(Standards Cutoff - May 31, 2016) Rev 4

SAC INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER

Electrical Resistivity Test SACIC-CV-0004 4-Nov-19 CIVIL-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

25-00053-0004,
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME CONSORTIUM of BRANCH OF SINOHYDRO CORPORATION
0005, 0006, 0007 /
INDUSTRIES AND SERVICES (MYP) PACKAGE 4, 5 AND 6 6600042823 (IK)
COMPANY LTD and SEPCO ARABIA COMPANY

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAC TIP NUMBER SAC ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Electrical resistivity Test At-Grade Measurment

Allignement & measurement shall include uniform topography over


the limits of the electrode span.Large condutive bodies such as
ASTM G57-
frozen soil,boulders,concrete foundation & so forth shall not be
A1 06(2012)
included.conductove structures such as pipes &cablesshall not with
section 7.1.1
in 1/2 a of electrode span unless they are at right angles to the
span.

Electrode spacing shall be selected with regards to the structures


of interest.pipelines shall be installed ar depth from 1.5-4.5m(5-
ASTM G57-
15ft) and electrode spacing 1.5,3.0&4.5m(5,10&15ft).spacing shall
A2 06(2012)
equal to the maximum depth of interest.resistivity spacing of
section 7.1.2
1.58,3.16 & 4.75m(5.2,10.4 & 15.5ft) shall have a mutiplication
factor of 1000,2000 & 3000 a d-c vibrator-galvanometer instrument.

Across the inner electrodes shall be recorded both the current & ASTM G57-
A3 voltage drop if seprated ammeter & voltmeter sre used.resistivity 06(2012)
meter shall be rocorded the resistance directly. section 7.1.3

Electrode spacing resistance or amperes or volts,date & time,air ASTM G57-


A4 temperature,topography,drainage & indication of contmination to 06(2012)
facilitate subsequent interpratation shall be recorded. section 7.1.4

B Electrical resistivity Test: Soil Sampling measurement

Sol samples shall represent of the area where the stratum of ASTM G57-
B1 interest soll box, ensuring air spaces are ellminated as far as 06(2012)
practicable. section 7.2.1

ASTM G57-
Resistivity measured shall be dependent on the degree of
B2 06(2012)
compaction moisture content, constituent solubility, & temperature.
section 7.2.2

A stiff slurry of sample shall be prepared, adding only sufficient


water to produce a slight amount of surface water allowing to ASTM G57-
B3 evaporate before the slurry is remixed and effect of variations in 06(2012)
compaction and moisture content is reduced after fully sturating the section 7.2.2
sample.

ASTM G57-
Ground water from the sample excavation for saturation shall be
B4 06(2012)
utlized or distilled water if ground water is unavailabe.
section 7.2.2

Ground tap water shall be utilized if soil resistivity is expected to be


ASTM G57-
below 10, 000 ohms cm reassuring no serious error is introduced.
B5 06(2012)
It shall be noted that some soils absorb moisture slowly, and the
section 7.2.2
resistivity may not stablized for as muc as 24hr. after saturation.

Saudi Aramco: Company General Use


Surplus water shall not be poured off to avoid elimination of soluble ASTM G57-
B6 B6 constituents in order fro saturated measurement to provide an 06(2012)
approaching minimum resistivity. section 7.2.2

Saudi Aramco: Company General Use


(Standards Cutoff - May 31, 2016) Rev 4

SAC INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER

Electrical Resistivity Test SACIC-CV-0004 4-Nov-19 CIVIL-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
CONSORTIUM of BRANCH OF
25-00053-0004, SINOHYDRO CORPORATION
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME
0005, 0006, 0007 / COMPANY LTD and SEPCO ARABIA
INDUSTRIES AND SERVICES (MYP) PACKAGE 4, 5 AND 6 6600042823 (IK) COMPANY

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

If sample are retained for subsequent mearsument,resistivity shall


be corrected if the measurement tempearture Is substantailly
ASTM G57-
different from the ground temperature. In case where sample
B7 06(2012)
temperature exceeds 21°C ( 70°F), it is recommended to utilized
section 7.2.3
15.5°C (60°F) for correction.

REMARKS:

REFERENCE DOCUMENTS:
1- ASTM G57-06 (Reapproved 2012) Electrical Resistivity Test
2- SCOPE OF WORK FOR GEOTECHNICAL INVESTIGATIONS RE-621003 Rev. B

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED