Name of Project: Expansion of Balasig Barangay Health Station W/ Birthing Location: Cabagan Isabela
Name of Project: Expansion of Balasig Barangay Health Station W/ Birthing Location: Cabagan Isabela
Name of Project: Expansion of Balasig Barangay Health Station W/ Birthing Location: Cabagan Isabela
Item
DESCRIPTION QTY
No.
(1) (2) (3)
I GENERAL REQUIREMENT
Mobilization/Temporary Structure Utilities and Services/demobilization 1.00
Standard Billboard 1.00
II EARTH WORKS
Excavation 7.1064
Soil poisoning 28.50
Gravel Bedding 14.076
Demolition 31.63
SUB-TOTAL
III CONCRETE &RSB WORKS (V=4.20 CU.M)
12mmx6.00mtrs RSB-FOOTING 6.00
12mmx6.00mtrs RSB-WALL FOOTING main bars 23.00
10mmx6.00mtrs RSB-WALL FOOTING - STIRRUPS 11.00
12mmx6.00mtrs RSB-COLUMN main bars 7.00
10mmx6.00mtrs RSB-COLUMN ties 14.00
#16 tie wire 10.00
Portland cement 45.00
Sand 2.50
Gravel 5.00
Lumber Forms Assorted (forms and scaffolds) 48.53
Assorted Nail 5.00
1/4 thk x 4' x 8' Marine Plywood 10.00
SUB-TOTAL
IV PARTITION WALL
masonry (A=137.16 sq.m)
100mm thk chb(4'') 1453.00
Portland cement 73.00
Sand 7.00
10mm x 6.00 mtrs RSB 76.00
#16 tie wire 9.00
SUB-TOTAL
V CARPENTRY WORKS
CABINET
3/4 plywood 15.00
Finishing nail(assorted) 5.00
Wood Glue 1.00
Wood Putty 1.00
Sand Paper 10.00
Paint Brush 4" 2.00
Roller Brush with Pan 1.00
Quick Dry Enamel 2.00
Paint Thinner 1.00
Body Filler 1.00
1/2 " X 1 " S4S 35.00
Miscellaneous(hinges,cabinet handle and other accessories) 1.00
SUB-TOTAL
VI ROOFING WORKS
Roof Framing(Proposed waiting area)
2" x 4" x 3/16" channel bar (Rafter) 7.00
2" x 4"x 1/4" channel bar (post) 4.00
2" x 4"x 1/4" channel bar (beam) 6.00
2"x 4"x 1.2mm C-purlins 19.00
3/16" x 2" x 2" Angular cleats 5.00
2" x 6" x 1.20mm C Purlins (fascia board) 8.00
Welding Rod 20.00
Red oxide primer 2.00
Paint thinner 1.00
Paint Brush 4" 3.00
Tinsmithry
0.4mm thk Long Span Rib type roofing 70.00
pre-painted gutter 6.00
pre-painted flashing 6.00
Tekscrew 2 1/2" 800.00
Roofing Sealant 2.00
Silicon Sealant 2.00
1/8" x 1/2" Roof Blind Rivets 2.00
SUB-TOTAL
VII DOORS & WINDOWS
D-1(1.8 x 2.1) Double Leaf, Double Swing Door on Aluminum Frame 1.00
D-2 (1.33 x 2.1) Double Leaf, Swing Type Wooden Flush Door 2.00
D-3 (0.8 x 2.1) Single Leaf, Swing Type Wooden Flush Door 1.00
D-4 ( 0.8 x 2.1) Pvc Flush Door 2.00
W-1 (2.0 x 1.2) Powder Coated sliding window 1.00
W-2 (0.6 x 0.5) Awning Type Window on Steel Frame 3.00
SUB-TOTAL
VIII PLUMBING WORKS
Sewer Line
4"Ø Soil Pipe (Series 600) 4.00
4"Ø elbow 45° 4.00
Wye 4"Ø x 4"Ø 1.00
Wye 4"Ø x 2"Ø 5.00
2"Ø Soil Pipe 4.00
2"Ø elbow 90° 6.00
2"Ø elbow 45° 2.00
Water Line
3/4"Ø uPVC Pipe (Series 8) 3.00
3/4"Ø Elbow 3.00
3/4"Ø x 1/2"Ø coupling reducer 1.00
1/2"Ø uPVC Pipe (Series 8) 3.00
1/2"Ø Elbow 90° 3.00
1/2"Ø x 1/2"Ø Tee 4.00
