Time Line Relocate RBC
Time Line Relocate RBC
Time Line Relocate RBC
MAN POWER /
NO WORK ITEM VOLUME SATUAN WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 REMAKS
STATUS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
I. CIVIL ACTIVITY
A1 CONCRETE WORK
1 Box Sludge 1.2 M3 COMPLETE
2 Precast Cover Intake Pond 10.27 M3 TASK FORCE
Control Box
I. CIVIL ACTIVITY
A1 CONCRETE WORK
1 Box Sludge 1.2 M3 COMPLETE
2 Precast Cover Intake Pond 10.27 M3 TASK FORCE
3 Control Box for pump 1 M3 TASK FORCE
TASK FORCE /
2 Install Line Plumbing At Intake Pond 120 M' INPROGRES
70%
IV. ELECTRIC
Dismantle equipment RBC existing
V. SCAFOLDING
Dismantle RBC existing