Chennai Metro Phase ||

Project˖ DZ1040 Ring˖ 11

Begin time˖ 9/20/2023 11:13:11 PM End time˖ 9/21/2023 11:54:07 AM Page˖ 1/4

Work efficiency:

Advance : 102 Min Ring Building: 367 Min Standby time: 293 Min Total : 762 Min

Cutter Wheel: Avg Max Min


Speed[rpm]: 1.5 1.6 0.6

Torque[kNm]: 1507 2164 396

Rolling[mm]: -7 2 -12

Thrust: Avg Max Min

Thrust[kN] : 12251 13924 905

Speed[mm/min] : 12 17 0

Penetration[mm/r] : 7.8 11.4 0.3

Thrust cylinder:
Avg(bar) Max(bar) Min(bar)

Group A
118 144 37
Group B
38 46 14
Group C

Group D 111 137 46

0 Avg pressure(bar)
400 147 158 50

2300

0 A B C D A B C D A B C D

Min stroke(mm) Max stroke(mm) Accumulate stroke(mm)


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 11

Begin time˖ 9/20/2023 11:13:11 PM End time˖ 9/21/2023 11:54:07 AM Page˖ 2/4

Articulation cylinder:
200 200

0 0
A B C D A B C D
Min stroke(mm) Max stroke(mm)
Avg Max Min
Contact Forcr(kN): 9315 12436 5645

Grout Injection: AVG(bar) Max(bar) Min(bar) Vol(L/Line) Total(L)


1 1.1 4.8 0 1900.0 4600.0

2 0 0 0 800.0
1# Liquid
A 3 0.6 4.8 -0.2 500.0
2#
4 1.4 12.1 -0.2 1400.0
3# 0.7 3.9 0 170.0 410.0
1
4# 2 0.7 2.7 0.4 60.0
Liquid
B 3 0.6 3.8 0.3 50.0
0
4 0.8 4.9 0 50.0
Avg pressure at Ports 25
Total(A And B) 5010.0 L

Earth Pressure(Excavation Chamber): Avg(bar) Max(bar) Min(bar)


1.7 2.2 1.4
1#
1.8 2.3 1.5
2#
1.9 2.4 1.6
3#
4# 1.9 2.3 1.6
5# 1.7 2.3 1.2
6#
1.4 1.6 1.1

0 Avg pressure(bar) 6 Total:


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 11

Begin time˖ 9/20/2023 11:13:11 PM End time˖ 9/21/2023 11:54:07 AM Page˖ 3/4

Screw Conveyor: Avg Max Min


Speed[rpm]: 3 4 0

Pressure[bar]: 55 74 28
Torque[KNm]: 14 24 0

Front(Bar) Center(Bar) Rear(Bar)


Earth Pressure Sensor(AVG):

Tail skin grease:


1 2 3 4 5 6 7 8

Front 74 52 52 81 85 52 52 74

Rear 85 63 63 85 75 53 47 62

Front 522 Impluses Total Weight: 475.17 kg

Rear 533 Impluses Total pulses: 1055 Impluses

Foam:
Avg pressure(bar) Max pressure(bar) Min pressure(bar) Sum air(m³)Litres Sum liquid(m³)Litres

1 3.5 6.8 0.9 5.4 1.82

2 3.3 6.1 0.1 5.7 1.81

3 3.3 4.9 1.9 20.5 1.8

4 2.6 3.5 1.5 24.7 1.8

5 2.7 3.7 2.2 24.3 1.92

6 2.3 3.8 0 24.6 1.91

Foam concentrate : 110 L polymers: 0 L


Water : 0 L Bentonite : 3.8 L
Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 11

Begin time˖ 9/20/2023 11:13:11 PM End time˖ 9/21/2023 11:54:07 AM Page˖ 4/4

Grease: EP2: HBW:


Impluses Kg
Outer Seal : 5316
Impulses HBW: 1945 Impluses

Screw Conveyor: 739 Impluses Kg 972.5


Total Weight of HBW: Kg
Rotary Joint : 249 Impluses Kg
Articulation joint : 250 Impluses Kg
Erector Bearing: 2.09 Impluses Kg
Erector Wheel: 0 Impluses Kg

Total Weight of EP2: 0 Kg Total Impluses of EP2: 0 Impluses

Gas Measuring: Avg Max Min


Methane Gad(CH4) : 0 0 0

Hydrogen sulfide(H2S) : 0 0 0
Carbon Monoxide(CO): 0.2 32.2 0

Oxygen(O2): 21.7 21.9 21.6