1/2"Ø Female Adaptor 5.00
1/2"Ø Cap Plug 4.00
Plumbing Fixtures
Water Closet Flush Type with Complete Accessories 2.00
Lavatory Pedestal Type with Complete Accessories 2.00
Urinal Standard With Complete Accessories 1.00
Sink Stainless with Complete Accessories 3.00
DownSpout
4" Pvc downspout pipe 4.00
4" dia. Elbow 90° 6.00
DownSpout Strainer 6.00
solvent cement 1.00
silicon sealant 1.00
Catch Basin (3 sets)
100mm thk chb(4'') 33.00
Portland cement 7.00
Sand 1.00
Gravel 2.00
12mm x 6.00 mtrs 10.00
1 1/2 x 1 1/2 angle bar 2.00
#16 tie wire 2.00
CONSTRUCTION OF ELEVATED WATER TANK
a. EARTHWORKS
Excavation 2.56
Structure Backfill 2.00
Gravel Bedding 1.00
b. CONCRETE WORKS
Portland cement 20.00
Gravel 2.00
Sand 3.00
16mm dia x 6m RSB 15.00
10mm x 6.00 mtrs RSB 10.00
#16 tie wire 5.00
1/4 thk x 4' x 8' Marine Plywood 8.00
2 X 2 Good Lumber 118.18
Assorted Nails 8.00
c. METAL WORKS
300mm x 300mm x 12mm Base Plate 5.00
16mm x 250mm Anchor Bolts 16.00
1/4 "x 3" x 3" x 6m Angle bar 10.00
1/4 "x 1 1/2" x 1 1/12"x6m Angle bar 20.00
E6013 Welding Electrodes 15.00
1/4" x 2 Flat Bar 12.00
Red Oxide Primer Paint 3.00
6mm x 4' x 8' MS plate 2.00
Gi pipe 3/4" S40 x 6 meters 4.00
Gi pipe 1/2" S40 x 6 meters 6.00
d. WATER LINES & TANK
Strainless Cylindrical Tank(800 liters Capacity) 1.00
2HP Water Pump w/ Start/Stop switch and wires 1.00
1 1/4 GI coupling SC40 4.00
1 1/4 x 1 GI coupling Reducer 1.00
1" PVC Male adaptor 1.00
1" dia. X 3.0m PVC BLUE 5.00
11/4 GI Pipe Sch. 40 6.00
1 1/4 GI Elbow Sch 40 4.00
1 1/4 Union Patente 2.00
11/4 Gate Valve 1.00
Tefion Tape 1/2" 8.00
e. Pipe Drilling
Drilling (labor) 1.00
3" GI Pipe S40 (casing) 4.00
3" coupling 3.00
1 1/4" coupling 4.00
1 1/4" GI Pipe 3.00
1 1/4" Foot Valve 1.00
Miscellaneous 1.00
SUB-TOTAL
IX ELECTRICAL WORKS
14.0 mm THW Service Entrance 20.00
8 Branches Panel Board (center main breaker) 1.00
100 AT Main Circuit Breaker , 1 phase, 2 Pole 1.00
15 AT Circuit breaker , 1 phase, 2 Pole 1.00
20 AT Circuit breaker , 1 phase, 2 Pole 2.00
30 AT Circuit breaker , 1 phase, 2 Pole 5.00
5.5mmTHHN 1.00
3.5mmTHHN 3.00
2.0mmTHHN 1.00
32mm PVC 3.00
25mm PVC 6.00
20mm PVC 30.00
12 Watts LED Bulb 13.00
Receptacle 4 inches dia. 13.00
2 Gang Switch Set 4.00
1 Gang Switch Set 4.00
2 Gang convinience outlet set with ground 12.00
ACU Outlet 2.00
Junction Box 30.00
Utility Box 30.00
AIR CON WINDOW TYPE 1.0 HP 220V 1.00
Miscellaneous- electrical tape, hacksaw blade, cutting disk etc. 1.00
10 KVA Single Phase Silent Type Diesel Engine Generator set including power
1.00
house,automatic transfer switch,cables,wires and accessories
SUB-TOTAL
X TILE WORKS (A=90.65SQ.M)
600mm x600mm Synthetic Granite Tile- COUNTERTOP 25.00
400mm x400mm Synthetic Granite Tile- INTERIOR 480.00
200mmx200m Floor tiles unglazed floor tiles- FLOOR TILE CR 80.00
200mm x 300mm Glazed tiles- WALL TILE CR 267.00
Tile Trim 14.00
Portland cement 36.00
Sand 4.00
Tile adhesive 15.00
Tile grout 15.00
SUB-TOTAL
XI PAINTING WORKS (A=109.73SQ.M)
Painting of Partition
flat wall latex - 2 coats 8.00
semi gloss latex - 2 coats 8.00
Concrete Nuetralizer 4.00
Concrete Putty 6.00
Acry Tining Color 5.00
Brush 4" 2.00
Roller Brush with Pan 1.00
miscellaneous(rug,masking tape, pallete, sand paper, etc) 1.00
SUB-TOTAL
XII PLACENTA VAULT AND SHARP & NEEDLES
Placenta vault
Excavation(Labor only) 4.30
Portland Cement 15.00
Gravel 2.00
Sand (plastering included) 3.00
12mm x 6.00 mtrs RSB 25.00
150mm thk chb(6') 130.00
4" dia PVC Pipe S-600 1.00
4" dia x 90 deg PVC Elbow 1.00
6" dia 45deg elbow 1.00
6" dia clean out 1.00
#16 tie wire 5.00
s/s cover manhole 300 mm x 300mm 1.00
s/s swing cover 300mm x 300mm 1.00
Sharp and needles
Excavation(Labor only) 1.00
Portland Cement 15.00
Gravel 4.00
Sand 3.00
12mm x 6.00 mtrs RSB 25.00
150mm thk chb(6') 120.00
4" dia PVC Pipe S-600 1.00
4" dia x 90 deg PVC Elbow 1.00
6" dia 45deg elbow 1.00
#16 tie wire 5.00
SUB-TOTAL
XIII MISCELLANEOUS
Acrylic "DOH" Logo (2-foot diameter) 4.00
Stainless Steel "BARANGAY HEALTH STATION" and "DOH" Letters (7" height) 24.00
Synthetic stoneworks 4.50
3-seaters stainless chair 1.00
Wall Fan 3.00
Working Table with Chair 1.00
SUB-TOTAL
TOTAL PROJECT COST
Regional Office II
Maharlika Highway, Carig Norte, Tuguegarao City
ity
EP 2018)
SION OF BALASIg BARANGAY HEALTH STATION WITH BIRTHING
AN ISABELA
BREAKDOWN EX
1,198,608.35
203,763.42
70,118.59
1,472,490.36
15,000.00
1,487,490.36
D. BAGAIN JR.
Republic of the Philippines
Department of Health
Regional Office II
Carig Norte, Tuguegarao City
Telephone Number: 304-6585, 304-8737, 846-7261 & 8467230
e-mail address: chdcvdoh@yahoo.com/dohregionaloffice2@gmail.com
TeleFax no. 304-6523
Title : Construction/ Expansion/ Repair/ Improvement of Various Health Facilities,
Civil Works and Electrical Component under the DOH-HFEP for the
Province of Isabela. ( HFEP 2018)
Project: : Completion of Balasig BHS
Location: : Balasig, Cabagan, Isabela
Mode of Implementation : Implemented by the DOH-RO2/ by Contract
Name Contractor : FRAGERR Construction
To Date Accomplishment : 100.00%
Subject : 2nd and Final Billing
Amount to be collected : PHP 205,389.29
Reviewed by:
Victorino F. Maningas
Engineer III – RCWIO
Approved:
Payment of the Physical Accomplishment is hereby recommended subject to the stipulations and
condition of RA 9184 as revised, its Implementing Rules and Regulations and to the usual accountingand auditing
rules and procedures and other laws and procedures governing government contracts, pursuant to the
attached documents supporting the Contractors’ claims.
Attached are:
1. Front Page
2. Billing Statement
3. Statement of Work Accomplishment
4. Letter Request from the Contractor
5. Contractor's Affidavit
6. Statement of Time Elapsed
7. Progress Photographs
8. Certificate of Completion and Turnover
9. Punchlisting/Final Inspection Report
Victorino F. Maningas
Engineer III – RCWIO
PROJECT TITLE
LOCATION
OWNER
ACCOMPLISHMENT (%)
ITEM WORK DESCRIPTION AMOUNT WEIGHT %
PREVIOUS PRESENT
CERTIFICATION
This is to certify that the above stated project is found the same to be 100.00% accomplished in accordance with the plan/s and specifications. Further stated that the p
accomplishment is hereby recommended subject to the stipulation of RA 9184 and IRR as revised.
OLIVER P.YAP
Architect I
ENGEL MAGADDON
Engineer I
PROJECT TITLE
LOCATION
OWNER
ACCOMPLISHMENT (%)
ITEM WORK DESCRIPTION AMOUNT WEIGHT %
PREVIOUS PRESENT
Total Accomplishm
less previo
We HEREBY CERTIFY on our honor that the work itemized
have been accomplished in accordance with plans, specifications and
Total Amount to b
requirements thereof; that I personally and physically verified the
quantity per project items and found the same to be correct; that this
report reflect the physical and actual accomplished of the project.
OLIVER P.YAP
Architect I
ENGEL MAGADDON
Engineer I
ACCOMPLISHMENT
r 14, 2018
ACCOMPLISHMENT (%)
REMARKS
TO DATE
CERTIFICATION
dance with the plan/s and specifications. Further stated that the project is satisfactorily undertaken. Payment of the
ACCOMPLISHMENT
r 14, 2018
ACCOMPLISHMENT (%)
REMARKS
TO DATE
Approved:
OLIVER P. YAP
Architect I
Republic of the Philippines
Department of Health
Regional Office 02
Maharlika Highway, Carig Norte, Tuguegarao City, Cagayan
OLIVER P.YAP
Architect I
ENGEL MAGADDON
Engineer I
Project Name: COMPLETION OF BALASIG BHS
Item No. Description Amount Weight No. of Days 24-Aug 25-Aug 26-Aug 27-Aug 28-Aug 29-Aug 30-Aug 31-Aug 1-Sep 2-Sep 3-Sep 4-Sep 5-Sep 6-Sep 7-Sep 8-Sep
I GENERAL REQUIREMENT 22,113.00 1.50 5.00 0.3003
0.00 4.00 0.3754
II EARTH WORKS 20,541.26 1.40 5.00 0.2790 0.2790 0.2790 0.2790 0.2790
0.00 4.00 0.3488 0.3488 0.3488 0.3488
III CONCRETE &RSB WORKS (V=4.20 CU.M) 50,417.27 3.42 40.00 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856
0.00 40.00 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856
IV PARTITION WALL 72,953.24 4.95 7.00 0.7078
0.00 5.00
0.00 7.00
0.00 13.00
0.00 2.00
0.00 25.00
0.00 7.00
0.00 15.00
0.00 18.00
XII PLACENTA VAULT AND SHARP & NEEDLES 60,150.43 4.08 15.00
0.00 15.00
- 0.00 2.00
Accomplishment (Ideal) 0.30 0.28 0.28 0.28 0.28 0.36 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.79
Accumulated Accomplishment (Ideal) 0.30 0.58 0.86 1.14 1.42 1.78 1.87 1.95 2.04 2.12 2.21 2.29 2.38 2.47 2.55 3.34
Accomplishment (Actual) 0.38 0.35 0.35 0.35 0.35 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
Accumulated Accomplishment (Actual) 0.38 0.72 1.07 1.42 1.77 1.86 1.94 2.03 2.11 2.20 2.28 2.37 2.46 2.54 2.63 2.71
9-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 15-Sep 16-Sep 17-Sep 18-Sep 19-Sep 20-Sep 21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep 1-Oct 2-Oct 3-Oct 4-Oct
0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856
0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856 0.0856
0.9909 0.9909
0.79 0.79 0.79 0.79 0.79 0.79 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
4.14 4.93 5.72 6.52 7.31 8.10 8.19 8.28 8.36 8.45 8.53 8.62 8.70 8.79 8.88 8.96 9.05 9.13 9.22 9.30 9.39 9.47 9.56 9.65 9.73 9.82
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 1.08 1.08
