DAFTAR HARGA SATUAN BAHAN

HARGA SATUAN
No. JENIS BAHAN SATUAN
( Rp. )

1 Pasir urug m3 140,000.00


2 Batu belah putih m3 150,000.00
3 Batu keprus m3 100,000.00
4 Kapur pasang m3 200,000.00
5 Pasir Pasang ( Progo ) m3 300,000.00
6 Batu pecah (split) 2/3 m3 275,000.00
7 Krikil/kroco m3 230,000.00
8 PCC ( 40 Kg ) zak 54,000.00
9 Portland semen kg 1,350.00
10 Air liter 60.00
11 Semen warna kg 3,000.00
12 Bata merah besar bj 800.00
13 Bataco bj 2,200.00
14 Roster ( 25 x 25 ) cm bj 7,500.00
15 Genteng plentong bulat "SOKKA KEBUMEN" bj 2,500.00
16 Genteng kerpus bulat "SOKKA KEBUMEN" bj 6,500.00
17 Genteng "SOKKA SUPER GODEHAN" bj 2,000.00
17 Genteng beton besar warna bj 8,000.00
18 Genteng beton besar natural bj 6,000.00
19 Kerpus beton natural bj 7,000.00
20 Kerpus beton WARNA bj 8,500.00
20 Plat GRC ( 1,00 X 1,00 )m m2 17,000.00
21 Gipsum board 9 mm ( 1,2 x 2,40 ) lbr 65,000.00
22 Kalsiboard 3,5 mm ( 1,2 x 2,40 ) lbr 60,000.00
23 Plafond UPVC ( 400x25x0,9 ) cm lbr 150,000.00
24 Plafond PVC ( 400x20x0,10 ) cm lbr 135,000.00
25 List profil kayu 5 cm m' 5,500.00
26 List plafond PVC m' 20,000.00
27 Plepet eternit 1/4 kayu kruing m' 3,500.00
28 List profil gypsum t. 5 cm m' 5,000.00
29 Tepung gypsum kg 9,000.00
30 Alkasit kg 30,000.00
31 Seng plat BJLS 30 lebar 70 cm m' 27,500.00
32 Seng plat BJLS 30 lebar 90 cm m' 47,000.00
33 Galvalum plat 0,30 mm, lebar 70 cm m' 45,000.00
34 Besi hollow galvalume 40 x 40 x 0,35 mm m' 11,000.00
35 Besi hollow galvalume 20 x 40 x 0,35 mm m' 8,500.00
36 Besi Tulangan polos kg 12,500.00
37 Besi Tulangan ulir kg 13,000.00
38 Bendrat kg 20,000.00
39 Paku usuk ( 8 s/d 12 cm kg 18,000.00
40 Paku reng ( 5 s/d 7cm ) kg 18,888.00
41 Paku eternit/pepet ( 1 s/d 3 cm ) kg 25,000.00
42 Paku skrup kg 22,000.00
43 Begel, bout, angkur ( baja strip ) kg 20,000.00
44 Baja WF/Siku kg 15,000.00
45 Paku skrup fixer bh 900.00
46 Penjaga jarak bekisting/spacer bh 15,000.00
No. JENIS BAHAN SATUAN HARGA SATUAN
( Rp. )

47 Papan bekisting m3 3,500,000.00


48 Kayu klas IV ( Terentang ) m3 3,000,000.00
49 Dolken kayu Ø 8-10 cm panjang 4 m btg 15,000.00
50 Kayu Jati lokal balok m3 14,000,000.00
51 Kayu Jati lokal papan m3 14,500,000.00
52 Kayu Bengkirai balok m3 12,000,000.00
53 Kayu Bengkirai papan m3 13,000,000.00
54 Kayu kamper balok m3 10,000,000.00
55 Kayu kamper papan m3 10,000,000.00
56 Kayu Kruing balok m3 8,500,000.00
57 Kayu Kruing papan m3 9,000,000.00
58 Usuk kruing 5/7 m3 7,000,000.00
59 Reng jati lokal 2/3 m3 8,500,000.00
60 Reng jati lokal 3/4 m3 7,000,000.00
61 Reng bengkirai 2/3 m3 7,500,000.00
62 Reng bengkirai 3/4 m3 6,000,000.00
63 Usuk glugu 5/7 m3 3,400,000.00
64 Triplek 9 mm ( 120 x 240 cm ) lbr 125,000.00
65 Minyak bekisting liter 10,000.00
66 Lem kayu kg 15,000.00
67 Meni kayu kg 25,000.00
68 Meni besi kg 35,000.00
69 Minyak Cat kg 26,000.00
70 Thinner ltr 25,000.00
71 Cat kayu ( EMCO ) kg 75,000.00
72 Cat tembok ( CATYLAC ) kg 25,000.00
73 Cat Genteng ( AVIAN/NIPPON PAINT ) kg 70,000.00
74 Cat besi kg 65,000.00
75 Plamur kayu kg 25,000.00
76 Plamur tembok kg 20,000.00
77 Kuas bh 12,500.00
78 Ampelas lbr 10,000.00
79 Cat Coating kg 90,000.00
80 Soda api kg 30,000.00
81 Keramik lantai 25/25 tekstur doos 68,000.00
82 Keramik lantai 30/30 putih polos doos 60,000.00
83 Keramik lantai30/30 motif doos 65,000.00
84 Keramik lantai 30/30 tekstur doos 67,000.00
85 Keramik lantai 40/40 putih polos doos 69,000.00
86 Keramik lantai 40/40 motif doos 75,000.00
87 Keramik lantai 40/40 tekstur doos 77,000.00
88 Keramik dinding 20/20 motif bh 3,200.00
89 Keramik dinding 20/25 motif bh 3,750.00
90 Keramik dinding 20/40 motif bh 6,500.00
91 Ubin difabel 30/30 ( bulatan/garis ) bh 20,000.00

HARGA SATUAN
No. JENIS BAHAN SATUAN
( Rp. )

92 Plint keramik 10/40 bh 3,250.00


93 Plint keramik 10/30 bh 2,000.00
94 Batu tempel m2 90,000.00
95 Buis beton 1/2 Ø 20 cm bh 50,000.00
96 Klosed jongkok INA bh 250,000.00
97 Klosed duduk INA bh 2,000,000.00
98 Wastafel lengkap INA bh 550,000.00
99 Buis beton 1/2 Ø 20 cm bh 50,000.00
100 Floor drain Stainless ONDA bh 40,000.00
101 Pipa PVC AW Ø 4"( Panjang 4 m ) btg 90,000.00
102 Pipa PVC AW Ø 3"( Panjang 4 m ) btg 60,000.00
103 Pipa PVC AW Ø 2"( Panjang 4 m ) btg 35,000.00
104 Pipa PVC AW Ø 1"( Panjang 4 m ) btg 28,000.00
105 Pipa PVC AW Ø 3/4"( Panjang 4 m ) btg 12,500.00
106 Pipa PVC AW Ø 1/2"( Panjang 4 m ) btg 8,000.00
107 Kran AIR Ø 3/4" SAN EI bh 40,000.00
108 Kran air Ø 1/2" SAN EI bh 35,000.00
109 Stop kran Ø 1" bh 175,000.00
110 Seal tape bh 8,000.00
111 Foding gate alur 0,8 mm m2 550,000.00
112 Alluminium 4" cokelat m' 110,000.00
113 Alluminium 3" cokelat m' 90,000.00
114 Ram Pintu Alluminium m' 100,000.00
115 Ram jendela Alluminium m' 70,000.00
116 Allumunium strip m' 20,000.00
117 Allumunium plat m2 47,000.00
118 Baja ringan profil C 75/075 (Gigasteel galvalum) m' 25,000.00
119 Baja ringan profil C 75/100 (Gigasteel galvalum) m' 35,000.00
120 Reng B35/045 (Gigasteel galvalume) m' 15,000.00
121 Sealant tube 35,000.00
122 Slot pintu bh 225,000.00
123 Ensel pintu bh 25,000.00
124 Engsel jendela 3" bh 20,000.00
125 Spring knife bh 25,000.00
126 Grendel pintu bh 10,000.00
127 Grendel jendela bh 6,000.00
128 Kait angin jendela bh 7,500.00
129 Kait angin pintu bh 10,000.00
130 Handle bh 7,000.00
131 Kaca bening 5 mm m2 90,000.00
132 Kaca bening 8 mm m2 150,000.00
133 Kaca cermin t = 3 mm m2 140,000.00
134 Profil Kaca m' 10,000.00
135 Kabel NYA 2,5 mm2 m' 7,500.00
136 Kabel NYM 3x2.5 mm2 m' 18,000.00
137 Kabel NYM 4x4 mm2 m' 37,800.00
138 Pipa Conduit PVC dia. 20 mm2 m' 10,000.00

HARGA SATUAN
No. JENIS BAHAN SATUAN
( Rp. )

139 Pipa listrik 5/8" m' 8,000.00


140 T Dus bh 5,000.00
141 Inbow doos bh 500.00
142 Las Dop bh 500.00
143 Klem 8x16 mm bh 500.00
144 Mangkok bh 2,500.00
145 Fitting tempel bh 15,000.00
146 Lampu SL 18 watt "PHILIPS" bh 42,000.00
147 Lampu SL 8 watt "PHILIPS" bh 30,000.00
148 Lampu Down light / PLC 18 watt bh 15,000.00
149 Saklar ganda "BROCO" bh 20,000.00
150 Saklar tunggal "BROCO" bh 18,000.00
151 Stop kontak lantai "BROCO" bh 350,000.00
152 Stop kontak IB "BROCO" bh 20,000.00
153 Stop kontak AC "BROCO" bh 100,000.00
154 AC PANASONIC 1.5 PK Unit 4,500,000.00
DAFTAR HARGA SATUAN UPAH TENAGA

No. JENIS TENAGA SATUAN HARGA SATUAN


( Rp. )

1 Pekerja Hari 76,000.00


2 Tukang Batu Hari 95,000.00
3 Tukang Besi Hari 95,000.00
4 Tukang Cat Hari 95,000.00
5 Tukang Kayu Hari 104,000.00
6 Tukang Listrik Hari 104,000.00
7 Kepala Tukang batu Hari 106,000.00
8 Kepala Tukang kayu Hari 106,000.00
9 Kepala Tukang besi Hari 106,000.00
10 Kepala Tukang cat Hari 106,000.00
11 Mandor Hari 114,000.00
DAFTAR ANALISA

1. A.2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2016 2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 18,730.00
B BAHAN
1 Kayu usuk glugu 5/7 m3 0.0120 3,400,000.00 40,800.00
2 Paku 2" - 3" kg 0.0200 18,000.00 360.00
3 Kayu tahun papan 2/20 m3 0.0070 3,500,000.00 24,500.00

JUMLAH HARGA BAHAN 65,660.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 84,390.00
E Jasa 10% 8,439.00
F Harga Satuan Pekerjaan 92,829.00
DIBULATKAN 92,829.00

2. A. 2.2.1.9. Pembersihan 1,00 m2 lapangan dan perataan


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2016 2 Mandor OH 0.0500 114,000.00 5,700.00
JUMLAH HARGA TENAGA KERJA 13,300.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 13,300.00
E Jasa 10% 1,330.00
F Harga Satuan Pekerjaan 14,630.00
DIBULATKAN 14,630.00

3. A. 2.2.1.13. Pembongkaran 1,00 m3 beton bertulang


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 13.3340 76,000.00 1,013,384.00
2016 2 Mandor OH 0.6660 114,000.00 75,924.00
JUMLAH HARGA TENAGA KERJA 1,089,308.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 1,089,308.00
E Jasa 10% 108,930.80
F Harga Satuan Pekerjaan 1,198,238.80
DIBULATKAN 1,198,238.00

4. A. 2.2.1.14. Pembongkaran 1,00 m3 dinding tembok bata


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 6.6670 76,000.00 506,692.00
2016 2 Mandor OH 0.3330 114,000.00 37,962.00
JUMLAH HARGA TENAGA KERJA 544,654.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 544,654.00
E Jasa 10% 54,465.40
F Harga Satuan Pekerjaan 599,119.40
DIBULATKAN 599,119.00

1 m2 Membongkar plesteran dinding


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.050 76,000.00 3,800.00
Rev. 2 Mandor OH 0.025 114,000.00 2,850.00
2005 JUMLAH HARGA TENAGA KERJA 6,650.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 6,650.00
E Jasa 10% 665.00
F Harga Satuan Pekerjaan 7,315.00
DIBULATKAN 7,315.00

1 m2 Membongkar lantai keramik


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.120 76,000.00 9,120.00
Rev. 2 Mandor OH 0.012 114,000.00 1,368.00
2005 JUMLAH HARGA TENAGA KERJA 10,488.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 10,488.00
E Jasa 10% 1,048.80
F Harga Satuan Pekerjaan 11,536.80
DIBULATKAN 11,536.00

1 m3 Membongkar genteng dipakai lagi


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.040 76,000.00 3,040.00
Rev. 2 Mandor OH 0.020 114,000.00 2,280.00
2005 JUMLAH HARGA TENAGA KERJA 5,320.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 5,320.00
E Jasa 10% 532.00
F Harga Satuan Pekerjaan 5,852.00
DIBULATKAN 5,852.00

5. A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7500 76,000.00 57,000.00
2016 2 Mandor OH 0.0250 114,000.00 2,850.00
JUMLAH HARGA TENAGA KERJA 59,850.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 59,850.00
E Jasa 10% 5,985.00
F Harga Satuan Pekerjaan 65,835.00
DIBULATKAN 65,835.00

6. A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.9000 76,000.00 68,400.00
2016 2 Mandor OH 0.0450 114,000.00 5,130.00
JUMLAH HARGA TENAGA KERJA 73,530.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 73,530.00
E Jasa 10% 7,353.00
F Harga Satuan Pekerjaan 80,883.00
DIBULATKAN 80,883.00

7. A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0500 76,000.00 79,800.00
2016 2 Mandor OH 0.0670 114,000.00 7,638.00
JUMLAH HARGA TENAGA KERJA 87,438.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 87,438.00
E Jasa 10% 8,743.80
F Harga Satuan Pekerjaan 96,181.80
DIBULATKAN 96,181.00

8. A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0000 76,000.00 76,000.00
2016 2 Mandor OH 0.0320 114,000.00 3,648.00
JUMLAH HARGA TENAGA KERJA 79,648.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 79,648.00
E Jasa 10% 7,964.80
F Harga Satuan Pekerjaan 87,612.80
DIBULATKAN 87,612.00
9. A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.5000 76,000.00 114,000.00
2016 2 Mandor OH 0.0600 114,000.00 6,840.00
JUMLAH HARGA TENAGA KERJA 120,840.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 120,840.00
E Jasa 10% 12,084.00
F Harga Satuan Pekerjaan 132,924.00
DIBULATKAN 132,924.00

10. Analys 1,5 A.5 : 1 m3 Galian batu


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 3.0000 76,000.00 228,000.00
2 Mandor OH 0.0900 114,000.00 10,260.00
JUMLAH HARGA TENAGA KERJA 238,260.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 238,260.00
E Jasa 10% 23,826.00
F Harga Satuan Pekerjaan 262,086.00
DIBULATKAN 262,086.00

11. 1.7.15.1.c ( a ) T.15.A.3) Mengangkut 1 m3 tanah lepas, jarak angkut > 20 s.d 30 meter
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2363 76,000.00 17,958.80
2022 2 Mandor OH 0.0118 114,000.00 1,345.20
JUMLAH HARGA TENAGA KERJA 19,304.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 19,304.00
E Jasa 10% 1,930.40
F Harga Satuan Pekerjaan 21,234.40
DIBULATKAN 21,234.00

12. 1.7.15.1.f ( a ) Mengangkut 1 m3 tanah lepas, jarak angkut > 50 s.d 100 meter
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3440 76,000.00 26,144.00
2022 2 Mandor OH 0.0172 114,000.00 1,960.80
JUMLAH HARGA TENAGA KERJA 28,104.80
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 28,104.80
E Jasa 10% 2,810.48
F Harga Satuan Pekerjaan 30,915.28
DIBULATKAN 30,915.00
13. 1.7.15.1.g ( a ) Mengangkut 1 m3 tanah lepas, jarak angkut > 100 s.d 200 meter
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.4843 76,000.00 36,806.80
2022 2 Mandor OH 0.0242 114,000.00 2,758.80
JUMLAH HARGA TENAGA KERJA 39,565.60
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 39,565.60
E Jasa 10% 3,956.56
F Harga Satuan Pekerjaan 43,522.16
DIBULATKAN 43,522.00

14. A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.5000 76,000.00 38,000.00
2016 2 Mandor OH 0.0500 114,000.00 5,700.00
JUMLAH HARGA TENAGA KERJA 43,700.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 43,700.00
E Jasa 10% 4,370.00
F Harga Satuan Pekerjaan 48,070.00
DIBULATKAN 48,070.00

15. 1.7.2.d ( c ) Pengurugan 1 m3 dengan pasir urug


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 23,940.00
B BAHAN
Pasir urug m3 1.2000 140,000.00 168,000.00
JUMLAH HARGA BAHAN 168,000.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 191,940.00
E Jasa 10% 19,194.00
F Harga Satuan Pekerjaan 211,134.00
DIBULATKAN 211,134.00

16. 1.7.2.e ( c ) Pengurugan dan pemadatan 1 m3 batu keprus


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2500 76,000.00 19,000.00
2022 2 Mandor OH 0.0250 114,000.00 2,850.00
JUMLAH HARGA TENAGA KERJA 21,850.00
B BAHAN
Batu keprus m3 1.2000 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 141,850.00
E Jasa 10% 14,185.00
F Harga Satuan Pekerjaan 156,035.00
DIBULATKAN 156,035.00
17. A.3.2.1.2. Memasang 1 m3 pondasi batu belah campuran 1 PC : 4 PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.5000 76,000.00 114,000.00
2 Tukang batu OH 0.7500 95,000.00 71,250.00
3 Kepala tukang batu OH 0.0750 106,000.00 7,950.00
2016 4 Mandor OH 0.0750 114,000.00 8,550.00
JUMLAH HARGA TENAGA KERJA 201,750.00
B BAHAN
1 Batu belah putih 15/20 cm m3 1.2000 150,000.00 180,000.00
2 Semen portland kg 163.0000 1,350.00 220,050.00
3 Pasir pasang m3 0.5200 300,000.00 156,000.00
JUMLAH HARGA BAHAN 556,050.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 757,800.00
E Jasa 10% 75,780.00
F Harga Satuan Pekerjaan 833,580.00
DIBULATKAN 833,580.00

18. A.3.2.1.3. Memasang 1 m3 pondasi batu belah campuran 1 PC : 5 PP


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.5000 76,000.00 114,000.00
2016 2 Tukang batu OH 0.7500 95,000.00 71,250.00
3 Kepala tukang batu OH 0.0750 106,000.00 7,950.00
4 Mandor OH 0.0750 114,000.00 8,550.00
JUMLAH HARGA TENAGA KERJA 201,750.00
B BAHAN
1 Batu belah putih 15/20 cm m3 1.2000 150,000.00 180,000.00
2 Semen portland kg 136.0000 1,350.00 183,600.00
3 Pasir pasang m3 0.5440 300,000.00 163,200.00
JUMLAH HARGA BAHAN 526,800.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 728,550.00
E Jasa 10% 72,855.00
F Harga Satuan Pekerjaan 801,405.00
DIBULATKAN 801,405.00

19. A.3.2.1.4. Memasang 1 m3 pondasi batu belah campuran 1 PC : 6 PP


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.5000 76,000.00 114,000.00
2016 2 Tukang batu OH 0.7500 95,000.00 71,250.00
3 Kepala tukang batu OH 0.0750 106,000.00 7,950.00
4 Mandor OH 0.0750 114,000.00 8,550.00
JUMLAH HARGA TENAGA KERJA 201,750.00
B BAHAN
1 Batu belah putih 15/20 cm m3 1.2000 150,000.00 180,000.00
2 Semen portland kg 117.0000 1,350.00 157,950.00
3 Pasir pasang m3 0.5610 300,000.00 168,300.00
JUMLAH HARGA BAHAN 506,250.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 708,000.00
E Jasa 10% 70,800.00
F Harga Satuan Pekerjaan 778,800.00
DIBULATKAN 778,800.00
20. A.4.4.1.8. Memasang 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1/2 batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2016 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 35,070.00
B BAHAN
1 Bata merah buah 70.0000 800.00 56,000.00
2 Semen portland kg 14.3700 1,350.00 19,399.50
3 Pasir pasang m3 0.0400 300,000.00 12,000.00
JUMLAH HARGA BAHAN 87,399.50
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 122,469.50
E Jasa 10% 12,246.95
F Harga Satuan Pekerjaan 134,716.45
DIBULATKAN 134,716.00

21. A.4.4.1.9. Memasang 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1/2 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2016 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 35,070.00
B BAHAN
1 Bata merah buah 70.0000 800.00 56,000.00
2 Semen portland kg 11.5000 1,350.00 15,525.00
3 Pasir pasang m3 0.0430 300,000.00 12,900.00
JUMLAH HARGA BAHAN 84,425.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 119,495.00
E Jasa 10% 11,949.50
F Harga Satuan Pekerjaan 131,444.50
DIBULATKAN 131,444.00

22. A.4.4.1.10. Memasang 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1/2 batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2016 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 35,070.00
B BAHAN
1 Bata merah buah 70.0000 800.00 56,000.00
2 Semen portland kg 9.6800 1,350.00 13,068.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
JUMLAH HARGA BAHAN 82,568.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 117,638.00
E Jasa 10% 11,763.80
F Harga Satuan Pekerjaan 129,401.80
DIBULATKAN 129,401.00
23. A.4.4.1.11. Memasang 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1/2 bata campuran 1 PC : 6 PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2016 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 35,070.00
B BAHAN
1 Bata merah buah 70.0000 800.00 56,000.00
2 Semen portland kg 8.3200 1,350.00 11,232.00
3 Pasir pasang m3 0.0490 300,000.00 14,700.00
JUMLAH HARGA BAHAN 81,932.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 117,002.00
E Jasa 10% 11,700.20
F Harga Satuan Pekerjaan 128,702.20
DIBULATKAN 128,702.00

24. 6.28 Memasang 1 m2 dinding bataco , campuran 1pc : 4ps


No. Uraian Satuan Harga Satuan Jumlah Harga
Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.5000 76,000.00 38,000.00
2007 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0250 114,000.00 2,850.00
JUMLAH HARGA TENAGA KERJA 51,410.00
B BAHAN
1 Bataco buah 12.5000 2,200.00 27,500.00
2 Semen portland kg 12.1300 1,350.00 16,375.50
3 Pasir pasang m3 0.3880 300,000.00 116,400.00

