Nothing Special   »   [go: up one dir, main page]

LCBForm v1 (BETA)

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 30

DBKL LCB Checklist Submittals

Kuala Lumpur Low Carbon Building Checklist


KL LCBC
Submission Calculator

Project Nickname

input "Y" date


Submission Date KM/DO not started P2-KM
PB/BP not started P2-PB
CCC not started P6-CCC

Assessment summary
baseline vs assessment estimation - tCO2e/yr
performance assessment estimation - tCO2e/yr
reduction estimation -

carbon reduction estimation, based on energy demand

0%

Instructions:
1. This calculator is to be used in conjunction with the LCB Guidebook.
2. Input data require in YELLOW boxes.
3. Use the appropriate "project stage" - KM/BP/CCC
4. Do not "save as", keep and preserve the original folder structure and files.
5. You can manouver the sheets using the , or hyperlink text.
button
6. All input for areas are to be consistent with plans, all pre-measured.

Good Luck! Go To Project

KLLCBC v1.0
DBKL/C40/CEmGBC
Last update 20/04/2024

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

General Project Information [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0 Proceed to checklist
-
Complete this section before attempting the criteria tabs. All base information are taken from this section to maintain calculation consistency.
Remarks
No OSC [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0 -

CO2e 0.758 0.758 kgCO2e/kWh


kgCO2e/kWh

Project Constants
Project Title project title

Project type 0 - <1,000m2 (Small scale)

GFA (excl. ancilliary buildings, and car park) - m2


<1,000m2
Main Purpose Group (PG) select UBBL 5th Sch
Mixed development? select

No. of blocks - bldgs/blocks -

Occupancy - pax
According to UBBL 5th Sch - m2 based on UBBL
-
10.0 0 nos. room, for PG I only
permanent - pax
- pax 0 nos. room, for PG III (hotel rooms) only
10% visitor - pax

No. of storeys select INPUT SELECTION

Typucal Floor-to-Floor height 0.00 m

Project Site area (lot size) 0 m2 - sqft

Building foot print 0 m2 0%


GFA (excl. ancilliary buildings) 0 m2 - sqft ancilliaries note required to be included

NFA/NLA (assumed 70%) 0.85 0 m2 161 sqft


NFA/NLA (to key in actual) 0 m2 138,416 sqft
Nett air-conditioned area 0 m2 - sqft #DIV/0!
- not applicable for residential
Assumed circulation (30%) 0 m2 - sqft
Calculated circulation area 0 m2 - sqft
0
Is this project demolish and rebuild? NO

Car parking (inside building)


Podium levels 0 storeys
area 0 m2 - sqft
Basement levels 0 storeys
area 0 m2 - sqft

Main Orientation select

No. of blocks 1 bldgs/blocks - enter façade calculations here


building/block PG floor area Number of facades wall area glazed area
1 select - 0 N No -
NE No -
E No -
SE No -
S No -
SW No -
W No -
NW No -
0 - - 0% WWR

Green space requirement 10% 0 m2

Open Space area provided 0 m2 0% <50% project site boundary


Green areas 0 m2 0% from total site area

Hardscape area 0 m2 0% Open space - Green space over total site area
Driveway m2 0%
Pavement m2 0%
Parking on ground m2 0% #DIV/0!
Open paving (grasscrete) m2 0%
open paving ratio (grass area) %
0 m2 0% check - m2 difference
Ares shaded by tree canopy (after 5 years) m2 #DIV/0! over hardscape area
0 m2 #DIV/0! shaded hardscape

Total Greenscape area 0 m2 0% over total site area, less building foot print
Greenscape on ground 0 m2 0% new or existing DBKL requirement is 10%, or 8% with 16% on building
Greenscape on building (podium/roof) 0 m2 0% new
Greenscape on building (vertical) 0 m2 0% new

Total roof area 0 m2 0%


slope roof area (>9deg) 0 m2 0% must comply SRI29
flat roof area (<9deg) 0 m2 0% must comply SRI78 min. 75%
green roof area 0 m2 0% if greenscape less 10%, green roof to be 16% min
equipment area on roof 0 m2 0%
skylight 0 m2 0%
0
Parking required by Planning Department 0 not available at KM?
Parking Provided 0 calculate not more than PBT
surface parking 0 0% 0 m2

LEV/Green parking (optional) 0 0% from overall parking count

Glazed location thickness (m) Description SC U-value VLT type


Ext. glazing main spaces 0 describe 1 0 0 1
Ext. glazing lobby 0 describe 2 0 0 2
Ext. glazing meeting 0 describe 3 0 0 3
Roof light/ skylight 0 describe 0 0 0 sl
*Fenestration for Non-habitable spaces are not calculated as part of OTTV, and is considered as opaque façade.

Sanitaryware & fittings description baseline flow rate/ liter per use
Pantry Taps NO 6.0 0.0
Washbasin Taps NO 6.0 0.0
Toilets Single Flush NO 6.0 0.0
Toilets Dual Flush NO 0.0 0.0
Urinals NO 0.5 0.0
Bidets/Bidet Spray NO 6.0 0.0
Showers NO 9.5 0.0
Ablution Fixtures NO 6.0 0.0

Estimated construction cost per GFA/area (m2) RM 3,000.00 insert estimated cost for demolish & rebuild project only
Estimated construction cost RM -
Est. material cost 45% RM - RM -

Application for other rating tool, please state Not Applicable Proceed to checklist

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
LCB Checklist 0 [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0

Click on the hyperlink below to proceed to criteria tabs. this is your LCB project type

project title - <1,000m2 (Small scale) KM BP CCC punca kuasa CR potential

not started not started not started


PENERANGAN Compliance Compliance Compliance
KOD 1.0 REKABENTUK PASIF 1.1 Pengurangan Fenomena Pulau Haba Bandar (UHI – Urban Heat Island)
CODE 1.0 PASSIVE DESIGN: 1.2 Reduction of Urban Heat Island Phenomenon

Penggunaan bahan-bahan yang sesuai di permukaan bangunan (bumbung & lanskap kejur) √
1.1.1
The use of appropriate materials on the surface of the building (roof and hardscape)

Meningkatkan keperluan litupan hijau bangunan √


1.1.2
Increasing green coverage requirements of buildings

Memperbaiki Litupan hijau pada bumbung rata bangunan sediada √


1.1.3
Enhanced green coverage on flat roof of existing building
KOD 3.0 KOMPONEN RENDAH KARBON 3.1 Penghapusan atau Pengurangan Bahan Cemar dengan Punca Tidak Bertitik
CODE 3.0 LOW CARBON COMPONENTS 3.1 Elimination or Reduction of Nonpoint Source Pollutants

Amalan Pengurusan Terbaik 'Best Management Practices' (BMPs) √


3.1.1
Best Management Practices (BMPs) at construction sites
KOD 1.0 REKABENTUK PASIF 1.2 Prestasi ‘Building Envolope’ Yang Cekap
CODE 1.0 PASSIVE DESIGN 1.1 Building Envelope Performance Efficiency

Keperluan minimum ‘building envelope’ (pengaliran haba) UBBL 2021 √


1.2.1
Building envelope minimum requirement (heat conduction)

Memperbaiki ‘building envelope’ untuk bangunan sediada UBBL 2021 √


1.2.2
Enhanced building envelope for existing building

Pengurangan kenaikan haba daripada radiasi solar secara langsung √


1.2.3
Heat gain reduction from direct solar radiation

Memaksimumkan zon pencahayaan siang MS1525/MS2680 √


1.2.4
Maximized daylighting zone

Menggalakkan penggunaan pengudaraan semulajadi.


1.2.5
To encourage the use of natural ventilation
KOD 1.0 REKABENTUK PASIF 1.3 Peningkatan Penggunaan Air Secara Efisien di dalam Bangunan
KOD 1.0 PASSIVE DESIGN 1.3 Increased efficient use of water in building

Pelaksanaan penuaian air hujan UBBL 2021


1.3.1
Implementation of rainwater harvesting

Penjimatan penggunaan air terawat


1.3.2
Savings on the use of treated water

a. cekap air
water efficiency

b. penggunaan selain untuk diminum


non-potable use

Meningkatkan penggunaan air secara efisyen di bangunan sedia ada ccc


1.3.3
Increase the use of water in existing buildings

a. cekap air
water efficiency

b. penggunaan selain untuk diminum


non-potable use

Penggunaan semula bahan binaan untuk projek pembangunan semula


1.3.4
Reuse of building materials for redevelopment projects
KOD 1.0 REKABENTUK AKTIF 2.1 Sistem Penyaman Udara Cekap Tenaga
CODE 2.0 ACTIVE DESIGN 2.1 Energy Efficient Air Conditioning System

Penyaman udara cekap tenaga ccc


2.1.1
Energy efficient air conditioning system

Penukaran kepada penyaman udara cekap tenaga ccc


2.1.2
Conversion to energy efficient air conditioning
KOD 2.0 REKABENTUK AKTIF 2.2 Sistem Pencahayaan Cekap Tenaga
CODE 2.0 ACTIVE DESIGN 2.1 Energy Efficient Air Conditioning System

Sistem pencahayaan cekap tenaga ccc


2.2.1
Energy efficient lighting

a. pematuhan UBBL
compliance to UBBL
b. sensor
sensor
Penukaran kepada pencahayaan cekap tenaga ccc
2.2.2
Conversion to energy efficient lighting

a. pematuhan UBBL
compliance to UBBL
b. sensor
sensor
KOD 2.0 REKABENTUK PASIF 2.3 Sistem Tenaga Boleh Baharu
CODE 2.0 ACTIVE DESIGN 2.1 Energy Efficient Air Conditioning System

