TABLE OF CONTENTS
1. Introduction .................................................... 3
1.1 Purpose .............................................................. 3
1.2 Scope ................................................................. 3
1.3 Definitions, Acronyms, and Abbreviations ....... 4
1.4 Reference ........................................................... 4
1.5 Overview ............................................................ 4
2. Overall Description.......................................... 6
2.1 Product Perspective ............................................ 6
2.2 Product Function ................................................ 7
2.3 User Characteristics ..............................................9
2.4 Constraints ........................................................... 9
2.5 Assumptions and Dependencies .......................... 9
2.6 Apportioning of Requirements ............................ 9
4. Appendices........................................................ 12
2
1. INTRODUCTION
1.1 Purpose
It has happened so many times that you have been waiting on railway
station for someone to arrive and you don’t have any exact information about
train timing and other stuff. So here we present to you a project on Railway
Tracking and Arrival time prediction. Using this system users can get the
information about train timing, and is it on time or not, and other information.
The purpose of this system is to track the train timing. That is, at what time the
train departed from a particular station and pass these timing details to other
station’s system where it will display the timing according to train departed from
previous station. If System will find any delay in train due to signal it will
automatically update the train timing in next station and will be displayed to
viewers. Also, there will be an application that works on android and passengers
can check their train timing online. This document will highlight the purpose and
the features of the system, whatthe system will do, the constraints under which it
must operate. This document is intended for both the stakeholders and the
developers of the system and is proposed to the SoftwareEngineering Principles
Professor Huda Al-Ali.
1.2 Scope
3
1.3 Definitions, Acronyms & Abbreviations
1.4 References
1.5 Overview
The SRS is laid out as three sections where the first section is the Introduction
section. This section is mainly intended for all the audiences since it contains
a brief idea of what is being made. The purpose of the document is quoted
in the first sub heading and the main reason or the scope of the project is also
included in this section. The abbreviations, acronyms used in this document
is given in the introduction section and also the reference of making this
product is also mentioned in it. Hence the introduction section contains the
overall ideaof the whole system in a nutshell.
4
The second section is the Overall Description section of the SRS, and it gives
an overview of the functionality of the product and explains the informal
requirements and the technical requirements which is used to create this
product. The basic working idea or the mode of operation of the system and
what all features are included in it are all mentioned briefly in the second
section. The memory constraints (if any), hardware interfaces, the whole
system interfaces are all included in the product perspective part of the second
section. The user characteristics and the design constraints which is closely
related to the product which the developers take into consideration are also
discussed. Even the future requirements and the factors that may affect the
SRS is included in this section. Developers and designers use this section for
gaining a brief understanding of the overall system architecture and the main
requirements. This section is mainly intended for audiences that has some
technical knowledge and not for all audiences.
The third section is called the Specific Requirement section. All the technical
requirements which are needed to develop the product is highlighted in this
section. It includes the external interfaces, the detailed functions of the system
and the key requirements such as performance requirements and the logical
database requirements. The constraints while developing the system such as
design constraints is also included in this section. Moreover, the attributes of
the software system such as the vital roles where the system can be used is
also a major part of the specific requirements section. This section is mainly
intended for designers and developers to design the system and testers to check
whether all the requirements of the system is met and test the final product.
Hence audiences with good technical knowledge will only be able to
comprehend this section.
All the sections of the document describe about the same software product but
are intended for different audiences and thus use different languages for
understanding.
5
2. OVERALL DESCRIPTION
The above figure shows the basic block diagram of the product. All
components are directly linked to a server. Hence the server is the heart of the
system. The server for handling this huge database can be obtained from
Google. Each train is installed with a GPS module along with a controller.
The role of microcontroller is to upload the data obtained from the GPS
module to server. These data is very useful to track the train when it is
running. Apart from the data received from GPS module attached to each
train, station masters on every station have a login to the server wherein they
may update train arrival time at their station when it arrives, there by
updating the database. A Display system is installed on various locations on
station for viewers to view the information. The third system which is a
mobile app is available in both android and iOS version. The both systems
will get data from the server.
6
2.2 Product Functions
7
• Display train timing in the Mobile Application
8
2.3 User Characteristics
The end-user need not have any technical knowledge on the product,
since every detail is displayed on the screen and in the Mobile app. In
order to use the app, the user want to create an account. By using their
login id and password they login and access the details. The passengers
can use these app while they are in train also. They can setup an alarm
for a particular station, by utilizing the data from the GPS module of
mobile. Apart from English, the app can be operated in French, Chinese
and Punjabi.
2.4 Constraints
The major constrain is obtaining the data from the GPS module
placed in train. Since there is a chance that train can run through area
where mobile coverage is not available. The microcontroller uploads
the location data using GSM module. Another constrain is admin
module create extra burden for the duty officer. In peak time, in large
stations there will be heavy traffic is there, so it will be very difficult
to upload the data of each train.
9
3. SPECIFIC REQUIREMENTS
The input of the system is the data from the GPS module and the
admin module. The output of the system is the data from the server.
So much external interfaces are not included in the system.
3.2 Functions
The primary function of the system is to track the whole train in the
railway network and give live update to the passengers.
10
3.5 Design Constrains
The system can be implemented using a PIC16F877A micro controller, which
is a general purpose 8-bit micro controller that offers high performance and
very low power consumption. If there are other efficient micro controllers
which offers the same functionality and use, then that can also be used. The
main design constrain is to add GPS module in the circuit.
• Maintainability
The whole system is easy to maintain.
The sensors are easily available in the market, so maintenance of the product
is quite simple.
The Server is the heart of the system, and it needs to be maintained properly
and it should not be crashed.
It does not have too many interconnections; hence troubleshooting is easier.
• Usability
The system can be easily used by both passengers and railway
authority.
11
4. APPENDICES
12