JUMLAH HARGA BAHAN 160,275.50


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 211,685.50
E Jasa 10% 21,168.55
F Harga Satuan Pekerjaan 232,854.05
DIBULATKAN 232,854.00

25. A.4.4.1.23. Memasang 1 m2 dinding terawang ( rooster ) 12 x 11 x 24 Campuran 1SP : 4PP


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 35,070.00
B BAHAN
1 Rooster buah 30.0000 7,500.00 225,000.00
2 Semen portland kg 11.0000 1,350.00 14,850.00
3 Pasir pasang m3 0.0350 300,000.00 10,500.00
JUMLAH HARGA BAHAN 250,350.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 285,420.00
E Jasa 10% 28,542.00
F Harga Satuan Pekerjaan 313,962.00
DIBULATKAN 313,962.00
26. Memasang 1 m' saluran buis beton 1/2 Ø 20 cm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.6350 76,000.00 48,260.00
2 Tukang batu OH 0.2400 95,000.00 22,800.00
3 Kepala tukang batu OH 0.0240 106,000.00 2,544.00
4 Mandor OH 0.0310 114,000.00 3,534.00
JUMLAH HARGA TENAGA KERJA 77,138.00
B BAHAN
1 Buis beton 1/2 Ø 20 cm buah 1.0000 50,000.00 50,000.00
2 Bata merah besar kg 56.0000 800.00 44,800.00
3 PC m3 13.8100 1,350.00 18,643.50
4 Pasir pasang m3 0.0560 300,000.00 16,800.00
5 Pasir urug m3 0.0325 140,000.00 4,550.00
JUMLAH HARGA BAHAN 134,793.50
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 211,931.50
E Jasa 10% 21,193.15
F Harga Satuan Pekerjaan 233,124.65
DIBULATKAN 233,124.00

27. 3.2.2.2.12.( c ) Memasang 1 m2 plesteran 1 PC : 3 PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Tukang batu OH 0.1500 95,000.00 14,250.00
3 Kepala tukang batu OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 40,350.00
B BAHAN
1 Semen portland kg 7.7760 1,350.00 10,497.60
2 Pasir pasang m3 0.0230 300,000.00 6,900.00

JUMLAH HARGA BAHAN 17,397.60


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 57,747.60
E Jasa 10% 5,774.76
F Harga Satuan Pekerjaan 63,522.36
DIBULATKAN 63,522.00

28. 3.2.2.2.14.( c ) Memasang 1 m2 plesteran 1 PC : 4 PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Tukang batu OH 0.1500 95,000.00 14,250.00
3 Kepala tukang batu OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 40,350.00
B BAHAN
1 Semen portland kg 6.2400 1,350.00 8,424.00
2 Pasir pasang m3 0.0240 300,000.00 7,200.00

JUMLAH HARGA BAHAN 15,624.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 55,974.00
E Jasa 10% 5,597.40
F Harga Satuan Pekerjaan 61,571.40
DIBULATKAN 61,571.00
29. 3.2.2.2.16.( c ) Memasang 1 m2 plesteran 1 PC : 5 PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Tukang batu OH 0.1500 95,000.00 14,250.00
3 Kepala tukang batu OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 40,350.00
B BAHAN
1 Semen portland kg 5.1840 1,350.00 6,998.40
2 Pasir pasang m3 0.0260 300,000.00 7,800.00

JUMLAH HARGA BAHAN 14,798.40


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 55,148.40
E Jasa 10% 5,514.84
F Harga Satuan Pekerjaan 60,663.24
DIBULATKAN 60,663.00

30. 3.2.2.2.18.( c ) Memasang 1 m2 plesteran 1 PC : 6 PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Tukang batu OH 0.1500 95,000.00 14,250.00
3 Kepala tukang batu OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 40,350.00
B BAHAN
1 Semen portland kg 4.4160 1,350.00 5,961.60
2 Pasir pasang m3 0.0270 300,000.00 8,100.00

JUMLAH HARGA BAHAN 14,061.60


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 54,411.60
E Jasa 10% 5,441.16
F Harga Satuan Pekerjaan 59,852.76
DIBULATKAN 59,852.00

31. 3.2.2.2.36.( c ) Memasang 1 m2 acian


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2000 76,000.00 15,200.00
2022 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang batu OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 26,900.00
B BAHAN
1 Semen portland kg 3.2500 1,350.00 4,387.50

JUMLAH HARGA BAHAN 4,387.50


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 31,287.50
E Jasa 10% 3,128.75
F Harga Satuan Pekerjaan 34,416.25
DIBULATKAN 34,416.00
32. A.4.4.2.20. Memasang 1 m' plester skoning 1PC : 3PP lebar 10 cm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0800 76,000.00 6,080.00
2022 2 Tukang batu OH 0.4000 95,000.00 38,000.00
3 Kepala tukang batu OH 0.0400 106,000.00 4,240.00
4 Mandor OH 0.0040 114,000.00 456.00
JUMLAH HARGA TENAGA KERJA 48,776.00
B BAHAN
1 Semen portland kg 0.5000 1,350.00 675.00
2 Pasir pasang m3 0.0130 300,000.00 3,900.00

JUMLAH HARGA BAHAN 4,575.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 53,351.00
E Jasa 10% 5,335.10
F Harga Satuan Pekerjaan 58,686.10
DIBULATKAN 58,686.00

33. A.4.4.2.26. Memasang 1 m2 finishing siar pasangan batu belah campuran 1 PC : 2 PP


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3000 76,000.00 22,800.00
2022 2 Tukang batu OH 0.1500 95,000.00 14,250.00
3 Kepala tukang batu OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0150 114,000.00 1,710.00
JUMLAH HARGA TENAGA KERJA 40,350.00
B BAHAN
1 Semen portland kg 6.3400 1,350.00 8,559.00
2 Pasir pasang m3 0.0120 300,000.00 3,600.00

JUMLAH HARGA BAHAN 12,159.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 52,509.00
E Jasa 10% 5,250.90
F Harga Satuan Pekerjaan 57,759.90
DIBULATKAN 57,759.00

34. Memasang 1 m' buis beton 1/2 Ø 20 cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.6350 76,000.00 48,260.00
2 Tukang batu OH 0.2400 95,000.00 22,800.00
3 Kepala tukang batu OH 0.0240 106,000.00 2,544.00
4 Mandor OH 0.0310 114,000.00 3,534.00
JUMLAH HARGA TENAGA KERJA 77,138.00
B BAHAN
1 Buis beton 1/2 Ø 20 cm bh 1.0000 50,000.00 50,000.00
2 Bata merah besar bh 56.0000 800.00 44,800.00
3 Semen portland kg 13.8100 1,350.00 18,643.50
4 Pasir pasang m3 0.0560 300,000.00 16,800.00
5 Pasir urug m3 0.0325 140,000.00 4,550.00
JUMLAH HARGA BAHAN 134,793.50
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 211,931.50
E Jasa 10% 21,193.15
F Harga Satuan Pekerjaan 233,124.65
DIBULATKAN 233,124.00
37. 6.1 1 m3 Membuat beton tumbuk 1Pc : 3Ps : 5Kr
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 1.6500 76,000.00 125,400.00
2010 2 Tukang batu OH 0.2500 95,000.00 23,750.00
3 Kepala tukang batu OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0800 114,000.00 9,120.00
JUMLAH HARGA TENAGA KERJA 160,920.00
B BAHAN
1 Semen portland kg 218.0000 1,350.00 294,300.00
2 Pasir beton m3 0.5200 300,000.00 156,000.00
3 Krikil m3 0.8700 230,000.00 200,100.00
JUMLAH HARGA BAHAN 650,400.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 811,320.00
E Jasa 10% 81,132.00
F Harga Satuan Pekerjaan 892,452.00
DIBULATKAN 892,452.00
38. A.4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa ( K 175 )
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.6500 76,000.00 125,400.00
2022 2 Tukang batu OH 0.2750 95,000.00 26,125.00
3 Kepala tukang batu OH 0.0280 106,000.00 2,968.00
4 Mandor OH 0.0830 114,000.00 9,462.00
JUMLAH HARGA TENAGA KERJA 163,955.00
B BAHAN
1 Semen portland kg 326.0000 1,350.00 440,100.00
2 Pasir beton m3 0.5429 300,000.00 162,857.14
3 Split 2/3 m3 0.7622 275,000.00 209,611.11
4 Air liter 215.0000 60.00 12,900.00
JUMLAH HARGA BAHAN 825,468.25
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 989,423.25
E Jasa 10% 98,942.33
F Harga Satuan Pekerjaan 1,088,365.58
DIBULATKAN 1,088,365.00
Catatan : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %

39. A.4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa ( K 200 )


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.6500 76,000.00 125,400.00
2022 2 Tukang batu OH 0.2750 95,000.00 26,125.00
3 Kepala tukang batu OH 0.0280 106,000.00 2,968.00
4 Mandor OH 0.0830 114,000.00 9,462.00
JUMLAH HARGA TENAGA KERJA 163,955.00
B BAHAN
1 Semen portland kg 352.0000 1,350.00 475,200.00
2 Pasir beton m3 0.5221 300,000.00 156,642.86
3 Split 2/3 m3 0.7637 275,000.00 210,018.52
4 Air liter 215.0000 60.00 12,900.00
JUMLAH HARGA BAHAN 854,761.38
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 1,018,716.38
E Jasa 10% 101,871.64
F Harga Satuan Pekerjaan 1,120,588.01
DIBULATKAN 1,120,588.00

40. A.4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa ( K 250 )


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.6500 76,000.00 125,400.00
2022 2 Tukang batu OH 0.2750 95,000.00 26,125.00
3 Kepala tukang batu OH 0.0280 106,000.00 2,968.00
4 Mandor OH 0.0830 114,000.00 9,462.00
JUMLAH HARGA TENAGA KERJA 163,955.00
B BAHAN
1 Semen portland kg 384.0000 1,350.00 518,400.00
2 Pasir beton m3 0.4943 300,000.00 148,285.71
3 Split 2/3 m3 0.7696 275,000.00 211,648.15
4 Air liter 215.0000 60.00 12,900.00
JUMLAH HARGA BAHAN 891,233.86
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 1,055,188.86
E Jasa 10% 105,518.89
F Harga Satuan Pekerjaan 1,160,707.75
DIBULATKAN 1,160,707.00
41. 2.2.6.1.b.(c) Penulangan 1 kg dengan besi polos
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0070 76,000.00 532.00
2022 2 Tukang batu OH 0.0070 95,000.00 665.00
3 Kepala tukang batu OH 0.0007 106,000.00 74.20
4 Mandor OH 0.0004 114,000.00 45.60
JUMLAH HARGA TENAGA KERJA 1,316.80
B BAHAN
1 Besi beton polos kg 1.0500 12,500.00 13,125.00
2 Kawat bendrat kg 0.0150 20,000.00 300.00
JUMLAH HARGA BAHAN 13,425.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 14,741.80
E Jasa 10% 1,474.18
F Harga Satuan Pekerjaan 16,215.98
DIBULATKAN 16,215.00

