Shop Drawing Submittal Form

TRS-CN-FRM-0020

General Information
Project Name Ummahat alshaykh Island 9.4-9.5 Project Code TRSDC-H11
R10-H11C23-ABT-
Contractor Abdullah Bintaleb co. Submittal No. MH-GF-SDW-AR-
31012
Contract No. R10-H11C23 Date 29-Mar-23
To the Engineer ATKINS & Partners Overseas
R10-H11D05-WTI-
R10-H11C23-ABT-MH-GF-SDW-AR-
Drawing No. Contract Drawing Ref. No. 00-ZZ-DWG-LS-
31012
20401
Discipline/Category Architectural Other (please specify)
Drawing Title Hub Pools Main Pool 2 PRECAST GENERAL DETAILS

The Contractor certifies that this submittal has been verified and coordinated by all related disciplines and related disciplines
and relevant subcontractors.

Contractor Certification

ADEL MAGDY 29-Mar-23


Name Signature Date

Design Consultant - Comments


Comments:

Engineer’s - Comments
Comments:
Refer Atkins Arch. review comments within page below and also within Aconex
comments box.
CODE-B (subject to final RSG review and comments)
Sirshad Shaikh Sd/- 10.04.2023
Name Signature Date

Status Code

☐ Accepted ☐ Accepted with Comments ☐ Revise and Resubmit

☐ Rejected ☐ Review not Required

Contractor Acknowledgement

Name Signature Date

Shop Drawing Submittal Form (TRS-CN-FRM-0020)


Revision 00,Rev. Date 05-May-2019 Page 1 of 1
NORTH

Key plan to be
Details to be provided THIS DRAWING

provided KEY PLAN


Detailed plan to be
provided & Section
line indicated

Hub Pools Main Pool 2

NOTES
Details to be 01- THIS DRAWING IS NOT TO BE SCALED. STATED DIMENSIONS
provided ONLY ARE TO BE CONSIDERED.
NORTH

KEY PLAN

POOL STEPS ( 150 mm RISERS ) 3 No. 400mm sq SUCTIONS GRIDS

LS-204
2
01
NOTES

01- THIS DRAWING IS THE PROPERTY OF : DEWAN AL EMARA - P.O.


BOX 60990, DUBAI, UAE IT IS NOT ALLOWED TO REPRODUCE
ITS CONTENTS IN ANY FORM EXCEPT FOR THE PURPOSE FOR
WHICH IT IS INTENDED.

02- THIS DRAWING IS NOT TO BE SCALED. STATED DIMENSIONS


ONLY ARE TO BE CONSIDERED.

03- ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION


OF THE ENGINEER AND RESOLVED PRIOR TO COMMENCEMENT
OF ANY WORK.

00 12/12/20 DD Issue WTI


No. Date Description Chk'd By
R E V I S I O N
LS-2 PROJECT :

3
0401
HOTEL 11
UMMAHAT ALSHAYKH ISLAND 9.3
CLIENT

ACCESS HATCH SURFACE DRAWOFF


INFINITY EDGE J:\2 - Live Projects\N196 - Ummahat Al Shaykh - AECOM KSA\09 Drawings\NA\In progress\Drawing borders\Current\R10-H11D06-DAE-04-ZZ-MOD-AR-00010-TRSDevCo-FinalIdentity-English+NoColor-949227.jpg

ACCESS HATCH
3rd Floor, Building IN01, ITCC Complex, Al Raidah Digital City,
Al Nakheel District 3807, Riyadh 12382-6726, Kindom of Saudi Arabia
BALANCE TANK SWL -150
EXECUTIVE ARCHITECT
Licence number - 5100000027
VALVE CHAMBER
J:\2 - Live Projects\N196 - Ummahat Al Shaykh - AECOM KSA\09 Drawings\NA\In progress\Drawing borders\Current\R10-H11D06-DAE-04-ZZ-MOD-AR-00010-DewanLogoColour-HiRes-949225.jpg

Olaya District
Riyadh 11625, KSA
TEL T +966 9200 29750
FAX F +966 9200 29750
EMAIL riyadh@dewan-architects.com
www.dewan-architects.com

