Project on PP Bag Manufacturing Factory
Table of Contents
Executive Summary.............................................................................................................3
1. Introduction..................................................................................................................4
1.1 General Background..................................................................................................4
1.2 objective of the project...............................................................................................5
1.3 Project Rationale...................................................................................................6
1.4 The significance of the project...................................................................................7
1.4 Project Location and Land use..............................................................................8
2. The market Study.........................................................................................................9
2.1 Market Analysis.........................................................................................................9
2.3 Current supply..........................................................................................................10
2.4 Future market or Demand........................................................................................11
2.5 Target customers......................................................................................................11
2.6 Marketing promotion and strategy...........................................................................11
2.7 competition...............................................................................................................12
2.8 Farm Capacity and Production Progress.............................................................12
2.8.1 Farm Capacity..............................................................................................12
2.8.2 Production Program.....................................................................................12
3. Technical Study..........................................................................................................13
3.1 Product Process and Technology.............................................................................13
3.2 Raw Materials and Input..........................................................................................13
3.3 Production Process..............................................................................................14
4. Organizational Structure.............................................................................................17
4.1 Organization and management.................................................................................17
4.1.1 Man Power........................................................................................................17
4.1.2 Organizational Structure....................................................................................17
5. Financial Requirement and Analysis..........................................................................18
5.1 Fixed Investment......................................................................................................18
5.2 Working Capital..................................................................................................19
5.2.1 Operating Expense at full Capacity...................................................................19
5.2.2. Pre-service Expenses........................................................................................20
5.3. Summary of Total initial investment cost...............................................................20
a. Financial analysis and Statements..........................................................................21
5.3.1 Underlying Assumption....................................................................................21
1|Page
Project on PP Bag Manufacturing Factory
2|Page
Project on PP Bag Manufacturing Factory
Executive Summary
S.No
1 Project Name Roman Difabacho PP Bag Manufacturing
Factory
2 Project Promoter Roman Difabacho
Address-Bishoftu city
Phone-+251 911687111
3 Project Sector Manufacturing
4 Project Location Bishoftu City, Oromia Regional State
5 Proposed Own Land Area 5830 m2
6 Total Initial Capital Birr. 6,000,000.00 Source of fund
20%= 1,200,000.00 financed by owner
80%=4,800,000.00 financed by bank loan
7 Employment opportunity The total man power required for the plant will
be 46 employees at full capacity.
Permanent workers 46
Skilled 30 (20 Male & 10 Female)
Unskilled 16 (6 Male & 10 Female)
Temporary workers 60
Skilled 40 ( 25 Male & 15 Female)
Unskilled 20 (5 Male & 15
Female)
8 Project Composition PP Sheets,
Tiles
Bags,
Mats and other packing materials
products
3|Page
Project on PP Bag Manufacturing Factory
1. Introduction
Ethiopia is one of the East African countries with the diversified climatic
conditions, natural scenery and resource bases. Currently the country
has a total population of about 130 million of which more than 60
million are found in Oromia regional state. Oromia is one of the regional
states of Ethiopia with very fertile land, very conducive weather condition
for both crop production and animal husbandry.
The government of the country has been excreting its maximum effort to
expand investment opportunities in the country by designing different
policies and strategies that will facilitate investment through attracting
both domestic and foreign investors. Likewise, the Oromia regional state
government has been working day and night to make poverty history by
making its door open to investors both (domestic and foreign) to come
and invest in the region.
Fallowing the nation’s economic growth the manufacturing sector is
booming result in bridging the market demand gap of such products in
the country, The Government is highly inviting the private sector to work
on import substitution is highly motivating the private sector to respond
to the government invitation, there by contributing their share to the
development process.
It is with this back ground that, the promoter Roman Difabacho came
up with this project study that aims to establish PP Bag Manufacturing
Factory in Bishoftu town on 5830 m2 of land to be provided by the
government.
4|Page
Project on PP Bag Manufacturing Factory
5|Page
Project on PP Bag Manufacturing Factory
6|Page
Project on PP Bag Manufacturing Factory
7|Page
Project on PP Bag Manufacturing Factory
B. Land use
The envisioned project requires a total of 5,830 m2. The premises
required and the land use plan is indicated in the table below;
Land
SN Description requirements (M²)
1 Plant building 2,200.00
2 Product finishing room 400
3 Raw materials room 300
4 Office Space 200
Living accommodations for
5 on duty 300
6 Green Area 1,180
7 Security Guard Room 50
Inner Roads, Parking and
8 Unloading Area 1,200
Total 5,830.00
8|Page
Project on PP Bag Manufacturing Factory
The table shows the demand for PP BAG has increased rapidly in recent
years. The same is true for the domestic production as well as the
import.
