PLANS - Student Services Center
PLANS - Student Services Center
PLANS - Student Services Center
A
O
R
L
A
N
O
I
T
A
N
R
E
T
P E R S P E C T I V E
E
1
M
A-1 DNTS
-
0
0
.
2
N
1
W E
SITE LOCATION
THIS SITE
2 V I C I N I T Y M A P 3 SITE DEVELOPMENT PLAN
A-1 DNTS A-1 DNTS
A B C D E F G G' H I
36.45
1.75 2.95 3.53 2.15 2.00 4.10 2.08 2.18 2.05 2.08 4.98 4.33
15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
W W W W W W W W W UP W W
8 6 6 5 5 5 5 8 8 8 4
1 CABINET
1.48
CABINET
D
TOILET 2 TOILET TOILET TOILET
STERILIZATION D D
STORAGE CABINET
A = 1.89 SQ.M. AUTOCLAVE A = 2.85 SQ.M.
A = 2.85 SQ.M. A = 2.85 SQ.M.
ROOM 4 4
D A = 7.79 SQ.M. ISOLATION D
4.35
4.35
4
1.43
ROOM 4
PANTRY STORAGE A = 7.78 SQ.M. EMERGENCY
A = 8.30 SQ.M. D
2 EMERGENCY ENTRANCE
D MALE WARD A = 20.25 SQ.M.
DENTAL ROOM
ENTRANCE
2 A = 21.62 SQ.M. STAFF A = 30.17 SQ.M.
CLINIC D LOUNGE D
3 A = 22.08 SQ.M. 2 A = 8.30 SQ.M.
W W A I T I N G A R E A 1
A5 LOCKER
5
2.80
2 D
2
D
3
D
2
D
2
2.90
2.90
D
H A L L W A Y
2
15
14
NURSE
13
W W STATION
W A I T I N G 9 9 A = 19.74 SQ.M.
3.10
D
14.75
14.75
3 12
11
10
A R E A
A = 13.16 SQ.M.
D
1
D
3 2
UP
9 2
8
3.20
7
6
D
ISOLATION DOCTOR'S W 3
2 W 4
FEMALE WARD OFFICE A5
10.40
5 ROOM
4.00
6
4.90
A = 21.92 SQ.M. A = 13.49 SQ.M.
4 LOBBY A = 7.88 SQ.M.
ENTRANCE
3 A = 41.66 SQ.M.
INFIRMARY
2.50
2
3.35
D
4 1 4
TOILET
A = 2.85 SQ.M.
PANTRY
CABINET
D
1
1.70
UP CABINET
D D W A I T I N G
W W W 4 4 A R E A
5 5 4 8
TOILET TOILET
A = 23.45 SQ.M.
W
9
1.85
1.85
2.60
W
9
6 W W
0.75
8 8 W
6.00
W W W
9 9 9 9
4 ENTRANCE
7 4.00 A5 D
1
P A R K I N G A R E A
LINE OF ROOF CANOPY
UP
2.30 4.70 2.85 2.30 2.30 2.40 2.50 4.50 3.35 3.35 5.90
36.45
A B C D E F F' G H I
23.85
W W W W W DN
5 5 7 6 7
1 D
FIRE
EXIT STEEL CABINETS
2.25
2
CABINET
W MALE TOILET
STEEL CABINETS
A = 10.14 SQ.M.
5
4.35
GUIDANCE ARCHIVE
STEEL CABINETS
D TESTING ROOM/MEETING W
OFFICE ROOM 4
2 CABINET A = 17.64 SQ.M. ROOM
FEMALE TOILET A = 24.89 SQ.M. A = 10.81 SQ.M.
A = 12.45 SQ.M.
3 PANTRY
D
A5 D 2
2
2 DN
D
2
D
2 CABINET
D PRIVATE
2 COUNSELING
2.90
A = 6.97 SQ.M. W
12.15
H A L L W A Y 7
8.20
D D D D
3 2 2 2 2
PANTRY
SAO OFFICE
3.20
WORKSTATION
FFPCC A = 24.38 SQ.M.
OFFICE PUBLICATION D 3
A = 21.30 SQ.M. STUDENT 2 A5
OFFICE
A = 22.89 SQ.M. W LOUNGE W
4 A = 35.31 SQ.M. 4
4 W
CABINET
SAO DIRECTOR'S 7
OFFICE
1.70
A = 11.84 SQ.M.
3.10
CABINET
5 CABINET
CABINET
1.40
CABINET
6 W
1
W
2
W
3
4
7 A5
23.85
1/4" THK. FIXED GLASS WINDOW ON POWDER TEMPERED GLASS RAILING WITH STAINLESS
COATED ALUMINUM FRAME STEEL TOP RAIL
4" CONCRETE LEDGE
ACRYLIC SIGNAGE (LETTERING & BISU LOGO)
A B C D E F G G' H I
36.45
2.00
4" X 4" CONCRETE MOULDING
6 MM TWIN-WALL POLYCARBONATE SHEET ON
2" X 4" RECTANGULAR TUBE FRAMING
ROOF BEAM LINE
3.00
8.50
SECOND FLOOR LINE
3.20
GROUND FLOOR LINE
0.30
FINISH GRADE LINE
1 FRONT ELEVATION
A-4 SCALE 1:100 METERS
I H G' G F E D C B A
36.45
2 REAR ELEVATION
A-5 SCALE 1:100 METERS
7 6 5 4 3 2 1 1 2 3 4 5 6 7
14.75 14.75
0.75 1.85 1.70 3.20 2.90 4.35 4.35 2.90 3.20 1.70 1.85 0.75
ROOF APEX LINE ROOF APEX LINE
2.00
2.00
ROOF BEAM LINE ROOF BEAM LINE
3.00
3.00
8.50
8.50
SECOND FLOOR LINE SECOND FLOOR LINE
3.20
3.20
GROUND FLOOR LINE GROUND FLOOR LINE
0.30
0.30
FINISH GRADE LINE FINISH GRADE LINE
A B C D E F G G' H I
1 2 3 4 5 6 7
36.45
14.75
2.30 4.70 5.15 4.70 4.80 4.40 1.15 3.25 6.00 4.35 2.90 3.20 1.70 1.85 0.75
ROOF APEX LINE
0.50 2.00
0.50 2.00
ROOF BEAM LINE
CEILING LINE
2.50
2.50
8.50
8.50
PRIVATE GUIDANCE
SECOND FLOOR LINE H A L L W A Y COUNSELING OFFICE PANTRY HALLWAY STUDENT LOUNGE
0.50
0.50
CEILING LINE
2.70
2.70
EMERGENCY STERILIZATION
GROUND FLOOR LINE DENTAL CLINIC H A L L W A Y NURSE STATION ENTRANCE ROOM HALLWAY LOBBY
0.30
0.30
FINISH GRADE LINE
2.10
2.10
2.10
2.10
2.10
FINISH FLOOR LINE
D D D D W
1 2 3 4 1
1.28
0.80 0.80 0.90 0.85 0.35 0.70 2.93
1.60
MADE: POWDER-COATED ALUM.