SIGNATURE/DESIGN ARCHITECT
ACCESS HATCH
KENGO KUMA & ASSOCIATES
FFL -1350
2-24-8 Minamiaoyama Minato-ku Tokyo 107-0062 Japan
Telephone No. +81-3-3401-7721 (By-Cube 3F)
STRUCTURAL & FACADE ENGINEER
AKT II
White Collar Factory 1 Old Street Yard, London EC1Y 8AF,
UK. Telephone No. +44-0-20-7250-7777
MEP ENGINEER
HILSON MORRAN
Shackleton House, Hay's Galleria
HUB POOLS MAIN POOL 2 HUB POOLS MAIN POOL 2
1 PLAN VIEW 2 SECTION VIEW
4 Battlebridge Lande, London SE1 2HP, UK

1 : 100 1 : 25 INTERIOR DESIGNER


KRISTINA ZANIC DESIGN
CONSULTANTS
Al Shafar Complex, Office No. 01, First Floor, Umm Suqeim
1, Dubai UAE Telephone No. +971-4-288-2440
LANDSCAPE ARCHITECT
AECOM
Shackleton House, Hay's Galleria
4 Battlebridge Lande, London SE1 2HP, UK
FIRE ENGINEER
DESIGN CONFIDENCE

POOL DECKING TO BE PREPARED (BY OTHERS) IBN Battuta Gate Offices, Level 6, Gardens Cross Road,

WATER LEVEL
PO Box 454418 Dubai, UAE, Telephone No. +971-4-432-9277

Ø43mm S.S. AISI 316L POOL HANDRAIL (ABT)


KITCHEN & LAUNDRY
HUMBLE ARNOLD ASSOCIATES
Farriers House, Farriers Close, Codicote Hertfordshire SG4
8DU, UK Telephone No. +44-0-1438-821444
ACOUSTIC ENGINEER

WSP
INFINITY EDGE WEIR
SURFACE DRAW OFF
CHANNEL
UPSTAND TO PREVENT SAND MARINE ENGINEER
ENTERING THE DRAW OFF CHANNEL
JACOBS
DECK BUILD UP SWL -150

SUSTAINABILITY CONSULTANT
600.0000

FFL -720

ARCADIS
SWIMMING POOL CONSULTANT
FFL -1350

J:\2 - Live Projects\N196 - Ummahat Al Shaykh - AECOM KSA\09 Drawings\NA\In progress\Drawing borders\Current\WTI Logo.jpg

BALANCE TANK

IRRIGATION CONSULTANT
SSL -2300
INSULATION SUMP CONCRETE POOL FLOOR J:\2 - Live Projects\N196 - Ummahat Al Shaykh - AECOM KSA\09 Drawings\NA\In progress\Drawing borders\Current\Irritech logo add #1.jpg

STRUCTURE FINISHES

PLOT NO. LOCATION


KSA

Deck Level: +2400 3 HUB POOLS MAIN POOL 2


SECTION VIEW
1 : 25
DRAWING TITLE :

DRAWN BY
WTI
Hub Pools Main Pool 2
Plan and Sections

ARCHITECT
DAE
APPROVED BY
AECOM
DATE
12/12/2020

JOB NO. SHEET SIZE SCALE REV. NO.


R10-H11D05 A1 1:100 & 1:25 00
DRAWING NO.
R10-H11D05-WTI-00-ZZ-DWG-LS-20401

Water Level: +2250


Step Level: +2100 IFC - REFERENCE DRAWING
Step Level: +1950 DWG. NO. R10-H11D05-WTI-00-ZZ-DWG-LS-20401
Step Level: +1800 DWG. TITLE Hub Pools Main Pool 2 Plan and Sections
Step Level: +1650
Step Level: +1500
3x (525x525) S.S.MAIN DRAIN (ABT) R E V I S I O N
Step Level: +1350 3x (525x525) S.S.MAIN DRAIN (ABT) TYPICAL
F.F.L: +1050 FLOOR INLET FITTING FLOOR INLET FITTING
TYPICAL
(TYPICAL) Step Level: +1200 (TYPICAL) PROJECT :
T.O.C: +1035