Pemasangan sistem tenaga boleh baharu ccc


2.3.1
Installation of renewable energy system

Perlaksanaan Net Energy Metering (NEM) untuk sistem Solar Panel (PV - Photo Voltaic) ccc
2.3.2
Implementation of Net Energy Metering (MET) for Solar Panel (PV-Photo Voltaic) Systems

Pengiraan BEI (Building Energy Index) bangunan hijau rendah karbon


2.3.3 √ not started not started not started
BEI (Building Energy Index) calculation for low-carbon green buildings.
KOD 4.0 KOMPONEN RENDAH KARBON 4.1 Pelan Bangunan Hijau Rendah Karbon
CODE 4.0 LOW CARBON COMPONENTS 4.1 Low Carbon Building Plan

Pengurusan Sisa Domestik yang mampan


4.1.1
Sustainable Domestic Waste Management

a. kebuk sampah
bin center

b. kawasan aktiviti kitar semula


recycling area

c. pelan pengurusan sampah


waste management plan
KOD 4.0 KOMPONEN RENDAH KARBON 4.2 Pembangunan Mampan dan Audit Bangunan
CODE 4.0 LOW CARBON COMPONENTS 4.2 Sustainable Development and Building Audit

Sistem Pengurusan Tenaga (BEMS – Building Energy Management System)


4.2.1
BEMS – Building Energy Management System

Pengumpulan data bangunan pintar dan pusat


4.2.2
Smart and central building data collection

Manual Penggunaan Bangunan Hijau


4.2.3 √ not started not started not started
Green building user manual

items to comply is 2

This endorsement is provided solely for the purpose of LCBC project


requirements and as a commitment to pursue low carbon initiatives. Any
information or statements contained herein are subject to verification and
should not be relied upon as legal advice.

--------------------------------------------------
(PSP stamp and signature)
This endorsement is provided solely for the purpose of LCBC project
requirements and as a commitment to pursue low carbon initiatives. Any
information or statements contained herein are subject to verification and
should not be relied upon as legal advice.

--------------------------------------------------
(PSP stamp and signature) Enter PSP name :
PSP company :
[OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Copy these tables into the submission plan, where applicable

1.1.1 Penggunaan bahan-bahan yang sesuai di permukaan bangunan (bumbung & lanskap kejur)
The use of appropriate materials on the surface of the building (roof and hardscape)

m2 m2
Project site area -
Building footprint -
Hard scape Area -
Driveway - SRI 0 Not complied
Pavement - SRI 0 Not complied
Parking on ground - SRI 0 Not complied

#DIV/0! #DIV/0!

Total Roof Area -


slope roof area (>9deg) - SRI 0 Not complied
flat roof area (<9deg) - SRI 0 Not complied
green roof area -
equipment area on roof -

#DIV/0! #DIV/0!

1.1.2 Meningkatkan keperluan litupan hijau bangunan


Increasing green coverage requirements of buildings

m2
Project site area -
Building footprint -
hardscape (pavement,surface parking,access road,etc) -
Green Area -

DBKL Green area requirement 10% - 10%

Greenscape on ground - #DIV/0!


Greenscape on building (podium/roof) - #DIV/0!
Greenscape on building (vertical) - #DIV/0!
- #DIV/0! #DIV/0!

1.1.3 Memperbaiki Litupan hijau pada bumbung rata bangunan sediada


Enhanced green coverage on flat roof of existing building

Green Area Coverage

DBKL Green area requirement 10% -

Walls (external) - #DIV/0! existing

Walls (external) - - new


Walls (external) - - new
#DIV/0! #DIV/0!

3.1.1 Amalan Pengurusan Terbaik 'Best Management Practices' (BMPs)


Best Management Practices (BMPs) at construction sites

Rainwater Management calculation

percentile based on calculator


90th 44.80 mm

Site area - m2

no run-off scenario (simplicity calculation) - worst case


site area x percentile
90th - m3

small storm hydrology method


land type x runoff coefficient x percentile rainfall depth water volume managed on-site

water management
Runoff volume percentile
areas basis of calcula depth/ capacity unit capacity (m3) LID/GI
(Rv) rainfall depth
area*depth

roof areas 0 0.9 0 - - 0 0 to RG


rain gard 0 0.15 0 - - m 0 evapotranspiration
LS crushe 0 0.15 0 - - m 0 infiltration
RWH roof 0 0.9 0 - - 0 18 reuse
permeable 0 0.15 0 - - m 0 infiltration
permeable 0 0.15 0 - - m 0 infiltration
sidewalk 0 0.9 0 - - 0 0 to RG
other gree 0 0.15 0 - - m 0 evapotranspiration
-
excess are - OK - m3 18.00 m3
total water managed #DIV/0! #DIV/0!

1.2.1 Keperluan minimum ‘building envelope’ (pengaliran haba)


Building envelope minimum requirement (heat conduction)
1.2.2 Memperbaiki ‘building envelope’ untuk bangunan sediada
Enhanced building envelope for existing building

Computed Overall Thermal Transfer Value (OTTV) no result W/m2 FAILED


Criteria not met, consider adding

Skylight? NO
Computed Roof Thermal Transfer Value (RTTV) N/A W/m2 PASSED

Roof U-Value lightweight 1 W/m2K


heavyweight 0 W/m2K

Area of Air-conditioned space 0 EMS NOT REQUIRED


Provision of Energy Management Control System ? YES
Nos EMS points 0 nos

1.2.3 Pengurangan kenaikan haba daripada radiasi solar secara langsung


Heat gain reduction from direct solar radiation

Orientasi utama bangunan select


jumlah fasad 0

keluasan fasad (m2) WWR SC2


Fasad Utara (N) - 0% -
Fasad Timur Laut (NE) - 0% 0
Fasad Timur (E) - 0% -
Fasad Tenggara (SE) - 0% 0
Fasad Selatan (S) - 0% -
Fasad Barat Daya (SW) - 0% 0
Fasad Barat (W) - 0% -
Fasad Barat Laut (NW) - 0% 0

Purata no result > 40% - NOT COMPLIED no result > 0.6 - NOT COMPLIED

1.2.4 Memaksimumkan zon pencahayaan siang


Maximized daylighting zone

NLA - m2
Daylit areas - m2

0% Not complied

1.2.5 Menggalakkan penggunaan pengudaraan semulajadi.


To encourage the use of natural ventilation

Natural ventilation
zone floor area window area ratio within 8m? Location Rp (L/s-p) Ra (L/s-m2) occupancy Pz Az Vbz (L/s) Voz (L/s) Comply ASHRAE
0 0 0 0 0 0 #N/A #N/A 0 0 0 #N/A 0 #N/A
0 0 0 0 0 0 #N/A #N/A 0 0 0 #N/A 0 #N/A
0 0 0 0 0 0 #N/A #N/A 0 0 0 #N/A 0 #N/A

Minimum windows requirement met? #VALUE!

ASHRAE requirement met for all NV areas? #VALUE! #VALUE!

1.3.1 Pelaksanaan penuaian air hujan


Implementation of rainwater harvesting

Keperluan Minimum
Skala kecil Banglo/ Semi-D 3m3
Terrace units 1m3/unit
Skala besar Comply 1m3/50m2 of total roof area (excl. green roof).

Keperluan Pengemukaan
Projek akan meYES

Jumlah kegunaan air sasaran (L/yr) 0 L/yr


Jumlah air tuaian SPAH 0 #DIV/0!

Kadar pengurangan yang dicapai #DIV/0!

JPIF requirement read


Demand requiremet read
RWH Tank provided read

Annual (m) 3579.57

Jenis Bangunan INPUT SELECTION Kaw. bumbung 0 m2


Jumlah tingkat select Kaw. Lain 0 m2
Jenis penuaian bumbung shj Jumlah kaw. tadahan 0 m2
kawasan tadahan sebenar 0 m2

Run-off Co-eff 0

Est. collectable water per annum 0 Litre/yr


Keperluan LCB (JPIF) 1m3/50m2 0 m3 0

Penggunaan SPAH annual est. % demand


0 Total Water Use (Washrooms) 0 0%
0 WC flushing 0 0%
0 Total Water use common areas 0 0%
0 WC flushing 0 0%
0 Total irrigation(22 days watering in a month) 0 0%
0 Swimming Pool make up water 0 0%
0 Reflective pond make up water 0 0%
0 car washing 0 0%
0 waste bin cleaning 0 0%
0 pantry and barbeque 0 0%
0 general cleaning 0 0%
0 Lain-lain state usage 0 0%
Jumlah keseluruhan 0 Liter/yr
Kapasiti yang menggunakan air 0 0% 0

Air cukup untuk penuaian TIDAK 0% Review water demand vs. captured capacity
Potensi penggunaan air hujan #DIV/0! 0%

Kuantiti keperluan harian 0 Liter/day


Kuantiti harian (jika hujan) 0 Liter/day
Jumlah hari simpanan 0 hari
Jumlah kuantiti simpanan 0L
Saiz tangki diperlukan 0 m3 insufficient to comply JPIF requirement

panjang lebar tinggi


0 0 0
Saiz tangki disediakan 0 m3 insufficient to comply JPIF requirement
Kuantiti tangki simpanan 0L
Kuantiti nominal 0L 0%
Not complied
Calculator output
Hari tangki penuh 365 100%
Hari tangki <1hari kapasiti 0 0%
Hari tangki <10% kapasiti 0
Hari tangki kosong 365 100%

Hari tanpa hujan 134 37%

1.3.2 Penjimatan penggunaan air terawat


Savings on the use of treated water
1.3.3 Meningkatkan penggunaan air secara efisyen di bangunan sedia ada
Increase the use of water in existing buildings

penggunaan produk cekap air baseline flow rate design flow rate Baseline water use Design water use RWH application
Pantry Taps 6.00 0.00 - - 0
Washbasin Taps 6.00 0.00 - - 0
Toilets Single Flush 0.00 0.00 - 0
Toilets Dual Flush 0.00 0.00 - - 0
Urinals 0.50 0.00 - - 0
Bidets/Bidet Spray 6.00 0.00 - - 0
Showers 9.50 0.00 - - 0
Ablution Fixtures 6.00 0.00 - - 0
- -
Water use reduction #DIV/0! #DIV/0!

