THE ATTENTION OF THE OWNER/ENGINEER SHALL BE CALLED IN WRITING. 6. SHOP PAINTING FOR STRUCTURAL STEEL SHALL BE RUST INHIBITIVE PRIMER WITH MINIMUM D.F.T. OF 2.0 MILS. COLUMN FLANGE
CONCRETE AND REINFORCEMENT 7. TOUCH-UP PAINTING: APPLY PAINT TO EXPOSED AREAS IN MANNER SATISFACTORY TO THE ENGINEER WITH SAME 50mm THK. CONCRETE TOPPING
150 50
IDENTIFICATION AND ASSEMBLY OF ALL BUILDING COMPONENTS. THESE DRAWINGS
MAX. SIZE OF WILL SHOW ANCHOR BOLT SETTING, PRIMARY SECONDARY, AND ROOF FRAMING, CONNECTOR PLATE (SHEAR)
LOCATION STRENGTH MAX. SLUMP AND NECESSARY INSTALLATION DETAILS. SUBMIT SHOP DRAWINGS FOR APPROVAL (COLUMN TO COLUMN CONNECTION)
AGGREGATES
BEFORE FABRICATION.
a. SLAB ON GRADE, 3000 PSi (20.685 Mpa) 1 in. (25mm) 4 in. (100mm) STEEL DECK TYPE 4 GA 20
CURBS, PAVEMENTS, 10. APPLICATION OF FIRE PROOFING SYSTEM IS REQUIRED FOR ALL STRUCTURAL CONNECTOR PLATE (MOMENT)
WALL FOOTING STEEL MEMBERS. PROVIDE 2 HOUR MINIMUM FIRE RATING. REFER TO
I - BEAM
ARCHITECTURAL AND MECHANICAL PLANS FOR ADDITIONAL FIRE PROOFING
b. GRADE BEAM, 4000 PSi (27.580 Mpa) 3/4 in. (19mm) 4 in. (100mm)
50
REQUIREMENTS.
SUSPENDED SLAB
FILLET FULL WELD
ON STEEL DECK FOUNDATION
FOUNDATIONS, PEDESTALS
1. FOUNDATION IS DESIGNED BASED ON NATIONAL BUILDING CODE OF THE PHILIPPINES FOR AN ALLOWABLE
3. ALL REINFORCING BARS SHALL CONFORM TO PNS 49 GRADE 275 SOIL BEARING CAPACITY OF 96 KPa.
FOR 12mm Ø AND SMALLER BARS AND GRADE 415 FOR 16mm Ø AND LARGER BARS.
2. FOUNDATION SHALL REST ON NATURAL SOIL, UNLESS OTHERWISE NOTED BY
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING 30 100 30 300
THE ENGINEER, NO PART OF THE FOUNDATION SHALL REST ON FILL.
REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: 3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER UPON COMPLETION OF FOUNDATION EXCAVATION FOR ACTUAL SOIL
CONDITIONS WHICH DO NOT CONFORM TO THE SOIL BEARING CAPACITY FOR PROPER REVISION.
CONCRETE DEPOSITED DIRECTLY AGAINST GROUND 75 mm
MASONRY WALLS
SUSPENDED SLABS 20 mm
SLAB ON GRADE 40 mm 1. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE W/ THE APPLICABLE STANDARD
& SPECIFICATIONS OF THE STRUCTURAL CODE OF THE PHILIPPINES & UNIFORM BUILDING CODE.
WALLS ABOVE GRADE 25 mm
2. MORTAR & GROUT FOR ALL CONCRETE MASONRY SHALL CONFORM TO ASTM 270 - TYPE N &
2 TYPICAL BEAM TO COLUMN CONNECTION 1 NTS
BEAMS & COLUMNS 40 mm SHALL HAVE A MINIMUM OF 28 DAYS STANDARD CYLINDER COMPRESSIVE STRENGTH OF 17.5 MPa (2500 PSi).
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN ACCORDANCE 3. ALL CHB SHALL BE LAID OUT WITH THE CELLS IN UNOBSTRUCTED VERTICAL CONTINUITY.
