Gas Distribution Lines
Gas Distribution Lines
Gas Distribution Lines
3.5 m 4.5 m 5m
8m
4m
Shelf Shelf CONTROL ROOM Shelf Shelf
Work Bench: Laboratory Work Bench, 2 m wide x 60 cm deep, 90 cm high Note: All Work Benches should have compressed air supply line, sink, cold water supply line and overhead shelf
Shelf: Laboratory Shelf, 2 m wide x 30 cm deep, 50-60 cm high
W: Window, 1 m wide, 2 m high, 1 m from floor
Sketch 2: Gas Distribution Lines in Pilot Plant Lab -2
4.5 m 4.5 m 5m 4m 4m
8m
10 m 10 m
4m
Shelf
W Shelf
W Shelf
W Shelf
W
Shelf
Work Bench: Laboratory Work Bench, 2 m wide x 60 cm deep, 90 cm high Note: All Work Benches should have compressed air supply line, sink, cold water supply line and overhead shelf
Shelf: Laboratory Shelf, 2 m wide x 30 cm deep, 50-60 cm high
W: Window, 1 m wide, 2 m high, 1 m from floor
Sketch 3: Fume Cupboards in Reaction Engineering Lab