-
Further reduction with RWH 0% Not complied

Total potable water Reduction (+RWH contribution) 0% Not complied

1.3.4 Penggunaan semula bahan binaan untuk projek pembangunan semula


Reuse of building materials for redevelopment projects

m2
GFA (excl. ancilliary buildings) 0

REUSED MATERIALS FOUND ON SITE


Any materials found on site being reused in the project? 0
what is the percentage estimate?
PATH 1 0.00
PATH 2 0.00

PATH 1 : Maintaining existing walls, floors and roof


total 0 0 0 0

0.00 <15% - not complied


Not complied

PATH 2 : Reuse or salvage existing materials


total 0 0 0 0

- 0

0.00 <15% - not complied

2.1.1 Penyaman udara cekap tenaga


Energy efficient air conditioning system
2.1.2 Penukaran kepada penyaman udara cekap tenaga
Conversion to energy efficient air conditioning

Complex criteria shall be based on self-declaration, Was the requirement achieved? 0


not complied

Please complete the following section, where relevant, to demonstrate compliance


For 100% Natural Ventilation
for building design with 100% Natural Ventilation, commit to providing 5-star rating fans.
not applicable

Project is 100% NV, where comfort is concerned, forced ventilation shall be provided (e.g. ceiling fans) that complies to EE requirements. 0

For ACSU 2.5HP or below √


for residential, use typical unit. For large areas using multiple ACSU, split the space.
not applicable
comply ST 5-star rating? 0 not complied

For other unitary systems (incl VRF/VRV)


for residential, use typical unit. For large areas using multiple ACSU, split the space.
not applicable

Air/Water-cooled system
not applicable

2.2.1 Sistem pencahayaan cekap tenaga


Energy efficient lighting
2.2.2 Penukaran kepada pencahayaan cekap tenaga
Conversion to energy efficient lighting

m2
GFA (excl. ancilliary buildings) 0
NLA 0
Lux level compliance to MS 0 0.9 /GFA

Lighting provision

room coun 0 total area consi 0 0


#DIV/0! #DIV/0!
areas in compliance to MS #DIV/0! #DIV/0!

Sensor provision
Individual switch for individual space, not exceeding 100m2 0

Photo sensors for all parameter zones and daylit areas 0


Areas connected to Photo sensor 0

Motion sensors to complement lighting zoning for at least 25% NLA 0


Areas connected to Motion sensor 0
#DIV/0! #DIV/0!

2.3.1 Pemasangan sistem tenaga boleh baharu


Installation of renewable energy system

m2
Total roof area 0
slope roof area (>9deg) 0
flat roof area (<9deg) 0
green roof area 0
equipment area on roof 0

areas not considered for solar PV (equipment, greenery, etc) 0

available roof area 0


ineffective roof area (due to overshadowing) 0

effective roof area 0

PV panel coverage provided 0


0% <30% - not complied

What is the total kWp? 0


What is the total energy required for the building - see BEI 0

Proposed energy generation possible 0 kWh


amounting to potential energy offset by 0.00 %

2.3.2 Perlaksanaan Net Energy Metering (NEM) untuk sistem Solar Panel (PV - Photo Voltaic)
Implementation of Net Energy Metering (MET) for Solar Panel (PV-Photo Voltaic) Systems

m2
GFA (excl. ancilliary buildings -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -

Total Building Energy - kWh/yr


Total RE yeild - kWh/yr
#DIV/0! %

The project commits to the following:


The project will be registered to advance energy metering upon CCC? -
Select net energy meter solution (NEM or Selco) -

#VALUE!
#VALUE!
2.3.3 Pengiraan BEI (Building Energy Index) bangunan hijau rendah karbon
BEI (Building Energy Index) calculation for low-carbon green buildings.

m2
GFA (excl. ancilliary buildings 0

NFA/NLA (assumed 70%) 0


Nett air-conditioned area 0
0
Floor Vacancy Rate (FVR) 0

Estimated total 0 kWh/yr


Estimated BEI 0 kWh/m2/yr

The project commits to the following:


The project will be registered to BeDOS system? 0
Commit to energy (BEI) reporting via BeDOS system? 0

#VALUE!
#VALUE!

Carbon reduction estimation

Baseline BEI 250 kWh/m2/yr


est. baseline kWh - kWh/yr

energy reduction - kWh/yr


carbon reduction equivalent - tCO2e/yr

4.1.1 Pengurusan Sisa Domestik yang mampan


Sustainable Domestic Waste Management

DURING BUILDING OCCUPANCY


3R Bins
Will there be permanent recycling (3R) Bins? 0 0
Apart from providing the colored (3R) Bins, bin for general waste is provided? 0
Location of (3R) Bins are indiated on plans? 0

Bin Center
Purpose group select
Project type IV - Office

total area (m2) -


estimated waste generation m3

SWCorp estimation #VALUE! m3

Bin center is sized to SWCorp standard? 0


Collection areas have adequate vehicular access for hauling? 0

capacity of bin center provided - m3


#VALUE!

Bin Center - sorting and recycling


There is an area in the bin center cor sorting of recyclables? 0
Will there be any labelling provided to indicate and educate the 3R initiative? 0

Bin Center area - m2


Additional area of the bin center dedicated for sorting of recyclables - m2
Total bin center size provided - m2
-
Additional area provided sufficient NO

Building waste management plan (BWMP)


A BWMP is being provided to the project? 0
The BWMP shall be enforced and maintained by the project? 0

#VALUE!
not complied

4.2.1 Sistem Pengurusan Tenaga (BEMS – Building Energy Management System)


BEMS – Building Energy Management System

m2
GFA (excl. ancilliary buildings -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -

The project will use EMS to monitor and analyse energy consumption YES
The EMS will be housed inside a dedicated space YES
EMS includes Maximum Demand Limiting programme YES

An alternative method is proposed for consideration ? NO

#VALUE!
COMPLIED

4.2.2 Pengumpulan data bangunan pintar dan pusat


Smart and central building data collection

m2
GFA (excl. ancilliary buildings -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -

The project commits to the following:


The project will be registered to BeDOS system? YES
The EMS data shall be shared with the BeDOS system and shall be maintained YES

#VALUE!
#VALUE!

4.2.3 Manual Penggunaan Bangunan Hijau


Green building user manual

Project to confirm that all the criteria under the LCBC sustainability code shall be fulfill for the project
and will be made available to the building owner in order to maintain the performance as approved.

Planning Scope
Kod 1 - Rekabentuk Pasif 0
Kod 3 - Komponen Rendah Karbon 0

Building Scope
Kod 1 - Rekabentuk Pasif 0
Kod 2 - Rekabentuk Aktif 0
Kod 4 - Komponen Rendah Karbon 0

1 COMPLIED
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0

-
Code Summary KM #DIV/0! not started
Code Summary BP #DIV/0! not started
Code Summary CCC #DIV/0! not started

1.1.1 Penggunaan bahan-bahan yang sesuai di permukaan bangunan (bumbung & lanskap kejur)
The use of appropriate materials on the surface of the building (roof and hardscape)

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Project site area - m2


Building footprint - m2
Hard scape Area - m2
Total Roof Area - m2
4 sheltered & secured waiting area
Non Roof Application

Component Material Color SRI Value (refer product reference or equivalent)


Driveway Not complied 0.00
Pavement Not complied 0.00
Parking on ground Not complied 0.00
Grasscrete (effective area) 0.00
0.00
Shaded area 0.00

% Area compliant to SRI value #DIV/0!


#DIV/0!

Roof Application
0 0
Component Material Color SRI Value (refer product reference or equivalent)
Steep slope roof area Not complied -
Low slope roof area Not complied -

No vegetation -
Vegetated roof ? 0
on roof

0
Equipment on roof NO -

total roof -

% Area compliant to SRI value 0%


Criteria not met, consider adding

Code Summary #DIV/0!

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM #DIV/0! not started
Code Summary BP #DIV/0! not started
Code Summary CCC #DIV/0! not started

1.1.2 Meningkatkan keperluan litupan hijau bangunan


Increasing green coverage requirements of buildings

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

### 3 not applicable


Credit Narration / Commitment
KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Project site area - m2


Building footprint - m2
hardscape (pavement,surface parking,access road,etc) - m2
Green Area - m2
4 sheltered & secured waiting area
Green Area Coverage

DBKL Green area requirement 10% -

Greenscape on ground - #DIV/0!