WITH TABLE 1 (TABLE OF LAP SPLICE AND ANCHORAGE LENGHT) UNLESS OTHERWISE SHOWN ON ALL CELLS ESPECIALLY THOSE WITH REINFORCEMENT SHALL BE FILLED WITH MORTAR.
DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE.
4. REINFORCEMENT, AS TABULATED BELOW SHALL BE PROVIDED UNLESS OTHERWISE SPECIFIED IN THE PLAN.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED AND
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 5. ALL MASONRY WALLS SHALL BE PROVIDED W/ STIFFENER BEAM BLOCK & STIFFENER AS REQUIRED.
COLUMN FLANGE
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENTS,
5.a. FOR HIGH WALLS & EVERY 3000 mm & COLUMN (BOLT) AT 3000 mm ON CENTER. 50mm THK. CONCRETE TOPPING
AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL
DRAWINGS. 5.b. FOR DOORS & WINDOWS OPENING PROVIDE LINTEL BEAM SAME AS STIFFENER BEAM BLOCK. 150mm THK. CONCRETE SLAB 20mm THK. CONCRETE PLASTERING
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS IMMEDIATELY
AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER CHB REINFORCEMENTS FFL
150 50
APPROVED METHODS. BLOCK REINFORCEMENT 50mm THK. CONNECTOR PLATE (SHEAR)
NOTES (COLUMN TO COLUMN CONNECTION)
10. STRIPPING OF FORMS AND SHORES:
THICKNESS (mm) HORIZONTAL VERTICAL
STEEL DECK TYPE 4 GA 20
CONCRETE CURING
FOUNDATION 24 HRS. 20mm THK. CONNECTOR PLATE (MOMENT)
50
PEDESTALS, COLUMNS, WALLS 2 DAYS FILLET FULLY WELDED
CONCRETE HOLLOW 4 - 12 mm Ø
BEAMS 21 DAYS BLOCKS
250
11. DEVELOPMENT LENGTH FOR ALL BARS SHALL BE A MINIMUM OF 60 BAR DIAMETER, UNLESS OTHERWISE NOTED.
NOTE:
CONCRETE
10 mm Ø STIRRUPS
COLUMN / PEDESTAL 4000 PSi STAIRS 4000 PSi SLAB ON GRADE 3000 PSi @ 200 mm O.C.
30 30 400
BEAM / GRADE BEAM 4000 PSi FOUNDATION/FOOTING 4000 (PSi) WALL FOOTING 3000 PSi
SUSPENDED SLAB 4000 PSi RETAINING WALL 4000 PSi STIFFENER BEAM BLOCK STIFFENER COLUMN
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-01 21
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 01 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
2 - 16mm Ø
5 - 16mm Ø
TOP BARS
400 400 TOP BARS 500 500
STIRRUPS 12mmØ
STIRRUPS 12mmØ
1 @ 50, 4 @ 100,
1 @ 50, 4 @ 100,
REST @ 200 Bf
REST @ 200
STEEL COLUMN ( SEE SCHEDULE)
12-20mmØ VERTICAL BARS 3-SETS
12mmØ TIES, 1 @ 50mm, 3 @ 75mm,
REST @ 125mm 8-25mmØ x 600mm
LONG ANCHOR BOLT ( A-36 )
500
500
tf
2 - 12mm Ø 2 - 12mm Ø 12mm THK STIFFENER PLATE
WEB BARS MIDSPAN SUPPORT WEB BARS
2-16mm Ø
500
500
5-16mm Ø
D
BOTTOM BARS