MEMBRANE LEVEL: +1000 HOTEL 11


B.O.P: +815
UMMAHAT ALSHAYKH ISLAND 9.3
WATER TABLE LEVEL: +750

EXCAVATION LEVEL: +656 EXECUTIVE ARCHITECT


Licence number - 5100000027

Ø63mm uPVC FLOOR INLET LINE Ø90mm uPVC FLOOR INLET LINE Ø90mm uPVC FLOOR INLET LINE Ø110mm uPVC MAIN DRAIN INLET LINE
50x50x5mm EZZARI MOSAIC TILES (ABT) Olaya District
Ø110mm uPVC MAIN DRAIN INLET LINE Ø63mm uPVC FLOOR INLET LINE Ø63mm uPVC FLOOR INLET LINE Riyadh 11625, KSA
3mm TILES ADHESIVE (ABT) TEL T +966 9200 29750
Ø90mm uPVC FLOOR INLET LINE 7mm FIBER GLASS SHEET INSULATION (ABT) FAX F +966 9200 29750
EMAIL riyadh@dewan-architects.com
300mm PRECAST CONCRETE (ABT) www.dewan-architects.com
BITUMEN LAYER (ABT)
20MM PROTECTION CONCRETE FOR MEMBRANE
SIGNATURE/DESIGN ARCHITECT
Details to be 2 LAYER 4mm MEMBRANE (ABT)
KENGO KUMA & ASSOCIATES
provided BITUMEN LAYER (ABT)
50mm PCC (ABT) Detailed plan to be 2-24-8 Minamiaoyama Minato-ku Tokyo 107-0062 Japan
Telephone No. +81-3-3401-7721 (By-Cube 3F)
2 MAIN POOL 2 SECTION A-A
COMPACTED SOIL (ABT)
provided & Section
CLIENT
AR-31012 line indicated
N.T.S

Plans to be
provided 3rd Floor, Building IN01, ITCC Complex, Al Raidah Digital City,
Details to be Al Nakheel District 3807, Riyadh 12382-6726, Kindom of Saudi Arabia
Ø63mm uPVC VACUUM ADAPTOR CONNECTION INFINITY EDGE WEIR (ABT) provided
FIBER GLASS OVERFLOW CHANNEL GRATE (ABT)
STRUCTURAL & FACADE ENGINEER
WHITE PEBBLES AKT II
OVERFLOW CHANNEL
White Collar Factory 1 Old Street Yard, London EC1Y 8AF,
Deck Level: +2400 UK. Telephone No. +44-0-20-7250-7777
Water Level: +2250 MEP ENGINEER
Step Level: +2100
Step Level: +1950
Ø160mm uPVC VENTILATION HILSON MORRAN
F.L: +1950 F.F.L.: +1800
Step Level: +1800 Shackleton House, Hay's Galleria
T.O.C: +1750 4 Battlebridge Lande, London SE1 2HP, UK
Step Level: +1650
Step Level: +1500 INTERIOR DESIGNER
Step Level: +1350 KRISTINA ZANIC DESIGN
F.F.L: +1050
Step Level: +1200 CONSULTANTS
Al Shafar Complex, Office No. 01, First Floor, Umm Suqeim
T.O.C: +1035 MEMBRANE LEVEL: +1000
1, Dubai UAE Telephone No. +971-4-288-2440
B.O.P: +815 LANDSCAPE ARCHITECT
WATER TABLE LEVEL: +750
Ø160mm uPVC OVERFLOW ATKINS REVIEW-COMMENTS -
EXCAVATION LEVEL: +656
WATER TABLE LEVEL: +750 AECOM
BALANCE TANK
1. This drawing is 'ACCEPTED WITH Shackleton House, Hay's Galleria
4 Battlebridge Lande, London SE1 2HP, UK
Ø90mm uPVC VACUUM
OVERFLOW SUMP S.S.L: +400 COMMENTS' and to be extracted as 2D
ADAPTOR MAIN LINE PUDDLE FLANGE
B.O.C: +150
extracts for the asset from the approved (LOD FIRE ENGINEER
Ø90mm uPVC FLOOR INLET LINE 400) BIM Model and to Pool Designer & RSG DESIGN CONFIDENCE
EXCAVATION LEVEL: +72
Ø63mm uPVC FLOOR INLET LINE confirmation/approval and will need to be IBN Battuta Gate Offices, Level 6, Gardens Cross Road,
resubmitted for final approval/records and PO Box 454418 Dubai, UAE, Telephone No. +971-4-432-9277
7mm FIBER GLASS SHEET INSULATION (ABT)
50x50x5mm EZZARI MOSAIC TILES (ABT) 250mm PRECAST CONCRETE (ABT) need to resubmitted also if BIM model (LOD KITCHEN & LAUNDRY
3mm TILES ADHESIVE (ABT) BITUMEN LAYER (ABT) 400) is not approved and the same will need HUMBLE ARNOLD ASSOCIATES
7mm FIBER GLASS SHEET INSULATION (ABT) 20MM PROTECTION CONCRETE FOR MEMBRANE to be reflected within the final As-built Farriers House, Farriers Close, Codicote Hertfordshire SG4
300mm PRECAST CONCRETE (ABT) 2 LAYER 4mm MEMBRANE (ABT) drawings as well. 8DU, UK Telephone No. +44-0-1438-821444
BITUMEN LAYER (ABT) BITUMEN LAYER (ABT)
2. Refer all comments within the drawing. ACOUSTIC ENGINEER
20MM PROTECTION CONCRETE FOR MEMBRANE 50mm PCC (ABT)
2 LAYER 4mm MEMBRANE (ABT)
3. Resubmission required with all updated WSP
COMPACTED SOIL (ABT)
BITUMEN LAYER (ABT) details provided herein.
50mm PCC (ABT)
COMPACTED SOIL (ABT) MARINE ENGINEER

