ADC BLASTING & PAINTING SUBCONTRACTOR RATES

ODC SUBCONTRACTOR TARIFF- 2020 Page 1 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

01 GENERAL TANKS CLEANING FOR INSPECTION

1) F.O.TANK 1) STAGING S TO BE EXTRA

A) OPEN/CLOSE MANHOLE PC 1) CLEANING FOR HOT WORKS: 100 UP OF PRICE.

B) FULL CLEANING 3) PARTIAL CLEANING : CASE BY CASE

UP TO 20 CUB.M/TANK TANK

UP TO 50 CUB.M/TANK CUB.M

UP TO 100 CUB.M/TANK CUB.M

OVER 100 CUB.M/TANK CUB.M

2) BALLAST WATER TANK

A) OPEN/CLOSE MANHOLE PC

B) CLEANING

UP TO 200 CUB.M/TANK CUB.M

UP TO 500 CUB.M/TANK CUB.M

UP TO 1,000 CUB.M/TANK CUB.M

UP TO 1,500 CUB.M/TANK CUB.M

3) FRESH WATER TANK

A) OPEN/CLOSE MANHOLE PC

B) CLEANING

UP TO 50 CUB.M TANK

UP TO 300 CUB.M CUB.M

UP TO 500 CUB.M CUB.M

C) WASH DOWN BY F.W CUB.M

D) WASH CEMENTING M2

E) COATING WITH OWNER'S PAINTING M2/COAT

02 HULL SIDE SHELL PAINTING - CONVENTIONAL PAINT

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

HARD SCRAPING M2

LIGHT SCRAPPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

GRIT BLASTING

SWEEPING M2

SA1.0 M2

ODC SUBCONTRACTOR TARIFF- 2020 Page 2 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING BY CONVENTIONAL PAINT PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

TOUCH UP FOR SPC (UP TO 150 MIC DFT) M2/COAT

TOUCH UP FOR SPC (UP TO 200 MIC DFT) M2/COAT

FULL COAT FOR SPC (UP TO 150 MIC DFT) M2/COAT

FULL COAT FOR SPC (UP TO 200 MIC DFT) M2/COAT

PAINTING BY SILICON PAINT PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

* MASKING & PROTECTION FOR SILICON PAINT SHIP

* SCUPPER PLUGGING AND HULL MASKING/PROTECTION FOR


PAINTING WORK

GROSS TONNAGE UP TO

5,000 SHIP

10,000 SHIP

30,000 SHIP

50,000 SHIP

80,000 SHIP

100,000 SHIP

150,000 SHIP

200,000 SHIP

250,000 SHIP

* HULL MARK REPAINTING

GROSS TONNAGE UP TO

10,000 SHIP

30,000 SHIP

50,000 SHIP

100,000 SHIP

150,000 SHIP

200,000 SHIP

210,000 SHIP

* FUNNEL MARK REPAINTING SHIP STAGING TO BE EXTRA.

ODC SUBCONTRACTOR TARIFF- 2020 Page 3 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

* COMPANY NAME REPAINTING LETTER

* RUDDER TRUNK CLEANING AND COATING TRUNK BASED ON SHIP G/T 56K: 90 M2

03 CARGO HOLD PAINTING

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

04 DECK PAINTING

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

ODC SUBCONTRACTOR TARIFF- 2020 Page 4 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

RAG CLEANING M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PROTECTION AND CLEANING

BELOW 2,000 M2 BLASTING AREA SHIP

OVER 2,000 M2 (BLASTING AREA X UNIT PRICE) M2

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

NON-SKID COATING M2/COAT

05 ACCOMMODATION & SUPER STRUCTURE PAINTING

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

MASKING AND PROTECTION JOB

NO SMOKING AND IMO SIGN MARKING & REPAINTING JOB

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

ODC SUBCONTRACTOR TARIFF- 2020 Page 5 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

06 FUNNEL PAINTING

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

MASKING AND PROTECTION JOB

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

* FUNNEL MARK REPAINTING SHIP STAGING TO BE EXTRA.

07 HATCH COVER PAINTING (BASED ON SHORE WORK)

REMOVAL/REFIT OF HATCH COVER/PACKING TO BE


* HATCH COVER (OUTSIDE)
EXTRA.

HIGH PRESSURE WASHING WORK IN PLACE : 30 PCT UP.

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

ODC SUBCONTRACTOR TARIFF- 2020 Page 6 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

* HATCH COVER (INSIDE)

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2 ""

SA2.0 M2 ""

SA2.5 M2 ""

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

* HATCH COVER PACKING WAY

HIGH PRESSURE WASHING

UP TO 200 BAR M

UP TO 400 BAR M

UP TO 600 BAR M

UP TO 1000 BAR M

WASH DOWN M

SCRAPING M

ODC SUBCONTRACTOR TARIFF- 2020 Page 7 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

CHIPPING M

DISC GRINDING M

WIRE BRUSH M

CHEMICAL CLEANING M

THINNER CLEANING M THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M

GRIT BLASTING

SA1.0 M

SA1.5 M ""

SA2.0 M ""

SA2.5 M ""