2.2 Demands-Supply Gap
Currently in Ethiopia the major end users of PP bag are the agricultural
and manufacturing sectors. According the Growth and Transformation
Plan (GTP) of the 83-8 government the agriculture and industrial sectors
of the country are expected to register a growth rate of 8.6% and 20%,
respectively. However, in order to be conservative growth rate of 11% is
considered for PP bags which are equivalent to the expected growth rate
of the country’s GDP. Moreover, it is assumed that the highest local
9|Page
Project on PP Bag Manufacturing Factory
production during the period 2002 – 2011 which is 170 million indicates
the local production capacity of PP bag. Accordingly, the projected
demand and demand supply gap for PP woven bag estimated on the
basis of the above assumption and using the estimated present demand
as a base is presented in Table.
Table Projected Demand-Supply Gap For PP bag production
Projected
Demand
year (m2)
2013 3,296
2014 5,323
2015 7,574
2016 10,073
2017 12,846
2018 15,925
2019 19,342
2020 23,135
2021 27,345
2022 32,019
2023 37,206
2024 42,964
2025 49,356
10 | P a g e
Project on PP Bag Manufacturing Factory
11 | P a g e
Project on PP Bag Manufacturing Factory
2.7 competition
There are different forms of competition that may face the factory. These
are price and non-price based competition. Moreover, there are different
competitors that will compete with the project either directly or
indirectly. But the factory is under discussion has diversified marketing
strategies that could enable it cope-up with the different competitors in
the market. Moreover it will frequently conduct competitors research
which focuses on, the strength and the weaknesses, the different
competitor’s strategies, the techniques they use in rendering the product,
their customer handling methods, and others.
Years 3-
Description Years 1 Years 2 10
Capacity Utilization
(%) 70 90 100
PP Bags (pcs) 10,500 13,500 15,000
PP Sheets (M²) 7,700 9,900 11,000
PP Mats (M²) 8,400 10,800 12,000
12 | P a g e
Project on PP Bag Manufacturing Factory
3. Technical Study
3.1 Product Process and Technology
Plastic is a common name for Polymers: materials made of long strings
of carbon and other elements. Each unit in a string is called a
monomer, and is a chemical usually derived from oil. There are many
different types of plastic, depending on the starting monomer selected,
the length of polymer chains, and the type of modifying compounds
added. Each plastic is developed for a special purpose. However the
varied use of plastic in our everyday life has made it an integral
component in almost everything. Plastic is used in everyday items like
ballpoint pen, buckets, cups, glasses water pipes, plastic bags to items
of engineering excellence like cars and airplanes. According to some
experts, around 350 kilograms plastic is used in every car
manufactured in Germany. With such a high ratio of usage in
developed countries, plastic has become a cheap but an important
commodity.
Most of the plastic products are manufactured using two types of
technologies. Blow molding and injection molding. The proposed
project envisages the setup of a blow molding products manufacturing
business. The setup will produce plastic products i.e. tumbler, bottles,
canes, drums, water coolers etc. The manufactured products will then
be sold in the local market to generate revenue. The proposed project is
assumed to manufacture PP Sheets, Bags & Mats:
It is desirable to have a vast array of products where most of the plastic
manufacturers have at least 20 to 25 different product categories
running in their production line, but initially the entrepreneur, needs to
be careful in choosing the product mix of the right able to cover the
mold costs required for each separate item.
13 | P a g e
Project on PP Bag Manufacturing Factory
Extrusion
Weaving
Finishing & Stitching
Extrusion
The process of manufacturing PP woven bags involves mixing raw
materials starting with PP or HDPE pellets and other additives, extruding
the raw materials into a yarn PP resin is heated with feeler of CaCo3 and
pigment, melted and extruded as a flat film. It is then slit into tape yarn
by the slitting unit and stretched and annealed. Next, a take-up winder
winds the heat oriented tape yarn onto a bobbin.
The Raw Material (PP & Filler) in the Granules form is fed to a Raffia
Tape Manufacturing Plant to obtain the Raffia Tapes of PP. The Raw
Material Mix is prepared in a Tray adjacent to the Feed Hopper. The
prepared Mix is sucked in to the Hopper by Vacuum. The Raw Material
Mix is fetched to the Extruder of the Plant; where the same is melt by
14 | P a g e
Project on PP Bag Manufacturing Factory
The Rolls of Woven Cloth are carried out to the Finishing & Stitching
Section of the Unit. The Cloth is cut into desired size and the printed.
