1 0 -EGEC will provide the initial equipment list to be connected to the UPS which was prepared by laboratory
specialist to PTE Team.
-As per our meeting held on 24/8/2020, QP internal meeting with all concerned parties will be held to assess the
Lab equipment loads on UPS.
-The comments on UPS load will be provided based on the meeting outcomes.
2 OAE/31R •UPS configuration shall be 4 feeder configuration ( double static UPS) as in DBM. Please modify.
•Nominal output voltage must be 415V
•Please confirm batteries shall be 2 X 100% as per QP requirement.
3 OBL/1R We confirm that All GCs Equipment are connected to Electricity 24 Hr .
Page 1 of 1
All electrical works shall be carried out in accordance with the latest version of
SHELL DEPs and SHELL standard drawings. Project specific requirements
over and above SHELL DEPs and SHELL Standard drawings are furnished in
the following section.
17.1 Project Specific Requirements For Electrical Design over SHELL DEPs
General
3.1 GENERAL
3.1.1 Design philosophy
1. The design of the electrical facilities shall meet the specific design criteria, philosophy
and/or objective stated in the project definition phase, e.g., in the basis of design
document or project specification, relating to a particular plant or facility.
For instance, it may be defined by plant lifetime, skill of operating and maintenance
personnel, operational flexibility, extension possibilities or noise limitations, etc.
The philosophies to be employed will depend on the size and complexity of the
installation.
2. Refer to Standard Forms DEP 00.00.07.75-Gen and DEP 00.00.07.96-Gen for
guidance on application of Design Class to electrical installations.Electrical installation
design per this DEP meets the requirements of Design Class 3 as specified in DEP
00.00.07.75-Gen. and DEP 00.00.07.96-Gen. (standard form).
If specified by the Principal, a (different) Design Class may be given for the design
of the electrical installation.
3. The conceptual designs and philosophies relating to the electrical system shall be
documented by a system design description, a key line diagram, basic layout drawings
and functional/outline specifications. Refer to Appendix G.
The overall design intent is a suitably robust system, with reduced energy
consumption through the selection and utilisation of efficient electrical equipment.
Capacity Utilization
Design Class
Design Item
Class 1 Class 2 Class 3
Backup Power Backup power shall be Backup power shall be Backup power shall be
provided as required for provided as required for a provided as required for a
a safe, orderly shutdown safe, orderly shutdown in safe, orderly shutdown in
in accordance with vital accordance with vital load accordance with vital load
load specifications. To specifications. Standby specifications. Standby
comply with safety generator(s) may be used generator(s) shall be used
requirements, this may for back up of UPS for back up of UPS
include standby systems if power is systems if power is
generators. (N+0) required for extended time required for extended time
periods to support critical periods to support critical
safety-operability loads. safety-operability loads.
(N+1) Provisions may be
provided for black-start
capability. (N+1)
Substation Substation Substation configuration Substation configuration
Configurations configurations shall be shall be consistent with shall be consistent with the
single ended, radial fed if the reliability and reliability and maintenance
the risk (likelihood and maintenance strategy, strategy, and shall include
consequences) of and may include redundant configurations
expected outages is redundant configurations such as ring buses, double
acceptable and if circuits such as double ended ended buses or
and equipment can be buses or maintenance maintenance buses
released for buses (double buses). (double buses).
maintenance in
accordance with Shell
and industry practices.
Transformers, Transformers shall be Transformers shall be Transformers shall be
Power sized based upon sized based upon sized based upon
(Radial System) designed load. No future designed and approved designed and future loads
loads shall be future loads using ONAN using ONAN rating. They
considered. There is no rating. They may be shall be suitable for
requirement for addition suitable for addition of addition of forced cooling
of forced cooling. forced cooling to allow for to allow for further load
further load growth. growth.
Transformers, Transformers shall be Transformers shall be Transformers shall be
Power sized based upon sized based on designed sized based on designed
(Double Ended designed load. No future load and may include and future loads using
System) loads shall be approved future loads ONAN rating. When a
considered. There is no using ONAN rating. single transformer is
requirement for addition When a single required to supply entire
of forced cooling. transformer is required to load of two or more
supply entire load of two systems, ONAF rating shall
or more systems, ONAF be used. (N+1)
rating shall be used.