FRAME W/ 41" THK BRONZE
GLASS
1 1 1 1
MADE: 4"
THK FRAMELESS TEMPERED MADE: 4"
THK FRAMELESS TEMPERED MADE: 4"
THK FRAMELESS TEMPERED MADE: 4"
THK FRAMELESS TEMPERED TYPE OF OPENING: FIXED
GLASS WITH POWDER COATED GLASS WITH POWDER COATED GLASS WITH POWDER COATED GLASS WITH POWDER COATED UNITS: 1 SET
ALUMINUM TRANSOM WINDOW ALUMINUM TRANSOM WINDOW ALUMINUM TRANSOM WINDOW ALUMINUM TRANSOM WINDOW
TYPE OF OPENING: SWING TYPE OF OPENING: SWING TYPE OF OPENING: SWING TYPE OF OPENING: SWING
UNITS: 4 SETS UNITS: 23 SETS UNITS: 2 SETS UNITS: 7 SETS
0.60
0.60
1.20
1.20
1.70
2.10
2.10
1.50
1.50
1.50
0.90
0.90
0.40
W W W W W W W W
2 3 4 5 6 7 8 9
EQ EQ EQ EQ EQ EQ
1.28
MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM. MADE: POWDER-COATED ALUM.
FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE FRAME W/ 41" THK BRONZE
GLASS GLASS GLASS GLASS GLASS GLASS GLASS GLASS
TYPE OF OPENING: FIXED TYPE OF OPENING: FIXED TYPE OF OPENING: AWNING TYPE OF OPENING: AWNING TYPE OF OPENING: SLIDING TYPE OF OPENING: SLIDING TYPE OF OPENING: AWNING TYPE OF OPENING: AWNING
UNITS: 1 SET UNITS: 1 SET UNITS: 6 SETS UNITS: 8 SETS UNITS: 4 SET UNITS: 4 SETS UNITS: 7 SETS UNITS: 8 SETS
DS
DS DS DS
1.20
1.20
1 DS
SECOND FLOOR LINE
DS
7.05
7.15
9.55
2
14.95
DS
16.05
13.65
5.30
3 DS
1.20
DS
2.20
5.30
6.50
DS DS
DS
5
2.30 6.90
6
1.20
1.20
DS DS
22.65 3.60
2.00
1 SECOND FLOOR ROOF PLAN
A-7 SCALE 1:100 METERS 5.05
DS
EQ EQ EQ EQ EQ EQ 1.03
1.03 EQ EQ EQ EQ EQ EQ 1.03
4.45
4.20
9.55
6.15
DS
2.00 6.90
DS
4.55
3.85
DS
3.50
DS
EQ EQ EQ EQ EQ EQ 1.03
DS DS
DS DS 5.05
10.90
OFFICE ENTRANCE EMERGENCY ENTRANCE
CANOPY ROOF PLAN EMERGENCY ENTRANCE
3
A-7 SCALE 1:100 METERS
4 R O O F P L A N 5 CLINIC ENTRANCE ROOF PLAN 6 CANOPY FRAMING DETAILS
A-7 SCALE 1:100 METERS
A-7 SCALE 1:100 METERS A-7 SCALE 1:100 METERS
ATS - 2
(TO BE VERIFIED
A
0.30
PC - 1 ATS - 1 A A
EXISTING RAFTER TRUSS A
A
0.60
EXISTING
EXISTING
BEAM
BEAM
EXISTING RAFTER TRUSS EXISTING
0.30
A A
BEAM
GUTTER
A
ATS - 2 A
PC - 1 ATS - 1
EXISTING RAFTER TRUSS 150mm x 300mm x 6mm THICK STEEL PLATE
ATS - 2
0.30 0.30 0.10
EXISTING
BEAM
ATS - 2 PC - 1 EXISTING RAFTER TRUSS ATS - 1 ADDITIONAL TRUSS SUPPORT 0.60
SCHEDULE OF TRUSS MEMBERS AND WELD
SIZE WELDS (mm)
A ∠ - 50 x 50 x 6 6 FULL WELD
ATS - 2
PC - 1 ATS - 1
EXISTING RAFTER TRUSS
ADDITIONAL TRUSS
AD DITION AL TRUSS SUPPOR T - 1 SUPPORT - 1 DETAILS
GUTTER
2 3
S-1 SCALE DNTS S-1 SCALE DNTS
PC - 1 PC - 1 PC - 1 ATS - 1
EXISTING RAFTER TRUSS
PC - 1 PC - 1 PC - 1 ATS - 1
EXISTING RAFTER TRUSS 0.20
0.15
4 - 10mm Ø VERTICAL REBARS
150mm x 100mm x 6mm THICK STEEL PLATE
2 - 12" Ø ANCHOR BOLT L-TYPE A307 BI
WITH NUT AND WASHER
0.10
0.20
0.10
GUTTER
VERIFY ON ACTUAL
4 - 10mm Ø VERTICAL REBARS
SITE CONDITION
SPOT DETAIL "A"
PLANTED COLUMN - 1
G R O U N D F L O O R 4 D E T A I L S
S-1
1 ROOF FRAMING PLAN SCALE DNTS
C1 F1 C1 F1 C1 F1 C1 F1
6" CHB PLASTERED BOTH 6" CHB PLASTERED BOTH 6" CHB PLASTERED BOTH 6" CHB PLASTERED BOTH
SIDES SIDES SIDES SIDES
F. F. L.
1.35
N. G.
0.15
5 RETAINING WALL DETAILS
S-2 DNTS
F G G' H I
0.25
11.00
ADDITIONAL R E T A I N I N G W A L L , L = 11.10m
1.20
ADDITIONAL SL AB
W W W UP W ON GROUND AREA = 13.07 SQ.M.
0.25
1 1 1 1
D D
1 1
0.40
10MMØ BARS @ 300MM O.C.
10MMØ STIRRUPS 3 @ 50MM, 5 @ 100MM ALONG THE SHORT SPAN
& REST @ 150MM
0.15
1
UP
S-2 DNTS
0.15
5MM THICK GRAVEL FILL
1 @ STAIR ACCESS
S-2 SCALE 1:100 METERS
3 COLUMN -1 DETAILS
S-2 DNTS
1. ALL GENERAL ELECTRICAL WORKS SHALL BE EXECUTED IN ACCORDANCE WITH THE PROVISIONS OF THEY ARE INTENDED TO BE INSTALLED.
THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, LAWS AND ORDINANCES OF THE LOCAL
21. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE
RECOMMENDING APPROVAL :
MUNICIPALITY, RULES AND REGULATIONS OF THE LOCAL POWER COMPANY.
FOR CONNECTION TO THE POWER SUPPLY, AND ALSO THE ACTUAL LOCATION OF TELEPHONE
2. POWER SERVICE TO THE BUILDING SHALL BE 230 V, THREE PHASE, THREE WIRES, 60Hz. SYSTEM SERVICE ENTRANCE TO THE LOCAL TELEPHONE CABLE FACILITIES.
3. WIRING SHALL BE AS FOLLOWS :
a ) SERVICE ENTRANCE - RIGID STEEL CONDUITS / IMC PIPES 22. ANY DISCREPANCY IN LOCATION AND RATINGS OF EQUIPMENT AND APPARATUS SHALL BE VERIFIED HEAD ELECTRICAL SECTION DATE
WITH THE OWNER OR ANY OF HIS REPRENTATIVES AND CHANGES SHALL BE MADE ACCORDINGLY.
b ) FOR LIGHTING - PVC PIPE
c ) FOR POWER - POLYVINYL CHLORIDE (PVC) PIPE 23. FOR EACH SPARE BRANCH CIRCUIT OF PANEL BOARDS, PROVIDE 20mm(3/4") DIA. EMPTY
CONDUIT TERMINATED TO 100mm x 100mm SQUARE BOX ABOVE THE CEILING. APPROVED BY :
d ) FOR FIRE ALARM SYSTEM - PVC PIPE
e ) FOR TELEPHONE SYSTEM - PVC PIPE 24. PROVIDE ENOUGH SUPPORT CONDUITS, PIPE STRAPS, WALL BRACKETS, HANGERS OR CEILING
TRAPEZE. FASTEN BY MACHINE SCREWS, WELDED THREADED STUDS, OR SPRING TENSION
f ) FOR PAGING SYSTEM - PVC PIPE
CLAMPS ON STEEL WORKS.
4. SMALLEST CONDUCTOR TO BE USED SHALL BE NO. 3.5mm(12) AWG AND SMALLEST RACEWAY SHALL BUILDING OFFICIAL DATE
BE 15mm(1/2) DIAMETER TRADE SIZE CONDUIT. CONDUCTORS SHALL BE INSULATED FOR 600 VOLTS 25. FLEXIBLE METAL CONDUIT CONNECTIONS OF SHORT LENGTH (MAXIMUM OF 1.8m) OR CIRCULAR
THHN OR THW OR AS INDICATED IN THE PLANS, PHELPS DODGE, DURAFLEX, OR APPROVED EQUAL. LOOM (MICA TUBE) (MAXIMUM OF 0.30m) SHALL BE PROVIDED FOR LIGHTING FIXTURES CONNECTION
TO NEAREST OUTLET BOXES. LIQUID TIGHT FLEXIBLE CONDUIT SHALL BE USE FOR MOTORS.
5. FEEDERS AND BRANCH CIRCUITS SHALL BE INSTALLED AS INDICATED IN THE PLANS. HOMERUN
SHALL NOT BE COMBINED IN THE SAME RACEWAY UNLESS SO NOTED. 26. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE SUPERVISION OF AN EXPERIENCED,
NO BRANCH CIRCUIT CONDUCTOR SHALL HAVE A LOAD OF MORE THAN 80% OF ITS RATING. DULY LICENSED ELECTRICAL ENGINEER.
6.
7. WIRE GUTTERS, SQUARE BOXES AND PULL BOXES SHALL BE PROVIDED ON CIRCUITS AND HOMERUN
IN EXCESS OF 30 METERS OR WHERE NECESSARY.
8. OUTLET BOXES SHALL BE GAUGE NO. 16 (MIN) PRESSED STEEL GALVANIZED DEEP TYPE. NOTE: Calculation of Schedule of Loads may varies upon approval of the Professional Electrical
a ) CEILING LIGHT OUTLETS - 40mm (1 1/2) DEEP, 100mm (4") OCTAGONAL BOX FOR 1 OR 2 RACEWAY Engineer (PEE).
ENTRIES, 50mm (21/8") DEEP, 100mm(4") OCTAGONAL BOX FOR 3 OR 4 RACEWAY ENTRIES.
b ) WALL SWITCHES - 55mm (2 1/8") DEEP; UTILITY BOX FOR 1 OR 2 SWITCHES ON STRAP, 40mm (1 1/2")
DEEP, 100mm (4") SQUARE BOX WITH ONE GANG RAISED COVER FOR 3 SWITCHES ON STRAPS.
c ) WALL OR COLUMN RECEPTACLE - 55mm (2 1/8") DEEP, UTILITY BOX FOR 1 OR 2 RACEWAY ENTRIES, 40mm
(1 1/2") DEEP, 100mm (4") SQUARE BOX WITH ONE GANG RAISED COVER FOR 3 OR MORE RACEWAY
ENTRIES.
d ) WALL OR COLUMN TELEPHONE OUTLET - 55mm (2 1/8") DEEP, UTILITY BOX UNLESS OTHERWISE
INDICATED ON THE PLANS.
9. ALL BRANCH CIRCUIT CONDUCTORS SHALL BE COLOR CODEDAS PER REQUIREMENT OF PEC. GROUNDED
CONDUCTOR SHALL BE IDENTIFIED BY A CONTINUOS GREEN COLOR UNLESS IT IS BARE. LINE 1-RED, LINE
2-BLUE, LINE 3-BLACK, GROUND-GREEN.
10. EXPOSE WIRING FOR LIGHTING AND CONVENIENCE OUTLETS SHALL BE IN RIGID STEEL CONDUIT (RSC) OR
ELECTRICAL METALLIC TUBING (EMT) PIPE RUN PARALLEL TO BEAM AND TRUSSES.
11. MOUNTING HEIGHTS SHALL BE AS FOLLOWS :
a ) LIGHT CONTROL SWITCHES - 1.40m. ABOVE FLOOR FINISH
b ) CONVENIENCE OUTLET - 0.30m. ABOVE FLOOR FINISH
c ) TELEPHONE OUTLET - 0.30m. ABOVE FLOOR FINISH
d ) AIRCONDITION OUTLET - 0.60m. ABOVE FLOOR FINISH
e ) PANEL BOARDS AND CABINETS - 1.80m. ABOVE FLOOR FINISH
f ) FIRE ALARM BELL - 0.30m. BELOW CEILING
g ) FIRE ALARM STATION - 1.40m. ABOVE FLOOR FINISH
h ) TV OUTLET - 0.30m. ABOVE FLOOR FINISH TO DP
i ) WATER HEATER OUTLET - 1.80m ABOVE FLOOR FINISH
j ) COUNTERTOP OUTLETS - 0.15m ABOVE COUNTER TABLE
12. ALL FLUORESCENT LIGHTING FIXTURES SHALL BE PROVIDED WITH RAPID START OR HIGH POWER
FACTOR BALLASTS WITH SPRING LOADED LAMP HOLDERS.
