Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Company Name: China State Construction Engineering Corporation Middle East LLC.
Project Title: Baniyas North Development – Phase 3
Work Description: Risk Assessment for Soil Improvement Works (Night Shift)
Page 3 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Rev No: 0
Adequate supervision.
Utilization of Trained & competent workmen.
• Site personnel unaware of 2 4 8 H Proper TBT before start of shift 1 4 4 M
potential hazards Briefing of MS & RA.
Briefing of emergency procedure.
Page 5 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Emergency preparedness Standby vehicle should be available at site during night work
Emergency contact numbers to be displayed at all locations
Fire, Minor & Major Injury
Third party approved first aider should be available during the night
shift
Bites from snakes, Insects and Escape routes shall be kept free from obstruction and trip hazards at
venomous reptiles, all times
Emergency lights to arranged in case of power failure
4 2 3 6 M All escape routes should be sufficiently lit for people to see their 1 3 3
way out safely.
check the operation of emergency lighting units at least monthly
Ensure fire wardens in place and fully trained in their duties and
responsibilities.
All works will be stopped and staff/workmen will be assembled in
nearest assembly point.
Ensure all personnel are administered with initial and booster doses of
Any of the Covid vaccines (approved by the UAE Government) and
have completed 14 days since then.
All personnel on site shall undergo PCR test at 14 days interval.
Personnel working in the PMO should conduct the PCR once in 7 days.
Maintain social distancing and hand sanitising / washing with soap (for
20secs) frequently especially after using common areas, toilets, door
handles etc..
Always wear face masks and maintain personal hygiene.
Do not touch the face unless hands are sanitised
Avoid sharing pen, towel, food etc.
Site personnel suffering from Avoid hand shake, hugging or sitting in close contact
Covid-19 or its variant infection Do not remove masks while indoor spaces with other people other
5 Covid-19 pandemic 5 4 20 H 2 3 6 M
resulting in serious health than people staying in the same house or rooms.
complications Provide an isolation room on site for temporarily keeping personnel
who are suspected of having Covid infection or for those who are
confirmed cases till they are shifted to hospital or home isolation.
Collect used masks, gloves, tissues in specific bins and dispose in
polythene bags.
Report to Admin if any symptoms (cough, cold, fever or body pain)
shows up
Report to Admin and take a PCR if you come in contact with a positive
Covid case.
If the test result is positive after a PCR test, report to Admin, shift to
isolation room and follow latest UAE Government Covid protocol for
further proceedings including contact tracing.
Page 6 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
No spitting, sneezing in open, cover the cough with tissue / shirt cuff
Collision during DC Major Injuries. Banks-men to guide the rig within the area of work.
operations and All movable equipment shall bear reverse alarm and must
Earthworks operations automatically engage when reverse gear is selected.
Setting up a safety perimeter and placing Danger signboards along
with hazard warning lights, around the area of compaction
6 4 4 16 H Ensure no one should be working near any working DC machine. 1 4 4 M
Anyone who need to go to the work platform / operator should ensure
they contact the rig assistant for that machine. Rig assistant should
stop the machine by alerting the operator using the alarm system.
If any unauthorized entry is observed by the rigger/rig assistant he
must stop them by alerting them using Red Flag / Whistle.
Projections of soil and Injuries Minimize the number of personnel in work area
rock from compaction All personnel must wear appropriate PPE at all times
7 works 4 2 8 H Setting up a safety perimeter and placing signboards along with hazard 1 2 2 L
warning lights, around the area of compaction.
Level the platform before & after DC works.
Instability of the Collapse of machine and serious Stability of the ground shall be inspected Monitoring supervision and
Pounder and instability injury and fatality availability of rigger Trained competent and experienced operatives
8 of the compactor Loss and damage to property 4 3 12 H Third party certified machines shall be used 1 3 3 L
Daily inspection of the lifting tools and machine must be present
Falling Objects from Injuries Ensure no loose objects are on the top of pounder.
Pounder Check the pounder frequently ensuring there is no cracks / loose
plates / loose nut & bolt
9 4 3 12 H Ensure the split pin & sleeve is secured properly so that the pulley will 1 3 3 L
not come out of the pounder.
Ensure the sand accumulated over the ponder is cleared before lifting
Exclusion zones must be in place around the rig.
Hit with pounder Injury, Fatality Ensure exclusion zone is made around the working platform.
No one should go inside the barricading unless the machine is
stopped, and the operator is aware the personnel is approaching the
machine.
Anyone who need to go to the exclusion zone /work platform /
operator should ensure they contact the rig assistant for that machine.
10 2 5 10 H Rig assistant should stop the machine by alerting the operator using 1 5 5 M
the alarm system.
If any unauthorized entry is observed by the rigger/rig assistant, he
must stop them by alerting them using Red Flag / Whistle.
Operator must refrain from using mobile phones while working in the
rig.
Rigger/rig assistant should monitor and ensure operator is not using
Page 7 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Ensure Rope and slings are certified and used in accordance with
regulations
Snapping of the wire Inspect the wire rope at regular intervals and change if found to be
11 Minor Injury 3 3 9 M 1 3 3 L
rope damaged.
Follow Geoharbour wire rope changing procedure.
Check for any loose materials, holding pins, safety pins before lifting
the boom.
Maintain a safe distance from the working rig.
16 Flying Objects Injuries 4 3 12 M Wear appropriate PPE’s 1 3 3 L
Provide proper barricading
Sign boards to be posted
Exclusion zones must be in place
Page 8 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Ensure shaded rest shelters are provided for the workers near the rig.
Ensure cool water is provided in the rest shelter.
Provide isotonic solutions during summer.
18 Lack of Welfare facilities Heat stress, tiredness, fatigue 3 3 9 M If there is no work people should take rest in the rest shelter. They 1 3 3 L
should not roam around the working platform.
Provide toilets at a reasonable distance.
Ensure proper PPE (High Visibility Vest dust mask, Safety goggle)
Ensure designated transportation roads
Ensure flagman or spotter will be used to direct the movement.
Setting up of RIC Operator should identify the access route before traveling the RIC
20 3 4 12 H 1 4 4 M
Machine Collisions / Accidental Striking Machine.
The operator shall accept signals only from designated signal person
except for any emergency stop signal.
Page 9 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Acceptable but must be managed at “As Low As Reasonably Practicable” (ALARP) Activity or process can operate subject to management and / or
4–6 Moderate Risk modification
Acceptable without required further action
1 -3 Low Risk
No action required unless escalation of risk is possible
Hierarchy of Control (Controls identified may be a mixture of the hierarchy in order to provide minimum operator exposure):
Elimination Eliminate the hazard.
Substitution Provide an alternative that is capable of performing the same task and is safer to use.
Page 10 of 11
Risk Assessment Ref: BNDP3 – RA – 005
Rev No: 0
Administrative Controls Develop policies, procedures practices and guidelines, in consultation with employees, to mitigate the risk. Provide training, instruction and supervision about the hazard.
Personal Protective Equipment Personal equipment designed to protect the individual from the hazard.
Page 11 of 11