BOTTOM BARS 25mm TGK 500mm x 500mm BASE PLATE
20 MM THK tw
MOMENT PLATE
D = tf =
I - COLUMN Bf = tw =
(SEE SCHEDULE)
3200
GROUND FLOOR LEVEL ( SEE SCHEDULE ) MAIN BOTTOM BARS COLUMN FLR. MARK
NGL D Bf tf tw
VERIFY
6" THICK CHB WALL C-1 ( WF18 x 60 ) 462.28 192.02 17.65 10.54
NGL
GROUND
FLOOR
600
D
w/ 2-16mmØ TOP & 12-20mmØ VERTICAL BARS 2-SETS B-5 ( WF12 x 26 ) 309.88 164.85 9.65 5.84
BOTTOM BARS, 12mmØ 12mmØ TIES, 1 @ 50mm, 3 @ 75mm,
L
REST @ 150mm
VERIFY
STIRRUPS 1 @ 50,
8 @ 80, REST @ 150
C-1 ( WF18 x 60 ) 462.28 192.02 17.65 10.54
D
SECOND FLOOR
GRADE BEAM (GB) 2B-1 ( WF16 x 57 ) 416.56 180.85 18.16 10.92
250mm x 400mm w/ 2-16mmØ TOP & TOP BARS
BOTTOM BARS, 12mmØ STIRRUPS 1 2B-2 ( WF16 x 45 ) 408.94 178.82 14.35 8.76
@ 50, 9 @ 80, REST @ 125mm B MAIN BOTTOM BARS
B
PLAN 50mm THK LEAN CONCRETE 2B-3 ( WF16 x 36 ) 403.86 177.55 10.92 7.50
SECTION
150mm THK PLAIN CEMENT 2B-4 ( WF16 x 26 ) 398.78 139.7 8.76 6.35
t
CONCRETE (1:2:3)
THIRD FLOOR
STEEL BEAM
D
MOMENT PLATE
50 mm THK 3B-3 ( WF16 x 45 ) 408.94 178.82 14.35 8.76
I - COLUMN GRAVEL BEDDING
L
T
SILA GROUT 214 (70 mPA)
500mm x 500mm x 20mm THK
BASE PLATE w/ 8-25mmØ x 600mm
LONG ANCHOR BOLT (A-36)
PEDESTAL 408.94 178.82 14.35 8.76
C-2 ( WF16 x 45 )
600
FOURTH FLOOR
4B-1 ( WF16 x 57 ) 416.56 180.85 18.16 10.92
VERIFY
SECTION
6" THICK CHB WALL
NGL 4B-2 ( WF16 x 50 ) 414.02 179.58 16.00 9.65
S C H E D U L E O F R . C . F O O T I N G S
600
LOWER DECK
250mm x 400mm w/ 2-16mmØ TOP &
BOTTOM BARS, 12mmØ STIRRUPS 1
@ 50, 9 @ 80, REST @ 125mm 5B-2 ( WF16 x 50 ) 414.02 179.58 16.00 9.65
S C H E D U L E O F R . C . B E A M S
5B-3 ( WF16 x 45 ) 408.94 178.82 14.35 8.76
S T E E L R E I N F O R C E M E N T WEB BAR
150mm THK PLAIN CEMENT
B H REBAR STIRRUPS
t
CONCRETE (1:2:3) BEAM SIZE 5B-4 ( WF16 x 26 ) 398.78 139.7 8.76 6.35
LEFT SUPPORT MIDSPAN RIGHT SUPPORT
MARK
5B-5 ( WF12 x 26 ) 309.88 164.85 9.65 5.84
(mm) (mm) (mm) TOP BARS BOT. BARS TOP BARS BOT. BARS TOP BARS BOT. BARS (mm) SPACING (START @, 1@50)
B=L
F-1 250 400 16 2 2 2 2 2 2 12 1 @ 50, 8 @ 80, REST @ 150mm O.C.
FOOTING TIE BEAM AND GRADE BEAM 3 TYPICAL FOOTING DETAILS 4 SCHEDULE OF BEAMS NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-02 22
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 02 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
10mmØ HORIZONTAL AND
LINK BARS @ 300mm O.C.
B-1 B-1
CONTINUITY PLATE, SAME
200
THICKNESS OF BEAM FLANGE
600 600
12mmØ TOP AND BOTTOM
REBARS @ 200mm O.C.