42. 2.2.6.1.b.(c) Penulangan 1 kg dengan besi ulir


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0070 76,000.00 532.00
2022 2 Tukang batu OH 0.0070 95,000.00 665.00
3 Kepala tukang batu OH 0.0007 106,000.00 74.20
4 Mandor OH 0.0004 114,000.00 45.60
JUMLAH HARGA TENAGA KERJA 1,316.80
B BAHAN
1 Besi beton ulir kg 1.0500 13,000.00 13,650.00
2 Kawat bendrat kg 0.0150 20,000.00 300.00
JUMLAH HARGA BAHAN 13,950.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 15,266.80
E Jasa 10% 1,526.68
F Harga Satuan Pekerjaan 16,793.48
DIBULATKAN 16,793.00

43. A.4.1.1.17. Memasang 1 kg jaring anyaman tulangan tunggal ( Wiremesh ) M8


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0025 76,000.00 190.00
2022 2 Tukang batu OH 0.0025 95,000.00 237.50
3 Kepala tukang batu OH 0.0025 106,000.00 265.00
4 Mandor OH 0.0001 114,000.00 11.40
JUMLAH HARGA TENAGA KERJA 703.90
B BAHAN
1 Wiremesh M8 kg 1.0200 12,500.00 12,750.00
2 Kawat bendrat kg 0.0050 20,000.00 100.00

JUMLAH HARGA BAHAN 12,850.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 13,553.90
E Jasa 10% 1,355.39
F Harga Satuan Pekerjaan 14,909.29
DIBULATKAN 14,909.00
44. A.4.1.1.18. Memasang 1 m2 bekisting untuk pondasi telapak beton bangunan gedung
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.5200 76,000.00 39,520.00
2022 2 Tukang kayu OH 0.2600 104,000.00 27,040.00
3 Kepala tukang batu OH 0.0260 106,000.00 2,756.00
4 Mandor OH 0.0260 114,000.00 2,964.00
JUMLAH HARGA TENAGA KERJA 72,280.00
B BAHAN
1 Papan kayu kelas III m3 0.0400 3,500,000.00 140,000.00
2 Paku 5 - 10 cm kg 0.3000 18,000.00 5,400.00
3 Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 146,400.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 218,680.00
E Jasa 10% 21,868.00
F Harga Satuan Pekerjaan 240,548.00
DIBULATKAN 240,548.00
Catatan : Semua pekerjaan bekisting termasuk pembongkaranya

45. A.4.1.1.19. Memasang 1 m2 bekisting untuk sloof beton bangunan gedung


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.5200 76,000.00 39,520.00
2022 2 Tukang kayu OH 0.2600 104,000.00 27,040.00
3 Kepala tukang batu OH 0.0260 106,000.00 2,756.00
4 Mandor OH 0.0260 114,000.00 2,964.00
JUMLAH HARGA TENAGA KERJA 72,280.00
B BAHAN
1 Papan kayu kelas III m3 0.0450 3,500,000.00 157,500.00
2 Paku 5 - 10 cm kg 0.3000 18,000.00 5,400.00
3 Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 163,900.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 236,180.00
E Jasa 10% 23,618.00
F Harga Satuan Pekerjaan 259,798.00
DIBULATKAN 259,798.00

A.4.1.1.19. Memasang 1 m2 bekisting untuk sloof beton bangunan gedung ( 2 x pakai )


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.5200 76,000.00 39,520.00
2022 2 Tukang kayu OH 0.2600 104,000.00 27,040.00
3 Kepala tukang batu OH 0.0260 106,000.00 2,756.00
4 Mandor OH 0.0260 114,000.00 2,964.00
JUMLAH HARGA TENAGA KERJA 72,280.00
B BAHAN
1 Papan kayu kelas III m3 0.0225 3,500,000.00 78,750.00
2 Paku 5 - 10 cm kg 0.3000 18,000.00 5,400.00
3 Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 85,150.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 157,430.00
E Jasa 10% 15,743.00
F Harga Satuan Pekerjaan 173,173.00
DIBULATKAN 173,173.00

46. A.4.1.1.20. Memasang 1 m2 bekisting untuk kolom beton bangunan gedung


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang batu OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0400 3,500,000.00 140,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0150 3,000,000.00 45,000.00
5 Triplek 9 mm lbr 0.3500 125,000.00 43,750.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 267,950.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 359,690.00
E Jasa 10% 35,969.00
F Harga Satuan Pekerjaan 395,659.00
DIBULATKAN 395,659.00
46.a. Memasang 1 m2 bekisting untuk kolom beton bangunan gedung ( 2x pakai )
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang batu OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0200 3,500,000.00 70,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0075 3,000,000.00 22,500.00
5 Triplek 9 mm lbr 0.1750 125,000.00 21,875.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 138,575.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 230,315.00
E Jasa 10% 23,031.50
F Harga Satuan Pekerjaan 253,346.50
DIBULATKAN 253,346.00

47. A.4.1.1.21. Memasang 1 m2 bekisting untuk balok beton bangunan gedung


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang batu OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0400 3,500,000.00 140,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0180 3,000,000.00 54,000.00
5 Triplek 9 mm lbr 0.3500 125,000.00 43,750.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 276,950.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 368,690.00
E Jasa 10% 36,869.00
F Harga Satuan Pekerjaan 405,559.00
DIBULATKAN 405,559.00

47.a. Memasang 1 m2 bekisting untuk balok beton bangunan gedung ( 2x pakai )


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang batu OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0200 3,500,000.00 70,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0090 3,000,000.00 27,000.00
5 Triplek 9 mm lbr 0.1750 125,000.00 21,875.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 143,075.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 234,815.00
E Jasa 10% 23,481.50
F Harga Satuan Pekerjaan 258,296.50
DIBULATKAN 258,296.00

48. A.4.1.1.22. Memasang 1 m2 bekisting untuk plat lantai beton bangunan gedung
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang batu OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0400 3,500,000.00 140,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0150 3,000,000.00 45,000.00
5 Triplek 9 mm lbr 0.3500 125,000.00 43,750.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 6.0000 15,000.00 90,000.00
JUMLAH HARGA BAHAN 327,950.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 419,690.00
E Jasa 10% 41,969.00
F Harga Satuan Pekerjaan 461,659.00
DIBULATKAN 461,659.00

48.a. Memasang 1 m2 bekisting untuk plat lantai beton bangunan gedung ( 2x pakai )
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang batu OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0200 3,500,000.00 70,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0075 3,000,000.00 22,500.00
5 Triplek 9 mm lbr 0.1750 125,000.00 21,875.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 3.0000 15,000.00 45,000.00
JUMLAH HARGA BAHAN 168,575.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 260,315.00
E Jasa 10% 26,031.50
F Harga Satuan Pekerjaan 286,346.50
DIBULATKAN 286,346.00

49. A.4.1.1.23. Memasang 1 m2 bekisting untuk dinding sheerwall


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0300 3,500,000.00 105,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.2000 10,000.00 2,000.00
4 Balok kayu kelas II m3 0.0200 3,000,000.00 60,000.00
5 Triplek 9 mm lbr 0.3500 125,000.00 43,750.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 3.0000 15,000.00 45,000.00
7 Penjaga jarak bekisting/spacer buah 4.0000 15,000.00 60,000.00
JUMLAH HARGA BAHAN 322,950.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 414,690.00
E Jasa 10% 41,469.00
F Harga Satuan Pekerjaan 456,159.00
DIBULATKAN 456,159.00

50. A.4.1.1.25. Memasang 1 m2 bekisting untuk tangga beton bangunan gedung


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6600 76,000.00 50,160.00
2022 2 Tukang kayu OH 0.3300 104,000.00 34,320.00
3 Kepala tukang OH 0.0330 106,000.00 3,498.00
4 Mandor OH 0.0330 114,000.00 3,762.00
JUMLAH HARGA TENAGA KERJA 91,740.00
B BAHAN
1 Papan kayu kelas III m3 0.0300 3,500,000.00 105,000.00
2 Paku 5 - 12 cm kg 0.4000 18,000.00 7,200.00
3 Minyak bekisting liter 0.1500 10,000.00 1,500.00
4 Balok kayu kelas II m3 0.0150 3,000,000.00 45,000.00
5 Triplek 9 mm lbr 0.3500 125,000.00 43,750.00
6 Dolken kayu Ø 8-10 cm panjang 4 m batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 232,450.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 324,190.00
E Jasa 10% 32,419.00
F Harga Satuan Pekerjaan 356,609.00
DIBULATKAN 356,609.00

51. A.4.4.3.35. Memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm putih polos


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 30 x 30 putih polos Dus 1.0500 60,000.00 63,000.00
2 Semen portlan kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 91,500.00
C PERALATAN
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 185,650.00
E Jasa 10% 18,565.00
F Harga Satuan Pekerjaan 204,215.00
DIBULATKAN 204,215.00

52. A.4.4.3.35. Memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm motif


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 30 x 30 motif Dus 1.0500 65,000.00 68,250.00
2 Semen portlan kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 96,750.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 190,900.00
E Jasa 10% 19,090.00
F Harga Satuan Pekerjaan 209,990.00
DIBULATKAN 209,990.00
53. A.4.4.3.35. Memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm tekstur
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 30 x 30 tekstur Dus 1.0500 67,000.00 70,350.00
2 Semen portlan kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 98,850.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 193,000.00
E Jasa 10% 19,300.00
F Harga Satuan Pekerjaan 212,300.00
DIBULATKAN 212,300.00

54. A.4.4.3.35. Memasang 1 m2 lantai keramik ukuran ( 40 x 40 ) cm putih polos


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 40 x 40 putih polos Dus 1.0500 69,000.00 72,450.00
2 Semen portlan kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 100,950.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 195,100.00
E Jasa 10% 19,510.00
F Harga Satuan Pekerjaan 214,610.00
DIBULATKAN 214,610.00

55. A.4.4.3.35. Memasang 1 m2 lantai keramik ukuran ( 40 x 40 ) cm motif


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 40 x 40 motif Dus 1.0500 75,000.00 78,750.00
2 Semen portlan kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 107,250.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 201,400.00
E Jasa 10% 20,140.00
F Harga Satuan Pekerjaan 221,540.00
DIBULATKAN 221,540.00
56. A.4.4.3.35. Memasang 1 m2 lantai keramik ukuran ( 40 x 40 ) cm tekstur
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 40 x 40 tekstur Dus 1.0500 77,000.00 80,850.00
2 Semen portlan kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 109,350.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 203,500.00
E Jasa 10% 20,350.00
F Harga Satuan Pekerjaan 223,850.00
DIBULATKAN 223,850.00

57. A.4.4.3.36. Memasang 1 m2 lantai keramik ukuran ( 25 x 25 ) cm tekstur


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2016 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Ubin keramik 25 x 25 tekstur Dus 1.0500 68,000.00 71,400.00
2 Semen portlan kg 10.4000 1,350.00 14,040.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.5000 3,000.00 1,500.00
JUMLAH HARGA BAHAN 100,440.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 194,590.00
E Jasa 10% 19,459.00
F Harga Satuan Pekerjaan 214,049.00
DIBULATKAN 214,049.00

