Sonmez-Weekly HSE Report (147) - 05 November-11 November 2019
Sonmez-Weekly HSE Report (147) - 05 November-11 November 2019
Sonmez-Weekly HSE Report (147) - 05 November-11 November 2019
ADPI-HSSE-WR-R-1 E
WEEKLY HSSE REPORT
BAHARAIN INTERNATIONAL AIRPORT MODERNISATION PROGRAM 2019
Week ending: 11/11/2019 Training Statistics
Contractor Sub-Contractor Total
Title
This Week To Date This Week To Date To Date
SITE SAFETY INDUCTION 14 1514 0 13 1,527
BAC SAFETY INDUCTION 0 0 0 0 0
MANUAL HANDLING 0 987 0 0 987
FIRE EXTINGUISHER TRAINING 0 17 0 0 17
EMERGENCY EVACUATION PROCEDURES 0 207 0 0 207
EMERGENCY RESPONSE TEAM TRAINING 0 107 0 0 107
HEAT STRESS TRAINING 0 868 0 0 868
ACCIDENT INVESTIGATION AND REPORTING 0 124 0 0 124
EXCAVATIONS 0 0 0 0 0
PERMIT TO WORK SYSTEM 0 16 0 0 16
HOT WORK 0 237 0 0 237
WORK AT HEIGHT 0 1005 0 0 1,005
BANKSMAN / FLAGMAN 5 318 0 0 318
COSHH AND MSDS 0 168 0 0 168
ELECTRICAL SAFETY 0 179 0 0 179
PORTABLE HAND AND POWER TOOLS 0 1539 0 0 1,539
LOTO 0 81 0 0 81
SCAFFOLD (SAFETY AWARENESS) 0 589 0 0 589
CONFINED SPACE ENRTY 0 331 0 0 331
HOUSEKEEPING/FOD 0 589 0 0 589
RISK ASSESSMENT 0 15 0 0 15
PPE 0 469 0 0 469
MEWPs 4 615 0 0 615
LIFTING AND RIGGING 0 60 0 0 60
ENVIRONMENTAL AWARENESS 0 17 0 0 17
DEFENSIVE DRIVING 0 1 0 0 1
SUPERVISOR SAFETY 0 74 0 0 74
OFFICE SAFETY 0 39 0 0 39
SAFE OPERATION OF EQUIPMENT'S 0 23 0 0 23
NIGHT WORKING 0 107 0 0 107
CPR,AED,FIRST AID FOR ADULT 0 12 0 0 12
NEAR MISS REPORTING 0 2 0 0 2
GENERAL SITE SAFETY AWARENESS TRAINING 0 190 0 0 190
FIRE WARDEN 0 28 0 0 28
HAZARD IDENTIFICATION 0 46 0 0 46
HSE LEADERSHIP 0 0 0 0 0
FORKLIFT SAFETY 0 2 0 0 2
DEMOLITION SAFETY 0 0 0 0 0
HAND INJURY PREVENTION 0 46 0 0 46
FOREMAN TRAINING 0 0 0 0 0
FALLING OBJECTS 0 0 0 0 0
WASTE MANAGEMENT 0 70 0 0 70
HEAVY EQUIPMENT SAFETY 0 19 0 0 19
FIRE WATCHER 1 238 0 0 238
CHEMICAL HANDLING 26 128 0 0 128
PTB (PRE TASK BRIEFING AWARENESS) 0 47 0 0 47
OIL SPILL RESPONSE 0 10 0 0 10
FIRE PREVENTION AND PROTECTION 0 40 0 0 40
HSE STAFF TRAINING 0 10 0 0 10
FALL PROTECTION 0 55 0 0 55
ALUMINIUM MOBILE SCAFFOLD ERECTION AND USE 0 812 0 0 812
BLOCK WORK SAFETY TRAINING 0 0 0 0 0
PRESSURE TESTING (HYDRO) 0 214 0 0 214
ROOF WORKS SAFETY 0 121 0 0 121
TESTING AND COMMISSIONING SAFETY 0 166 0 0 166
ENERGIZED ROOM SAFETY 19 330 0 0 330
SIMULTANEOUS OPERATIONS TRAINING (SIMOP) 0 35 0 0 35
NOTOM 0 8 0 0 8
LEGAL HSE REQUIREMENTS 0 0 0 0 0
TOTALS 69 12925 0 13 12,938
Report Prepared by: Tajummal Khan
(Print Name) (Signature)
1 1 0 0 2
75 TESTING AND COMMISSIONING OF TAB OF CHILLED WATER SYSTEM
76 TESTTING COMMISSIONING OF FANS 1 1 1 0 3
CERMIC COATING ON CHILLER CONDENSER-TUBE SHEET, WATER 1 0 0 0 1