13. CONDUITS AND METAL FRAMES OF EQUIPMENT SHALL BE BONDED TOGETHER BY MEANS OF COPPER
STRAPS. CONDUITS OF SYSTEM SHALL BE PROPERLY GROUNDED TO THE WATER SUPPLY SERVICE
PIPES WHENEVER POSSIBLE OR GROUND ROD INSTALLED FOR THE PURPOSE. GROUND ROD SHALL BE
20mmØ x 3000mm. COPPER CLAD STEEL EMBEDDED TO THE GROUND WITH ITS TOP ACCESSIBLE FOR
INSPECTION.
14. UNDERGROUND RUN OF CONDUITS SHALL BE EMBEDDED AT LEAST 610mm (24") FROM FINISH
GRADELINE. CONCRETE ENVELOPES FOR CONDUITS RUNS ACROSS OR CROSSING STREETS AND
DRIVEWAYS SHALL BE REINFORCED AND SHALL HAVE THE STRENGTH CAPABLE TO WITHSTAND THE
m
0m M
3000mm MINIMUM
d ) PROVIDE AMMETER AND VOLTMETER, ATS AND VTS FOR MANUAL TRANSFER SWITCH
INCLUDING PILOT LIGHT RED AND GREEN 25mmØ.
e ) PROVIDE ACTUAL SCHEDULES OF LOADS AND DIRECTORIES FOR EACH INDIVIDUAL PANELBOARD.
PUT NAMEPLATES (MICARTA) FOR EACH PANELS.
f ) ALL CIRCUIT BREAKERS FOR UNITIZED PANEL SHALL BE "GE" OR SQUARE "D" IN BRAND OR
APPROVED EQUAL.
19. THE CONTRACTOR SHALL CONDUCT TEST TOGETHER WITH OWNERS REPRESENTATIVE SUCH AS
INSULATION TEST, GROUND RESISTANCE TEST, PHASE SEQUENCE TEST AND OPERATING TEST. ALL
TEST RESULT SHALL BE SUBMITTED TO THE OWNERS REPRESENTATIVE. MINIMUM INSULATION TEST
SHALL BE 250,000 OHMS. MINIMUM GROUND RESISTANCE TEST SHALL BE 25 OHMS.
STORAGE CABINET
Sa a EMERGENCY
a a a Sa MALE WARD a TOILET Sa a
Sa ENTRANCE RECOMMENDING APPROVAL :
a a
Sa a Sa
EMERGENCY
Sa LEGEND
ENTRANCE
Sa a a a
PANTRY Sa Sa ROOM
PB1 a a a Sa a LED HEAVY DUTY EMERGENCY LIGHT, 2 x 0.5W,
FIRE EXIT
C2 a a
a 600 LUMENS, 4V 4AH SEALED LEAD ACID BATERRY
a b
b b a a EL HEAD ELECTRICAL SECTION DATE
DENTAL a a a
CLINIC Sa Sa S3Wab W A I T I N G A R E A S3Wab Sa
FIRE EXIT EXIT SIGNAGE
b PB2 PB2 S3Wa S3Wa Sa
a PB2 C5 C6 APPROVED BY :
C8
Sab
a a a a PB PANEL BOARD
a a a a
a a FIRE EXIT
S3Wa H A L L W A Y MDP MAIN DISTRIBUTION PANEL BUILDING OFFICIAL DATE
ISOLATION Sa Sab a
UP
ROOM a
W A I T I N G NURSE 15W DOWNLIGHT (APPROVED PROFILE)
A R E A
a
b b b a STATION
Sa a Sa
Sab DOCTOR'S 21W DOWNLIGHT RECESSED ( APPROVED
LOBBY a
Sa OFFICE PROFILE )
UP a a
Sa Sa
ENTRANCE
b b a a
a b 28W LED LUMINAIRE ( APPROVED PROFILE )
FIRE EXIT
to 2nd floor a PANTRY a a
a a a
PB2
S3Wa a C7 Sa
FEMALE WARD Sa
S3Wa TOILET a
a a S3Wa Sa 1-GANG LIGHTING SWITCH (RECESSED)
FIRE EXIT
To Eaves
Lighting Fixture
Sa Sa
a
S ab 2-GANG LIGHTING SWITCH (RECESSED)
a a
a
TOILET TOILET
W A I T I N G
FIRE EXIT A R E A
2-GANG CONVENIENCE OUTLET
ENTRANCE
UP
UP
G R O U N D F L O O R MDP
CABINET
CABINET
LIGHTING LAYOUT PLAN TOILET STERILIZATION PB2 TOILET TOILET
STORAGE CABINET
PB2
1 PB1 ROOM C1
E-2 DNTS
STORAGE EMERGENCY
PANTRY PB2
C2 ENTRANCE
DENTAL MALE WARD A = 20.25 SQ.M.
ENTRANCE
ISOLATION STAFF PB2
CLINIC LOUNGE EMERGENCY
PB1 ROOM C3
C1 ROOM
LOCKER
W A I T I N G A R E A
D
1
H A L L W A Y PB2
C4
NURSE
STATION
W A I T I N G
A R E A
UP
ISOLATION DOCTOR'S
ROOM FEMALE WARD OFFICE
LOBBY
ENTRANCE
TOILET PANTRY
CABINET
CABINET
UP
W A I T I N G
A R E A
TOILET TOILET
ENTRANCE
P A R K I N G A R E A
LINE OF ROOF CANOPY
UP
G R O U N D F L O O R
2 POWER LAYOUT PLAN
E-2 DNTS
FFPCC a a b b
PB3 SAO DIRECTOR'S
OFFICE C10 OFFICE
2-GANG CONVENIENCE OUTLET
a PB3 a a
C9 to switch located
ground floor
a
AIR CONDITIONED UNIT OUTLET
ACU
S E C O N D F L O O R
1 LIGHTING LAYOUT PLAN
E-4 DNTS
DN
FIRE
EXIT STEEL CABINETS
CABINET
MALE TOILET
STEEL CABINETS
GUIDANCE
OFFICE ARCHIVE
STEEL CABINETS
TESTING ROOM/MEETING
ROOM ROOM
CABINET
PB3 FEMALE TOILET
PANTRY
DN CABINET
PB3 PB3
C5 PB3 C2
C1 PRIVATE
H A L L W A Y COUNSELING
PB3
C4 PB3
C3
PANTRY
FFPCC
OFFICE SAO OFFICE
PUBLICATION
OFFICE STUDENT
LOUNGE
CABINET
SAO DIRECTOR'S
OFFICE
CABINET
CABINET
CABINET
CABINET
S E C O N D F L O O R
2 LIGHTING LAYOUT PLAN
E-3 DNTS
C3 PANELBOARD 3 92 53 10 6 2 6 11,995.0 230 V 1 65.19 100 100 2 10 2 - 30.0 1 - 8.0 32 C3 SPARE 1,000.0 230 V 1 4.35 30 60 2 10
SPARE FOR THE ACU FOR GROUND
C4 10,000.0 230 V 1 43.48 C4 SPARE 1,000.0 230 V 1 4.35 30 60 2 10
FLOOR HEAD ELECTRICAL SECTION DATE
SPARE FOR THE ACU FOR SECOND 13 11 6 1 4,330.0 230 V 1
C5 10,000.0 230 V 1 43.48 TOTAL 18.83 MAIN FEEDER/BREAKER DETAILS
FLOOR
SPARE I. FOR MAIN FEEDER/SERVICE ENTRANCE LOAD AND II. MAIN SERVICE BREAKER/DISCONNECT/SAFETY SWITCH MAIN BREAKER MAIN FEEDER SIZE CONDUIT
C6 3,000.0 230 V 1 13.04
(mm. dia.)
