Quotation Smoking Shelter - Bsa Project

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

COST BREAK DOWN (건축공사)

Currency : Rp.

MATERIAL LABOR EXPENSES TOTAL

NO. DESCRIPTION SPECIFICATION UNIT Q'TY UNIT AMOUNT UNIT AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT NOTE

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

신축 건축 공사

1 SMOKING SHELTER - BSA PROJECT

1.1 Preparation Work

Mobilitas & Demobilitas Material +


ls 1.00
Worker

Mobilitas & Demobilitas Heavy Tools ls 1.00

Heavy Tools ls 1.00

Scaffolding ls 1.00

Cleaning Area ls 1.00

Waste Disposal ls 1.00

1.2 Foundation Work

Excavation and Transportation of earth m3 4.80

Form work Ply Wood THK=12mm m2 2.40

Riverstone m3 2.40

Basecourse THK=50mm m3 0.80

Lean Concrete K-175 kg/cm2 ; THK=100mm m3 1.60

Hanging Sloof K-300 m3 0.21

Amount

1.3 Steel Structure Work

H-Beam: 150x150x7x10 TON 1.43

Plate Joint kg 71.78

Steel Plate THK=8mm kg 593.46

Hollow 50x50 EA 18.00

Painting Color: light grey m2 113.16

Amount

1.4 Roof Work

Steel Pipe 100x50mm EA 7.00 - -

Polycarbonate THK10mm; motif: dark m2 10.89 - -

Amount

1.5 Window Work

Polycarbonate THK=10mm (motif: light grey);


Type - A EA 2.00 - -
Frame stainless steel 40x30mm
Amount

1.6 Floor Work

Ceramic 400x400mm motif: dark m2 9.00 - -


Amount

1.7 Miscellaneous Items Work

Queue Pole motif: blue EA 4.00 - -

Exterior Chair EA 4.00 - -

HTB Bolt M16 EA 48.00

Bolt and Nut M16 EA 48.00

Electricity Pole EA 1.00

Amount

TOTAL 0 0 0 0