / a