Scan 27 Sep 2020
Scan 27 Sep 2020
Scan 27 Sep 2020
InspectionBy Remarks
Sr No. Description Referance Document Aceptance Criteria
Contractor Atul OC/TPI
MOM Technical Specification H H
Pre-InspectionMeeting
Document Verification
Availibility of Approved Drawing Approved Drawing DR
H A
WPS&PQR ASME Sec IX ASME Sec IX_
H A
Welder Qualification Certificates ASME Sec IX ASME Sec IX
Fit-up Inspection
4.1 Marking, Cutting &Rolling of Plates Approved Drawing ASME Sec IlV H S
4.2 Verifying Dimension of Dome/Dish Approved Drawing ASMESec IIV H S
4.3 Fit-up Inspection of All Longitudinal Joints and Circumferential Joints. Approved Drawing ASME Sec lIIV H
5.3 Control of Process Parameter Like Preheat, Interpass and Weld Size
WPS WPS H
etc.
Approved
5.4
|Penetrant Test(PT) on All Back-gouged Welds. ASME Sec illV H
Drawing/Section V
5.5 Weld Visual Approved Approved Drawing/
Drawing/Section lllV ASME Sec llIV
5.6 Pad Pneumatic Test Pressure Test Procedure ASME Sec IIV H RW
RF
N o n Destructive Examination
Approved ASME Sec IIV H R RT Film Review
5.7
Drawing/Section V
Final Weld visual Inspection From Inside As Well As From Outside, Approved Approved Drawin8/ W
H
5.8 Inspection, PMI For SS and Low Alloy Steel Drawing/Section IIV ASME Sec lIIV
Dimension
Pressure Testing &Painting
Approved
W
6. 1 Pressure Test of Equipment Drawing/Pressure Test ASME Sec IIV
Procedure
Drawn)
Pickling and Passivation Pickling and Passivation W
Passivation for SS Material Procedure
6.3 Pickling and Procedure
RW DFTcheck on Final Painting
Approved Drawing Approved Drawin8
6.4 Surface Preparation and Painting Approved ITP
Approved ITP H