CONDUCTOR COMPUTATION AT AF POLEKAIC LINE GROUND APPROVED BY :
TOTAL 177 95 36 8 2 12 37,524.0 230 V 1 203.94 MAIN FEEDER/BREAKER DETAILS ISE/BREAKER = 125% x ISERVICE ENTRANCE
40 60 2 10 2 - 8.0 1 - 5.5 32
Total Load = DF x ∑Loads = 4,330 VA = 125% x 18.36 = 22.95 Amperes
MAIN BREAKER MAIN FEEDER SIZE CONDUIT
I. FOR MAIN FEEDER/SERVICE ENTRANCE LOAD AND II. MAIN SERVICE BREAKER/DISCONNECT/SAFETY SWITCH
AT AF POLEKAIC LINE GROUND (mm. dia.) ISERVICE ENTRANCE = Total Connected Load/VL-G + 25% x ILargest motor USE: 40AT/50AF, 2-POLE, 6KAIC @250V BOLT-ON TYPE CIRCUIT
CONDUCTOR COMPUTATION BREAKER
ISE/BREAKER = 125% x ISERVICE ENTRANCE 250 250 3 6 2 - 60.0 1 - 22.0 50
= 4,330 VA/ 230 + 25% x 0 Amperes
= 18.36 Amperes
BUILDING OFFICIAL DATE
Total Load = DF x ∑Loads = 80% x (4,330 + 7,580 + 11,995 + 10,000 + = 125% x 163.15 A = 204 Amperes
10,000 + 3,000)
USE: 250AT/200AF, 3-POLE, 10KAIC @250V BOLT-ON TYPE CIRCUIT III. GENERATOR SIZING COMPUTATION USE: 2-8.0 mm2 THHN Stranded Copper Conductor
= 37,524 VA
BREAKER AND CONSIDERATIONS & 1-5.5 mm2 TW Wire For Grounding Electrode Conductor
FOR MANUAL TRANSFER SWITCH (MTS)
ISERVICE ENTRANCE = Total Connected Load/VL-G + 25% x ILargest motor USE: MTS RATED 250AT/250AF, 3-POLE, 6 KAIC, 250-V, 60-Hz 100% of Total Connected Load (kVA) = 37.5
LEGEND
= 37,524 VA/ 230 + 25% + 0 Amperes WITH 2 - 250AT/3P CIRCUIT BREAKERS AND MECHANICAL INTERLOCK
= 163.15 Amperes
SIZING COMPUTATIONS (100% OF LED HEAVY DUTY EMERGENCY LIGHT, 2 x 0.5W,
2
USE: 3-60.0 mm THHN Stranded Copper Conductor CONNECTED LOAD) SCHEDULE OF LOADS: PANELBOARD NO.3 - PB3 EL
600 LUMENS, 4V 4AH SEALED LEAD ACID BATERRY
& 1-22.0 mm2 TW Wire For Grounding Electrode Conductor Standby Genset kVA Rating = 37.5
OUTLETS SWITCHES PHASE CURRENT PROTECTION CONDUCTOR CONDUIT
@80% Loading of Genset = 46.88 CIRCUIT DEMAND RATED
DESCRIPTION POWER PHASE
NO. FACTOR VOLTAGE FIRE EXIT EXIT SIGNAGE
LO CO OTHERS S1 S2 S3 S3W 3-PH AN BN CN AT AF POLEKAIC LINE GROUND (mm. dia.)
Use 50-kVA, 1-PH, 230-Volts LG, 60Hz,
Standby Generator CONVENIENCE OUTLETS: 7-180VA 7
C1 1,260.0 230 V 1 5.48 20 60 2 10 2 - 5.5 1 - 3.5 20
GROUNDING DUPLEX CO
CONVENIENCE OUTLETS: 13-180VA 13
PB PANEL BOARD
C2 2,340.0 230 V 1 10.17 20 60 2 10 2 - 5.5 1 - 3.5 20
GROUNDING DUPLEX CO
CONVENIENCE OUTLETS: 13-180VA 13
C3 2,340.0 230 V 1 10.17 20 60 2 10 2 - 5.5 1 - 3.5 20
SCHEDULE OF LOADS: PANELBOARD NO.2 - PB2 GROUNDING DUPLEX CO MDP MAIN DISTRIBUTION PANEL
CONVENIENCE OUTLETS: 11-180VA 11
OUTLETS SWITCHES PHASE CURRENT PROTECTION CONDUCTOR CONDUIT C4 1,980.0 230 V 1 8.61 20 60 2 10 2 - 5.5 1 - 3.5 20
GROUNDING DUPLEX CO
CIRCUIT DESCRIPTION DEMAND RATED
POWER PHASE CONVENIENCE OUTLETS: 9-180VA
NO. FACTOR VOLTAGE C5 9 1,620.0 230 V 1 7.04 20 60 2 10 2 - 5.5 1 - 3.5 20
LO CO OTHERS S1 S2 S3 S3W 3-PH AN BN CN AT AF POLEKAIC LINE GROUND (mm. dia.) GROUNDING DUPLEX CO 15W DOWNLIGHT (APPROVED PROFILE)
CONVENIENCE OUTLETS: 8-180VA LIGHTING OUTLETS: 21
C1 8 1,440.0 230 V 1 6.26 20 60 2 10 2 - 5.5 1 - 3.5 20 C6 1 1 2 560.0 230 V 1 2.43 15 60 2 10 2 - 3.5 1 - 2.0 20
GROUNDING DUPLEX CO 17-28W LO + 4-21W LO
LIGHTING OUTLETS: 21W DOWNLIGHT RECESSED ( APPROVED
CONVENIENCE OUTLETS: 6-180VA 6 C7 14 392.0 230 V 1 1.70 15 60 2 6 2 - 3.5 1 - 2.0 20
C2 1,080.0 230 V 1 4.70 20 60 2 10 2 - 5.5 1 - 3.5 20 14-28W LO 1 2 PROFILE )
GROUNDING DUPLEX CO
CONVENIENCE OUTLETS: 6-180VA LIGHTING OUTLETS: 20
C3 6 1,080.0 230 V 1 4.70 20 60 2 10 2 - 5.5 1 - 3.5 20 C8 4 2 1 2 712.0 230 V 1 3.10 15 60 2 6 2 - 3.5 1 - 2.0 20