After printing the cut pieces are sent for stitching. Prior to the stitching
of the Cloth, a valve is made in one corner of the cut piece, as per the
Customers specification. The Woven Sacks passed through the Quality
Control Test are bundled in 500 or 1000 Nos. and pressed on a Bailing
Press. The pressed Woven Sacks are wrapped, bundled, packed and
dispatched.
15 | P a g e
Project on PP Bag Manufacturing Factory
The Quality Control checks are carried out at each and every step to
avoid rejections. The parameters pertaining to the Weight, Denier,
Bursting Strength etc. are strictly adhered to.
3.4. Project implementation
The project’s implementation is expected to take 8 months. The major
activities include Bank loan processing construction of the building,
cleaning the area around the building, Procurement of equipment’s and
start Manufacturing and Supplying product for market. The time
schedule for the above matured major activities is presented below:
Table: project Implementation schedule
SN Activities Date
1 Project request processing March, 2024
2 Project approval April, 2024
3 Bank loan processing May, 2024
4 Site Development May, 2024
5 Building and construction work June, 2024-Aug, 2024
6 Preparation for Product Sep, 2024
7 Processing and Supplying Oct, 2024
product for market
16 | P a g e
Project on PP Bag Manufacturing Factory
4. Organizational Structure
4.1 Organization and management
The organizational structure should be in a way that the company able to
achieve its objectives as well as the satisfaction and quality product.
General
Manager
17 | P a g e
Project on PP Bag Manufacturing Factory
1 Double screw
extruder with power
loader Unit 1 300,000.00 300,000.00
2 Injection Molding Unit 1 25,000.00 25,000.00
3 Blow Molding
Machine Unit 1 25,000.00 25,000.00
4 Crusher 14” Unit 1 10,000.00 10,000.00
5 Molds Unit 3 35,000.00 105,000.00
6 Lathe Machine 8 F1 Unit 1 32,000.00 32,000.00
7 Support structure
(cutter, batteries, etc.) Set 1 40,000.00 40,000.00
8 Mold Unit 1 30,000.00 30,000.00
9 Vacuum Thank Unit 1 98,000.00 98,000.00
10 Hauling Off Unit 1 60,000.00 60,000.00
11 Automatic cutting
machine Unit 1 75,000.00 75,000.00
18 | P a g e
Project on PP Bag Manufacturing Factory
19 | P a g e
Project on PP Bag Manufacturing Factory
b. Operating Expenses
S List of Items Annual cost in birr Assumptions Used
N
1 Audit and legal fee 2,400.00 200 birr/per ,month
2 Stationery supplies 2,400.00 200 birr/month
3 Promotional Cost 2,000.00 Lump sum annual cost
4 Property Insurance 36,000.00 1% of the building
5 Cleaning Supplies 12,000.00 1000 br. Per month
6 Uniforms 3,600.00 200 per person for 18 people
7 Water consumption 5,000.00 2500 m3 by 3.15 birr
8 Electric consumption 6,000.00 20000KWH By Br.0.4736
9 Fuel 0.00 2032 lit per year by Br. 21
10 Oil & lubricants 0.00 10% of fuel cost
11 Telephone & fax 6,000.00 500 per month
12 Repair expense 72,000.00 2% of building cost
13 Miscellaneous costs 9,600.00 800 per month
Total 157,000.00
20 | P a g e
Project on PP Bag Manufacturing Factory
21 | P a g e
Project on PP Bag Manufacturing Factory
0 4,800,000
1 781,178 301,178 480,000 4,498,822
2 781,178 331,296 449,882 4,167,526
3 781,178 364,425 416,753 3,803,101
4 781,178 400,868 380,310 3,402,233
5 781,178 440,955 340,223 2,961,279
6 781,178 485,050 296,128 2,476,229
7 781,178 533,555 247,623 1,942,674
8 781,178 586,911 194,267 1,355,763
9 781,178 645,602 135,576 710,162
10 781,178 710,162 71,016 0
b. Revenue
5.4.1 Production Program and Capacity
Based on plant capacity and progress this plant assumed to produce PP
Bags (pcs) 15,000 (psc), PP Sheets (M2) 11,000 (psc) and PP Mats (M²)
12,000 (M²) full capacity and processing 310 days per year and 8 hours
per day.
Considering the gradual growth of demand and the time required to
develop the required skill the rate of capacity utilization during the 1st,
22 | P a g e
Project on PP Bag Manufacturing Factory
2nd and 3rd year of production will be 70%, 90% and 100% respectively.
Full capacity utilization will be reach during the third year of processing.
PP Bags (pcs) 70
23 | P a g e
Project on PP Bag Manufacturing Factory
24 | P a g e
Project on PP Bag Manufacturing Factory
25 | P a g e
Project on PP Bag Manufacturing Factory
26 | P a g e