FN: 13.02.

01/ HSE-OCP-16/F-01/R0
CHECKLIST FOR
ROPE SUSPENDED PLATFORM (RSP) Rev. No: 00
Date: 04.02.2020

Name of Project: Work Location:


Sub-Contractor: Date: Time: Shift: Day □ / Night □
S.N Description Yes No NA Remarks
1 Is Rope Suspended Platform (RSP) installed as per manufacturing guidelines?
2 Has the supplier provided a copy of the operator’s manual and copies of the daily checklist?
3 Is RSP checked by facility engineering department and valid inspection tag available?
4 Is RSP having a valid Third Party Inspection Certificate (TPI) after each installation and displayed?
5 Total number of counter weight pieces are ensured as per manufacturer’s guidelines?
6 Are weather protection cover provided to electric Hoist & motor?
7 Is Emergency Stop Switch/button is working?
8 Ensure good condition of wire rope and tightness at top suspension frame?
Are antitilting (not more than 15 cm height drop) & antirotation limit switch and cut-off switch installed
9
and in working?
Are Limit switch of Anti-Sway Rope, over load cut-off switch, hoist limit switch and emergency switch
10
functioning?
Are the counter weight locked & key is under possession with operator to prevent unauthorized
11
removal?
12 Is the Key of main electrical panel under authorised electrician to avoid unauthorised operation?

13 Are all the Bolts, nuts and pins placed properly?


Are top supporting structure & suspension arrangement stable and arrested for any lateral
14
movement?
15 Are Heavy hammers fixed with wire ropes at ground level?
16 Are Protruding obstructions in the wall removed?
17 After installation of RSP trial run conducted?
18 Has Risk assessment (HIRA)/Job Safety Analysis (JSA) along with LMRA prepared for working in RSP?
All the workers have been explained regarding safe work-procedures related to working on RSP
19
including the specific identified activity for which the PTW is being issued?
Use of basic and job specific PPE ensured for all along with every workman is having separate fall
20
arrestor?
Are Suitable Emergency arrangement including rescue system, Ambulance / Emergency vehicle with
21
driver & first aider, is available and kept standby in case of emergency?
22 Are Emergency contact numbers & SWL displayed on RSP?
23 Are weather conditions & illumination suitable for RSP Operation?
Workplace & elevation area inspected prior to start of work for any overhead utility line in the path of
24
RSP operation?
25 Are all workmen are trained and certified by concerned department/supplier?
26 Are all workmen having valid Height Pass?
27 Is Manual descending system working?
28 Electrical Power cable, Main & safety wire ropes are free from defects?
29 Working platform and handrails of RSP are free from defects?
30 Is area barricaded below the RSP?
31 Is communication system available between person working on RSP and standby person?
NOTE: Before issuing PTW, Site Safety In-charge and Execution Engineer/Supervisor shall ensure the above points are checked and complied.
• The above Checklist is mandatory at every site & manufacturing units of TPL wherever RSP operation is involved.
• Wherever the Checklist prescribed by client/ customer is mandated for compliance, the same shall be followed.

Signature of the Execution Engineer Signature of Site Safety In-charge


Checked by Reviewed By

Page 1 of 1