GROUNDING DUPLEX CO 13-28W LO + 7-21W LO
LIGHTING OUTLETS: 28W LED LUMINAIRE ( APPROVED PROFILE )
CONVENIENCE OUTLETS: 11-180VA 11 C9 18 1 294.0 230 V 1 1.28 15 60 2 6 2 - 3.5 1 - 2.0 20
C4 1,980.0 230 V 1 8.61 20 60 2 10 2 - 5.5 1 - 3.5 20 14-15W LO + 4-21W LO 2
GROUNDING DUPLEX CO
LIGHTING OUTLETS: LIGHTING OUTLETS: 19
C5 11 5 301.0 230 V 1 1.31 15 60 2 10 2 - 3.5 1 - 2.0 20 C10 3 1 1 497.0 230 V 1 2.16 15 60 2 6 2 - 3.5 1 - 2.0 20
14-28W LO + 5-21W LO
10-28W LO + 1-21W LO Sa 1-GANG LIGHTING SWITCH (RECESSED)
LIGHTING OUTLETS: 19 C11 SPARE 230 V 1 30 60 2 10
C6 7 2 511.0 230 V 1 2.22 15 60 2 10 2 - 3.5 1 - 2.0 20
16-28W LO + 3-21W LO
LIGHTING OUTLETS: 30
C7
11-28W LO + 8-21W LO
19 7 1 476.0 230 V 1 2.07 15 60 2 6 2 - 3.5 1 - 2.0 20 C12 SPARE 230 V 1 60 2 10 S ab 2-GANG LIGHTING SWITCH (RECESSED)
LIGHTING OUTLETS: 23 TOTAL 92 53 10 6 2 6 11,995.0 230 V 1 52.15 MAIN FEEDER/BREAKER DETAILS
C8 1 4 712.0 230 V 1 3.10 15 60 2 6 2 - 3.5 1 - 2.0 20
24-28W LO + 4-10W EL
I. FOR MAIN FEEDER/SERVICE ENTRANCE LOAD AND II. MAIN SERVICE BREAKER/DISCONNECT/SAFETY SWITCH MAIN BREAKER MAIN FEEDER SIZE CONDUIT S abc 3-GANG LIGHTING SWITCH (RECESSED)
C9 SPARE 230 V 1 30 60 2 10
CONDUCTOR COMPUTATION AT AF POLEKAIC LINE GROUND (mm. dia.)
C10 SPARE 230 V 1 30 60 2 10 ISE/BREAKER = 125% x ISERVICE ENTRANCE
100 100 2 10 2 - 30.0 1 - 8.0 32
Total Load = DF x ∑Loads = 11,995.0 VA = 125% x 52.15 A = 65.19 Amperes 2-GANG CONVENIENCE OUTLET
TOTAL 72 31 20 1 6 7,580.0 230 V 1 32.97 MAIN FEEDER/BREAKER DETAILS
ISERVICE ENTRANCE = Total Connected Load/VL-G + 25% x ILargest motor USE: 100AT/100AF, 2-POLE, 10KAIC @250V BOLT-ON TYPE CIRCUIT
I. FOR MAIN FEEDER/SERVICE ENTRANCE LOAD AND II. MAIN SERVICE BREAKER/DISCONNECT/SAFETY SWITCH MAIN BREAKER MAIN FEEDER SIZE CONDUIT
= 11,995 VA/ 230 + 25% x 0 Amperes BREAKER
CONDUCTOR COMPUTATION AT AF POLEKAIC LINE GROUND (mm. dia.) AIR CONDITIONED UNIT OUTLET
= 52.15 Amperes
ISE/BREAKER = 125% x ISERVICE ENTRANCE ACU
60 100 2 10 2 - 14.0 1 - 8.0 32
Total Load = DF x ∑Loads = 7,580.0 VA = 125% x 32.97 A = 41.21 Amperes USE: 2-30.0 mm2 THHN Stranded Copper Conductor
& 1-8.0 mm2 TW Wire For Grounding Electrode Conductor
ISERVICE ENTRANCE = Total Connected Load/VL-G + 25% x ILargest motor USE: 60AT/100AF, 2-POLE, 6KAIC @250V BOLT-ON TYPE CIRCUIT
= 7,580 VA/ 230 + 25% x 0 Amperes BREAKER
= 32.97 Amperes
30A 30A
SPARE C11 C12 SPARE
GROUND
DISTRIBUTION PANELBOARD - A
GROUND
DISTRIBUTION PANELBOARD - A
GROUND
DISTRIBUTION PANELBOARD - A
FD
TWO AND ONE HALF DEGREES (22 21").
B) ONE AND ONE HALF METERS (1.50 m.) INSIDE THE PROPERTY LINES
BEFORE THE HOUSE DRAINAGE CONNECTION.
C) EVERY FIFTEEN METERS (15.00 m.) IN HORIZONTAL RUN OF PIPES.
HB
D) AT THE END OF ANY HORIZONTAL PIPE LINES.
5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE
SS CB
WATERPROOFED.
CO 6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN
FD
THE TOP OF THE SEWAGE AND THE UNDER PART OF VAULT ROOF
WC
KS
SLAB.
LAV LAV
CB
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
LAV 8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPERVISION OF A
UR
FD FD
LICENSED MASTER PLUMBER AND A LICENSED PLUMBING
WC WC
CB
CB
CONTRACTOR.
CO
HB
HB
CB DESIGN CRITERIA:
a. LIVE LOAD ________________ 1000 Pa
ii. ALLOWABLE STRESSES
1. CONCRETE
a. FOR FOOTING, BEAMS AND SLABS
fc" = 20 MPa
2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)
fm' = 6.90 MPa, fm = 2.41 MPa
3. REINFORCING STEEL BARS
GROUND FLOOR PLUMBING AND SANITARY LAYOUT L E G E N D: FOR BARS SMALLER THAN 16 mm Ø
SCALE 1:100 M.