58. A.4.4.3.53. Memasang 1 m2 dinding keramik ukuran ( 20 x 20 ) cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.9000 76,000.00 68,400.00
2022 2 Tukang batu OH 0.4500 95,000.00 42,750.00
3 Kepala tukang OH 0.0450 106,000.00 4,770.00
4 Mandor OH 0.0450 114,000.00 5,130.00
JUMLAH HARGA TENAGA KERJA 121,050.00
B BAHAN
1 Keramik dinding 20 x 20 bh 26.0000 3,200.00 83,200.00
2 Semen portlan kg 9.3000 1,350.00 12,555.00
3 Pasir pasang m3 0.0180 300,000.00 5,400.00
4 Semen warna kg 1.9400 3,000.00 5,820.00
JUMLAH HARGA BAHAN 106,975.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 228,025.00
E Jasa 10% 22,802.50
F Harga Satuan Pekerjaan 250,827.50
DIBULATKAN 250,827.00
59. A.4.4.3.53. Memasang 1 m2 dinding keramik ukuran ( 20 x 25 ) cm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.9000 76,000.00 68,400.00
2022 2 Tukang batu OH 0.4500 95,000.00 42,750.00
3 Kepala tukang OH 0.0450 106,000.00 4,770.00
4 Mandor OH 0.0450 114,000.00 5,130.00
JUMLAH HARGA TENAGA KERJA 121,050.00
B BAHAN
1 Keramik dinding 20 x 25 bh 20.8000 3,750.00 78,000.00
2 Semen portlan kg 9.3000 1,350.00 12,555.00
3 Pasir pasang m3 0.0180 300,000.00 5,400.00
4 Semen warna kg 1.9400 3,000.00 5,820.00
JUMLAH HARGA BAHAN 101,775.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 222,825.00
E Jasa 10% 22,282.50
F Harga Satuan Pekerjaan 245,107.50
DIBULATKAN 245,107.00

60. A.4.4.3.53. Memasang 1 m2 dinding keramik ukuran ( 25 x 40 ) cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.9000 76,000.00 68,400.00
2022 2 Tukang batu OH 0.4500 95,000.00 42,750.00
3 Kepala tukang OH 0.0450 106,000.00 4,770.00
4 Mandor OH 0.0450 114,000.00 5,130.00
JUMLAH HARGA TENAGA KERJA 121,050.00
B BAHAN
1 Keramik dinding 25 x 40 bh 10.4000 6,500.00 67,600.00
2 Semen portlan kg 9.3000 1,350.00 12,555.00
3 Pasir pasang m3 0.0180 300,000.00 5,400.00
4 Semen warna kg 1.9400 3,000.00 5,820.00
JUMLAH HARGA BAHAN 91,375.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 212,425.00
E Jasa 10% 21,242.50
F Harga Satuan Pekerjaan 233,667.50
DIBULATKAN 233,667.00

61. A.4.4.3.5. Memasang 1 m2 lantai ubin warna ukuran ( 30 x 30 ) cm, Ubin difabel
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2600 76,000.00 19,760.00
2022 2 Tukang batu OH 0.1300 95,000.00 12,350.00
3 Kepala tukang OH 0.0130 106,000.00 1,378.00
4 Mandor OH 0.0130 114,000.00 1,482.00
JUMLAH HARGA TENAGA KERJA 34,970.00
B BAHAN
1 Ubin warna ( difabel ) 30 x 30 bh 11.8700 20,000.00 237,400.00
2 Semen portland kg 10.0000 1,350.00 13,500.00
3 Pasir pasang m3 0.0450 300,000.00 13,500.00
4 Semen warna kg 0.6000 3,000.00 1,800.00
JUMLAH HARGA BAHAN 266,200.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 301,170.00
E Jasa 10% 30,117.00
F Harga Satuan Pekerjaan 331,287.00
DIBULATKAN 331,287.00
62. A.4.4.3.24. Memasang 1 m' plint keramik ukuran ( 10 x 30 ) cm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0900 76,000.00 6,840.00
2016 2 Tukang batu OH 0.0900 95,000.00 8,550.00
3 Kepala tukang OH 0.0090 106,000.00 954.00
4 Mandor OH 0.0050 106,000.00 530.00
JUMLAH HARGA TENAGA KERJA 16,874.00
B BAHAN
1 Plint keramik 10 x 30 bh 3.5300 2,000.00 7,060.00
2 Semen portland kg 1.1400 1,350.00 1,539.00
3 Pasir pasang m3 0.0030 300,000.00 900.00
4 Semen warna kg 0.1000 3,000.00 300.00
JUMLAH HARGA BAHAN 9,799.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 26,673.00
E Jasa 10% 2,667.30
F Harga Satuan Pekerjaan 29,340.30
DIBULATKAN 29,340.00

63. A.4.4.3.24. Memasang 1 m' plint keramik ukuran ( 10 x 40 ) cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0900 76,000.00 6,840.00
2016 2 Tukang batu OH 0.0900 95,000.00 8,550.00
3 Kepala tukang OH 0.0090 106,000.00 954.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 16,914.00
B BAHAN
1 Plint keramik 10 x 40 bh 2.6500 3,250.00 8,612.50
2 Semen portland kg 1.1400 1,350.00 1,539.00
3 Pasir pasang m3 0.0030 300,000.00 900.00
4 Semen warna kg 0.1000 3,000.00 300.00
JUMLAH HARGA BAHAN 11,351.50
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 28,265.50
E Jasa 10% 2,826.55
F Harga Satuan Pekerjaan 31,092.05
DIBULATKAN 31,092.00

64. A.4.4.3.57. Memasang 1 m' dinding batu tempel


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.7000 76,000.00 53,200.00
2022 2 Tukang batu OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0350 114,000.00 3,990.00
JUMLAH HARGA TENAGA KERJA 94,150.00
B BAHAN
1 Batu tempel m2 1.1000 90,000.00 99,000.00
2 Semen portland kg 11.7500 1,350.00 15,862.50
3 Pasir pasang m3 0.0350 300,000.00 10,500.00

JUMLAH HARGA BAHAN 125,362.50


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 219,512.50
E Jasa 10% 21,951.25
F Harga Satuan Pekerjaan 241,463.75
DIBULATKAN 241,463.00
65. A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 6.0000 76,000.00 456,000.00
2022 2 Tukang kayu OH 18.0000 104,000.00 1,872,000.00
3 Kepala tukang OH 1.8000 106,000.00 190,800.00
4 Mandor OH 0.3000 114,000.00 34,200.00
JUMLAH HARGA TENAGA KERJA 2,553,000.00
B BAHAN
1 Balok kayu jati lokal m3 1.2000 14,000,000.00 16,800,000.00
2 Paku 10 cm kg 1.2500 18,000.00 22,500.00
3 Lem kayu kg 1.0000 15,000.00 15,000.00

JUMLAH HARGA BAHAN 16,837,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 19,390,500.00
E Jasa 10% 1,939,050.00
F Harga Satuan Pekerjaan 21,329,550.00
DIBULATKAN 21,329,550.00

66. A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela kayu bengkirai
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 6.0000 76,000.00 456,000.00
2022 2 Tukang kayu OH 18.0000 104,000.00 1,872,000.00
3 Kepala tukang OH 1.8000 106,000.00 190,800.00
4 Mandor OH 0.3000 114,000.00 34,200.00
JUMLAH HARGA TENAGA KERJA 2,553,000.00
B BAHAN
1 Balok kayu bengkirai m3 1.2000 12,000,000.00 14,400,000.00
2 Paku 10 cm kg 1.2500 18,000.00 22,500.00
3 Lem kayu kg 1.0000 15,000.00 15,000.00

JUMLAH HARGA BAHAN 14,437,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 16,990,500.00
E Jasa 10% 1,699,050.00
F Harga Satuan Pekerjaan 18,689,550.00
DIBULATKAN 18,689,550.00

67. A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 6.0000 76,000.00 456,000.00
2022 2 Tukang kayu OH 18.0000 104,000.00 1,872,000.00
3 Kepala tukang OH 1.8000 106,000.00 190,800.00
4 Mandor OH 0.3000 114,000.00 34,200.00
JUMLAH HARGA TENAGA KERJA 2,553,000.00
B BAHAN
1 Balok kayu kruing m3 1.2000 8,500,000.00 10,200,000.00
2 Paku 10 cm kg 1.2500 18,000.00 22,500.00
3 Lem kayu kg 1.0000 15,000.00 15,000.00

JUMLAH HARGA BAHAN 10,237,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 12,790,500.00
E Jasa 10% 1,279,050.00
F Harga Satuan Pekerjaan 14,069,550.00
DIBULATKAN 14,069,550.00
68. A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0000 76,000.00 76,000.00
2022 2 Tukang kayu OH 3.0000 104,000.00 312,000.00
3 Kepala tukang OH 0.3000 106,000.00 31,800.00
4 Mandor OH 0.0500 114,000.00 5,700.00
JUMLAH HARGA TENAGA KERJA 425,500.00
B BAHAN
1 Papan kayu jati lokal m3 0.0400 14,500,000.00 580,000.00
2 Lem kayu kg 0.5000 15,000.00 7,500.00

JUMLAH HARGA BAHAN 587,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 1,013,000.00
E Jasa 10% 101,300.00
F Harga Satuan Pekerjaan 1,114,300.00
DIBULATKAN 1,114,300.00

69. A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel kayu kamper
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0000 76,000.00 76,000.00
2022 2 Tukang kayu OH 3.0000 104,000.00 312,000.00
3 Kepala tukang OH 0.3000 106,000.00 31,800.00
4 Mandor OH 0.0500 114,000.00 5,700.00
JUMLAH HARGA TENAGA KERJA 425,500.00
B BAHAN
1 Papan kayu kamper m3 0.0400 10,000,000.00 400,000.00
2 Lem kayu kg 0.5000 15,000.00 7,500.00

JUMLAH HARGA BAHAN 407,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 833,000.00
E Jasa 10% 83,300.00
F Harga Satuan Pekerjaan 916,300.00
DIBULATKAN 916,300.00

70. A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0000 76,000.00 76,000.00
2022 2 Tukang kayu OH 3.0000 104,000.00 312,000.00
3 Kepala tukang OH 0.3000 106,000.00 31,800.00
4 Mandor OH 0.0500 114,000.00 5,700.00
JUMLAH HARGA TENAGA KERJA 425,500.00
B BAHAN
1 Papan kayu kruing m3 0.0400 9,000,000.00 360,000.00
2 Lem kayu kg 0.5000 15,000.00 7,500.00

JUMLAH HARGA BAHAN 367,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 793,000.00
E Jasa 10% 79,300.00
F Harga Satuan Pekerjaan 872,300.00
DIBULATKAN 872,300.00
71. A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel kayu jati lokal lapis alumunium sebelah
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0000 76,000.00 76,000.00
2022 2 Tukang kayu OH 3.0000 104,000.00 312,000.00
3 Kepala tukang OH 0.3000 106,000.00 31,800.00
4 Mandor OH 0.0500 114,000.00 5,700.00
JUMLAH HARGA TENAGA KERJA 425,500.00
B BAHAN
1 Papan kayu jati lokal m3 0.0400 14,500,000.00 580,000.00
2 Lem kayu kg 0.5000 15,000.00 7,500.00
3 Allumunium plat m2 1.0000 47,000.00 47,000.00

JUMLAH HARGA BAHAN 634,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 1,060,000.00
E Jasa 10% 106,000.00
F Harga Satuan Pekerjaan 1,166,000.00
DIBULATKAN 1,166,000.00

72. A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.8000 76,000.00 60,800.00
2022 2 Tukang kayu OH 2.4000 104,000.00 249,600.00
3 Kepala tukang OH 0.2400 106,000.00 25,440.00
4 Mandor OH 0.0400 114,000.00 4,560.00
JUMLAH HARGA TENAGA KERJA 340,400.00
B BAHAN
1 Papan kayu jati lokal m3 0.0240 14,500,000.00 348,000.00
2 Lem kayu kg 0.3000 15,000.00 4,500.00