Greenscape on building (podium/roof) - #DIV/0!
Greenscape on building (vertical) - #DIV/0!
#DIV/0!
#DIV/0!

Code Summary #DIV/0!

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM #DIV/0! not started
Code Summary BP #DIV/0! not started
Code Summary CCC #DIV/0! not started

1.1.3 Memperbaiki Litupan hijau pada bumbung rata bangunan sediada


Enhanced green coverage on flat roof of existing building

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

### 3 not applicable


Credit Narration / Commitment
KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

- m2
Project site area
Building footprint - m2
hardscape (pavement,surface parking,access road,etc) - m2
Green Area - m2
4 sheltered & secured waiting area
Green Area Coverage

DBKL Green area requirement 10% -

Greenscape on ground - #DIV/0! existing

Greenscape on building (podium/roof) - 0% new


Greenscape on building (vertical) - 0% new
#DIV/0! #DIV/0!
#DIV/0!

Code Summary #DIV/0!

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

3.1.1 Amalan Pengurusan Terbaik 'Best Management Practices' (BMPs)


Best Management Practices (BMPs) at construction sites

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Site condition select

this credit is not attempted

Exceeds MASMA by 25% select

Complies with MASMA? select


Rainwater Management calculation

percentile based on calculator


90th 44.80 mm

Site area - m2

no run-off scenario (simplicity calculation) - worst case


site area x percentile
90th - m3

small storm hydrology method


land type x runoff coefficient x percentile rainfall depth water volume managed on-site

water
Runoff volume percentile depth/ management
areas basis of calculation unit LID/GI
(Rv) rainfall depth capacity capacity (m3)
area*depth

roof areas - 0.9 - - to RG


rain garden (RG) - 0.15 - m - evapotranspiration
LS crusher - 0.15 - m - infiltration
RWH roof water capture (from RWH - 0.9 - 18.00 reuse
permeable roadways 0.15 - m - infiltration
permeable surface parking 0.15 - m - infiltration
sidewalk 0.9 - - to RG
other green areas (mainly turf) 0.15 - m - evapotranspiration
-
excess area (from site area) - OK - m3 18.00 m3
total water managed 0.00% Not complied
Not complied
or OSD sizing (PATH 2)
Code Summary NOT COMPLIED

sample
small storm hydrology method
land type x runoff coefficient x percentile rainfall depth water volume managed on-site

water
Runoff volume percentile depth/ management
areas basis of calculation unit LID/GI
(Rv) rainfall depth capacity capacity (m3)
area*depth

roof areas 680.39 0.9 27.43 - - to RG


rain garden (RG) 267.00 0.15 1.79 Surface area x average depth (0.45) 0.4500 m 120.15 evapotranspiration
LS crusher 686.00 0.15 4.61 Surface area x Void space percentage (0.45) x average depth (0.1) 0.0450 m 30.87 infiltration
RWH roof 204.12 0.1 0.91 RWH Tank (min 30% roof coverage capacity) 18.00 reuse
permeable roadways 0.15 - Surface area x Void space percentage (0.2) x Depth of water (0.001) - m - infiltration
permeable surface parking 300.00 0.15 2.02 Surface area x Void space percentage (0.2) x Depth of water (0.001) - m - infiltration
sidewalk - 0.9 - - to RG
other green areas (mainly turf) 0.15 - Surface area x Soil depth (0.2) x Water holding capacity by volume (0.1) 0.0200 m - evap
2,137.50
excess area 454.58 36.77 m3 169.02 m3

GDS Master site


02 230420
www.cesb.my
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

1.2.1 Keperluan minimum ‘building envelope’ (pengaliran haba)


Building envelope minimum requirement (heat conduction)
1.2.2 Memperbaiki ‘building envelope’ untuk bangunan sediada
Enhanced building envelope for existing building

Project type - <1,000m2 APPLICABLE FOR ALL PROJECT TYPES

Comply with 1.2.1 u-values, 1.2.3 SC2 criteria

Credit Narration / Commitment / Deviation statement


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Computed Overall Thermal Transfer Value (OTTV) no result W/m2 FAILED


Criteria not met, consider adding

Skylight? NO
Computed Roof Thermal Transfer Value (RTTV) N/A W/m2 PASSED

lightweight Roof U-Value lightweight 0.54 W/m2K


heavyweight heavyweight 0.22 W/m2K

Area of Air-conditioned space - EMS NOT REQUIRED


Provision of Energy Management Control System ? YES
Nos EMS points 0 nos

Code Summary NOT COMPLIED

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
0

FAÇADE CONSTRUCTION MATERIALS

A Opaque Walls (main façade)

1 External Walls Claybrick wall + Aluminium panel Colour White Solar absorptivity (a) 0.3

Item Material/Surfaces Thickness T. Conductivity T. Resistance


(m) K Value R Value
(W/mk) (m2k/W)
External Surface 0.040
1 #DIV/0!
2 #DIV/0!
3 #DIV/0!
4 #DIV/0!
insert wall cross section for reference
5 #DIV/0!
6 #DIV/0!
7 #DIV/0!
8 #DIV/0!
Internal surface 0.130
0.000 Total R #DIV/0!
U Value #DIV/0! W/m2K

C GLAZING SELECT MAIN fenestration, refer Gen Info


Thickness U-value SC VLT
(m) W/m2K SC %
0 0 0 0 0

ROOF CONSTRUCTION MATERIALS

A Opaque roof (main roof)

1 main roof

Item Material/Surfaces Thickness T. Conductivity T. Resistance


(m) K Value R Value
(W/mk) (m2k/W)
External Surface 0.040
1 #DIV/0!
2 #DIV/0!
3 #DIV/0!
4 #DIV/0!
insert wall cross section for reference
5 #DIV/0!
6 #DIV/0!
7 #DIV/0!
8 #DIV/0!
Internal surface 0.130
0.000 Total R #DIV/0!
U Value #DIV/0! W/m2K

C SKYLIGHT
Thickness U-value SC VLT
(m) W/m2K SC %
0 0 0 0

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out ~select~


[OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
1 0
Code Summary KM NOT COMPnot started
Code Summary BP NOT COMPnot started
Code Summary CCC NOT COMP 30-Dec-99

1.2.3 Pengurangan kenaikan haba daripada radiasi solar secara langsung


Heat gain reduction from direct solar radiation

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE


L = Window length
This calculator is set for 1 block only. Key in the necessary input for the blocks. If additional block is required, click on the 'LINK' at bottom page. HP = Horizontal Projection / Protrusion
How to: HP = Horizontal projection
1. prepare all façade based on orientation.
Y = distance between top of fenestration to HP
2. If the building is cylindrical, assume 8 sides and use projection to determine elevation.
3. calculate the façade area.
4. review windows and identify if there are any extruded projections or if the windows are recessed.
5. calculate the windows area. Z = Height of window
6. Determine WWR for each façade
7. enter the lenghts HP for Z, Y, and VP for L to determine SC2

Building No 1 select Nos. façade 0


Typical Floor to Floor height 0.00

WINDOW-TO-WALL RATIO & SHADING COEFFICIENT CALCULATION


1 2

North Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win area HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections YES 22 2.0 1 44 N/A 0 0.1 0.0 0.00 0.00 0.00 1.00 1.00 1 1.00 0.00 22.00 0.00 1.00 1.00 0.00 1.00 44.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

44.00
total wall area 0.0 0.0
total window/glass area 0.0 44 window area must be similar to façade calculation
N WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) 0.00 < 0.7 - COMPLIED

North East Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win area HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0 0.0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 1.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

#DIV/0!
total wall area 0.0 0.0
total window/glass area 0 0 window area must be similar to façade calculation
NE WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

East Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win area HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0 0.0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

#DIV/0!
total wall area 0.0 0.0
total window/glass area 0.0 0 window area must be similar to façade calculation
E WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

South East Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
win width height (z) win area HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) win area x SC1 SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0.0 0.0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0.0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0.0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 4 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 5 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 6 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 7 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 8 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 9 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 10 NO 0.0 0.0 0 0 N/A 0 0.0 0 0.00 0.00 0.00 1.00 1.00 0 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

0.00
total wall area 0.0 0.0
total window/glass area 0.00 0 window area must be similar to façade calculation
SE WWR 0.0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

South Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0 0.0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

#DIV/0!
total wall area 0.0 0.0
total window/glass area 0 0 window area must be similar to façade calculation
S WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

South West Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0 0.0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

#DIV/0!
total wall area 0.0 0.0
total window/glass area 0 0 window area must be similar to façade calculation
SW WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

West Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0 0.0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! 0.00 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 0.60 0.00 0 0.00 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

0.00
total wall area 0.0 0.0
total window/glass area 0 0 window area must be similar to façade calculation
W WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

North West Facade not applicable

insert Horizontal Projection fenestration area qty win ht 0 0.2 0.4 0.6 0.8 1 1.2 avg from General info
glass type
width Height win area HP Z Y R1n R1y R1y1 SC +y SC -y R1-y R1 VP L R2n R2 R1+R2 Eggcrate? SC2(obs) SC1(glass) SC(all) Uf
fenestration with no projections NO 0 0.0 1 0 N/A 0 0 0.0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0.0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 4 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 4 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 1 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 2 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 3 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 4 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00
façade type 4 NO 0.0 0.0 0 0 N/A 0 0 0 #DIV/0! #DIV/0! 0.00 #DIV/0! 1.00 #DIV/0! #DIV/0! 0.00 0.00 0.00 1.00 #DIV/0! 0.00 #DIV/0! #DIV/0! 0 #DIV/0! 0
1.00 Err:504 0.00 0.00 0.00 0.00 0.00

#DIV/0!
total wall area 0.0 0.0
total window/glass area 0 0 window area must be similar to façade calculation
NW WWR 0% #DIV/0! #DIV/0! #DIV/0! SC (weighted average) #DIV/0! #DIV/0! #DIV/0!