250
B-1
B-1
3500
3100
600
600
1 CORBEL / STEEL DECKING DETAIL NTS
200
500
B-1 B-1
PLAN
8100
200 5000 200 2500 200
FTB (SEE SCHEDULE)
200
16mmØ VERTICAL BARS @ 250mm w/
12mmØ HORIZONTAL BARS @ 250mm
2550
3050
150mm THK PLAIN CEMENT 12mmØ REBARS @ 250mm O.C. BOTHWAYS
CONCRETE ( 1 : 2 : 3 )
300
300
1100 100mm THK LEAN CONCRETE ( 1 : 2 : 3 )
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-03 23
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 03 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
400
400
400
400
400
WF 16 x 45
WF 18 x 60
CONTINUITY PLATE
SAME THICKNESS OF BEAM FLANGE
250
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-04 24
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 04 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
26800 200 53800
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
F FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
25300
FORPHASEII C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
C2-F2 C2-F2 C2-F2
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
A C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
FTB-1
C2-F2 C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
FTB-1
C2-F2 C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
FTB-1
C2-F2
KEYPLAN
SCALE 1:500M
6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
5000
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
5000
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
5000
25300
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
C2-F2 C2-F2
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
A FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-05 25
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 05 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
26800 200 53800
C1
GB-1 / 6" CHB GB-1 GB-1 / 6" CHB
C1
GB-1 / 6" CHB C1 GB-1 / 6" CHB C1 GB-1 / 6" CHB GB-1 GB-1 / 6" CHB
C1 C1
GB-1
C1
GB-1 / 6" CHB C1 GB-1 / 6" CHB C1 GB-1 C1
GB-1
(PLEASE SEE ARCHITECTURAL PLAN)
4" CHB
4" CHB
-50 -50 -50 -50
WF-2 /
WF-2 /
C1 GB-1 / 4" CHB C1 GB-1 C1 GB-1 / GB-1 / GB-1 /C1 GB-1 / GB-1 C1 C1 GB-1 C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 GB-1 C1 C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 / 4" CHB C1
4" CHB
WF-2 /
4" CHB
WF-2 /
4" CHB 4" CHB 4" CHB 4" CHB
4" CHB
WF-2 / 4" CHB
WF-2 /
WF-2 / 4" CHB
GB-1
GB-1
WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB
GB-1
4" CHB WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB 4" CHB
GB-1
C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 C1 C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 C1
FORPHASEII
GB-1
WF-2 / 4" CHB
GB-1
WF-1 / 4" CHB WF-1 / 4" CHB
-50 -50
C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1 C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1 C1 GB-1 C1 C1 GB-1 C1 GB-1 C1
GB-1
4" CHB
WF-2 /
-50 -50
GB-1
GB-1 / 6" CHB
GB-1
WF-2 / LOW 4" CHB
GB-1
WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB
GB-1
WF-2 / 4" CHB WF-2 / 4" CHB
GB-1
WF-2 / 4" CHB WF-1 / 4" CHB
WF-2 /
LOW 4" CHB
LOW 4" CHB
WF-2 / LOW 4" CHB
GB-1
GB-1
WF-2 / LOW 4" CHB WF-2 / LOW 4" CHB WF-2 / LOW 4" CHB
C1 C1 C1 C1 C1 C1 C1 C1 C1
GB-1
GB-1
GB-1
GB-1
A SIDEWALK
C1
GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1 C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1 C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1
KEYPLAN
SCALE 1:500M
6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
GB-1
WF-2 / 4" CHB
WF-2 / WF-2 / 4" CHB
4" CHB
-50 -50
WF-2 /
GB-1 C1 C1 GB-1 C1 GB-1 / 4" CHB C1 GB-1 / 4" CHB C1 GB-1 C1 C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 / 4" CHB C1
E
4" CHB
WF-2 /
4" CHB
WF-2 /
125mm THK CONCRETE SLAB
GB-1
GB-1
GB-1
POLYMER
GB-1
4" CHB WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB 4" CHB
GB-1
GB-1 / 6" CHB
GB-1
WF-2 / 4" CHB
25300
POLYMER
4" CHB
WF-2 /
-50 -50
GB-1
GB-1
WF-2 / 4" CHB
GB-1
WF-2 / 4" CHB WF-2 / 4" CHB WF-2 / 4" CHB WF-1 / 4" CHB
WF-2 / LOW 4" CHB
WF-2 /
LOW 4" CHB
LOW 4" CHB
GB-1
C1 C1 C1 C1 C1
B GB-1 C1 GB-1 C1 GB-1 GB-1 C1 GB-1
GB-1
GB-1
GB-1
GB-1
POLYMER
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-06 26
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 06 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
26800 200 53800
C1 C1
C1 C1
C1 C1 C1
C1 C1 C1
FORPHASEII
WF 16 x 67
WF 16 x 67
WF 16 x 67
WF 16 x 67
B-1 B-1 B-1 B-1
B-5
B-5
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
