File 395
File 395
File 395
• Introduction of NTDC
• NTDC Projects
• Human Resource
3
BACKGROUND OF PAKISTAN POWER
SECTOR
In 1992, GOP approved commercialization and privatization of Power Sector
with the objective of:
a) Enhance capital formation outside the GOP budget
b) Improve efficiency thru competition, accountability, managerial
autonomy, and profit incentives
c) Rationalize prices and social subsidies
In 1994 PPIB was established
In 1997 NEPRA was established
In 1998 the power wing of WAPDA was restructured in to:
Three Generation Companies (GENCOs)
One National Transmission and Dispatch Company (NTDC)
Eight Distribution Companies (DISCOs). Subsequently one more GENCO
and two DISCOs spun out from the existing
In 2000 Privatization Commission was established
In 2005 KESC was privatized thru transfer of 73% equity
4
In 2015, CPPA-G spun out from NTDC
ENEGERY DEMAND & SUPPLY AND HISTORICAL VIEW
5
HISTORICAL GENERATION MIX (Including
KESC)
Installed Capacity Thermal and
Year Hydel
(MW) others
1947 61
Pre-WAPDA 119 44% 56%
1965 636 42% 58%
1975 1,740 50% 50%
1980 2,685 58% 42%
1985 4,339 67% 33%
1990 6,409 45% 55%
1995 10,563 46% 54%
2000 14,444 33% 67%
2005 17,395 37% 63%
2010 18,892 34% 66%
2015 22,666 31% 69% 6
HISTORICAL GENERATION MIX (Including
KESC)
Installed Capacity Thermal and
Year Hydel
(MW) others
2016 22,481 32% 68%
2017 28,453 25% 75%
2018 31,743 26% 74%
7
HISTORICAL DEMAND & SUPPLY POSITION
Computed Peak
Corresponding Supply Surplus/ Shortfall
Fiscal Year Demand
(MW) (MW)
(MW)
2007-08 17,398 12,442 -4,956
2008-09 17,852 13,637 -4,215
9
NET ELECTRICAL OUT PUT
Import from KE - - 29
10
NET GENERATION OUTPUT IN Million KWH (UNIT)
Type Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18
Hydel 3.8 4.1 4.1 2.4 2.2 1.2 0.6 1.3 0.8 1.4 2.1 -
GENC
6.4 6.3 5.3 6.0 4.0 5.6 6.0 4.6 6.4 7.5 8.5 -
O
IPPs 2.5 2.4 2.1 1.8 0.9 0.9 1.3 1.0 1.4 1.1 1.6 -
11
PAKISTAN POWER SECTOR
(Unbundled Power Wing of WAPDA)
NEPRA Ministry
(W&P)
KESC
(Vertically
Integrated utility)
IPPs
Oth
u m er
er C
ers
Thermal
n s ow
CPPA
C o LK P
on
WAPDA
su
BU
m
HYDRO BULK Power
ers
Consumers
DIST
Nuclear
GEN
Imports
Provision of Service
Financial Flows
12
ENABLING THE REFORM AND RESTRUCTURING
GOVERNMENT OF PAKISTAN
WAPDA PEPCO
Water K-
SPPs/
Projects & GENCOs DISCOs NTDC PPIB AEDB IPPs Electric
CPPs
Dams
CPPA-G
14
INTRODUCTION OF NTDC
8
CORE FUNCTIONS
Incorporation
• 6th Nov, 1998
• Commencement of business 24th Dec, 1998
Transmission License
• Granted on 31st Dec, 2002
• Modification on 4th Sep, 2015
Board of Directors
• Members: 12
• Appointed by GOP
17
CORPORATE STATUS OF NTDC
In Nov, 1998 NTDC was incorporated as a Public Ltd.
Company
The paid-up Capital is Rs. 52.7 Billion (5.27 Billion
ordinary shares of Rs. 10 each)
GoP owns 88% shares whereas employee owns 12%.
GOP issued Certificate for Commencement of Business
to the Company on Dec 24, 1998 and it started
commercial operations from March 01, 1999.
in Dec, 2002 NEPRA granted Transmission License to
NTDC to engage in the exclusive transmission business
for a term of thirty (30) years,
The 1st tariff determination was announced by NEPRA in
April, 2004. 18
NTDC VISION STATEMENT
19
NTDC MISSION STATEMENT
21
MAXIMUM DEMAND OF DISCOs NON-ACCIDENTAL
Total 24,
946
22
BRIEF BUSINESS OF NTDC
Continue…… 23
POWER PLANT INTERCONNECTIONS
Power Plant
Sr. No. Fiscal Year
Interconnections
1 Upto 2014-15 75
2 2015-16 4
3 2016-17 26
4 2017-18 20
Total 125
24
ORGANIZATIONAL STRUCTURE OF NTDC IN RECENT
PAST
BOD
Company
GM (CCC)
Secretary
M.D. NTDC
Technical Team
GM/Tech.
GM (Planning) GM (SO) GM (GSO) GM (GSC) GM (Projects) GM (Services) GM (HV&SC)
Dir.
Non-Technical Team
25
PRESENT ORGANIZATIONAL STRUCTURE OF NTDC
“The Present”
26
Board of Directors NTDC
GM (Asset Management–
GM (Technical North) GM (HR) 6
Services Group)
GM (Asset Management–
South)
GM (SO) NPCC CLO 7
GM (Procurement &
Contract Management)
GM (Performance
Assessment) GM (Design & CIS 8
Engineering)
CE (DASU)
GM(Technical) 10
ROLE OF VARIOUS NTDC DEPARTMENTS
20
ROLE OF GM (PERFORMANCE ASSESSMENT) NTDC
29
ROLE OF GM (SO) NPCC
1. Economic Dispatch.
2. Maintaining balance between supply & demand.
3. Frequency and voltage control.
4. Operational Control of Power Network.
5. Maintaining security & stability of network.
6. Month-wise Annual Energy Estimation.
7. Scheduling of maintenance shut-downs on power-plants &
Transmission network elements.
8. Short to medium term operational planning.
9. Advance notifications to thermal plants for fuel
arrangement.
10. Collection of system data and preparation of reports
30
ROLE OF GM DESIGN & ENGINEERING
NAME OF
500 kV 220 kV TOTAL
REGION
(Nos.)
ISLAMABAD 2 10 11
LAHORE 5 19 24
MULTAN 4 5 9
QUETTA 0 5 5
HYDERABAD 5 5 10
G.TOTAL 16 44 60
33
500 kV GRID STATIONS
Sr.
Region Locations
No.
1 Sheikh Muhammadi Peshawar
Islamabad
2 Rawat
3 Sheikhupura
4 Gatti (Faisalabad)
5 Lahore New Lahore
6 Yousafwala
7 Nokhar (Gujranwala)
34
500 kV GRID STATIONS
8 New Multan
9 MuzaffarGarh
Multan
10 D.G Khan
35
220 kV GRID STATIONS
Sr. No. Region Locations
1 Islamabad University
2 Mansehra
3 Chakdara
4 Sangjani
5 Burhan
Islamabad
6 Mardan
7 Shahi Bagh
8 Daud Khel
9 Bannu
10 D.I.Khan
11 New Kot Lakhpat
12
Bund Road
Lahore
13 Sarfraznagar
14 Wapda Town 36
Continued……
220 kV GRID STATIONS
15 Ravi
16 Kala Shah Kaku
17 Ghakkar
18 Bandala
19 Sialkot
20 Lahore Nishatabad, Faisalabad
21 Jaranwala Road Faisalabad
22 Summundari Road Faisalabad
23 Shalamar
24 Ghazi Road
25 Toba Tek Singh
37
220 kV GRID STATIONS
Sr. No. Region Locations
26 Ludewala
27 Okara
Lahore
28 Kassowal
29 Gujrat
30 New MuzaffarGarh
31 Chishtian
32 Multan Bahawalpur
33 Vehari
34 Lal Sohanra (Solar Park)
Continue…… 38
220 kV GRID STATIONS
39
ROLE OF PROJECT DELIVERY (GSC) NTDC
40
SALIENT FEATURES OF NTDC TRANSMISSION
NETWORK
It is longitudinal network i.e. It extends from North to
South
Hydro generation is mainly in Northern part of the
country and major thermal generation in South & in
lower middle part of network
Large load centers are remote from major generation
sources
Seasonal variation in generation despatch and in
power flows:
• Bulk power flows from North to mid-country in
summer
• Bulk power flows South to mid-country & North in
winter
42
GENERATION AT 500KV LEVEL
Sr. No. Name of the Plant Capacity (MW)
1. Rousch 450
2. HUBCO 1,292
3. Guddu New 747
4. Tarbela 2,778
5. Tarbela-17 470
6. Ghazi Barotha 1,450
7. Bhikki 1,198
8. Haveli Bahadur Shah 1,230
9. Sahiwal Coal 1,320
10. Port Qasim 1,320
11. Baloki (Testing) 1,223
12. Neelum Jehlum (Testing) 485
Total 13,957
43
Generation at 220kV Level
Sr. No. Name of the Plant Capacity (MW)
1. Allai Khwar 121
2. Tarbela 720
3. Mangla 800
4. Atlas 219
6. Muzzafargarh-I 950
7. Muzzafargarh-II 400
8. AES Pakgen 365
9. AES Lalpir 362
10. Kot Addu 1,226
11. Guddu 1,655
12. Engro Energy 226
13. Foundation Power 184
14. Uch 586