Code Summary wall area WWR SC area weighted average


North Facade not applicable 0.00 0% 0% - - 0.0
North East Facade not applicable 0.00 0% 0% - 0 0.0
East Facade not applicable 0.00 0% 0% - - 0.0
South East Facade not applicable 0.00 0% 0% - 0 0.0

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0

-
MAIN ORIENTATION select

OTTV 15 α ( 1 - WWR ) Uw + 6 ( WWR ) Uf + ( 194 x CF x WWR x SC )

N 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 0.9 x - x 0.00 )


= 0.00 + 0.00 + 0.00
= 0 n/a

NE 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 1.09 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
= 0.00 n/a

E 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 1.23 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
= 0 n/a

SE 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 1.13 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
= 0.00 n/a

S 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 0.92 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
= 0 n/a

SW 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 0.9 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
= 0.00 n/a

W 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 0.94 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
= 0 n/a

NW 15 0.3 ( 1 - - ) #DIV/0! + 6 ( - ) 0.00 + ( 194 x 0.9 x 0.00 x #DIV/0! )


= 0.00 + 0.00 + 0.00
0.00 n/a

OTTV AREA OTTV AREA


OTTV x Wall Area = N 0.00 0.00 NE 0.00 0.00
E 0.00 0.00 SE 0.00 0.00
S 0.00 0.00 SW 0.00 0.00
W 0.00 0.00 NW 0.00 0.00 0.00

= - / wall area
OTTV = #DIV/0! ### 50 W/m2
#DIV/0!

RTTV = [ ((Ar x Ur x Tdeq) ) + ( (As x Us x ΔT ) + ( As x SC x SF ] / Ao

= [ 0 x #DIV/0! x 24 ) + ( 0 + - x 5 ) + ( 0 x 0 x 323 ] / 0
#DIV/0! + 0 + 0

RTTV #DIV/0! ### 25 W/m2


NO SKYLIGHT #DIV/0!
DBKL LCB Checklist Submittals

A OTTV CALCULATION

Project # 0
Project -
Date 8-Aug-23
Operator AF

Transfer Value
U-value (Uw /
Window Area

(SC=SC1xSC2)
Façade Area

Window-to-

Uf) W/m2.k
Orientation

Orientation
Absorption

Factor (CF)

Coefficient

Coefficient
Correction

coefficient
Constants

Factor (α)

wall ratio

Thermal
Building
Shading

Shading

Shading
1-WWR

Glazing
(WWR)

Overall

(OTTV)
(A) m2

(A) m2

(SC1)

(SC2)
Solar
Elevation Floor Level A x OTTV

1 S 1 1,023.00 581.00 15.00 0.30 0.57 0.43 #REF! n/a n/a n/a n/a #REF! #REF!
1 W 1 711.00 - 15.00 0.30 - 1.00 #REF! n/a n/a n/a n/a #REF! #REF!
Heat Conduction through
[ 15α (1-WWR) Uw ]

1 N 1 1,260.00 991.00 15.00 0.30 0.79 0.21 #REF! n/a n/a n/a n/a #REF! #REF!
opaque surfaces

1 E 1 488.00 158.00 15.00 0.30 0.32 0.68 #REF! n/a n/a n/a n/a #REF! #REF!
1 Select - - 15.00 - 0 1.00 2.89 n/a n/a n/a n/a - -
1 Select - - 15.00 - 0 1.00 2.89 n/a n/a n/a n/a - -
1 Select 15.00 - 0 1.00 2.89 n/a n/a n/a n/a - -
1 Select 15.00 - 0 1.00 2.89 n/a n/a n/a n/a - -

Total Wall OTTV #REF!

1 S 1 1,023.00 581.00 6.00 n/a 0.57 n/a n/a n/a n/a n/a - -
Heat Conduction through glazed

1 W 1 711.00 - 6.00 n/a - n/a 3.23 n/a n/a n/a n/a - -


1 N 1 1,260.00 991.00 6.00 n/a 0.79 n/a n/a n/a n/a n/a - -
[ 6 (WWR) Uf ]

1 E 1 488.00 158.00 6.00 n/a 0.32 n/a 3.23 n/a n/a n/a n/a 6.27 3,062.04
surfaces

1 Select 0 - - 6.00 n/a 0 n/a 4.60 n/a n/a n/a n/a - -


1 Select 0 - - 6.00 n/a 0 n/a 4.60 n/a n/a n/a n/a - -
1 Select 0 - - 6.00 n/a 0 n/a 4.60 n/a n/a n/a n/a - -
1 Select 0 - - 6.00 n/a 0 n/a 4.60 n/a n/a n/a n/a - -

Total Window OTTV 3,062.04


Select
N 1 S 1 1,023.00 581.00 194.00 n/a 0.57 n/a n/a 0.92 0.66 Err:509 Err:509 Err:509 Err:509
Solar Heat Gain through glazed

S 1 W 1 711.00 - 194.00 n/a - n/a n/a 0.94 0.66 #DIV/0! #REF! #REF! #REF!
[ 194 x CF x WWR x SC ]

E 1 N 1 1,260.00 991.00 194.00 n/a 0.79 n/a n/a 0.90 0.66 Err:509 Err:509 Err:509 Err:509
W 1 E 1 488.00 158.00 194.00 n/a 0.32 n/a n/a #REF! 0.66 Err:509 #REF! #REF! #REF!
surfaces

NE 1 Select 0 - - 194.00 n/a 0 n/a n/a n/a 0.66 - - - -


SE 1 Select 0 - - 194.00 n/a 0 n/a n/a n/a 0.66 - - - -
NW 1 Select 0 - - 194.00 n/a 0 n/a n/a n/a 0.66 - - - -
SW 1 Select 0 - - 194.00 n/a 0 n/a n/a n/a 0.66 - - - -

Total Solar Heat Gain Err:509

Overall Building OTTV 3,482.00 #REF! #REF!


#REF!

Opaque
surface (α) 0.3

glass
SC1 0.66

glass U-value 4.6

wall U-value 2.89

building SC2 0.00

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
- ~select~
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

1.2.4 Memaksimumkan zon pencahayaan siang


Maximized daylighting zone

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
NLA 0
Daylit areas required 0 50.0%

Sky angle 1.57 90


Color of internal space bright 0.8

Any use of strategies to assist daylight coverage into interior spaces No


If yes, please list down stratgies

glass U-value 1.00 glass VLT 0.50


Obstruction 1.00 Maintenance f 1.00

Insert Main spaces only comply 1-3.5 DF performance criteria


Space name quantity room length room depth room height room area room surface avg. SR Window area (m2) DF Status
1 0 0 0.00 0.00% fail 0
2 0 0 0.00 0.00% fail 0
3 0 0 0.00 0.00% fail 0
4 0 0 0.00 0.00% fail 0
5 0 0 0.00 0.00% fail 0
6 0 0 0.00 0.00% fail 0
7 0 0 0.00 0.00% fail 0
8 0 0 0.00 0.00% fail 0
9 0 0 0.00 0.00% fail 0
10 0 0 0.00 0.00% fail 0
11 0 0 0.00 0.00% fail 0
12 0 0 0.00 0.00% fail 0
13 0 0 0.00 0.00% fail 0
14 0 0 0.00 0.00% fail 0
15 0 0 0.00 0.00% fail 0
16 0 0 0.00 0.00% fail 0
17 0 0 0.00 0.00% fail 0
18 0 0 0.00 0.00% fail 0
19 0 0 0.00 0.00% fail 0
20 0 0 0.00 0.00% fail 0
0 0 0.00 0.00% fail 0
select row above, copy+paste to add rows manually needed.

total area considered - 0 of NLA


room count 0 total area complied DF 1-3.5 - 0% <50% - not complied
Not complied

Code Summary NOT COMPLIED

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0

-
Code Summary KM #VALUE! not started
Code Summary BP #VALUE! not started
Code Summary CCC #VALUE! not started

1.2.5 Menggalakkan penggunaan pengudaraan semulajadi.


To encourage the use of natural ventilation

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

1 Minimum ventilation rate complied to ASHRAE 62.1 ? YES


YES
NO Cross ventilation for corridors & public spaces provided? YES

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

[OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0


0
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

1.3.1 Pelaksanaan penuaian air hujan


Implementation of rainwater harvesting

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Keperluan Minimum
Skala kecil Banglo/ Semi-D 3m3
Terrace units 1m3/unit
Skala besar

Keperluan Pengemukaan
Projek akan mereka bentuk SPAH berdasarkan garis panduan NAHRIM YES 0

Jumlah kegunaan air sasaran (L/yr) - L/yr


Jumlah air tuaian SPAH - #DIV/0!

Kadar pengurangan yang dicapai #DIV/0!

