PrimeTest 350 Instruction Manual Aus NZ Rev4
PrimeTest 350 Instruction Manual Aus NZ Rev4
PrimeTest 350 Instruction Manual Aus NZ Rev4
Bracken Hill
South West Industrial Estate
Peterlee
Co Durham
SR8 2SW
ENGLAND
Tel: +44(0)191 5863511
www.seaward.co.uk
sales@seaward.co.uk
service@seaward.co.uk
-2-
PrimeTest 300 Operating Instructions
-3-
PrimeTest 300 Operating Instructions
-4-
PrimeTest 300 Operating Instructions
-5-
PrimeTest 300 Operating Instructions
-6-
PrimeTest 300 Operating Instructions
-7-
PrimeTest 300 Operating Instructions
Table of Contents
-9-
PrimeTest 300 Operating Instructions
DECLARATION OF CONFORMITY
PRIMETEST 300
IEC 61010-1:2001
Safety requirements for electrical equipment for
measurement, control, and laboratory use – Part 1:
General requirements.
IEC 61326:1998
Electrical equipment for measurement, control and
laboratory user-EMC Requirements
- 10 -
PrimeTest 300 Operating Instructions
Introduction
Earth Continuity
Insulation Resistance
IEC Cord Test
Class I Leakage Current
Class II Leakage Current
RCD Trip Time
Earth Loop Resistance
Power socket wiring check
User defined tests
- 11 -
PrimeTest 300 Operating Instructions
1.0 User Notes
- 12 -
PrimeTest 300 Operating Instructions
2.0 Safety Notes
- 13 -
PrimeTest 300 Operating Instructions
- 14 -
PrimeTest 300 Operating Instructions
3.0 Accessories
- 15 -
PrimeTest 300 Operating Instructions
4.0 Unit Description
1 LCD Display
- 16 -
PrimeTest 300 Operating Instructions
5.0 Getting Started
Before using the PrimeTest 300 for the first time the
rechargeable cells provided will need to be inserted into
the unit and then charged. See section 16.4.
5.2 Power On
- 18 -
PrimeTest 300 Operating Instructions
The Data Transfer functions are accessed by pressing
Menu (F4), selecting Data Transfer using the arrow
keys and pressing OK (F4).
6.1 Download to PC
- 19 -
PrimeTest 300 Operating Instructions
- 20 -
PrimeTest 300 Operating Instructions
6.3 Send/Receive Config Data
The Send (F4) key will transfer the Site, Location, User
and Comments list from the PrimeTest 300 to the PC as
text which will appear in the Bluetooth Downloader
screen.
- 21 -
PrimeTest 300 Operating Instructions
Data is transferred to the PrimeTest 300 using the
format shown below:
[SiteName]
London
Leeds
Newcastle
[LocationName]
Sales Office
Eng Office
[UserName]
Tom
Dick
Harry
[Comment]
Printer
Photocopier
Projector
[END]
- 22 -
PrimeTest 300 Operating Instructions
6.3.2 Receive Config Data
Note: The Config file must be ASCII text and the last
entry must be the [END] statement.
7.1 Search
7.2 Options
- 24 -
PrimeTest 300 Operating Instructions
Menu (F4)
Select View Saved Data
OK (F4)
Search (F1)
Select Site “My town”
OK (F4)
Options (F3)
Delete All Assets
- 25 -
PrimeTest 300 Operating Instructions
8.0 Memory Options
- 26 -
PrimeTest 300 Operating Instructions
9.0 Configuration
- 27 -
PrimeTest 300 Operating Instructions
- 28 -
PrimeTest 300 Operating Instructions
9.1.4 Creating a New Sequence
- 29 -
PrimeTest 300 Operating Instructions
Now scroll through the list of default tests until the
required test is highlighted and press Select (F4).
The new test will now appear in the sequence with the
values entered for each parameter shown.
- 31 -
PrimeTest 300 Operating Instructions
- 32 -
PrimeTest 300 Operating Instructions
An example test sequence created to measure
microwave leakage is shown below.