NOTE:
HB HOSE BIB
CB CATCH BASIN
KS KITCHEN SINK SS SOIL STACK
VTR VENT THRU ROOF
FD FD WC
UR UR UR WC
FD CO
KS
WC LAV
FD
WC
CO WC
FD
FD
KS LAV
OVERHEAD
LAV LAV GV
TANK KS
WC
FD 4"
4" Ø HB
Ø LAV PV
PV C
FD C PIP
PIP EM
FROM MAIN EM AIN
AIN SO
WATER SOURCE 3 - CHAMBER LIN LID
E E AN
SEPTIC TANK LIN D
WA
GV TE ST
AS E
CO NDW LIN
E
KS
I DA
SS OL
AI NS
GV EM
GV IP
CP
PV
Ø
4" LAV
SS
UR
FD
HB
KS WC
CO
CO FD WC
LAV
INE
WC
L FD
GV TE
W AS LAV
WATER PUMP AND
FD FD
LID
SO
AIN
CISTERN TANK IPEM
CP
PV
4 "Ø
WC
FD
KS
VTR
KS
FD
OVERHEAD
TANK
GV
5.80
2.40
0.85 0.70 1.25 0.70 1.00 0.70 0.60 ISOMETRIC VIEW - GROUND FLOOR
0.86 0.70 0.85 WC
WC
0.90
WC D
AN
0.85
0.70
ON CENTER BOTHWAYS
SO AN Ø PV FD
SS
IN D
WA C PI
MA WC P
IPE ST E
E MA
KS KS
CP E
MANHOLE MANHOLE MANHOLE
IN
2.40
0.70
V
P LIN SO FD
2" Ø PVC PIPE AIR VENT
0.90
Ø
0.60 4" STE LID LAV
W A FD LAV
MANHOLE 0.10 0.40 0.10 CO
150 MM Ø PVC LAV
0.86
PIPE (OUTLET)
PLAN CONCRETE
LAV
COVERING CO
UR
FD
0.10
PLAN UR
5.80
UR
150 MM Ø
0.60
0.40
150 MM Ø PVC
2.40 PVC PIPE PIPE (OUTLET)
(OUTLET)
0.20 1.98 0.20 1.51 0.20 1.40 0.20
0.20 2.00 0.20
0.10
0.66 0.70 0.65
2" Ø PVC PIPE AIR VENT PLAN
TO WATER PUMP
OUTLET
0.60
INLET
0.10
INLET 4" THK. CHB WALL WITH 12 mm Ø OUTLET TO SEWER
1.80
0.60
0.40
150 MM Ø 150 MM Ø
WITH 10 mm Ø HORIZONTAL BARS
1.80
0.10
SAND
0.10
2 % SLOPE
UP
1
TOILET TOILET TOILET TOILET
A = 0.00 SQ.M. STERILIZATION A = 0.00 SQ.M. A = 0.00 SQ.M. A = 0.00 SQ.M.
ROOM
A = 0.00 SQ.M. ISOLATION
ROOM
PANTRY STORAGE A = 0.00 SQ.M. EMERGENCY
A = 0.00 SQ.M. E.L. E.L.
EMERGENCY ENTRANCE
DENTAL MALE WARD ROOM
A = 0.00 SQ.M.
ENTRANCE
A = 0.00 SQ.M. STAFF A = 0.00 SQ.M.
CLINIC E.L. LOUNGE
A = 0.00 SQ.M. A = 0.00 SQ.M. W A I T I N G A R E A
2 E.L.
E.L.
E.L. H A L L W A Y
NURSE
STATION
W A I T I N G E.L. A = 0.00 SQ.M.
3 E.L.
A R E A
A = 0.00 SQ.M. E.L.
E.L. UP
ISOLATION DOCTOR'S
ROOM FEMALE WARD OFFICE
E.L. A = 0.00 SQ.M. A = 0.00 SQ.M.
LOBBY A = 0.00 SQ.M.
ENTRANCE
A = 0.00 SQ.M.
4 TOILET
A = 0.00 SQ.M.
PANTRY
CABINET
UP
W A I T I N G
E.L. E.L. A R E A
5 TOILET TOILET
A = 0.00 SQ.M. A = 0.00 SQ.M.
E.L.
6
ENTRANCE
7 4.00
P A R K I N G A R E A
LINE OF ROOF CANOPY
UP
GROUND FLOOR
1 FIRE & LIFE SAFETY MASTER PLAN
FS-1 SCALE 1:235 METERS
0.25 0.20
0.50
0.50
DN
1 FIRE
1.00
EXIT STEEL CABINETS
MALE TOILET
STEEL CABINETS
A = 0.00 SQ.M.
GUIDANCE ARCHIVE
STEEL CABINETS
TESTING ROOM/MEETING
OFFICE
0.90
E.L. ROOM ROOM
A = 0.00 SQ.M. A = 0.00 SQ.M.
FEMALE TOILET E.L. A = 30.00 SQ.M. E.L. E.L.
A = 0.00 SQ.M.
PANTRY
2 DN
PRIVATE
COUNSELING
H A L L W A Y
A = 0.00 SQ.M.
4 FI R E EXTINGUISHER CABINET DETAIL
F 1 SCALE 1:10 METERS
3 E.L. E.L.
PANTRY
SAO OFFICE
FFPCC A = 0.00 SQ.M.
OFFICE PUBLICATION
A = 0.00 SQ.M. STUDENT
OFFICE
A = 0.00 SQ.M. LOUNGE
A = 0.00 SQ.M.
4 E.L.
SAO DIRECTOR'S
OFFICE
LEGEND
A = 0.00 SQ.M.
PB PANEL BOARD
EXIT ROUTE
6
GATHERING AREA
7 EMERGENCY LAMP
HUMAN
SECOND FLOOR
1 FIRE & LIFE SAFETY MASTER PLAN
FS-2 SCALE 1:200 METERS
1.75 2.95 3.53 2.15 2.00 4.10 2.08 2.18 2.05 2.08 4.98 4.33
UP
1.48
TOILET
A = 0.00 SQ.M.
SD
STERILIZATION TOILET TOILET TOILET
A = 0.00 SQ.M.
A = 0.00 SQ.M. A = 0.00 SQ.M.
ROOM
A = 0.00 SQ.M. ISOLATION
SD SD HD SD SD
4.35
4.35
1.43
ROOM
PANTRY STORAGE A = 0.00 SQ.M. EMERGENCY
A = 0.00 SQ.M.
EMERGENCY ENTRANCE
DENTAL MALE WARD ROOM
A = 0.00 SQ.M.
ENTRANCE
HD CLINIC
HD A = 0.00 SQ.M. STAFF A = 0.00 SQ.M.
A = 0.00 SQ.M.