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M/COAT

TOUCH UP (UP TO 200 MIC DFT) M/COAT

FULL COAT (UP TO 150 MIC DFT) M/COAT

FULL COAT (UP TO 200 MIC DFT) M/COAT

* HATCH COAMING TOP PLATE

HIGH PRESSURE WASHING

UP TO 200 BAR M

UP TO 400 BAR M

UP TO 600 BAR M

UP TO 1000 BAR M

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M

SCRAPING M

CHIPPING M

DISC GRINDING M

WIRE BRUSH M

CHEMICAL CLEANING M

THINNER CLEANING M THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M

GRIT BLASTING

SA1.0 M

SA1.5 M

SA2.0 M

SA2.5 M

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M/COAT

TOUCH UP (UP TO 200 MIC DFT) M/COAT

FULL COAT (UP TO 150 MIC DFT) M/COAT

FULL COAT (UP TO 200 MIC DFT) M/COAT

08 BALLAST TANK PAINTING

ODC SUBCONTRACTOR TARIFF- 2020 Page 8 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

CLEANING OF TANK TO BE EXTRA.


STAGING M3
PROTECTION/MASKING TO BE EXTRA.

FULL HIGH PRESSURE WASHING BASED ON FULL TANK CAPACITY

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

FULL GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

SPOT GRIT BLASTING UP TO 40%

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

SPOT GRIT BLASTING UP TO 60% CLEANING OF DISTURB AREA TO BE EXTRA.

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PARTIAL GRIT BLASTING (CEILING PART)

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PARTIAL GRIT BLASTING (BOTTOM PART)

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

ODC SUBCONTRACTOR TARIFF- 2020 Page 9 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

FULL COAT (UP TO 200 MIC DFT) M2/COAT

09 CARGO TANK PAINTING

CLEANING OF TANK TO BE EXTRA.


STAGING M3
PROTECTION/MASKING TO BE EXTRA.

FULL HIGH PRESSURE WASHING BASED ON FULL TANK CAPACITY

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

FULL GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

SPOT GRIT BLASTING UP TO 40%

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

SPOT GRIT BLASTING UP TO 60%

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PARTIAL GRIT BLASTING (CEILING PART)

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PARTIAL GRIT BLASTING (BOTTOM PART)

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING PAINT TO BE SUPPLIED BY OWNER.

ODC SUBCONTRACTOR TARIFF- 2020 Page 10 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

ZINC SYSTEM

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

STRIPE COAT M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

EPOXY SYSTEM

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

STRIPE COAT M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

STRIPE COAT M2/COAT

MASKING AND PROTECTION MANHOUR

PROTECTION OF ANODES MANHOUR

PROTECTION OF HEATING COILS ( during blasting/ removal post


MANHOUR
blasting and cover again for painting)

10 A.P.T/VOID/COFFERDAM/SMALL TANKS PAINTING

FULL HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

POWER TOOLING M2

CHEMICAL CLEANING M2

THINNER CLEANING M2

RAG CLEANING M2

FULL GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

SPOT GRIT BLASTING UP TO 40%

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

ODC SUBCONTRACTOR TARIFF- 2020 Page 11 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

SPOT GRIT BLASTING UP TO 60%

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PARTIAL GRIT BLASTING (CEILING PART)

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PARTIAL GRIT BLASTING (BOTTOM PART)

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

STRIPE COAT M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

MASKING AND PROTECTION MANHOUR

PROTECTION OF ANODES MANHOUR

PROTECTION COVERING OF ADJACENT AREAS DURING


MANHOUR
PARTIAL BLASTING AND PAINTING

11 ANCHOR AND ANCHOR CHAIN

RANGING DOWN AND CLEANING

GROSS TONNAGE UP TO

5,000 SHIP

10,000 SHIP

30,000 SHIP

50,000 SHIP

100,000 SHIP

150,000 SHIP

200,000 SHIP

250,000 SHIP

SHOT MARKING (RED+WHITE REMARKING WITH CANVAS AND


SUS BAND)

GROSS TONNAGE UP TO

5,000 SHIP

10,000 SHIP

30,000 SHIP

50,000 SHIP

100,000 SHIP

ODC SUBCONTRACTOR TARIFF- 2020 Page 12 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

150,000 SHIP

200,000 SHIP

250,000 SHIP

CHAIN COATING WITH BITUMINOUS PAINT

GROSS TONNAGE UP TO

5,000 SHIP

10,000 SHIP

30,000 SHIP

50,000 SHIP

100,000 SHIP

150,000 SHIP

200,000 SHIP

250,000 SHIP

BLASTING AND PAINTING OF ANCHOR MANHOUR

BLASTING OF ANCHOR CHAIN MANHOUR

PAINTING OF ANCHOR CHAIN (Additional time for flip over and


MANHOUR
manual painting in between shackles)

12 CHAIN LOCKER

CHAIN LOCKER CLEANING

5,000 LOCKER

10,000 LOCKER

30,000 LOCKER

50,000 LOCKER

100,000 LOCKER

150,000 LOCKER

200,000 LOCKER

250,000 LOCKER

CHAIN LOCKER JET WASHING 200 BAR

5,000 LOCKER

10,000 LOCKER

30,000 LOCKER

50,000 LOCKER

100,000 LOCKER

150,000 LOCKER

200,000 LOCKER

250,000 LOCKER

CHAIN LOCKER STAGING

5,000 LOCKER

10,000 LOCKER

30,000 LOCKER

ODC SUBCONTRACTOR TARIFF- 2020 Page 13 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

50,000 LOCKER

100,000 LOCKER

150,000 LOCKER

200,000 LOCKER

250,000 LOCKER

CHAIN LOCKER COATING PAINT TO BE SUPPLIED BY OWNER.