- 33 -
PrimeTest 300 Operating Instructions
9.2 Set Date/Time
- 34 -
PrimeTest 300 Operating Instructions
10.0 User Options
- 35 -
PrimeTest 300 Operating Instructions
10.1.1 Asset ID
- 36 -
PrimeTest 300 Operating Instructions
- 37 -
PrimeTest 300 Operating Instructions
Pressing New Test (F2) will proceed to the Asset
Details window, ready for a new test. Pressing Options
(F3) will open a list of options including View Results,
Information, Print Label, Print Result and Write RFID
Tag.
10.1.5 Comments
- 38 -
PrimeTest 300 Operating Instructions
10.2 Preferences
The first field shows the User Name. Any changes made
to these preferences will be stored against this User
only. Use the up/down arrow keys to highlight the
desired feature. Once the required preferences have
been setup press OK (F4) to store the changes. Esc
(F2) will exit this screen without saving the changes.
- 39 -
PrimeTest 300 Operating Instructions
10.2.3 Auto Off Time (mins)
10.2.7 Tones
The Tones (F3) key will open a screen which will allow
the various tones to be set up, i.e. Beep on Key Press or
Beep on Warning etc. Use up/down arrow keys to
- 40 -
PrimeTest 300 Operating Instructions
highlight desired function and the left/right arrow keys to
set.
- 41 -
PrimeTest 300 Operating Instructions
- 42 -
PrimeTest 300 Operating Instructions
Note: Access for other Users is only restricted after
a password has been set for the Admin User.
- 43 -
PrimeTest 300 Operating Instructions
- 44 -
PrimeTest 300 Operating Instructions
11.0 Manual Test Functions
Refer to fig. 3.
This test is applicable to Class I equipment
only.
Refer to Fig. 4
This test is applicable to Class I and Class II
equipment.
This test is used to verify that the mains supply pins are
adequately insulated from earth.
Refer to Fig. 5
The test durations for the each of the 3 stages are fixed.
Press Setup (F3) to set the Pass/Fail limits for
Continuity and Insulation stages. Use the arrow keys to
highlight and set. The pass/fail limit for the continuity
stage can be calculated Calc (F2). Enter the type and
length of cable and a new limit will be calculated. This
can be overridden by selecting the limit from the list.
Press OK (F4) when complete. Esc (F2) will exit setup
mode without saving changes.
The lead polarity stage checks for short and open circuit
conditions on the live and neutral conductors. It also
checks that the live and neutral wires are not crossed.
The display shows the final result and the pass/fail
status.
- 47 -
PrimeTest 300 Operating Instructions
11.4 Class II Leakage Current
Refer to Fig 6
This test is applicable on Class II Equipment.
- 48 -
PrimeTest 300 Operating Instructions
Neutral short exists or the EUT mains current
consumption is too high.
Once the test has started it will run for the duration set.
To end the test sooner, press the red STOP key.
Refer to Fig 7
This test is applicable on Class I Equipment.
- 49 -
PrimeTest 300 Operating Instructions
Press Setup (F3) to set the Test Duration and Pass/Fail
limit. Use the arrow keys to highlight and set. Press OK
(F4) when complete. Esc (F2) will exit setup mode
without saving changes.
Once the test has started it will run for the duration set.
To end the test sooner, press the red STOP key.
Refer to Fig 8
This test is applicable to the mains electrical
installation.
While the PrimeTest 300 performs the test the LCD will
show 0.0Ω flashing. When the test is complete the
measured value will be displayed.
Refer to Fig 8
This test is applicable to the mains electrical
installation.
- 51 -
PrimeTest 300 Operating Instructions
12.0 Bluetooth Functions
Barcode Scanner
Printer (thermal)
Computer
RFID wand
Make sure that the device you want to add to your new
favourites is switched on.
Press Search (F1). The PrimeTest 300 will search for all
discoverable Bluetooth devices within a 10m range. The
time taken to perform the search will vary depending on
the number of Bluetooth devices in range.
- 53 -
PrimeTest 300 Operating Instructions
- 55 -
PrimeTest 300 Operating Instructions
A PIN number can be entered if required by the device
to be added to the Favourites list.