JPIF requirement read


Demand requiremet read
RWH Tank provided read

Anggaran Hujan 5628.76


Station Sg Besi Month mm
Lat Lat.: 3° 05' N JAN 371
Long Long.: 101° 7' E FEB 305
Ht abv S.L Ht. above M.S.L.: 8.5 m MAR 324
Period 2013 APR 465
MAY 339
JUNE 20
JUL 153
AUG 193
SEPT 250
OCT 342
NOV 290
DEC 528
Annual (m) 3,580

Jenis Bangunan Kaw. bumbung 0 m2

Jumlah tingkat select Kaw. Lain 0 m2


Jenis penuaian bumbung shj Jumlah kaw. tadahan 0 m2
kawasan tadahan sebenar 0 m2

Run-off Co-eff 0

Est. collectable water per annum - Litre/yr


0 m3

Penggunaan SPAH annual est. % demand


Total Water Use (Washrooms) 0.00 0.0%
WC flushing 0.00
Total Water use common areas 0.00 0.0%
WC flushing 0.00
Total irrigation (22 days watering in a month) 0.00 0.0%
Swimming Pool make up water 0.00 0.0%
Reflective pond make up water 0.00 0.0%
car washing 0.00 0.0%
waste bin cleaning 0.00 0.0%
pantry and barbeque 0.00 0.0%
general cleaning 0.00 0.0%
Lain-lain state usage 0.00 0.0%
Jumlah keseluruhan 0.00 Liter/yr
Kapasiti yang menggunakan air hujan - 0% 0

Air cukup untuk penuaian TIDAK 0% Review water demand vs. captured capacity
Potensi penggunaan air hujan untuk RWH #DIV/0! 0%

Kuantiti keperluan harian - Liter/day


Kuantiti harian (jika hujan) - Liter/day
Jumlah hari simpanan 0 hari
Jumlah kuantiti simpanan - L
Saiz tangki diperlukan - m3 insufficient to comply JPIF requirement

panjang lebar tinggi


0 0 0
Saiz tangki disediakan 0 m3 insufficient to comply JPIF requirement
Kuantiti tangki simpanan - L
Kuantiti nominal - L 0%
Not complied
Calculator output
Hari tangki penuh 365 100%
Hari tangki <1hari kapasiti 0 0%
Hari tangki <10% kapasiti 0 0%
make up wtr L Hari tangki kosong 365 100%

Hari tanpa hujan 134 37%

Code Summary NOT COMPLIED

DATA MASUKDapatkan data setahun dari MET Malaysia, dan copy&paste.


0.2

volume tank start use in house

1 0.0 - - - - - - TOP UP -
2 6.4 - - - - - - - -
3 0.0 - - - - - - - -
4 70.0 - - - - - - - -
5 1.0 - - - - - - - -
6 1.4 - - - - - - - -
7 0.0 - - - - - - - -
8 0.0 - - - - - - - -
9 0.0 - - - - - - - -
10 0.0 - - - - - - - -
11 0.4 - - - - - - - -
12 0.0 - - - - - - - -
13 4.2 - - - - - - - -
14 4.8 - - - - - - - -
15 0.6 - - - - - - - -
16 1.4 - - - - - - - -
17 0.8 - - - - - - - -
18 1.0 - - - - - - - -
19 0.0 - - - - - - - -
20 25.2 - - - - - - - -
21 0.0 - - - - - - - -
22 0.0 - - - - - - - -
23 30.4 - - - - - - - -
24 90.2 - - - - - - - -
25 103.0 - - - - - - - -
26 0.0 - - - - - - - -
27 16.6 - - - - - - - -
28 13.8 - - - - - - - -
29 0.0 - - - - - - - -
30 0.0 - - - - - - - -
31 0.0 - - - - - - - -
1 28.4 - - - - - - - -
2 0.0 - - - - - - - -
3 1.6 - - - - - - - -
4 1.6 - - - - - - - -
5 0.0 - - - - - - - -
6 7.4 - - - - - - - -
7 4.4 - - - - - - - -
8 10.4 - - - - - - - -
9 0.0 - - - - - - - -
10 0.0 - - - - - - - -
11 0.0 - - - - - - - -
12 2.4 - - - - - - - -
13 1.6 - - - - - - - -
14 9.6 - - - - - - - -
15 0.0 - - - - - - - -
16 13.8 - - - - - - - -
17 12.8 - - - - - - - -
18 65.8 - - - - - - - -
19 0.2 - - - - - - - -
20 24.2 - - - - - - - -
21 51.6 - - - - - - - -
22 0.0 - - - - - - - -
23 1.0 - - - - - - - -
24 30.4 - - - - - - - -
25 7.2 - - - - - - - -
26 4.4 - - - - - - - -
27 26.0 - - - - - - - -
28 0.0 - - - - - - - -
29 0.0 - - - - - - - -
1 0.0 - - - - - - - -
2 0.2 - - - - - - - -
3 0.0 - - - - - - - -
4 0.0 - - - - - - - -
5 0.0 - - - - - - - -
6 0.0 - - - - - - - -
7 24.0 - - - - - - - -
8 0.0 - - - - - - - -
9 22.4 - - - - - - - -
10 44.8 - - - - - - - -
11 39.0 - - - - - - - -
12 64.8 - - - - - - - -
13 0.0 - - - - - - - -
14 0.4 - - - - - - - -
15 3.6 - - - - - - - -
16 0.3 - - - - - - - -
17 19.2 - - - - - - - -
18 0.2 - - - - - - - -
19 0.3 - - - - - - - -
20 4.0 - - - - - - - -
21 14.4 - - - - - - - -
22 20.8 - - - - - - - -
23 0.3 - - - - - - - -
24 6.6 - - - - - - - -
25 6.0 - - - - - - - -
26 0.0 - - - - - - - -
27 10.2 - - - - - - - -
28 18.8 - - - - - - - -
29 14.6 - - - - - - - -
30 9.2 - - - - - - - -
31 12.8 - - - - - - - -
1 5.8 - - - - - - - -
2 1.0 - - - - - - - -
3 0.0 - - - - - - - -
4 0.3 - - - - - - - -
5 6.3 - - - - - - - -
6 1.3 - - - - - - - -
7 0.0 - - - - - - - -
8 15.8 - - - - - - - -
9 48.2 - - - - - - - -
10 12.2 - - - - - - - -
11 6.4 - - - - - - - -
12 3.0 - - - - - - - -
13 0.3 - - - - - - - -
14 0.0 - - - - - - - -
15 0.0 - - - - - - - -
16 10.0 - - - - - - - -
17 0.0 - - - - - - - -
18 1.2 - - - - - - - -
19 0.4 - - - - - - - -
20 56.2 - - - - - - - -
21 66.4 - - - - - - - -
22 3.2 - - - - - - - -
23 101.0 - - - - - - - -
24 0.3 - - - - - - - -
25 27.6 - - - - - - - -
26 0.0 - - - - - - - -
27 0.8 - - - - - - - -
28 78.0 - - - - - - - -
29 6.6 - - - - - - - -
30 1.0 - - - - - - - -
1 0.4 - - - - - - - -
2 68.0 - - - - - - - -
3 1.2 - - - - - - - -
4 103.8 - - - - - - - -
5 37.4 - - - - - - - -
6 84.0 - - - - - - - -
7 2.2 - - - - - - - -
8 0.0 - - - - - - - -
9 0.0 - - - - - - - -
10 0.0 - - - - - - - -
11 0.0 - - - - - - - -
12 0.0 - - - - - - - -
13 0.6 - - - - - - - -
14 1.0 - - - - - - - -
15 0.0 - - - - - - - -
16 1.0 - - - - - - - -
17 0.4 - - - - - - - -
18 0.2 - - - - - - - -
19 0.3 - - - - - - - -
20 0.0 - - - - - - - -
21 0.0 - - - - - - - -
22 0.0 - - - - - - - -
23 7.6 - - - - - - - -
24 2.0 - - - - - - - -
25 0.3 - - - - - - - -
26 8.4 - - - - - - - -
27 6.6 - - - - - - - -
28 1.4 - - - - - - - -
29 1.8 - - - - - - - -
30 9.2 - - - - - - - -
31 0.0 - - - - - - - -
1 0.2 - - - - - - - -
2 0.0 - - - - - - - -
3 0.2 - - - - - - - -
4 2.8 - - - - - - - -
5 0.3 - - - - - - - -
6 4.4 - - - - - - - -
7 0.3 - - - - - - - -
8 8.8 - - - - - - - -
9 0.0 - - - - - - - -
10 1.2 - - - - - - - -
11 0.0 - - -