15. Uch-II 393
16. Jamshoro 850
17. C1,C2,C3,C4 1,345
Total 10,402 44
POWER EVACUATION ON DIFFERENT VOLTAGE
220 kV 10,652
132 kV 7,384
Total 31,993
45
NTDC TRANSMISSION EXPANSION PLAN
“The Future”
46
PLANNED NTDC
NETWORK
YEAR 2024-25
46
SUMMARY OF NTDC TRANSMISSION EXPANSION PLAN
Upto 2024-25
NTDC Transmission System Information
500 kV 220 kV Generation
Description
No. of Grid Capacity Transmission No. of Grid Capacity Transmission Addition (MW)
Stations (MVA) Lines (km) Stations (MVA) Lines (km)
FY 2024-25
01 1500 350 01 500 670 865
49
NTDC PROJECTS
50
ONGOING PROJECTS
51
ONGOING PROJECTS
Ongoing Projects
PC-I Cost Expected
Sr. MVA Addition in PC-I Approval
Name of the Project Financing (MRs. Completion
No. Capacity T/L (km) Date
MUS$)
01 No. T/F
220 kV GIS Ghazi Road 2592
1- 2x250 30 25.02.2005 KfW Energized on
Lahore G/S 43
16.01.2019
Completed
ADB Tr-IV 4397
2- 220kV Chakdara G/S 2x250 85 03.10.2014 on
MFF-I 45
16.09.2018
Transmission Line
3rd 500 kV Circuit from Jamshoro to ADB- Tr-III 36857
11- - 600 26.08.2013 31.12.2018
Rahim Yar Khan MFF-I 351
Ph-1: completed
Ph-1: 150km Own 21697
1- 969 MW Neelum Jhelum HPP - 02.03.2015 on 01.02.2018
Ph-2: 130km Resources 218
Ph-2: Feb 2019
Reinforcement in Islamabad
-
and Burhan area for Tarbela - - - -
4th Extension:
58
FY 2019-20
Planned Projects (2019-20)
Estimated
Sr. MVA Addition in Date of Cost Expected
Name of the Project Financing
No. Capacity T/L (km) Approval (MRs. Completion
MUS$)
Submitted to
Procurement of 5 No 220kV USAID 6202
2- - - MoE on 2019-20
Mobile Grid Stations 53
04.06.2018
2x750
125 (220 kV) 9380
7- 500 kV Faisalabad West GS + 12.01.2015 JICA 2020-21
32 (500 kV) 93
3x250
2x450
6710
8- 500kV Chakwal G/S + 33 12.04.2017 KFW 2020-21
64
4x160
14,155
9- 220kV Mastung G/S 2x250 120 22.05.2018 WB 2021-22
128
2x750
500 kV Islamabad West G/ 35 (220 kV) 8288
10- + 20.07.2016 WB 2021-22
S 27(500 kV) 79
3x250
Approved by
Enterprise Resource 2583
11- - - CDWP on WB 2021-22
Planning System. (ERP) 23
19-03-2018
Evacuation of Power from
Recommended ADB Tr-III
Suki Kinari, Kohala and 500kV 75680
12- - by CDWP on & Tr-IV 2021-22
Mahal Hydro Power 697 675
24-05-2018 MFF-II
Projects
Evacuation of Power from
2x660 MW Coal Based 275 Yet to be 21783
13- - 12.04.2017 2021-22
(SSRL)/ (SECL) Power (500kV) arranged 208
Plant at Thar
Planned Projects (2021-22)
Estimated Cost
Sr. MVA Addition Expected
Name of the Project PC-I Status Financing (MRs.
No. Capacity in T/L (km) Completion
MUS$)
Ready for
Yet to be
submission to 4813
14- 220kV Larkana Grid Station 3x250 65 arranged 2021-22
MoE 43
Upgradation/Extension of
ADB Tr-II 11410
15- NTDC's Telecom & SCADA - - 07-03-2018 2021-22
MFF-II 108
System
Cleared by
Yet to be 5505
16- 220kV Head Faqirian 2x160 88 CDWP on 2021-22
arranged 44
17.10.2018
2x750 Submitted to PC
ADB Tr-IV 5404
17- 500kV Moro Grid Station + - on 2021-22
MFF-II 46
3x250 12-11-2018
Submitted to
220kV Dharki-Rahimyar ADB Tr-IV 12273
18- - 335 PC on 2021-22
khan-Bahawalpur D/C T/L MFF-II 119
12.07.2018
Yet to be 2398
19- 220kV Jamrud G/S 2 x 250 20 19-10-2017 2021-22
arranged 23
Under process
Yet to be 4909
20- 220 kV Nawabshah 3x250 65 of approval in 2021-22
arranged 43
PC
2022-23
Planned Projects (2022-23)
Estimated Cost
Sr. MVA Addition Expected
Name of the Project PC-I Status Financing (MRs.