77 BOX & END COVERS
TESTING & COMMISSIONING OF CLEAN AGENT NOVEC AND FOAM 1 1 0 0 2
78 WATER SYSTEM
79 TESTING AND COMMISSIONING FOR TAB OF AIR SYSTEM 1 1 1 1 4
80 FLUSHING OF FIRE FIGHTING LINES 1 0 0 0 1
81 INSTALLATION OF UV PROTECTION COATING FOR PVC PIPES 1 0 0 0 1
82 TESTING & COMMISSIONING OF AHU, HRU, FCU & VAV/CAV 1 1 0 0 2
2 0 0 0 2
83 TESTING AND COMMISSIONING OF BOOSTER & BORE WELL PUMPS
TESTING AND COMMISSIONING OF SUBMERSIBLE SEWAGE & 1 1 0 0 2
84 DRAINAGE LIFTING PUMPS
85 TESTING AND COMMISSIONING OF FIRE HOSE CABINETS 1 1 0 0 2
86 TESTING AND COMMISSIONING OF FIRE HYDRANTS 1 0 0 0 1
T & C PROCEDURE FOR FLUSHING OF PTB, UNDERGROUND AND CAR 1 1 0 0 2
87 PARK HVAC PIPING
1 0 0 0 1
88 TESTING AND COMMISSIONING OF CHILLERS SOFT STARTER PANELS
TESTING AND COMMISSIONING PROCEDURE FOR CHEMICAL 1 1 0 0 2
89 TREATMENT SYSTEM
TESTING AND COMMISSIONING PROCEDURE OF ELECTRICAL WATER 1 1 1 0 3
90 HEATER
TESTING AND COMMISSIONING OF SMOKE AND FIRE COMBINED 1 1 0 0 2
91 DAMPERS
TESTING & COMMISSIONING OF REVERSE OSMOSIS (RO) PLANT 1 1 1 0 3
92 SYSTEM
93 LIFTING OF DUCT AND SPECIALTIES IN SHAFT 1 0 0 0 1
94 TESTING & COMMSSIONING OF OIL & GREASE INTERCEPTOR 1 1 0 0 2
TESTING & COMMISSIONING OF LOW VOLTAGE (LV) LOCAL 1 0 0 0 1
95 CONTROL PANELS
INSTALLATION OF IDENTIFICATION LABELING FOR MECHANICAL 1 0 0 0 1
96 DISCIPLINES
97 T & C PRESSURIZTION & DE-AERATOR VACUUM UNITS 1 1 0 0 2
98 INSTALLATION OF REVERSE OSMOSIS (RO) PLANT 1 1 1 0 3
INSTALLATION OF PRESSURIZATION UNIT AND VACUUM DE- 1 0 0 0 1
99 AERATOR
100 TESTING AND COMMISSIONING OF UV STERILIZERS 1 0 0 0 1
101 ENVIRONMENTAL ASPECT/IMPACT ASSESSMENT 1 1 0 0 2
102 TESTING AND COMMISSIONING OF AIR CURTAINS 1 1 0 0 2
103 TESTING AND COMMISSIONING OF CRAC UNIT AND ACSU 1 1 0 0 2
104 PRESSURE TEST OF FCU & AHU PIPE CONNECTIONS 1 0 0 0 1
105 INSTALLATION OF COPPER PIPE FOR REFRIGERANT PIPING 1 0 0 0 1
106 WORKING OVER INSTALLED DUCTS 1 1 1 1 4
107 INSTALLATION OF PLUMBING FIXTURES 1 1 0 0 2
INSTALLATION OF FUEL SYSTEM AND PRESSURE SENSING PIPES FOR 1 0 0 0 1
108 FIRE PUMPS
FLUSHING OF UNDERGROUND AND ABOVEGROUND WATER SUPPLY 1 0 0 0 1
109 LINES
110 INSTALLATION OF BOREWELL PUMPS 1 0 0 0 1
111 INSTALLATION OF DRINKING WATER FOUNTAINS 1 0 0 0 1
112 TESTING AND COMMISSIONING FOR PLUMBING FIXTURES 1 0 0 0 1
113 TESTING AND COMMISSIONING OF SPRINKLER SYSTEM 1 0 0 0 1
114 INSTALLATION OF COMPRESSED AIR SYSTEM 1 1 0 0 2
REPARING WORK OF PRE-INSULATED HDPE PIPE FOR
UNDERGROUND CHILLED WATER 1 0 0 0 1
115
116 TESTING AND COMMISSIONING OF AIR COMPRESSOR 1 0 0 0 1
117 INSTALALTION OF PLUMBING ACCESSORIES 1 0 0 0 1
% TOTALS 108 45 22 8 183