Incoming Material Inspection Report: Tata Projects Limited

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TATA PROJECTS LIMITED

EPCC-05 PACKAGE MS BLOCK


(NSU+NHT+PENEX+FUEL GAS SYSTEM UNITS); + GATE 1A + GATE BS-VI + CONTROL ROOM + OCTAMAX UNIT, LuPech Project of
M/s IOCL GUJARAT REFINERY, VADODARA

INCOMING MATERIAL INSPECTION REPORT


Owner : Indian Oil Corporation Limited Format No. : LuPech(J-18)/EPCC05/TPL/GENERAL/FORMAT/01 Rev. 00
PMC : Technip Energies Report No. : TPL/MSEC/IOCL/01 Sheet : 1 of 1
Contractor : TATA Projects Limited. Date: : 6-2-2024
L R No : P.O No. :
Vehicle No : GJ06 BT5721
Transporter : SELF

Sl. SOR Item Date of Quantity Quantity MTC No. / IRN No.
Material Description /Tag No. Unit Manufacture /Vendor Heat / Batch No. Ref. Invoice / Challan No. Remarks
No. No. Receipt Received Accepted With Date / Field, Lab

WELDING ELECTRODE D & H SECHERON 2024/E-8179/1 E0529138179 DT: NTI/0015


1 N/A 02-Jun-24 PKT 32 32
Ø 3.15 MM X 350 LONG ELECTRODES LTD. DT:15-05-2024 14-05-2024 DT: 27-05-2024

WELDING ELECTRODE D & H SECHERON 2024/E-6937 E0129126937 DT: NTI/0015


2 N/A 02-Jun-24 PKT 16 16
Ø 2.5 MM X 350 LONG ELECTRODES LTD. DT:16-01-2024 09-01-2024 DT: 27-05-2024

WELDING ELECTRODE D & H SECHERON 2024/E-7582 E0329127582 DT: NTI/0015


3 N/A 02-Jun-24 PKT 12 16
Ø 2.5 MM X 350 LONG ELECTRODES LTD. DT: 04-05-2024 15-03-2024 DT: 27-05-2024

REMARKS:

TPL-STORE/ FE TPL-QA/QC TPIA PMC/OWNER

Signature

Name

Date

Page 1 of 1