LOUNGE
A = 0.00 SQ.M. W A I T I N G A R E A
2.80
2 MP
MP AP FACP
SD SD SD 1 SD
2.90
2.90
H A L L W A Y
JB NURSE
W A I T I N G ZONE 01-GF STATION
A = 0.00 SQ.M.
3.10
14.75
14.75
3 SDA R E A
A = 0.00 SQ.M.
UP
SD SD SD
3.20
ISOLATION DOCTOR'S
FEMALE WARD OFFICE JB
10.40
ROOM
4.90
A = 0.00 SQ.M. A = 0.00 SQ.M.
LOBBY A = 0.00 SQ.M.
EOLD
ENTRANCE
A = 0.00 SQ.M.
HD
HD
3.35
4 TOILET
A = 0.00 SQ.M.
PANTRY
CABINET
1.70
UP
W A I T I N G
A R E A
5 TOILET TOILET
1.85
1.85
2.60
6
0.75
ENTRANCE
7 4.00
P A R K I N G A R E A
LINE OF ROOF CANOPY
UP
2.30 4.70 2.85 2.30 2.30 2.40 2.50 4.50 3.35 3.35 5.90
36.45
GROUND FLOOR
1 FIRE DETECTION & ALARM SYSTEM LAYOUT PLAN
FS-3 SCALE 1:235 METERS
A B C D E F F' G H I
23.85
DN
1 FIRE
EXIT STEEL CABINETS
2.25
MALE TOILET
STEEL CABINETS
A = 0.00 SQ.M.
HD SD SD
4.35
GUIDANCE ARCHIVE
STEEL CABINETS
TESTING ROOM/MEETING
OFFICE ROOM
A = 0.00 SQ.M. ROOM
FEMALE TOILET A = 30.00 SQ.M. A = 0.00 SQ.M.
A = 0.00 SQ.M.
SD
PANTRY
2 DN
MP
AP
PRIVATE
2 COUNSELING
2.90
A = 0.00 SQ.M.
12.15
H A L L W A Y
MP JB SD SD SD SD
3
6.10
4 JB HD HD
SAO DIRECTOR'S
OFFICE
SD
1.70
A = 0.00 SQ.M.
SD SD
3.10
CABINET
6 SD
HD
7
4.80 3.84 5.51 2.93 3.08 0.87 2.83
23.85
FACP
EOLD
EOLB
SECOND FLOOR
EOLMP/B
1 FIRE DETECTION & ALARM SYSTEM LAYOUT PLAN
FS-4 SCALE 1:200 METERS
1.75 2.95 3.53 2.15 2.00 4.10 2.08 2.18 2.05 2.08 4.98 4.33
1.5hp ACCU
UP
1hp ACCU 2hp ACCU
1
REFRIGERANT LINE
1.48
TOILET TOILET TOILET TOILET
A = 0.00 SQ.M. STERILIZATION A = 0.00 SQ.M. A = 0.00 SQ.M. A = 0.00 SQ.M.
ROOM
A = 0.00 SQ.M. ISOLATION
4.35
4.35
1.43
ROOM
PANTRY STORAGE A = 0.00 SQ.M. EMERGENCY
A = 0.00 SQ.M.
EMERGENCY ENTRANCE
DENTAL MALE WARD ROOM
A = 0.00 SQ.M.
ENTRANCE
A = 0.00 SQ.M. STAFF A = 0.00 SQ.M.
CLINIC LOUNGE
2hp ACCU
A = 0.00 SQ.M. A = 0.00 SQ.M.
2.80 W A I T I N G A R E A
RE
FR
IG
ER
1hp ACCU
AN
T
LI
NE
PPR PN20 - DRAIN PIPE
3
2.90
2.90
4Ø PPR PN20 - DRAIN PIPE
H A L L W A Y
NURSE
4Ø
STATION
3
W A I T I N G A = 0.00 SQ.M.
3.10
14.75
14.75
3 A R E A
A = 0.00 SQ.M.
UP
3.20
ISOLATION DOCTOR'S
FEMALE WARD OFFICE
10.40
ROOM
4.90
A = 0.00 SQ.M. A = 0.00 SQ.M.
LOBBY A = 0.00 SQ.M.
ENTRANCE
A = 0.00 SQ.M.
3.35
4 TOILET
E
LIN
PANTRY
A = 0.00 SQ.M.
NT
CABINET
ERA
RIG
1.70
REF
UP
W A I T I N G
1.5hp ACCU 1hp ACCU A R E A
5 TOILET TOILET
1.85
1.85
2.60
6
0.75
ENTRANCE
7 4.00
P A R K I N G A R E A
LINE OF ROOF CANOPY
UP
2.30 4.70 2.85 2.30 2.30 2.40 2.50 4.50 3.35 3.35 5.90
36.45
GROUND FLOOR
1 AIR CONDITIONING SYSTEM LAYOUT PLAN
M-1 SCALE 1:235 METERS
DN
2hp ACCU
1 FIRE
REFR
2.25
IGERA
MALE TOILET
STEEL CABINETS
4Ø
A = 0.00 SQ.M.
3
NT
LINE
4.35
GUIDANCE ARCHIVE
STEEL CABINETS
TESTING ROOM/MEETING
OFFICE ROOM
A = 0.00 SQ.M. ROOM
FEMALE TOILET A = 30.00 SQ.M. A = 0.00 SQ.M.
A = 0.00 SQ.M.
PANTRY
2 DN
PRIVATE
COUNSELING
2.90
A = 0.00 SQ.M.
12.15
H A L L W A Y
3 6.10
PANTRY
SAO OFFICE
3.20
4 SAO DIRECTOR'S
OFFICE
1.70
A = 0.00 SQ.M.
REFRIGERANT LINE
3.10
5 CABINET
1.40
CABINET
6 1.5hp ACCU
7
4.80 3.84 5.51 2.93 3.08 0.87 2.83
23.85
SECOND FLOOR
1 AIR CONDITIONING SYSTEM LAYOUT PLAN
M-2 SCALE 1:200 METERS
LEGEND :
FLOOR MOUNTED AC UNIT
ACCU
OUTDOOR UNIT
EQUIPMENT DESIGNATION
EXISTING UNIT
270
REFRIGERANT
70
45 RETURN GRILLE PIPES
(AIR INLET)
REFRIGERANT 70 70 DRAIN LINE
PIPE HOLE Ø70 125 & ELECTRICAL
790 PIPE HOLE Ø70
WALL HANG BRACKET SUPPLY GRILLE DRAIN PIPE
(AIR OUTLET)
REFRIGERANT
.
REMOTE CEILING LINE PIPES
150
mm
MIN
VIBRATION ISOLATOR
CONTROLLER
HIGHEST POSSIBLE
VERIFY SITE
TO OUTDOOR Ca
rrie
r