No. Capacity in T/L (km) Completion
MUS$)
60 Yet to be 5000
9- 220kV Haripur Substation 2x250 Under Study 2022-23
(220kV) arranged 40
2023-24
Planned Projects (2023-24)
Estimated Cost
Sr. MVA Addition Expected
Name of the Project PC-I Status Financing (MRs.
No. Capacity in T/L (km) Completion
MUS$)
Yet to be 4500
1- 220 kV Arifwala 2x250 10 -do- 2023-24
arranged 43
On Going Projects
Provinces (No. / Rs. Billion)
Baluchistan 11/128
Sindh 12/300
Punjab 23/428
KPK 8/41 75
50
HUMAN RESOURCE
76
MAN-POWER (TECHNICAL VS NON-TECHNICAL)
59
MAN-POWER STATISTICS AS ON 21-06-2018 (OFFICERS)
Total
BPS Sanctioned Regular Contract Working Vacant
20 62 37 2 39 23
19 100 79 2 81 19
18 373 298 6 304 69
17 881 587 187 774 107
Total 1416 1001 197 1198 218
60
MAN-POWER STATISTICS (OFFICIALS) AS ON
21-06-2018
Sanctione
BPS d Regular Contract D/Wage Total Vacant
16 442 291 15 0 306 136
15 1166 771 84 0 855 311
14 1127 541 143 0 684 443
13 34 22 0 0 22 12
12 30 9 3 0 12 18
11 686 457 25 1 483 203
10 0 0 0 0 0 0
9 1318 737 73 0 810 508
8 1063 658 85 5 748 315
7 1509 617 303 13 933 576
6 1577 933 321 0 1254 323
5 172 39 11 1 51 121
4 17 12 0 0 12 5
3 147 75 30 0 105 42
1,2 1713 964 317 38 1319 394
Total 11001 6126 1410 58 7594 3407 61
CHALLENGES & ISSUES
80
CHALLENGES TO THE COMPANY
NTDC runs an integrated system which connect Generators with
Load Centers but unable to control both of them being independent
entities. Partial Power Breakdowns in the country dated 15.01.2016
initiated from Muzaffargarh, 21.01.2016 and 16.05.2018 from Guddu
and 21.05.2018 from Rawat as NTDC, neither own 132kV Network
nor the sub-station at Generation end.
Transmission Network is under tremendous stress due to system
constraints creating an unbalance between demand and supply, so
system is suffering from under frequency, low voltage & power loss
problem. Consequently the system experiences violation in voltage
beyond + 5% and frequency + 1%.
Therefore, NTDC has under taken an ambitious Expansion &
Augmentation Plan to address these issues.
NEPRA has allowed Annual Average Loss of 2.8% which is less than
the actual Transmission & Transformation Loss, which may deprive
NTDC worth multi-billion rupees.
81
CHALLENGES TO THE COMPANY
Weak industrial base in the country
Only a few vendors are providing quality material of 220kV & 500kV
Transmission Line Towers
Restructuring
Autonomy
Capacity building
82
OTHER IMPORTANT ISSUES
84
SWOT ANALYSIS
STRENGTHS
NTDC is a leading licensee of Transmission system so a major
player of National Power System.
Large & growing population.
Stable Regulatory Environment
Wheeling of Power between North & South.
Abundant Resources of Power Generation
WEAKNESSES
Existing infrastructure & facilities are inadequate to cater the
requirements of evacuation of power.
Due to constraints/resources, difficult to meet growing needs of
public at large.
Push & Pull between GoP/Ministry and Regulator.
Frequent breakdowns/non compliance to Regulatory requirements.
Congestion at Major load centers. 85
SWOT ANALYSIS
OPPORTUNITIES
NTDC operates in semi-monopolistic environment.
NTDC own fix assets worth Billion of Rupees; Financial institutions
are always inclined to lend.
Due to better career growth, Youth is inclined to join.
Ever increasing market demand is opening new avenues.
High return on investment.
THREATS
Higher expectations to deliver.
Old & obsolete equipment and infrastructure.
Political and social instability.
Extensive development of Generation facilities.
Inadequate Revenue collection plus compulsory sale of 650MW
Power to K-Electric with no Monitory return.
86
Any Question ?
THANK YOU