JUMLAH HARGA BAHAN 352,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 692,900.00
E Jasa 10% 69,290.00
F Harga Satuan Pekerjaan 762,190.00
DIBULATKAN 762,190.00

73. A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca kayu kamper
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.8000 76,000.00 60,800.00
2022 2 Tukang kayu OH 2.4000 104,000.00 249,600.00
3 Kepala tukang OH 0.2400 106,000.00 25,440.00
4 Mandor OH 0.0400 114,000.00 4,560.00
JUMLAH HARGA TENAGA KERJA 340,400.00
B BAHAN
1 Papan kayu kamper m3 0.0240 10,000,000.00 240,000.00
2 Lem kayu kg 0.3000 15,000.00 4,500.00

JUMLAH HARGA BAHAN 244,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 584,900.00
E Jasa 10% 58,490.00
F Harga Satuan Pekerjaan 643,390.00
DIBULATKAN 643,390.00
74. A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.8000 76,000.00 60,800.00
2022 2 Tukang kayu OH 2.4000 104,000.00 249,600.00
3 Kepala tukang OH 0.2400 106,000.00 25,440.00
4 Mandor OH 0.0400 114,000.00 4,560.00
JUMLAH HARGA TENAGA KERJA 340,400.00
B BAHAN
1 Papan kayu kruing m3 0.0240 9,000,000.00 216,000.00
2 Lem kayu kg 0.3000 15,000.00 4,500.00

JUMLAH HARGA BAHAN 220,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 560,900.00
E Jasa 10% 56,090.00
F Harga Satuan Pekerjaan 616,990.00
DIBULATKAN 616,990.00

75. A.4.6.1.10. Pembuatan dan pemasangan 1 m2 jalusi kusen kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6700 76,000.00 50,920.00
2022 2 Tukang kayu OH 2.0000 104,000.00 208,000.00
3 Kepala tukang OH 0.2000 106,000.00 21,200.00
4 Mandor OH 0.3350 114,000.00 38,190.00
JUMLAH HARGA TENAGA KERJA 318,310.00
B BAHAN
1 Papan kayu jati lokal m3 0.0220 14,500,000.00 319,000.00
2 Paku 1 - 2,5 cm kg 0.1500 25,000.00 3,750.00

JUMLAH HARGA BAHAN 322,750.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 641,060.00
E Jasa 10% 64,106.00
F Harga Satuan Pekerjaan 705,166.00
DIBULATKAN 705,166.00

76. A.4.6.1.10. Pembuatan dan pemasangan 1 m2 jalusi kusen kayu bengkirai


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6700 76,000.00 50,920.00
2022 2 Tukang kayu OH 2.0000 104,000.00 208,000.00
3 Kepala tukang OH 0.2000 106,000.00 21,200.00
4 Mandor OH 0.3350 114,000.00 38,190.00
JUMLAH HARGA TENAGA KERJA 318,310.00
B BAHAN
1 Papan kayu bengkirai m3 0.0220 13,000,000.00 286,000.00
2 Paku 1 - 2,5 cm kg 0.1500 25,000.00 3,750.00

JUMLAH HARGA BAHAN 289,750.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 608,060.00
E Jasa 10% 60,806.00
F Harga Satuan Pekerjaan 668,866.00
DIBULATKAN 668,866.00
77. A.4.6.1.10. Pembuatan dan pemasangan 1 m2 jalusi kusen kayu kamper
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6700 76,000.00 50,920.00
2022 2 Tukang kayu OH 2.0000 104,000.00 208,000.00
3 Kepala tukang OH 0.2000 106,000.00 21,200.00
4 Mandor OH 0.3350 114,000.00 38,190.00
JUMLAH HARGA TENAGA KERJA 318,310.00
B BAHAN
1 Papan kayu kamper m3 0.0220 10,000,000.00 220,000.00
2 Paku 1 - 2,5 cm kg 0.1500 25,000.00 3,750.00

JUMLAH HARGA BAHAN 223,750.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 542,060.00
E Jasa 10% 54,206.00
F Harga Satuan Pekerjaan 596,266.00
DIBULATKAN 596,266.00

78. A.4.6.1.10. Pembuatan dan pemasangan 1 m2 jalusi kusen kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.6700 76,000.00 50,920.00
2022 2 Tukang kayu OH 2.0000 104,000.00 208,000.00
3 Kepala tukang OH 0.2000 106,000.00 21,200.00
4 Mandor OH 0.3350 114,000.00 38,190.00
JUMLAH HARGA TENAGA KERJA 318,310.00
B BAHAN
1 Papan kayu kruing m3 0.0220 9,000,000.00 198,000.00
2 Paku 1 - 2,5 cm kg 0.1500 25,000.00 3,750.00

JUMLAH HARGA BAHAN 201,750.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 520,060.00
E Jasa 10% 52,006.00
F Harga Satuan Pekerjaan 572,066.00
DIBULATKAN 572,066.00

79. A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional kayu bengkirai


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 4.0000 76,000.00 304,000.00
2022 2 Tukang kayu OH 12.0000 104,000.00 1,248,000.00
3 Kepala tukang OH 1.2000 106,000.00 127,200.00
4 Mandor OH 0.2000 114,000.00 22,800.00
JUMLAH HARGA TENAGA KERJA 1,702,000.00
B BAHAN
1 Balok kayu bengkirai m3 1.1000 12,000,000.00 13,200,000.00
2 Besi strip tebal 5 mm kg 15.0000 20,000.00 300,000.00
3 Paku 12 cm kg 5.6000 18,000.00 100,800.00

JUMLAH HARGA BAHAN 13,600,800.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 15,302,800.00
E Jasa 10% 1,530,280.00
F Harga Satuan Pekerjaan 16,833,080.00
DIBULATKAN 16,833,080.00
80. A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 4.0000 76,000.00 304,000.00
2022 2 Tukang kayu OH 12.0000 104,000.00 1,248,000.00
3 Kepala tukang OH 1.2000 106,000.00 127,200.00
4 Mandor OH 0.2000 114,000.00 22,800.00
JUMLAH HARGA TENAGA KERJA 1,702,000.00
B BAHAN
1 Balok kayu kruing m3 1.1000 8,500,000.00 9,350,000.00
2 Besi strip tebal 5 mm kg 15.0000 20,000.00 300,000.00
3 Paku 12 cm kg 5.6000 18,000.00 100,800.00

JUMLAH HARGA BAHAN 9,750,800.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 11,452,800.00
E Jasa 10% 1,145,280.00
F Harga Satuan Pekerjaan 12,598,080.00
DIBULATKAN 12,598,080.00

81. A.4.6.1.15. Pemasangan 1 m3 konstruksi gording kayu bengkirai


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 2.4000 76,000.00 182,400.00
2022 2 Tukang kayu OH 7.2000 104,000.00 748,800.00
3 Kepala tukang OH 0.7200 106,000.00 76,320.00
4 Mandor OH 0.1200 114,000.00 13,680.00
JUMLAH HARGA TENAGA KERJA 1,021,200.00
B BAHAN
1 Balok kayu bengkirai m3 1.1000 12,000,000.00 13,200,000.00
2 Besi strip tebal 5 mm kg 15.0000 20,000.00 300,000.00
3 Paku 12 cm kg 3.0000 18,000.00 54,000.00

JUMLAH HARGA BAHAN 13,554,000.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 14,575,200.00
E Jasa 10% 1,457,520.00
F Harga Satuan Pekerjaan 16,032,720.00
DIBULATKAN 16,032,720.00

82. A.4.6.1.15. Pemasangan 1 m3 konstruksi gording kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 2.4000 76,000.00 182,400.00
2022 2 Tukang kayu OH 7.2000 104,000.00 748,800.00
3 Kepala tukang OH 0.7200 106,000.00 76,320.00
4 Mandor OH 0.1200 114,000.00 13,680.00
JUMLAH HARGA TENAGA KERJA 1,021,200.00
B BAHAN
1 Balok kayu kruing m3 1.1000 8,500,000.00 9,350,000.00
2 Besi strip tebal 5 mm kg 15.0000 20,000.00 300,000.00
3 Paku 12 cm kg 3.0000 18,000.00 54,000.00

JUMLAH HARGA BAHAN 9,704,000.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 10,725,200.00
E Jasa 10% 1,072,520.00
F Harga Satuan Pekerjaan 11,797,720.00
DIBULATKAN 11,797,720.00
83. Pemasangan 1 m3 konstruksi gording kayu lama
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 2.4000 76,000.00 182,400.00
2022 2 Tukang kayu OH 7.2000 104,000.00 748,800.00
3 Kepala tukang OH 0.7200 106,000.00 76,320.00
4 Mandor OH 0.1200 114,000.00 13,680.00
JUMLAH HARGA TENAGA KERJA 1,021,200.00
B BAHAN
1 Balok kayu kruing m3 - - -
2 Besi strip tebal 5 mm kg 15.0000 20,000.00 300,000.00
3 Paku 12 cm kg 3.0000 18,000.00 54,000.00

JUMLAH HARGA BAHAN 354,000.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 1,375,200.00
E Jasa 10% 137,520.00
F Harga Satuan Pekerjaan 1,512,720.00
DIBULATKAN 1,512,720.00

84. A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, usuk kayu kruing, reng kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 19,630.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0140 7,000,000.00 98,000.00
2 Reng 2/3 cm kayu jati lokal kg 0.0036 8,500,000.00 30,600.00
3 Paku 5 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 133,100.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 152,730.00
E Jasa 10% 15,273.00
F Harga Satuan Pekerjaan 168,003.00
DIBULATKAN 168,003.00

85. A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, usuk kayu kruing, reng kayu bengkirai
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 19,630.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0140 7,000,000.00 98,000.00
2 Reng 2/3 cm kayu bengkirai kg 0.0036 7,500,000.00 27,000.00
3 Paku 5 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 129,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 149,130.00
E Jasa 10% 14,913.00
F Harga Satuan Pekerjaan 164,043.00
DIBULATKAN 164,043.00
86. A.4.6.1... Pemasangan 1 m2 rangka atap genteng keramik, usuk kayu lama, reng kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 19,630.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 - - -
2 Reng 2/3 cm kayu jati lokal kg 0.0036 8,500,000.00 30,600.00
3 Paku 5 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 35,100.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 54,730.00
E Jasa 10% 5,473.00
F Harga Satuan Pekerjaan 60,203.00
DIBULATKAN 60,203.00

87. A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, usuk kayu kruing, reng kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 19,630.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0140 7,000,000.00 98,000.00
2 Reng 3/4 cm kayu jati lokal kg 0.0057 7,000,000.00 39,900.00
3 Paku 5 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 142,400.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 162,030.00
E Jasa 10% 16,203.00
F Harga Satuan Pekerjaan 178,233.00
DIBULATKAN 178,233.00

88. A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, usuk kayu kruing, reng kayu bengkirai
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 19,630.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0140 7,000,000.00 98,000.00
2 Reng 3/4 cm kayu bengkirai kg 0.0057 6,000,000.00 34,200.00
3 Paku 5 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 136,700.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 156,330.00
E Jasa 10% 15,633.00
F Harga Satuan Pekerjaan 171,963.00
DIBULATKAN 171,963.00
89. A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, usuk kayu lama, reng kayu jati lokal
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 19,630.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 - - -
2 Reng 3/4 cm kayu jati lokal kg 0.0057 7,000,000.00 39,900.00
3 Paku 5 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 44,400.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 64,030.00
E Jasa 10% 6,403.00
F Harga Satuan Pekerjaan 70,433.00
DIBULATKAN 70,433.00