5,000 LOCKER

10,000 LOCKER

30,000 LOCKER

50,000 LOCKER

100,000 LOCKER

150,000 LOCKER

200,000 LOCKER

250,000 LOCKER

CHAIN LOCKER GRIT BLASTING SA2.0

5,000 LOCKER

10,000 LOCKER

30,000 LOCKER

50,000 LOCKER

100,000 LOCKER

150,000 LOCKER

200,000 LOCKER

250,000 LOCKER

13 SEA CHEST

SEA CHEST CLEANING AND COATING PAINT TO BE SUPPLIED BY OWNER.

GROSS TONNAGE UP TO

5,000 SET

10,000 SET

30,000 SET

50,000 SET

100,000 SET

150,000 SET

200,000 SET

250,000 SET

SEA CHEST CLEANING, BLASTING AND COATING PAINT TO BE SUPPLIED BY OWNER.

GROSS TONNAGE UP TO

5,000 SET

10,000 SET

30,000 SET

50,000 SET

ODC SUBCONTRACTOR TARIFF- 2020 Page 14 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

100,000 SET

150,000 SET

200,000 SET

250,000 SET

14 ACCOMMODATION LADDER BLASTING & COATING SET

15 BOW THRUSTER TUNNEL BLASTING & COATING SET

16 LOG STANCHION REMOVE AND BLASTING, COATING PC

17 MAIN DECK CRANE

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

ULTRA HIGH PRESSURE WATER JETTING JW2 STANDARD M2 MACHINE SUPPLIED BY SUBCONTRACTOR

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

THINNER CLEANING M2 THINNER TO BE SUPPLIED BY SHIP-OWNER.

RAG CLEANING M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

MASKING AND PROTECTION JOB

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

20 OUT FITTING / SKY LIGHT PREPARE & BLASTING, COATING MANHOUR

21 MISC ITEMS BLASTING AND PAINTING in blasting area MANHOUR

22 STRUCTURAL STEEL PROJECTS

HIGH PRESSURE WASHING

ODC SUBCONTRACTOR TARIFF- 2020 Page 15 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

WASH DOWN M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

GRIT BLASTING

SA1.0 M2

SA1.5 M2

SA2.0 M2

SA2.5 M2

PAINTING BY CONVENTIONAL PAINT PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

23 TURBO CHARGER ASH BLASTING

VTR 160 - 320 OR SIMILAR SET BASED ON ENGINE CYLINDER BORE

VTR 500 OR SIMILAR SET ""

VTR 630 OR SIMILAR SET ""

VTR 750 OR SIMILAR SET ""

VTR 900 OR SIMILAR SET ""

24 ENGINE ROOM TREATMENT HIGH PRESSURE WASHING

HIGH PRESSURE WASHING

UP TO 200 BAR M2

UP TO 400 BAR M2

UP TO 600 BAR M2

UP TO 1000 BAR M2

WASH DOWN M2

SCRAPING M2

CHIPPING M2

DISC GRINDING M2

WIRE BRUSH M2

CHEMICAL CLEANING M2

RAG CLEANING M2

MASKING AND PROTECTION MANHOUR

PAINTING PAINT TO BE SUPPLIED BY OWNER.

TOUCH UP (UP TO 150 MIC DFT) M2/COAT

TOUCH UP (UP TO 200 MIC DFT) M2/COAT

FULL COAT (UP TO 150 MIC DFT) M2/COAT

FULL COAT (UP TO 200 MIC DFT) M2/COAT

ODC SUBCONTRACTOR TARIFF- 2020 Page 16 of17


ADC SUBCONTRACTOR TARIFF
COST
NO DESCRIPTION UNIT REMARKS
(USD)

ENGINE ROOM BULKHEAD CLEANING M2

ENGINE ROOM BILGE CLEANING M2

25 PIPES BLASTING SA2.5 AND 1 COAT OWNER PAINT

UP TO 3'' PIPES M2 ADD COAT $0.23/M2/COAT

4'' TO 6'' PIPES M2 ADD COAT $0.22/M2/COAT

8'' TO 16''PIPES M2 ADD COAT $0.20/M2/COAT

ABOVE 16''PIPES M2 ADD COAT $0.19/M2/COAT

26 PLATES AND LOOSE ITEM OWNER PAINT

PLATES AND LOOSE ITEM BLASTING SA2.5 AND 1 COAT M2 ADD COAT $0.20/M2/COAT

ODC SUBCONTRACTOR TARIFF- 2020 Page 17 of17