B-5
B-5
WF 16 x 67
WF 16 x 67
WF 16 x 67
WF 16 x 67
B-1 B-1 B-1 B-1
B-5
B-5
C1 C1 C1 C1 C1 C1 C1 C1 C1
B-5
B-5
WF 16 x 67
WF 16 x 67
WF 16 x 67
WF 16 x 67
B-1 B-1 B-1 B-1
B-5
B-5
A SIDEWALK
C1
KEYPLAN
SCALE 1:500M 6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
C1 C1 C1 C1 C1 C1
F C1 C1 C1 C1 C1
WF 16 x 67
WF 16 x 67
POLYMER
5000
25300
B-1 B-1
B-5
ON FILL FULLY COMPACTED
SOIL w/ 10mmØ @ 250mm SPACED
BOTH WAYS & FIBRE REINFORCED
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
POLYMER
C B-2 B-2
B-5
WF 16 x 67
WF 16 x 67
5000
B-1 B-1
B-5
C1 C1 C1 C1 C1
B C1 C1 C1 C1 C1 C1 B-2 B-2
R A M P
B-5
WF 16 x 67
WF 16 x 67
5300
B-1 B-1
B-5
A C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 B-2 B-2 C1
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-07 27
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 07 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
26800 200 53800
C2 C2 C2 C2
C1 2B-4 C1
C1
2B-4
C2
2B-4
C2
2B-4
C1 2B-4 C1 2B-4 C1
2B-4
C2
2B-4
C2
2B-4
C1
C1 2B-4 C1
2B-4 C1 2B-4 C1 2B-4 C1
2B-3
2B-3
2B-4
2B-4
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1
2B-4
2B-4
C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1
2B-3
2B-4
2B-4
2B-3
2B-3
2B-4
2B-4
2B-3
2B-5
2B-3
2B-5
2B-3
2B-3
2B-3
2B-3
2B-4
2B-4
2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1
C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1
25300
FORPHASEII
2B-3
2B-3
2B-4
2B-4
2B-3
2B-5
2B-3
2B-3
2B-3
2B-3
2B-4
2B-4
2B-3
2B-3
2B-5
2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1
2B-4
2B-4
C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1
2B-3
2B-3
2B-5
2B-4
2B-4
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-5
2B-4
2B-4
2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1
2B-3
C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1
2B-2 2B-2
2B-4
2B-4
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1
2B-4
2B-4
A C1 2B-4 C1 2B-4 C1 2B-4 C1 2B-4 C1 C1 2B-4 C1 2B-4 C1 2B-4 C1 2B-4 C1 C1 2B-4 C1 2B-4 C1 2B-4 C1 2B-4 C1
KEYPLAN
SCALE 1:500M
5 6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
2B-3
2B-3
2B-4
2B-4
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1
5000
2B-4
C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1 C1 2B-2 C1 2B-2 C1 2B-2 C1 2B-2 C1
E
2B-3
2B-4
2B-4
2B-4
2B-4
2B-3
2B-3
2B-5
2B-3
2B-3
2B-3
2B-4
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1
5000
2B-3
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-3
2B-5
2B-4
2B-4
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1
5000
2B-4
25300
2B-3
2B-5
2B-4
2B-4
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-4
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1 2B-1
5000
2B-3
2B-4
2B-4
2B-4
2B-3
2B-3
2B-3
2B-3
2B-3
2B-3
2B-1 2B-2 2B-2 2B-1 2B-1 2B-2 2B-2 2B-1
5300
2B-4
A C1 C1 2B-4 C1 2B-4 C1 2B-4 C1 2B-4 C1 C1 2B-4 C1 2B-4 C1 2B-4 C1 2B-4 C1
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-08 28
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 08 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
26800 200 53800
C2 3B-3 C2
C2
3B-3
C2
3B-3
C2
3B-3
C2 3B-3 C2 3B-3 C2
3B-3
C2
3B-3
C2
3B-3
C2
C2 3B-3 C2
3B-3 C2 3B-3 C2 3B-3 C2
3B-4
3B-4
3B-4
3B-4
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-2 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-2
3B-4
3B-4
C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2
3B-3
3B-3
3B-4
3B-4
3B-4
3B-4
3B-5
3B-5
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-4
3B-4
3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1
C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2
25300
FORPHASEII
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-4
3B-4
3B-4
3B-4
3B-5
3B-5
3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1
3B-4
3B-4
C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-4
3B-4
3B-4
3B-4
3B-5
3B-5
3B-4
3B-4
3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1
C2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 C2
3B-2 3B-2
3B-4
3B-4
3B-4
3B-4
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
2B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 2B-1
3B-4
3B-4
A C2 3B-3 C2 3B-3 C2 3B-3 C2 3B-3 C2 C2 3B-3 C2 3B-3 C2 3B-3 C2 3B-3 C2 C2 3B-3 C2 3B-3 C2 3B-3 C2 3B-3 C2
KEYPLAN
SCALE 1:500M
5 6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
C2 C2 C2 C2
C2 C2 C2 C2 125mm THK CONCRETE SLAB w/
FIBRE REINFORCED POLYMER
ON 1.0mm THK STEEL DECKING
w/ 10mmØ REBARS @ 200mm O.C.
