QHSEDOCS-Demolition Work Activities Risk Assessment
QHSEDOCS-Demolition Work Activities Risk Assessment
QHSEDOCS-Demolition Work Activities Risk Assessment
Page 1 of 14
Demolition Work
Residual
Who Might be Risk Level Responsible
Sr. Activities Hazard Identified Control Measures Risk
Harm/Consequences Person
L S R L S R
The whole working area must
HSE Manager
Accident to other be properly isolated from other
Major/Minor injury due to Site/Project
people who are not unauthorized personnel.
1. Isolation of the area unprotected demolition 4 2 H 2 2 M Engineer/Superviso
involved in the Watch person be provided
area. rs/Employees/Empl
activity. aware other people of the
oyer
ongoing activity.
2. Disconnection of all Major/ minor injury due to Physical injury to the 4 2 H All the utility services including 2 2 M HSE Manager
the services. utility services. workers involved in the the waterline and Cables should Site/Project
activity. be disconnected before the Engineer/Superviso
demolition process started. rs/Employees/Empl
Respective NOCs should be oyer
obtained from the concerned
authority before the
commencement of work.
Toolbox must be conducted
and it must be documented.
A supervisor must be available
RISK ASSESSMENT
Page 2 of 14
Demolition Work
be demolished must be
protected to prevent them
from toppling over.
Safe access must be provided
for going in and out of the
working area.
The site engineer together with
the safety officer will conduct a
toolbox talk, with the involved
group before commencing the
job.
MS and RA must be
Accident due to not
Preparation of the Major/ Minor injury due to communicated to the site
4. following the safety 4 2 H
workers. unprotected operatives and recorded.
procedures.
The only competent person
shall be permitted to carry out
the demolition activity.
Full-time supervisor to facilitate
and look over and monitor the
whole operation.
RISK ASSESSMENT
Page 4 of 14
Demolition Work
5. Removing of roof Fall from height. Injury to the workers 4 4 H Edge protection must be 2 2 M HSE Manager
sheet and wall An object falling from a involved in the provided over the roof sheet. Site/Project
cladding height, activity. Edge protection post to be Engineer/Superviso
installed using rs/Employees/Empl
MEWP. Ensure that MEWP and oyer
operator is 3rd party certified
Provide roof access and avoid
using MEWP for accessing the
roof.
A safety net will be provided
beneath the roof sheet to
prevent the person from falling
from height.
Toolbox talk must be conducted
regarding the hazard and risks
associated with the removal of
the existing roof sheet.
Where tools or equipment are
being used adjacent to a roof
edge and there is a risk of
RISK ASSESSMENT
Page 5 of 14
Demolition Work
a minimum
Make sure that the area is
isolated
Keep the area clean such that
no
machines or materials are HSE Manager
Major Injury to stored in the area Site/Project
The collapse of block wall on
7. Block Wall person, or property 4 2 H Keep adequate signboards. 2 2 M Engineer/Superviso
material or Person
damage The Excavators and its operator rs/Employees/Empl
to be 3rd party certified oyer
Spray water periodically to
avoid dust pollution
Remove the concrete waste
periodically
8. Soft Stripping Minor Injury Physical injury and 4 2 H Toolbox talks to be given before
hand injury to the commencing the activity
workers involved. Suitable PPE likes Safety shoes
and safety gloves to be worn by
the workers.
Ear protection is to be provided
RISK ASSESSMENT
Page 7 of 14
Demolition Work
hearing protection
Debris collection and disposal
must be supervised to avoid
congestion of the working area. HSE Manager
congestion Site/Project
Accumulation of waste/ Slip, trip, and fall
13. Housekeeping 4 2 H Housekeeping shall be provided 2 2 M Engineer/Superviso
working area congestion hazards.
as the work is - going where rs/Employees/Empl
accumulated debris is to be oyer
removed to sustain a workable
area.
RISK ASSESSMENT
Page 11 of 14
Demolition Work
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Frequent/Almost Certain
5 10 15 20 25
(5)
15 - 25 Extreme Risk Activity or Industry Should Not Proceed in Current Form
Activity or Industry should be modified to include remedial planning and action and be subject
8 - 12 High Risk
to detailed OSH Assessment
4-6 Moderate Risk Activity or industry can operate subject to management & Modification
2. This Standard Risk Assessment may be revised to suit the site condition.
3. All persons will familiarize themselves and conform to project HSE rules and requirements and wear Basic PPE (Hard Hat, High-Viz Vest, and Steel Toe
Safety Shoes) at all times – use additional PPE required by the job.
RISK ASSESSMENT
Page 13 of 14
Demolition Work
4. Only trained and certified operators shall operate vehicles and mobile construction machinery. Proof of competence will be available with the operator at
all times for site verification
5. Use of mobile phones during working hours is prohibited, except for emergency reporting only.
6. No eating, smoking, and sleeping at the construction worksite. Use the facilities provided on-site
7. Do not use defective PPE, tools, machinery, or equipment – get them replaced before you start your work
8. Report all near misses and accidents immediately to HSE In-charge and your work leader
10. Conduct a Tool Box Talk, Risk Assessment Review, or issue safety instructions before the start of the day’s work.
Environmental
1. All waste materials will be removed daily from the wok area and transferred to the designated waste skip
2. All Hazardous waste shall be immediately removed as per UAE regulation and dispatched slip maintained.
RISK ASSESSMENT
Page 14 of 14
Demolition Work