3 MAIN POOL 2 SECTION B-B ACCEPTED WITH COMMENTS


JACOBS
AR-31012 N.T.S
SUSTAINABILITY CONSULTANT

STANDARD NOTES :
HUB POOLS (MAIN POOL 2) ARCADIS
1.ITEMIZED LOCATION & DETAILS INDICATED WITHIN THIS DRAWING ARE TO FULLY CONFORM TO LATEST APPROVED BIM MODELS AND EXTRACTED FROM BIM-LOD400DRAWINGS FOR THE ASSET. LEGEND:
2. ALL CONSTRUCTION ELEMENTS ARE TO BE FULLY COORDINATED BETWEEN THE SPECIALIST POOL CONTRACTOR, MEP CONTRACTOR & EXTERNAL WORKS-LANDSCAPING NO. SYMBOL ITEM'S DESCRIPTIONS SPECIFICATIONS QTY. SUPERVISION CONSULTANT
WORKS (CONTRACTOR) WORKS WHEREVER INTERFACED WITH.
3. ALL MATERIALS INDICATED HEREIN TO BE PRIOR APPROVED VIA MARs PRIOR TO PROCUREMENT & PROCEEDING WITH WORKS ON SITE. SAND FILTERS (CARTRIDGE FILTER) 150 GPM, 420SQ FT 1.5” CONNECTION WITH HIGH FLOW
SF MANUAL AIR RELIEF VALVE (CCP 320)
3 Nos.
PENTAIR WATER, U.S.A Is the BIM Model for
4. GAUGE, GRADE & BRAND/MAKE OF MATERIAL ITEMS INDICATED HEREIN TO BE FULLY SPECIFIED. ELEV. PLAN

5. LEGENDS AND SYMBOLS TO BE PROVIDED WITHIN THE TITLE BLOCK . ELEV. CIRCULATION PUMPS 10 HP, 380 / 440V – 60HZ, 3 PHASE , 300 GPM AND 85 FT, this building
CP 2 Nos. submitted and
PENTAIR WATER, U.S.A FIBER CASING PUMP WITH BASKET STRAINER
6. PIPE SIZES TO BE AS PER APPROVED HYDRAULIC CALCULATIONS. PLAN
SWIMMING POOL CONSULTANT
approved in Aconex ?
7. 'ALL UPDATED DETAILS' TO BE FULLY INCORPORATED WITHIN FINAL AS-BUILT DRAWINGS. BP
PLAN
BOOSTER PUMP 10 HP, 380 / 440V – 60HZ, 3 PHASE , 300 GPM AND 85 FT,
1 No.
ELEV. PENTAIR WATER, U.S.A FIBER CASING PUMP WITH BASKET STRAINER

CHEMICAL DOSING PUMPS


CD PULSAFEEDER, U.S.A MODEL: LBS4 CAPACITY: 58 GPD, DIPHRAGM TYPE, 220v
2 Nos.
ELEV. PLAN

CHEMICAL TANKS IRRIGATION CONSULTANT


CT PULSAFEEDER, U.S.A CAPACITY: 35GALLONS POLYPROPYLENE MADE.
3 Nos.
ELEV. PLAN

® ® pH
pH
7.5
® pH / ORP
AUTOMATED CONTRLLER

ORP
650

CHEMICAL CONTROLLER
CC 1 No.
ORP

pH ORP

pH

ELEV. PLAN HAYWARD, U.S.A MODEL: CAT 2000, PH and ORP Control, 220/110v,

SALT CHLORINATOR SWIMMING POOL CONTRACTOR :