3B-4
3B-4
3B-4
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-2
5000
3B-4
C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2 C2 3B-2 C2 3B-3 C2 3B-3 C2 3B-2 C2
E
3B-3
3B-3
3B-4
3B-4
3B-4
3B-4
3B-5
3B-3
3B-3
3B-3
3B-3
3B-3
3B-4
3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1
5000
3B-3
3B-3
3B-3
3B-3
3B-3
3B-4
3B-4
3B-4
3B-4
3B-5
3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1
5000
3B-4
25300
3B-3
3B-3
3B-3
3B-3
3B-3
3B-4
3B-4
3B-4
3B-4
3B-5
3B-4
3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 3B-1 3B-1
5000
3B-4
3B-4
3B-4
3B-3
3B-3
3B-3
3B-3
3B-3
3B-3
3B-1 3B-3 3B-3 3B-1 3B-1 3B-3 3B-3 2B-1
5300
3B-4
A C2 C2 3B-3 C2 3B-3 C2 3B-3 C2 3B-3 C2 C2 3B-3 C2 3B-3 C2 3B-3 C2 3B-3 C2
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-09 29
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 09 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
26800 200 53800
C2 C2 C2 C2
C2 4B-3 C2
C2
4B-3
C2
4B-3
C2
4B-3
C2 4B-3 C2 4B-3 C2
4B-3
C2
4B-3
C2
4B-3
C2
C2
2B-4
4B-3 C2
4B-3 C2 4B-3 C2 4B-3 C2
4B-4
4B-4
4B-4
4B-4
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-2 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-2
4B-4
4B-4
C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2
4B-4
4B-4
4B-4
4B-4
4B-5
4B-5
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-4
4B-4
4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1
C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2
25300
FORPHASEII
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-4
4B-4
4B-4
4B-4
4B-5
4B-5
4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1
4B-4
4B-4
C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-4
4B-4
4B-4
4B-4
4B-5
4B-5
4B-4
4B-4
4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1
C2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 C2
4B-2 4B-2
4B-4
4B-4
4B-4
4B-4
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
2B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 2B-1
4B-4
4B-4
A C2 4B-3 C2 4B-3 C2 4B-3 C2 4B-3 C2 C2 4B-3 C2 4B-3 C2 4B-3 C2 4B-3 C2 C2 4B-3 C2 4B-3 C2 4B-3 C2 4B-3 C2
KEYPLAN
SCALE 1:500M
5 6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
C2 C2 C2 C2
125mm THK CONCRETE SLAB w/
FIBRE REINFORCED POLYMER
ON 1.0mm THK STEEL DECKING
w/ 10mmØ REBARS @ 200mm O.C.