- 56 -
PrimeTest 300 Operating Instructions
“My Laptop” is now a Bluetooth Favourite and the
PrimeTest 300 will automatically establish a connection
with “My Laptop” when using functions that
communicate with a computer e.g. downloading records
to PATGuard.
- 57 -
PrimeTest 300 Operating Instructions
13.0 Automatic Test Mode
Note: If the egg timer does not appear check that the
PrimeTest 300 has been configured to accept
data entry form a barcode scanner.
Menu (F4), User Options, Preferences, Data
Entry should be set to Barcode or Barcode
Options.
- 61 -
PrimeTest 300 Operating Instructions
The UP/DOWN can now be used to scroll through the
Site list until the required Site is highlighted.
- 62 -
PrimeTest 300 Operating Instructions
13.2.2 Adding a new Site
- 63 -
PrimeTest 300 Operating Instructions
13.3 Entering Location Information
- 64 -
PrimeTest 300 Operating Instructions
- 65 -
PrimeTest 300 Operating Instructions
- 66 -
PrimeTest 300 Operating Instructions
- 67 -
PrimeTest 300 Operating Instructions
To enter a value, simply move the cursor to the correct
field using the UP/DOWN arrows
- 68 -
PrimeTest 300 Operating Instructions
- 69 -
PrimeTest 300 Operating Instructions
- 70 -
PrimeTest 300 Operating Instructions
- 71 -
PrimeTest 300 Operating Instructions
- 73 -
PrimeTest 300 Operating Instructions
The Class I icon is illuminated to indicate that the
insulation resistance is measured between the
live/neutral conductors and the protective earth.
- 74 -
PrimeTest 300 Operating Instructions
- 75 -
PrimeTest 300 Operating Instructions
13.7 Options
- 76 -
PrimeTest 300 Operating Instructions
This will display the results for each test in the sequence
as shown below.
13.7.2 Information
- 78 -
PrimeTest 300 Operating Instructions
Using Change Format (F1) to select a label format that
displays a printed header will now display the text
entered in the setup window as shown below.
- 79 -
PrimeTest 300 Operating Instructions
14.0 Electrical Specifications
- 80 -
PrimeTest 300 Operating Instructions
14.4 Class II Leakage Current
- 81 -
PrimeTest 300 Operating Instructions
14.7 RCD Trip Time
- 82 -
PrimeTest 300 Operating Instructions
15.0 Environmental Conditions
- 83 -
PrimeTest 300 Operating Instructions
16.0 Maintenance
Power the unit off using the red OFF button, ref fig. 1 (3)
Disconnect the IEC mains cable, from the IEC socket ref
fig 2 (8).
Power the unit off using the red OFF button, ref fig. 1 (3)
- 85 -
PrimeTest 300 Operating Instructions
16.5 Battery Replacement
- Power the unit off using the red OFF button, ref
fig. 1 (3)
- Disconnect the black test lead from the unit
- Disconnect cable, from the mains inlet socket,
ref fig. 2 (8).
- Disconnect the EUT mains cable, from the EUT
socket, ref fig. 1 (6).
- Position the PrimeTest 300 face down and
release the captive screw in the battery
compartment cover.
- Remove the battery compartment cover.
- Remove the old batteries from the compartment.
- Insert the new set of batteries into the battery
compartment ensuring that the battery polarity
matches the marking on the inside of the battery
compartment.
- Relocate the battery cover over the battery
compartment and fasten in position with the
battery cover captive screw.
Power the unit off using the red OFF button, ref fig. 1
(3).
Disconnect the IEC mains cable, from the IEC socket ref
fig 2 (8).
Lift one end of the fuse out of the fuse holder with the
help of a flat bladed screwdriver.
- 88 -
PrimeTest 300 Operating Instructions
16.8 Spare Parts.
Seaward Part No
Service Department
Seaward Electronic
Bracken Hill
South West Industrial Estate
Peterlee
Co Durham SR8 2SW
England
OR
- 89 -
PrimeTest 300 Operating Instructions
17.0 Useful Information
- 90 -