2.80 2.88 2.97 3.05 3.14 3.23 3.31 3.40 3.48 3.57 3.65 3.74 3.82 3.91 4.00 4.08 4.17 4.25 4.34 4.42 4.51 4.60 4.68 4.77 5.84 6.92
5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct
0.3003
0.3754
0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985 0.4985
0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480 0.8480
1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176 1.0176
0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723
0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723 0.2723
0.09 0.09 0.39 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.55 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28
9.90 9.99 10.37 11.49 12.61 13.74 14.86 15.98 17.10 18.22 19.34 20.46 21.58 22.70 23.82 24.94 26.06 27.61 28.89 30.17 31.45 32.73 34.01 35.29 36.57 37.85
1.08 1.08 1.45 1.29 1.29 1.29 1.02 1.02 1.29 1.29 1.29 1.29 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.52 1.52 1.52 1.52 1.52 1.02
8.00 9.07 10.52 11.81 13.10 14.39 15.41 16.43 17.72 19.01 20.30 21.59 23.38 25.17 26.95 28.74 30.53 32.32 34.11 35.90 37.41 38.93 40.45 41.96 43.48 44.50
31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov
0.3003
0.3754
0.2956 0.2956 0.2956 0.2956 0.2956 0.2956 0.2956 0.2956 0.2956 0.2956
1.0176 1.0176
3.3016 3.3016 3.3016 3.3016 3.3016 3.3016 3.3016 3.3016 3.3016 3.3016
0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014
0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845
1.28 1.28 1.28 1.28 1.28 1.28 4.15 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.60 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
39.13 40.41 41.69 42.97 44.25 45.53 49.68 52.98 56.28 59.59 62.89 66.19 69.49 72.79 76.09 79.70 80.09 80.49 80.89 81.28 81.68 82.08 82.48 82.87 83.27 83.67
1.02 1.39 4.72 4.72 4.72 4.72 4.72 4.72 4.72 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.51 0.51 0.51 0.51 0.51 0.51
45.51 46.91 51.62 56.34 61.06 65.77 70.49 75.21 79.92 80.01 80.09 80.18 80.26 80.34 80.43 80.51 80.60 80.68 80.77 80.85 81.36 81.86 82.37 82.88 83.39 83.89
26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
0.3003 0.3003
0.3754
0.4222
2.1358 2.1358
0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912
0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912 0.3912
0.0845
2.5427 2.5427
2.5427 2.5427
0.10 0.10 0.10 0.10 0.10 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.69 1.42 1.42 1.42 2.54 2.54 0.30
83.77 83.87 83.97 84.07 84.17 84.56 84.96 85.35 85.74 86.13 86.52 86.91 87.30 87.69 88.09 88.48 88.87 89.26 89.65 90.34 91.77 93.19 94.61 97.16 99.70 100.00
0.51 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 2.53 2.53 2.54 2.54 0.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00
84.40 84.79 85.18 85.57 85.96 86.35 86.75 87.14 87.53 87.92 88.31 88.70 89.09 89.48 92.01 94.54 97.08 99.62 100.00
Project Name: COMPLETION OF BALASIG BHS
Item No. Description Amount Weight No. of Days AUGUST SEPTEMBER OCTOBER
I GENERAL REQUIREMENT 22,113.00 1.50 5.00### ###
0.00 4.00### ###
II EARTH WORKS 20,541.26 1.40 5.00 ###
###
###
###
###
0.00 4.00 ###
###
###
###
III CONCRETE &RSB WORKS (V=4.20 CU.M) 50,417.27 3.42 40.00 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.00 40.00 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
IV PARTITION WALL 72,953.24 4.95 7.00 ###
###
###
###
###
###
###
0.00 5.00 ###
###
###
###
###
V CARPENTRY WORKS 43,519.61 2.96 10.00
0.00 7.00
0.00 13.00
0.00 2.00
0.00 7.00
0.00 15.00
0.00 18.00
XII PLACENTA VAULT AND SHARP & NEEDLES 60,150.43 4.08 15.00 ###
###
###
###
###
###
###
###
###
0.00 15.00 ###
###
### ###
###
###
###
XIII MISCELLANEOUS 74,883.22 5.09 2.00
- 0.00 2.00
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###