4B-4
4B-4
4B-4
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-2
5000
4B-4
C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2 C2 4B-2 C2 4B-3 C2 4B-3 C2 4B-2 C2
E
4B-4
4B-4
4B-4
4B-4
4B-5
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-4
4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1
5000
4B-3
4B-3
4B-3
4B-3
4B-3
4B-4
4B-4
4B-4
4B-4
4B-5
4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1
5000
4B-4
25300
4B-3
4B-3
4B-3
4B-3
4B-3
4B-4
4B-4
4B-4
4B-4
4B-5
4B-4
4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 4B-1 4B-1
5000
4B-4
4B-4
4B-4
4B-3
4B-3
4B-3
4B-3
4B-3
4B-3
4B-1 4B-3 4B-3 4B-1 4B-1 4B-3 4B-3 2B-1
5300
4B-4
A C2 C2 4B-3 C2 4B-3 C2 4B-3 C2 4B-3 C2 C2 4B-3 C2 4B-3 C2 4B-3 C2 4B-3 C2
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-10 30
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 10 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
26800 200 53800
C2 C2 C2 C2
C2 5B-3 C2
C2 C2
5B-3
C2 C2 5B-3 C2 5B-3 C2 C2
5B-3
C2 C2
C2 5B-3 C2
5B-3 C2 5B-3 C2 5B-3 C2
5B-4
5B-4
5B-4
5B-4
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-2 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-2
5B-4
5B-4
C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2
5B-4
5B-4
5B-4
5B-4
5B-5
5B-5
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-4
5B-4
5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1
C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2
25300
FORPHASEII
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-4
5B-4
5B-4
5B-4
5B-5
5B-5
5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1
5B-4
5B-4
C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-4
5B-4
5B-4
5B-4
5B-5
5B-5
5B-4
5B-4
5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1
C2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 C2
5B-2 5B-2
5B-4
5B-4
5B-4
5B-4
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
2B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 2B-1
5B-4
5B-4
A C2 5B-3 C2 5B-3 C2 5B-3 C2 5B-3 C2 C2 5B-3 C2 5B-3 C2 5B-3 C2 5B-3 C2 C2 5B-3 C2 5B-3 C2 5B-3 C2 5B-3 C2
KEYPLAN
SCALE 1:500M
5 6 7 8 9 10 11 12 13 14 15
53800
26800 20 26800
7500 5900 5900 7500 7500 5900 5900 7500
5B-4
5B-4
5B-4
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-2
5000
5B-4
C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2 C2 5B-2 C2 5B-3 C2 5B-3 C2 5B-2 C2
E
5B-4
5B-4
5B-4
5B-4
5B-5
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-4
5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1
5000
5B-3
5B-3
5B-3
5B-3
5B-3
5B-4
5B-4
5B-4
5B-4
5B-5
5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1
5000
5B-4
25300
5B-3
5B-3
5B-3
5B-3
5B-3
5B-4
5B-4
5B-4
5B-4
5B-5
5B-4
5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 5B-1 5B-1
5000
5B-4
5B-4
5B-4
5B-3
5B-3
5B-3
5B-3
5B-3
5B-3
5B-1 5B-3 5B-3 5B-1 5B-1 5B-3 5B-3 2B-1
5300
5B-4
A C2 C2 5B-3 C2 5B-3 C2 5B-3 C2 5B-3 C2 C2 5B-3 C2 5B-3 C2 5B-3 C2 5B-3 C2
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-11 31
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 11 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
7500
7000 500
2750 11 EQ TREADS @ 250 EA=2750 1500
C8 x 13.75
1200
STAIR DETAIL PLAN
2400
LANDING
AT GROUND FLOOR C8 x 13.75
1200
TOP OF HANDRAIL
900
LOWER DECK 16
GB-1
C1 C1
C8 x 13.75
15
14
12 EQ TREADS @ 250 EA=3000 13
2500 1500 500
12
11
10
7750 9
8 75
3100
3.