90. A.4.6.1.... Pemasangan 1 m2 reng kayu jati lokal 3/4


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0500 76,000.00 3,800.00
2022 2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0025 114,000.00 285.00
JUMLAH HARGA TENAGA KERJA 9,815.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 - - -
2 Reng 3/4 cm kayu jati lokal kg 0.0057 7,000,000.00 39,900.00
3 Paku 5 dan 10 cm kg 0.1500 18,000.00 2,700.00

JUMLAH HARGA BAHAN 42,600.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 52,415.00
E Jasa 10% 5,241.50
F Harga Satuan Pekerjaan 57,656.50
DIBULATKAN 57,656.00

91. A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit ( 50 x 100 ) cm, kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1500 76,000.00 11,400.00
2022 2 Tukang kayu OH 0.3000 104,000.00 31,200.00
3 Kepala tukang OH 0.0300 106,000.00 3,180.00
4 Mandor OH 0.0750 114,000.00 8,550.00
JUMLAH HARGA TENAGA KERJA 54,330.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0154 7,000,000.00 107,800.00
2 Paku 7 dan 10 cm kg 0.2000 18,000.00 3,600.00

JUMLAH HARGA BAHAN 111,400.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 165,730.00
E Jasa 10% 16,573.00
F Harga Satuan Pekerjaan 182,303.00
DIBULATKAN 182,303.00
92. 6.20. Pemasangan 1 m2 rangka langit-langit ( 100 x 100 ) cm, kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.1500 76,000.00 11,400.00
2007 2 Tukang kayu OH 0.2500 104,000.00 26,000.00
3 Kepala tukang OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0075 114,000.00 855.00
JUMLAH HARGA TENAGA KERJA 40,905.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0120 7,000,000.00 84,000.00
2 Paku 7 dan 10 cm kg 0.1000 18,000.00 1,800.00

JUMLAH HARGA BAHAN 85,800.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 126,705.00
E Jasa 10% 12,670.50
F Harga Satuan Pekerjaan 139,375.50
DIBULATKAN 139,375.00

93. 6.20. Pemasangan 1 m2 rangka langit-langit ( 100 x 100 ) cm, kayu lama
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.1500 76,000.00 11,400.00
2007 2 Tukang kayu OH 0.2500 104,000.00 26,000.00
3 Kepala tukang OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0075 114,000.00 855.00
JUMLAH HARGA TENAGA KERJA 40,905.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0120 - -
2 Paku 7 dan 10 cm kg 0.1000 18,000.00 1,800.00

JUMLAH HARGA BAHAN 1,800.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 42,705.00
E Jasa 10% 4,270.50
F Harga Satuan Pekerjaan 46,975.50
DIBULATKAN 46,975.00

94. A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit ( 60 x 60 ) cm, kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2000 76,000.00 15,200.00
2022 2 Tukang kayu OH 0.3000 104,000.00 31,200.00
3 Kepala tukang OH 0.0300 106,000.00 3,180.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 50,720.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0163 7,000,000.00 114,100.00
2 Paku 7 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 118,600.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 169,320.00
E Jasa 10% 16,932.00
F Harga Satuan Pekerjaan 186,252.00
DIBULATKAN 186,252.00
95. A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit ( 60 x 120 ) cm, kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2000 76,000.00 15,200.00
2022 2 Tukang kayu OH 0.3000 104,000.00 31,200.00
3 Kepala tukang OH 0.0300 106,000.00 3,180.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 50,720.00
B BAHAN
1 Usuk kayu kruing 5/7 cm m3 0.0133 7,000,000.00 93,100.00
2 Paku 7 dan 10 cm kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 97,600.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 148,320.00
E Jasa 10% 14,832.00
F Harga Satuan Pekerjaan 163,152.00
DIBULATKAN 163,152.00

96. A.4.2.1.20. Memasang 1 m2 rangka besi hollow galvanis 40x40x0,35mm, modul (60 x 120) cm, untuk partisi
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2500 76,000.00 19,000.00
2022 2 Tukang besi OH 0.2500 95,000.00 23,750.00
3 Kepala tukang OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0130 114,000.00 1,482.00
JUMLAH HARGA TENAGA KERJA 46,882.00
B BAHAN
1 Rangka besi hollow 40x40x0,35 mm m' 3.5000 11,000.00 38,500.00
2 Acesories ( perkuatan, las dll ) ls 10% 38,500.00 3,850.00

JUMLAH HARGA BAHAN 42,350.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 89,232.00
E Jasa 10% 8,923.20
F Harga Satuan Pekerjaan 98,155.20
DIBULATKAN 98,155.00

97. A.4.2.1.20. Memasang 1 m2 rangka besi hollow galvanis 40x40x0,35mm, modul (60 x 100) cm, untuk plafond
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2500 76,000.00 19,000.00
2022 2 Tukang besi OH 0.2500 95,000.00 23,750.00
3 Kepala tukang OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0130 114,000.00 1,482.00
JUMLAH HARGA TENAGA KERJA 46,882.00
B BAHAN
1 Rangka besi hollow 40x40x0,35 mm m' 3.6750 11,000.00 40,425.00
2 Acesories ( perkuatan, las dll ) ls 10% 40,425.00 4,042.50

JUMLAH HARGA BAHAN 44,467.50


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 91,349.50
E Jasa 10% 9,134.95
F Harga Satuan Pekerjaan 100,484.45
DIBULATKAN 100,484.00
98. A.4.2.1.21. Memasang 1 m2 rangka besi hollow galvanis 40x40x0,35mm, modul (60 x 60) cm, untuk plafond
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.3500 76,000.00 26,600.00
2022 2 Tukang besi OH 0.3500 95,000.00 33,250.00
3 Kepala tukang OH 0.0350 106,000.00 3,710.00
4 Mandor OH 0.0180 114,000.00 2,052.00
JUMLAH HARGA TENAGA KERJA 65,612.00
B BAHAN
1 Rangka besi hollow 40x40x0,35 mm m' 4.0000 11,000.00 44,000.00
2 Acesories ( perkuatan, las dll ) ls 10% 44,000.00 4,400.00

JUMLAH HARGA BAHAN 48,400.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 114,012.00
E Jasa 10% 11,401.20
F Harga Satuan Pekerjaan 125,413.20
DIBULATKAN 125,413.00

99. A.4.6.1.21. Pemasangan 1 m' Lisplank ukuran ( 2 x 20 ) cm, kayu bengkirai


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu bengkirai m3 0.0048 13,000,000.00 62,400.00
2 Paku 5 dan 7 cm kg 0.1000 18,000.00 1,800.00

JUMLAH HARGA BAHAN 64,200.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 95,290.00
E Jasa 10% 9,529.00
F Harga Satuan Pekerjaan 104,819.00
DIBULATKAN 104,819.00

100. A.4.6.1.21. Pemasangan 1 m' Lisplank ukuran ( 2 x 20 ) cm, kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu kruing m3 0.0048 9,000,000.00 43,200.00
2 Paku 5 dan 7 cm kg 0.1000 18,000.00 1,800.00

JUMLAH HARGA BAHAN 45,000.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 76,090.00
E Jasa 10% 7,609.00
F Harga Satuan Pekerjaan 83,699.00
DIBULATKAN 83,699.00
101. A.4.6.1.22. Pemasangan 1 m' Lisplank ukuran ( 2 x 25 ) cm, kayu bengkirai
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu bengkirai m3 0.0060 13,000,000.00 78,000.00
2 Paku 5 dan 7 cm kg 0.0500 18,000.00 900.00

JUMLAH HARGA BAHAN 78,900.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 109,990.00
E Jasa 10% 10,999.00
F Harga Satuan Pekerjaan 120,989.00
DIBULATKAN 120,989.00

102. A.4.6.1.22. Pemasangan 1 m' Lisplank ukuran ( 2 x 25 ) cm, kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu kruing m3 0.0060 9,000,000.00 54,000.00
2 Paku 5 dan 7 cm kg 0.0500 18,000.00 900.00

JUMLAH HARGA BAHAN 54,900.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 85,990.00
E Jasa 10% 8,599.00
F Harga Satuan Pekerjaan 94,589.00
DIBULATKAN 94,589.00

103. Pemasangan 1 m' Lisplank kayu lama


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1000 76,000.00 7,600.00
2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu kruing m3 - - -
2 Paku 5 dan 7 cm kg 0.0500 18,000.00 900.00

JUMLAH HARGA BAHAN 900.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 31,990.00
E Jasa 10% 3,199.00
F Harga Satuan Pekerjaan 35,189.00
DIBULATKAN 35,189.00
104. Pemasangan 1 m' Wenfiir ukuran 2/10 cm kayu bengkirai
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1000 76,000.00 7,600.00
2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu bengkirai m3 0.0024 13,000,000.00 31,200.00
2 Paku 5 dan 7 cm kg 0.0500 18,000.00 900.00

JUMLAH HARGA BAHAN 32,100.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 63,190.00
E Jasa 10% 6,319.00
F Harga Satuan Pekerjaan 69,509.00
DIBULATKAN 69,509.00

105. Pemasangan 1 m' Wenfiir ukuran 2/10 cm kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1000 76,000.00 7,600.00
2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 31,090.00
B BAHAN
1 Papan kayu kruing m3 0.0024 9,000,000.00 21,600.00
2 Paku 5 dan 7 cm kg 0.0500 18,000.00 900.00

JUMLAH HARGA BAHAN 22,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 53,590.00
E Jasa 10% 5,359.00
F Harga Satuan Pekerjaan 58,949.00
DIBULATKAN 58,949.00

106. Pemasangan 1 m' Papan ruiter ukuran 2/20 cm kayu kruing


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0280 76,000.00 2,128.00
SNI 2 Tukang kayu OH 0.0800 104,000.00 8,320.00
2007 3 Kepala tukang OH 0.0080 106,000.00 848.00
4 Mandor OH 0.0014 114,000.00 159.60
JUMLAH HARGA TENAGA KERJA 11,455.60
B BAHAN
1 Papan kayu kruing m3 0.0040 9,000,000.00 36,000.00
2 Paku 5 dan 7 cm kg 0.0200 18,000.00 360.00

JUMLAH HARGA BAHAN 36,360.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 47,815.60
E Jasa 10% 4,781.56
F Harga Satuan Pekerjaan 52,597.16
DIBULATKAN 52,597.00
107. Pemasangan 1 m2 Papan tutup keong ukuran 2/20 cm kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.5000 76,000.00 38,000.00
SNI 2 Tukang kayu OH 1.0000 104,000.00 104,000.00
2007 3 Kepala tukang OH 0.1000 106,000.00 10,600.00
4 Mandor OH 0.0250 114,000.00 2,850.00
JUMLAH HARGA TENAGA KERJA 155,450.00
B BAHAN
1 Papan kayu kruing m3 0.0220 9,000,000.00 198,000.00
2 Paku 5 dan 7 cm kg 0.0500 18,000.00 900.00

JUMLAH HARGA BAHAN 198,900.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 354,350.00
E Jasa 10% 35,435.00
F Harga Satuan Pekerjaan 389,785.00
DIBULATKAN 389,785.00

