Vacuum Test Risk Assessment
Vacuum Test Risk Assessment
Vacuum Test Risk Assessment
1. Preparation 1. Slip/Trip Hazards Laborer, 3 3 9 Medium 1. Supervisor to ensure approved PTW is 1 4 4 Low Site Engr.
- Arranging the tools and Supervisor available prior activity Supervisor
2. Hand Injuries 2. Only competent and authorized
materials Foreman
3. Poor personnel to be deployed.
Housekeeping 3. Supervisor to give toolbox talk prior to
start the task. This shall cover the
method statement and risk assessment
4. Proper Coordination with Contractors
prior commencement of the activity
5. Walkway shall be free from obstruction
6. Maintain proper housekeeping of the
working area
2. Vacuum Testing 1. Potential Electric Laborer, 3 4 12 Medium 1. Obtain Work Permit prior start of testing 1 4 4 Low Site Engr.
Shock Supervisor 2. Avoid working around electrical Supervisor
2. Slip / Trip / Fall equipment or outlets; ensure insulation Foreman
Hazard on electrical cord; call electrician for Safety
3. Fire and explosion electrical repair if broken. Officer
while refueling 3. Ensure that proper safety PPE is used.
4. Cuts or pinch point These include safety shoes, hardhat,
hazard during safety gloves, and safety goggles.
operation and/or 4. Always use proper tools and
maintenance equipment.
5. Failure of testing 5. Provide fire extinguisher in place
kit/machine 6. Testing area shall be barricaded and
6. Ergonomic with a proper sign which read
Hazards “TESTING IN PROGRESS KEEP
7. Heat related AWAY”
illness 7. Access the testing area to be
barricaded and assign a watchman
8. Barricade the area to avoid
unauthorized entry
9. All testing equipment must be in good
condition
10. Maintain good housekeeping around
the working area
11. Walkway shall be kept free of
Nakatomi ElectroMechanical CONSTRUCTION OF PROPOSED LBC OFFICE AND WAREHOUSE
and Services BLDG. Page 2 of 6
HSE Risk Assessment
Date: 18-MAY-2023
Revision: 00
Main Activity: VACUUM TEST
Tools / Equipment Used: Vacuum Machine, Pressure Gauge, Hand Tools
Location: C5 Extension Road, Brgy. Moonwalk, Parañaque City
Method Statement
Reference:
Base Risk Rank Base Risk Rank
Actions
Identified Risk and People (Without Controls) (With Controls)
No. Activity Control Measures
Hazards Involved Risk Risk Risk Risk
L S L S By Date
Score Rating Score Rating
obstructions
12. Take periodic breaks or stretching.
3. Material storing 1. Slips Laborer 3 4 12 Medium 13. Ensure accesses are kept clear at all 1 4 4 Low Site Engr.
2. Trips and fall Store times.
Supervisor
3. Poor house keeper 14. Housekeeping to be carried out
Foreman
keeping regularly throughout the day when
required Safety
15. Supervisor to ensure operatives are Officer
stacking
16. material neatly and stacks are stable
and in a safe condition
17. Provide adequate lighting especially
during night hours
18. Appropriate space is allowed around
storage areas for employees to move
around safely without the risk being
trapped between stacked materials.
19. Maintain good housekeeping (5S).
4. Use of Hand tools 1. Improper Laborer 3 3 9 Medium 1. Hand tools should be visually inspected 1 3 3 Low Site Engr.
selection of for defects, prior to use.
Supervisor
hand tools. 2. Never use damaged, blunt or broken
2. Damaged and tools to avoid injury. Foreman
Defective Hand 3. Select right tools for right job. Safety
tools. 4. Ensure no homemade or makeshift Officer
3. Hand injuries tools to be used at site.
4. Pinch point 5. Remove from service any tool that
5. Ergonomics shows signs of damage or defect.
Hazard 6. Ensure Hand tools are Stored in
6. Repetitive accordance with the manufacturer’s
Movement instructions.
7. Strain injury 7. Ensure hands are not in direct line of
fire while working with hand tools.
8. Ensure appropriate PPE at all times.
9. Ensure work with a pop rivet gun, must
Nakatomi ElectroMechanical CONSTRUCTION OF PROPOSED LBC OFFICE AND WAREHOUSE
and Services BLDG. Page 3 of 6
HSE Risk Assessment
Date: 18-MAY-2023
Revision: 00
Main Activity: VACUUM TEST
Tools / Equipment Used: Vacuum Machine, Pressure Gauge, Hand Tools
Location: C5 Extension Road, Brgy. Moonwalk, Parañaque City
Method Statement
Reference:
Base Risk Rank Base Risk Rank
Actions
Identified Risk and People (Without Controls) (With Controls)
No. Activity Control Measures
Hazards Involved Risk Risk Risk Risk
L S L S By Date
Score Rating Score Rating
1. Planning
a) Construction and HSE team must ensure that hazard identification is complete.
b) Construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well established legal
requirements, potentially high risks).
c) Construction and HSE team to prepare the risk assessment plan for the priorities identified hazards for these potential high risks.
2. Risk Assessment
Risk is the probability of an event occurring in a given set of circumstances. The ‘event’ is an exposure to hazard. The hazard is the potential to cause harm. The
risk assessment is the technique of evaluating not just the likelihood of an event occurring, but also the outcome will be in terms of injury, loss, damage or harm.
3. Risk Assessment Process
The process of carrying out a risk assessment should be as follows.
1.Identify the hazards.
2.Identify who might be harmed and how.
3.Evaluate the risk and implement the control measures.
4.Record the significant findings.
5.Review the assessment and update if necessary.
o Severity
o Risk level and their tolerability.
Possible (3) 3 6 9 12 15
Likely (4) 4 8 12 16 20
Almost
5 10 15 20 25
Certain (5)
Document Review
Activity Company Name Title Signature Date