7 x1
6 C8
5
C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 4
3
1- 1- 1- 1- 1- 1-
∠5 0 ∠5 0 ∠ 0 ∠ 0 ∠5 0 ∠5 0 2
∠5 0 ∠5 50 ∠5 50 ∠5 0 ∠5 ∠5
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
0 1- 1- 0
1- 1- 1- 1- 1
1- FOURTH FFL 16
0 0 0 5 0 5 0 0 ∠5
-∠
5 1- -∠
5 1- -∠
5 1-
∠5 -∠ 1-
∠5 -∠ 1-
1-
∠5 0 C8 x 13.75
15
1 ∠5 1 1 1 1 ∠5
C8 x 13.75
50 0 14
STAIR DETAIL PLAN 0
∠
0 0 C8 x 13.75
2400
13
1-
AT SECOND FLOOR 1-
∠5 5 0 ∠5 5 0
C8 x 13.75 1-
∠5
∠5
0 12
C8 x 13.75
0
C8 x 13.75
0 -∠ -∠ 0
C8 x 13.75
C8 x 13.75
1 1 1- 11
1- 10
0 0 ∠ 0 1-
5 1- 5 50 ∠5 ∠5 9
1 -∠ ∠5 1 -∠ 1- 0
8 75
3100
C8 x 13.75 0 C8 x 13.75 C8 x 13.75 C8 x 13.75 3.
7 x1
6 C8
C1 2B-4 C1 2B-4 5
4
7750 3
2
1
16
THIRD FFL
15
C8 x 13.75 14
C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75
13
1- 1- 1- 1- 1- 1-
∠5 0 ∠5 0 ∠5 0 ∠5 5 0 ∠5 0 ∠5 0 12
∠5 0 ∠5 0 -∠
5 0 -∠ 0 ∠5 ∠5
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
0 1- 0
1- 1- 1 1- 11
14300
1
10
0 0 0 0 0 0 1-
TYPICAL STAIR DETAIL PLAN 1-
∠5 1-
∠5 1-
∠5 1-
1-
∠5 1-
∠5 1 -∠
5 1-
∠5 1 -∠
5 1-
∠5 1-
∠5 ∠5
0
9
C8 x 13.75
50 0 0 8
∠
0 0
3100
C8 x 13.75
2400
0
C8 x 13.75
0 5
C8 x 13.75
C8 x 13.75
1- 1- 1-
4
0 1- 1-
0 ∠5 0 ∠ 3
-∠
5 1- ∠5 0 1-
∠5 50
1 ∠5 1- 2
C8 x 13.75 0 C8 x 13.75 C8 x 13.75 C8 x 13.75
1
SECOND FFL 25
C2 3B-3 C2 3B-3
C8 x 13.75 24
C8 x 13.75
23
7750 22
21
20
19
2600
18
C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 C8 x 13.75 17
1- 1- 1- 1- 1- 16
∠5 0 ∠5 0 ∠ 0 ∠5 0 ∠5 0 1-
∠5 ∠5 50 ∠5 ∠5 ∠5 ∠5
∠5
0 15
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
C8 x 13.75
0 0 0 0
1- 1- 1- 1- 1- 0 1- 14
1- 1- 1- 1- 1-
∠5 ∠5 ∠5 ∠ ∠ 13
50 50 0 50 0 50 50 50 50
5000
∠ 0 ∠ ∠ ∠ ∠
1- 1- 1- 1- 1- LANDING 12
STAIR DETAIL PLAN
C8 x 13.75
C8 x 13.75
10
AT LOWER DECK 1-
∠5 5 0
1-
∠ 50 5 0
C8 x 13.75 1-
∠5 0 9
∠5
C8 x 13.75
C8 x 13.75
C8 x 13.75
0 -∠ -∠ 0
C8 x 13.75
1 1 1-
8
1- 1- 1-
∠5 ∠5 7
50 50 ∠5
2100
∠ 50 0 ∠ 0 ∠ 0 C8
1- 1- 1- 6
x1
3. 5
75
4
5B-3 5B-3 3
C2 C2
2
GROUND FFL
1
300
NGL
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS KARL CHRISTIAN O. PACALA
AS SHOWN ENGINEER II
NATIONAL CAPITAL REGION Construction of Multi-Purpose Building,
QUEZON CITY 2ND DISTRICT ENGINEERING OFFICE ST-12 32
Phase 1, V. Luna Hospital Compound, PREPARED:
ELENA C CASTILLO MARK JAMES R. BERBOSO GENE S. LEAÑO JOHNNY L. PROTESTA, JR.
790 EDSA, DILIMAN, QUEZON CITY 12 12 54
Quezon City WILFRED G. TULIO ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC.-DISTRICT ENGINEER