Nothing Special   »   [go: up one dir, main page]

POW Handwashing

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Republic of the Philippines

Department of Education
REGION VI- WESTERN VISAYAS
SCHOOLS DIVISION OF ESCALANTE CITY
LANGUB NATIONAL HIGH SCHOOL
(Formerly: BNHS-LANGUB EXTENSION)

PROGRAM OF WORKS

1. Name of Project : Installation of Handwashing Facility


2. Scope of Works : Masonry
3. Name of Office : Langub National High School 11,482 materials
4. Address : Brgy. Langub, Escalante City 4,518 labor
5. Appropriation : Php 11 16000
6. Source of Fund : MOOE JHS 2024
7. Date of Implementation : FEBRUARY 2024
8. Bill of Materials (Estimates) 11, 482.00

ITEM MATERIAL COST LABOR COST


DESCRIPTION UNIT QTY GRAND TOTAL
NO. UNIT COST TOTAL COST UNIT COST TOTAL COST
1 marine plywood 1/4" thick (4' X 8') pc 24 525.00 12,600.00 183.75 4,410.00 17,010.00
2 tek screw (for metal furring attached to plywood) pc 840 2.00 1,680.00 0.70 588.00 2,268.00
3 skim coat bag 2 586.00 1,172.00 205.10 410.20 1,582.20
4 flat enamel paint (white) gal 2 776.00 1,552.00 271.60 543.20 2,095.20
5 roller brush pc 2 130.00 260.00 45.50 91.00 351.00
6 paint brush pc 2 105.00 210.00 36.75 73.50 283.50
7 paint thinner gal 1 400.00 400.00 140.00 140.00 540.00
8 jalouplus window frame pc 12 680.00 8,160.00 238.00 2,856.00 11,016.00
9 sand paper no. 1000 pc 12 30.00 360.00 10.50 126.00 486.00
35,631.90

9. SUMMARY
Description Amount
A. Bill of Materials 35,631.90
B. Labor Cost 12,468.10
C. Delivery 500.00
10. Total Project Cost 48,600.00

Prepared by: Okay as to allocation: Reviewed by:

LOIDA C. ARO KATHY S. CINCO CLINT S. CINCO


School Princiapl Budget Officer ITO-I/Division PFC, Designate

Approved:

RENATO T. BALLESTEROS, PhD, CESO VI


Schools Division Superintendent

You might also like