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

4 0.3 - - - - - - - -
5 0.0 - - - - - - - -
6 0.0 - - - - - - - -
7 0.6 - - - - - - - -
8 24.6 - - - - - - - -
9 24.4 - - - - - - - -
10 0.3 - - - - - - - -
11 0.3 - - - - - - - -
12 24.6 - - - - - - - -
13 0.3 - - - - - - - -
14 0.0 - - - - - - - -
15 23.6 - - - - - - - -
16 4.0 - - - - - - - -
17 0.4 - - - - - - - -
18 0.0 - - - - - - - -
19 0.0 - - - - - - - -
20 0.0 - - - - - - - -
21 0.0 - - - - - - - -
22 0.0 - - - - - - - -
23 0.0 - - - - - - - -
24 0.0 - - - - - - - -
25 9.8 - - - - - - - -
26 0.0 - - - - - - - -
27 0.0 - - - - - - - -
28 3.4 - - - - - - - -
29 0.0 - - - - - - - -
30 0.0 - - - - - - - -
31 0.0 - - - - - - - -
1 0.0 - - - - - - - -
2 0.0 - - - - - - - -
3 0.0 - - - - - - - -
4 0.0 - - - - - - - -
5 0.0 - - - - - - - -
6 0.4 - - - - - - - -
7 0.0 - - - - - - - -
8 0.0 - - - - - - - -
9 0.0 - - - - - - - -
10 2.6 - - - - - - - -
11 22.2 - - - - - - - -
12 0.3 - - - - - - - -
13 0.0 - - - - - - - -
14 0.3 - - - - - - - -
15 6.4 - - - - - - - -
16 0.3 - - - - - - - -
17 0.4 - - - - - - - -
18 29.8 - - - - - - - -
19 0.0 - - - - - - - -
20 0.0 - - - - - - - -
21 84.8 - - - - - - - -
22 0.3 - - - - - - - -
23 0.0 - - - - - - - -
24 0.3 - - - - - - - -
25 0.3 - - - - - - - -
26 0.3 - - - - - - - -
27 0.3 - - - - - - - -
28 0.3 - - - - - - - -
29 4.8 - - - - - - - -
30 38.4 - - - - - - - -
31 88.6 - - - - - - - -
1 2.0 - - - - - - - -
2 29.6 - - - - - - - -
3 19.8 - - - - - - - -
4 40.8 - - - - - - - -
5 0.0 - - - - - - - -
6 10.2 - - - - - - - -
7 0.8 - - - - - - - -
8 4.4 - - - - - - - -
9 0.3 - - - - - - - -
10 7.8 - - - - - - - -
11 0.0 - - - - - - - -
12 2.4 - - - - - - - -
13 16.2 - - - - - - - -
14 0.0 - - - - - - - -
15 0.0 - - - - - - - -
16 0.0 - - - - - - - -
17 0.0 - - - - - - - -
18 0.0 - - - - - - - -
19 0.3 - - - - - - - -
20 0.0 - - - - - - - -
21 0.0 - - - - - - - -
22 0.0 - - - - - - - -
23 0.0 - - - - - - - -
24 0.0 - - - - - - - -
25 16.0 - - - - - - - -
26 0.2 - - - - - - - -
27 0.0 - - - - - - - -
28 10.6 - - - - - - - -
29 0.0 - - - - - - - -
30 0.0 - - - - - - - -
1 0.2 - - - - - - - -
2 3.0 - - - - - - - -
3 0.0 - - - - - - - -
4 0.4 - - - - - - - -
5 0.0 - - - - - - - -
6 0.0 - - - - - - - -
7 0.0 - - - - - - - -
8 0.0 - - - - - - - -
9 118.0 - - - - - - - -
10 0.0 - - - - - - - -
11 1.6 - - - - - - - -
12 0.0 - - - - - - - -
13 0.4 - - - - - - - -
14 0.3 - - - - - - - -
15 0.0 - - - - - - - -
16 3.6 - - - - - - - -
17 12.2 - - - - - - - -
18 26.6 - - - - - - - -
19 0.0 - - - - - - - -
20 10.6 - - - - - - - -
21 0.6 - - - - - - - -
22 15.0 - - - - - - - -
23 0.0 - - - - - - - -
24 0.4 - - - - - - - -
25 0.0 - - - - - - - -
26 4.4 - - - - - - - -
27 6.8 - - - - - - - -
28 0.3 - - - - - - - -
29 37.2 - - - - - - - -
30 100.2 - - - - - - - -
31 4.4 - - - - - - - -
1 14.4 - - - - - - - -
2 9.0 - - - - - - - -
3 21.6 - - - - - - - -
4 17.8 - - - - - - - -
5 4.4 - - - - - - - -
6 1.8 - - - - - - - -
7 2.2 - - - - - - - -
8 9.4 - - - - - - - -
9 30.4 - - - - - - - -
10 1.2 - - - - - - - -
11 7.2 - - - - - - - -
12 3.6 - - - - - - - -
13 56.6 - - - - - - - -
14 0.3 - - - - - - - -
15 29.6 - - - - - - - -
16 6.2 - - - - - - - -
17 12.8 - - - - - - - -
18 7.8 - - - - - - - -
19 13.2 - - - - - - - -
20 0.0 - - - - - - - -
21 0.0 - - - - - - - -
22 0.0 - - - - - - - -
23 0.0 - - - - - - - -
24 14.2 - - - - - - - -
25 0.4 - - - - - - - -
26 12.6 - - - - - - - -
27 6.4 - - - - - - - -
28 0.4 - - - - - - - -
29 2.2 - - - - - - - -
30 7.2 - - - - - - - -
1 22.4 - - - - - - - -
2 15.6 - - - - - - - -
3 0.3 - - - - - - - -
4 88.6 - - - - - - - -
5 5.0 - - - - - - - -
6 0.4 - - - - - - - -
7 0.0 - - - - - - - -
8 20.0 - - - - - - - -
9 24.8 - - - - - - - -
10 1.2 - - - - - - - -
11 11.4 - - - - - - - -
12 18.6 - - - - - - - -
13 1.6 - - - - - - - -
14 0.0 - - - - - - - -
15 0.0 - - - - - - - -
16 0.0 - - - - - - - -
17 0.0 - - - - - - - -
18 38.0 - - - - - - - -
19 7.6 - - - - - - - -
20 33.0 - - - - - - - -
21 32.6 - - - - - - - -
22 44.2 - - - - - - - -
23 21.8 -

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
0
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

1.3.2 Penjimatan penggunaan air terawat


Savings on the use of treated water
1.3.3 Meningkatkan penggunaan air secara efisyen di bangunan sedia ada
Increase the use of water in existing buildings

Project type - <1,000m2 NOT APPLICABLE FOR ALL PROJECT TYPES

KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Reduction by Water Efficient Fittings 0% FAILED

Occupancy 0 pax Dual flush use total use 0 Occupancy Type select
Full 0.0 L Urinal/Low flush 0
Gender Split Male 50% Low 0.0 L full flush 0 Annual occupancy days 0 days/yr
Female 50%
sensor taps Flow duration reduction sensor Ablution? % Male urinals 0% No urinals

Muslim 0% metered 0% metered 0.167


sensors 0% infrared 0.117 0% People using bidet 100%

Included? FTE Set Uses per Day Adjusted Baseline Uses Per day Adjusted Design Uses Per day Flowrates (l/min or l/use) Flow Duration (mins/use) Litres/use Water Use (l/yr) eff

Male Female Male Female Male Female Baseline Design Baseline Design Baseline Design Baseline Design RWH?
Pantry Taps NO 1.00 1.00 1.00 1.00 1.00 1.00 6.00 0.00 0.25 0.25 1.50 0.00 - -
Washbasin Taps NO 0.00 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.25 0.25 1.50 0.00 - -
Toilets Single Flush NO 0.00 0.00 0.00 0.00 0.00 1 0.00 -
Toilets Dual Flush NO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 1 0.00 0.00 - -
Urinals NO 0.00 0.00 0.00 0.00 0.00 0.00 0.50 0.00 1 1 0.50 0.00 - -
Bidets/Bidet Spray NO 0.00 0.00 0.00 1.00 0.00 1.00 6.00 0.00 0.15 0.15 0.90 0.00 - -
Showers NO 0.02 0.02 0.02 1.00 0.02 1.00 9.50 0.00 5 5 47.50 0.00 - -
Ablution Fixtures NO 2.00 1.80 0.00 0.00 0.00 0.00 6.00 0.00 1.5 1.50 9.00 0.00 - -
- -

Bathroom Taps 0.00 0.00 0.00 0.00 0.00 0.00 0.25 0.25 Reduction 0%
Adjusted Bathroom Taps 0 0.00 0.00 0.00 0.00 0.00 0.00 0.25 0.25
Bathroom Tap Ablution Flow Duration 1.50 RWH Contribution -
RWH Available - ok
Volume/ Volume/ Overall Effective
Toilet Use Ratio Male Design Use Volume/ use Volume/ day Female Design Use
use day Volume

Design Low Flush 0 0.0 0.0 0 0.0 0.0 #DIV/0! Reduction with RWH Contribution 0%
Full Flush 0 0.0 0 0 0.0 0
Baseline Low Flush 0 4.0 0.0 0 4.0 0.0 #DIV/0! Total potable water Reduction (+RWH contribution) 0%
Full Flush 0 6.0 0 0 6.0 0

Code Summary Not complied

Plumbing Fixture or Fixture Fitting Flowrate Units Reference Pressure


Bathroom Taps, private 6.0 litres/min 413.7 kilopascals
Bathroom Taps, public 1.9 litres/min 413.7 kilopascals
Shower Head 9.5 litres/min 551.6 kilopascals
Kitchen Sink Faucet 6.0 litres/min 413.7 kilopascals
Urinal 0.5 litres per flushing cycle
Toilet (Full Flush) 6.0 litres per full flushing cycle
Toilet (Low Flush) 4.0 litres per low flushing cycle
Bidets / Bidet Sprays 6.0 litres/min 413.7 kilopascals
Ablution Taps 6.0 litres/min 413.7 kilopascals

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
0
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

1.3.4 Penggunaan semula bahan binaan untuk projek pembangunan semula


Reuse of building materials for redevelopment projects

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

New - Non-residential <1,000m2


Credit Narration / Commitment
KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
GFA (excl. ancilliary buildings) -

REUSED MATERIALS FOUND ON SITE


Any materials found on site being reused in the project?
what is the percentage estimate? PATH 1 0.00%
PATH 2 0.00%