SC PENTAIR
INTELLICHLOR IC-30, 220V INCLUDE WITH ACCESSORIES 1 No.
ELEV. PLAN

HEAT PUMP HEATING CAPACITY: 210KW, COOLING CAPACITY: P.O.Box: 15310, Riyadh 11444

HP 150KW SUPPLY VOLTAGE: 380-415/3N/60HZ 1 No. A.BIN TALEB FOR SWIMMING POOLS CO.
Kingdom of Saudi Arabia
Tel.: + 966-11-248-4111
ISO. PLAN PENTAIR WATER, U.S.A RIYADH - SHARJAH - JEDDAH - KHOBAR - ABHA-BURAIDA
Fax.: + 966-11-248-4541
C.R. 1010157278
SWIMMING POOL
DESIGN www.bintaleb.com
MAIN DRAINS 500 MM X 500 MM FRAME & GRATE,
MD 3 Nos.
Landscape Comments : ELEV. PLAN ASTRAL SPAIN
STAINLESS STEEL MADE MATERIAL
PLOT NO. LOCATION
FILTRATION (FLOOR) INLETS KSA
FI 2" CONNECTION , STAINLESS STEEL MADE MATERIAL 18 Nos.
ASTRAL SPAIN
1. All levels, coordinates and dimensions to be coordinated with the landscape contractor and latest/modified approved Landscape drawing. ELEV. PLAN
DRAWING TITLE :
VACUUM ADAPTORS
2. All coping and skirting finish material and grout color to be approved from RSG Landscape design team as well. VA 2 " CONNECTION , STAINLESS STEEL MADE MATERIAL 3 Nos. Hub Pools Main Pool 2
ASTRAL SPAIN
ELEV. PLAN
PRECAST GENERAL DETAILS
UWL UNDER WATER LIGHT IK10,TEMPERED GLASS,CRYSTAL CLEAR STAINLESS
8 Nos.
FILIX / CROATIA STEEL TYPE 316L,MARINE GRADE 3W/12-24 VDC BIM FILE REFERENCE :
GENERAL NOTE : ELEV. PLAN
R10-H11C23-ABT-PH-XX-MOD-PO-00001.nwc
DECK/JUNCTION BOX 100x100mm, ABS PLASTIC MADE.
DB 8 Nos. Asset code to be DRAWN BY ARCHITECT APPROVED BY DATE
AKUA4CE, K.S.A
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LANDSCAPE, EXTERNAL MEP WORKS' DRAWINGS AND ALL INTER- ELEV. PLAN

PANEL ASSEMBLED IN ABTCO STANDARD.For the power supply of all matched


ON
L1

FILTRATION PUMP
TRIP
L2

FILTRATION PUMP
ON TRIP ON
L3

AIR BLOWER
TRIP

ELECTRIC CONTROL PANEL ABT GROUP ENG. ADEL 29-03-2023


DISCIPLINARY COMMENTS TO BE FULLY INCORPORATED BEING SEPARATELY PROVIDED WITH. 1 No.
AUTO HAND AUTO HAND ON OFF

electrical motors, chemical controlling system, pool lights. Equipped with all
PRESSURE PUMP DOSING PUMP PH DOSING PUMP ORP
ON TRIP ON ON

ON OFF AUTO HAND AUTO HAND

ECP
OZONE U.W LIGHT
ON ON

ON OFF ON OFF
MM

ELECTRA AL FANAR K.S.A


D=200

MCCB, MCB, Contactors, Over Load Relays, indicators etc. All the
2. ANY STRUCTURAL (PRECAST CONSIDERATIONS) TO BE FULLY COMPLIED WITH AND DEDICATED STRUCTURAL
ELEV. PLAN
components UL listed. Cabinet Al-fanar make BIM - REFERENCE DRAWING JOB NO. SHEET SIZE SCALE REV. NO.

DRAWINGS AND ASSOCIATED CALCULATIONS TO BE SEPARATELY SUBMITTED AND GOT PRIOR APPROVED PRIOR TO UV GENERATOR 3 LAMPS/320W/438 GPM WITH 6” PORT R10-H11C23 A1 N.T.S. C1
PLAN R10-H11C23-ABT-PH-XX-MOD-PO-00001.nwc
UV SIZE CONNECTION (CLP63A8-XN) 1 No.
PROCEEDING WITH WORKS ON SITE. ELEV.
PENTAIR, U.S.A
DRAWING NO.
R10-H11C23-ABT-MH-GF-SDW-AR-31012