PATH 1 : Maintaining existing walls, floors and roof


List all existing structural elements first.
Structure/Envelope Element Exisiting Area Reused Area % avg
0% -
0% -
0% -
0% -
0% -
0% -
select row above and add rows (copy+insert) manually if needed.
total - - -

0% <15% - not complied


Not complied

PATH 2 : Reuse or salvage existing materials


Structure/Envelope Element Quantity Unit comparison comparison % cost reference
0% - 0
0% - 0
0% - 0
0% - 0
select row above and add rows (copy+insert) manually if needed.
total - - - - -

Est. material cost -

0% <15% - not complied


Not complied

Code Summary Not Complied

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

2.1.1 Penyaman udara cekap tenaga


Energy efficient air conditioning system
2.1.2 Penukaran kepada penyaman udara cekap tenaga
Conversion to energy efficient air conditioning

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

Complex criteria shall be based on self-declaration, Was the requirement achieved?


not complied

Please complete the following section, where relevant, to demonstrate compliance


For 100% Natural Ventilation
for building design with 100% Natural Ventilation, commit to providing 5-star rating fans.
not applicable

Project is 100% NV, where comfort is concerned, forced ventilation shall be provided (e.g. ceiling fans) that complies to EE requirement

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

2.2.1 Sistem pencahayaan cekap tenaga


Energy efficient lighting
2.2.2 Penukaran kepada pencahayaan cekap tenaga
Conversion to energy efficient lighting

Project type - <1,000m2 APPLICABLE FOR THIS PROJECT TYPES

###
Credit Narration / Commitment
KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
GFA (excl. anc -
NLA -
Lux level compliance to MS - 90.0% /GFA

Lighting provision
Space name level room length room depth room height room area MS LPD Designed LDP MS Lux Designed Lux are in compliance to MS
m m m m2 W/m2 W/m2 lx lx m2
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
0 0.00 ok 0 ok 0
select row above and Copy and insert rows manually if needed.

room count 0 total area considered - 0


0% insufficient, please add more space
areas in compliance to MS 0% <90% - not complied
Not complied
Sensor provision
if space has both photo and motion sensor, select motion sensior. photo Motion Area

select row above and Copy and insert rows manually if needed.
Individual switch for individual space, not exceeding 100m2

Photo sensors for all parameter zones and daylit areas


Areas connected to Photo sensor

Motion sensors to complement lighting zoning for at least 25% NLA


Areas connected to Motion sensor
0% <25% - not complied

Not complied

Code Summary NOT COMPLIED

w/m2 lux
1
Bathroom 6 150
Bedroom 5 100
15
Class room, library, reading area 500
Corridor, passageways, 5 stairs 100
Detailed and precise 60
work 2000
Drawing office 14 400
Entrance and exit 5 100
Entrance hall, lobbies,5waiting room 100
Escalator, travellator 6 100
Exacting drawing 40 1000
12and stores, reading
General offices, shops 400 and writing
Guard house 8 200
Infrequent reading and8 writing 200
Inquiry desk 11 300
5
Interior walkway and car-park 100
Kitchen 11 300
Lift interior 5 100
Lounge 6 150
3
Minimum service illuminance 20
Museum and gallery 11 300
Proof reading 18 500
8
Restaurant, canteen, cafeteria 200
Restroom 6 150
Retail 224 750
5
Staff changing room, locker 100 room, cloak room, lavatories, stores.
and cleaner

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

2.3.1 Pemasangan sistem tenaga boleh baharu


Installation of renewable energy system

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

NO Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
Total roof area -
slope roof area (>9deg) -
flat roof area (<9deg) -
green roof area -
equipment area on roof -

areas not considered for solar PV (equipment, greenery, etc) -

available roof area - -


ineffective roof area (due to overshadowing)

effective roof area - m2 -

PV panel coverage provided m2 -


0% <30% - not complied
Not complied

What is the total kWp? kWp


What is the total energy required for the building - see BEI -

Proposed energy generation possible kWh


amounting to potential energy offset by %

YES
Code Summary NOT COMPLIED

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM #VALUE! not started
Code Summary BP #VALUE! not started
Code Summary CCC #VALUE! not started

2.3.2 Perlaksanaan Net Energy Metering (NEM) untuk sistem Solar Panel (PV - Photo Voltaic)
Implementation of Net Energy Metering (MET) for Solar Panel (PV-Photo Voltaic) Systems

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

NO Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
GFA (excl. ancilliary buildings) -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -
-

Total Building Energy - kWh/yr


Total RE yeild - kWh/yr
#DIV/0! %

The project commits to the following:


The project will be registered to advance energy metering upon CCC?
Select net energy meter solution (NEM or Selco)

#VALUE!
#VALUE!
#VALUE!

Code Summary #VALUE!

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM #VALUE! not started
Code Summary BP #VALUE! not started
Code Summary CCC #VALUE! not started

2.3.3 Pengiraan BEI (Building Energy Index) bangunan hijau rendah karbon
BEI (Building Energy Index) calculation for low-carbon green buildings.

Project type - <1,000m2 APPLICABLE FOR THIS PROJECT TYPES

NO Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
GFA (excl. ancilliary buildings) -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -
-
Floor Vacancy Rate (FVR)

Estimated total energy per year kWh/yr - tCO2e/yr


Estimated BEI - kWh/m2/yr

The project commits to the following:


The project will be registered to BeDOS system?
Commit to energy (BEI) reporting via BeDOS system?

#VALUE!
#VALUE!
#VALUE!

Code Summary #VALUE!

Carbon reduction estimation

Baseline BEI 250 kWh/m2/yr


est. baseline kWh - kWh/yr - tCO2e/yr

energy reduction - kWh/yr


carbon reduction equivalent - tCO2e/yr

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
0
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

4.1.1 Pengurusan Sisa Domestik yang mampan


Sustainable Domestic Waste Management

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks: ,,

DURING BUILDING OCCUPANCY


3R Bins
Will there be permanent recycling (3R) Bins? 0
Apart from providing the colored (3R) Bins, bin for general waste is provided?
Location of (3R) Bins are indiated on plans?

Bin Center
Purpose group select
Project type

total area (m2) 0


estimated waste generation m3
1
SWCorp estimation #VALUE! m3

Bin center is sized to SWCorp standard?


Collection areas have adequate vehicular access for hauling?

capacity of bin center provided m3 #VALUE!


#VALUE!

Bin Center - sorting and recycling


There is an area in the bin center cor sorting of recyclables?
Will there be any labelling provided to indicate and educate the 3R initiative?

Bin Center area m2


Additional area of the bin center dedicated for sorting of recyclables m2
Total bin center size provided 0 m2
0%
Additional area provided sufficient NO

Building waste management plan (BWMP)


A BWMP is being provided to the project?
The BWMP shall be enforced and maintained by the project?

#VALUE!
not complied
Not complied

Code Summary NOT COMPLIED

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

4.2.1 Sistem Pengurusan Tenaga (BEMS – Building Energy Management System)


BEMS – Building Energy Management System

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

NO Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
GFA (excl. ancilliary buildings) -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -
-

The project will use EMS to monitor and analyse energy consumption
The EMS will be housed inside a dedicated space
EMS includes Maximum Demand Limiting programme

An alternative method is proposed for consideration ?

#VALUE!
not complied
Not complied

Code Summary NOT COMPLIED

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
-
Code Summary KM #VALUE! not started
Code Summary BP #VALUE! not started
Code Summary CCC #VALUE! not started

4.2.2 Pengumpulan data bangunan pintar dan pusat


Smart and central building data collection

Project type - <1,000m2 NOT APPLICABLE FOR THIS PROJECT TYPE

NO Credit Narration / Commitment


KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

m2
GFA (excl. ancilliary buildings) -

NFA/NLA (assumed 70%) -


Nett air-conditioned area -
-

The project commits to the following:


The project will be registered to BeDOS system?
The EMS data shall be shared with the BeDOS system and shall be maintained

#VALUE!
#VALUE!
#VALUE!

Code Summary #VALUE!

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023
DBKL LCB Checklist Submittals

Gen Info Checklist plan out [OSC (X) X8 888888-888 (X8 X88 888888)] pindaan 0
0
Code Summary KM NOT COMPLI not started
Code Summary BP NOT COMPLI not started
Code Summary CCC NOT COMPLI not started

4.2.3 Manual Penggunaan Bangunan Hijau


Green building user manual

Project type - <1,000m2 APPLICABLE FOR THIS PROJECT TYPES

off- 4
Credit Narration / Commitment
KM Stage - PSP Remarks:

BP Stage - PSP Remarks:

CCC Stage - PSP Remarks:

KM stage BP stage CCC


The Applicant commits to document all LCBC features & strategies
for user information and guide to sustain performance during occupancy.

A Building User Manual, which documents passive and active features


that should not be downgraded shall be provided.

Project to confirm that all the criteria under the LCBC sustainability code shall be fulfill for the project
and will be made available to the building owner in order to maintain the performance as approved.

Planning Scope
Kod 1 - Rekabentuk Pasif
Kod 3 - Komponen Rendah Karbon

Building Scope
Kod 1 - Rekabentuk Pasif
Kod 2 - Rekabentuk Aktif
Kod 4 - Komponen Rendah Karbon

#VALUE! not complied


Not complied

Code Summary NOT COMPLIED

DBKL LCB Checklist


CREATIVE ENVIRONMENTS/mGBC 2023

You might also like