108. A.4.5.2.1. Pasang 1 m2 Atap Genteng Palentong Kecil "SOKKA KEBUMEN"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1500 76,000.00 11,400.00
AHSP 2 Tukang kayu OH 0.0750 104,000.00 7,800.00
2022 3 Kepala tukang OH 0.0075 106,000.00 795.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 20,907.00
B BAHAN
1 Genteng palentong "Sokka Kebumen" bh 25.0000 2,500.00 62,500.00

JUMLAH HARGA BAHAN 62,500.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 83,407.00
E Jasa 10% 8,340.70
F Harga Satuan Pekerjaan 91,747.70
DIBULATKAN 91,747.00

108.a. A.4.5.2.1. Pasang 1 m2 Atap Genteng Palentong Kecil "GODEHAN"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1500 76,000.00 11,400.00
AHSP 2 Tukang kayu OH 0.0750 104,000.00 7,800.00
2022 3 Kepala tukang OH 0.0075 106,000.00 795.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 20,907.00
B BAHAN
1 Genteng palentong "Godehan" bh 25.0000 2,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 70,907.00
E Jasa 10% 7,090.70
F Harga Satuan Pekerjaan 77,997.70
DIBULATKAN 77,997.00
109. A.4.5.2.32. Pasang 1 m2 Atap Genteng beton besar warna
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2000 76,000.00 15,200.00
AHSP 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
2022 3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 27,800.00
B BAHAN
1 Genteng beton besar warna bh 9.0000 8,000.00 72,000.00
2 Paku biasa 2" - 5" kg 0.0300 18,000.00 540.00

JUMLAH HARGA BAHAN 72,540.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 100,340.00
E Jasa 10% 10,034.00
F Harga Satuan Pekerjaan 110,374.00
DIBULATKAN 110,374.00

110. A.4.5.2.32. Pasang 1 m2 Atap Genteng beton besar natural


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2000 76,000.00 15,200.00
AHSP 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
2022 3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 27,800.00
B BAHAN
1 Genteng beton besar natural bh 9.0000 6,000.00 54,000.00
2 Paku biasa 2" - 5" kg 0.0300 18,000.00 540.00

JUMLAH HARGA BAHAN 54,540.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 82,340.00
E Jasa 10% 8,234.00
F Harga Satuan Pekerjaan 90,574.00
DIBULATKAN 90,574.00

111. Pasang 1 m2 Atap Genteng Palentong lama


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1500 76,000.00 11,400.00
2 Tukang kayu OH 0.0750 104,000.00 7,800.00
3 Kepala tukang OH 0.0075 106,000.00 795.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 20,907.00
B BAHAN
1 Genteng palentong bh - - -

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 20,907.00
E Jasa 10% 2,090.70
F Harga Satuan Pekerjaan 22,997.70
DIBULATKAN 22,997.00
112. Pasang 1 m2 Atap Genteng beton lama
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2000 76,000.00 15,200.00
2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 27,800.00
B BAHAN
1 Genteng beton besar warna bh - - -

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 27,800.00
E Jasa 10% 2,780.00
F Harga Satuan Pekerjaan 30,580.00
DIBULATKAN 30,580.00

113. A.4.5.2.6. Pemasangan 1 m' Nok/Bubungan genteng palentong


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.4000 76,000.00 30,400.00
2022 2 Tukang batu OH 0.2000 95,000.00 19,000.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0020 114,000.00 228.00
JUMLAH HARGA TENAGA KERJA 51,748.00
B BAHAN
1 Nok/bubungan Genteng palentong bh 4.0000 6,500.00 26,000.00
2 Semen portland kg 8.0000 1,350.00 10,800.00
3 Pasir pasang m3 0.0320 300,000.00 9,600.00

JUMLAH HARGA BAHAN 46,400.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 98,148.00
E Jasa 10% 9,814.80
F Harga Satuan Pekerjaan 107,962.80
DIBULATKAN 107,962.00

114. A.4.5.2.36. Pemasangan 1 m' Nok/bubungan genteng beton


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.4000 76,000.00 30,400.00
2022 2 Tukang batu OH 0.2000 95,000.00 19,000.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0200 114,000.00 2,280.00
JUMLAH HARGA TENAGA KERJA 53,800.00
B BAHAN
1 Nok/Bubungan Genteng beton bh 3.5000 7,000.00 24,500.00
2 Paku biasa 1/2" - 1" kg 0.0500 18,000.00 900.00
3 Semen portland kg 10.8000 1,350.00 14,580.00
4 Pasir pasang m3 0.0320 300,000.00 9,600.00
5 Semen warna kg 1.0000 3,000.00 3,000.00
JUMLAH HARGA BAHAN 52,580.00
C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 106,380.00
E Jasa 10% 10,638.00
F Harga Satuan Pekerjaan 117,018.00
DIBULATKAN 117,018.00
115. A.4.5.1.1. Memasang 1 m2 langit-langit GRC ( 1,00 X 1,00 ) m tebal 4 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0300 76,000.00 2,280.00
2022 2 Tukang kayu OH 0.0700 104,000.00 7,280.00
3 Kepala tukang OH 0.0070 106,000.00 742.00
4 Mandor OH 0.0040 114,000.00 456.00
JUMLAH HARGA TENAGA KERJA 10,758.00
B BAHAN
1 Plat GRC 1,00 X 1,00 m m2 1.1000 17,000.00 18,700.00
2 Paku eternit kg 0.0100 25,000.00 250.00

JUMLAH HARGA BAHAN 18,950.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 29,708.00
E Jasa 10% 2,970.80
F Harga Satuan Pekerjaan 32,678.80
DIBULATKAN 32,678.00

116. A.4.5.1.7. Memasang 1 m2 langit-langit gypsum board ukuran (120x240) cm, tebal 9 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 13,900.00
B BAHAN
1 Papan Gipsum 120 X 240 x 0,9 cm lbr 0.3640 65,000.00 23,660.00
2 Paku sekrup kg 0.1100 22,000.00 2,420.00

JUMLAH HARGA BAHAN 26,080.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 39,980.00
E Jasa 10% 3,998.00
F Harga Satuan Pekerjaan 43,978.00
DIBULATKAN 43,978.00

117. A.4.5.1.7. Memasang 1 m2 langit-langit kalsi board ukuran (120x240) cm, tebal 3,5 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1000 76,000.00 7,600.00
2022 2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 13,900.00
B BAHAN
1 Kalsiboard 120 X 240 x 0,35 cm lbr 0.3640 60,000.00 21,840.00
2 Paku sekrup kg 0.1100 22,000.00 2,420.00

JUMLAH HARGA BAHAN 24,260.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 38,160.00
E Jasa 10% 3,816.00
F Harga Satuan Pekerjaan 41,976.00
DIBULATKAN 41,976.00
118. Memasang 1 m2 langit-langit UPVC ukuran (25x400) cm, tebal 9 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1000 76,000.00 7,600.00
2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 13,900.00
B BAHAN
1 Plafon UPVC ( 400x25x0,9 ) cm lbr 1.0500 150,000.00 157,500.00
2 Paku sekrup kg 0.1100 22,000.00 2,420.00

JUMLAH HARGA BAHAN 159,920.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 173,820.00
E Jasa 10% 17,382.00
F Harga Satuan Pekerjaan 191,202.00
DIBULATKAN 191,202.00
119. Memasang 1 m2 langit-langit PVC ukuran (20x400) cm, tebal 10 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1000 76,000.00 7,600.00
2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 13,900.00
B BAHAN
1 Plafon PVC ( 400x20 ) cm, tebal 10 cm lbr 1.3130 135,000.00 177,255.00
2 Paku sekrup kg 0.1100 22,000.00 2,420.00

JUMLAH HARGA BAHAN 179,675.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 193,575.00
E Jasa 10% 19,357.50
F Harga Satuan Pekerjaan 212,932.50
DIBULATKAN 212,932.00

120. A.4.5.1.10. Memasang 1 m’ list langit-langit kayu profil


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0500 76,000.00 3,800.00
2022 2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 9,872.00
B BAHAN
1 List kayu profil lbr 1.0500 5,500.00 5,775.00
2 Paku plepet kg 0.0100 25,000.00 250.00

JUMLAH HARGA BAHAN 6,025.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 15,897.00
E Jasa 10% 1,589.70
F Harga Satuan Pekerjaan 17,486.70
DIBULATKAN 17,486.00

121. Memasang 1 m’ list langit-langit dengan list gypsum 12cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1125 76,000.00 8,550.00
2 Tukang kayu OH 0.0375 104,000.00 3,900.00
3 Kepala tukang OH 0.0037 106,000.00 392.20
4 Mandor OH 0.0065 114,000.00 741.00
JUMLAH HARGA TENAGA KERJA 13,583.20
B BAHAN
1 List profil gipsum m' 1.0500 5,000.00 5,250.00
2 Alkasit kg 0.0044 30,000.00 132.00
3 Tepung gipsum kg 0.8750 9,000.00 7,875.00

JUMLAH HARGA BAHAN 13,257.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 26,840.20
E Jasa 10% 2,684.02
F Harga Satuan Pekerjaan 29,524.22
DIBULATKAN 29,524.00
122. Memasang 1 m’ plepet eternit 1/4 cm kayu kruing
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0500 76,000.00 3,800.00
2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 9,872.00
B BAHAN
1 Plepet kayu 1/4 cm m' 1.0500 3,500.00 3,675.00
2 Paku plepet kg 0.0100 25,000.00 250.00

JUMLAH HARGA BAHAN 3,925.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 13,797.00
E Jasa 10% 1,379.70
F Harga Satuan Pekerjaan 15,176.70
DIBULATKAN 15,176.00

123. Memasang 1 m’ list plafond PVC


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0500 76,000.00 3,800.00
2 Tukang kayu OH 0.0500 104,000.00 5,200.00
3 Kepala tukang OH 0.0050 106,000.00 530.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 9,872.00
B BAHAN
1 List Plafond PVC m' 1.0500 20,000.00 21,000.00
2 Paku plepet kg 0.0100 25,000.00 250.00

JUMLAH HARGA BAHAN 21,250.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 31,122.00
E Jasa 10% 3,112.20
F Harga Satuan Pekerjaan 34,234.20
DIBULATKAN 34,234.00

124. A.4.2.1.18. Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.2000 76,000.00 15,200.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0010 114,000.00 114.00
JUMLAH HARGA TENAGA KERJA 38,234.00
B BAHAN
1 Seng plat BJLS 20 lebar 90 cm m' 1.0500 47,000.00 49,350.00
2 Paku 1cm - 2,5cm kg 0.0150 25,000.00 375.00
3 Kayu kruing papan 2/20 m3 0.0190 9,000,000.00 171,000.00

JUMLAH HARGA BAHAN 220,725.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 258,959.00
E Jasa 10% 25,895.90
F Harga Satuan Pekerjaan 284,854.90
DIBULATKAN 284,854.00
125. Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 70 cm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2000 76,000.00 15,200.00
2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0010 114,000.00 114.00
JUMLAH HARGA TENAGA KERJA 38,234.00
B BAHAN
1 Seng plat BJLS 20 lebar 70 cm m' 1.0500 27,500.00 28,875.00
2 Paku 1cm - 2,5cm kg 0.0150 25,000.00 375.00
3 Kayu kruing papan 2/20 m3 0.0150 9,000,000.00 135,000.00

JUMLAH HARGA BAHAN 164,250.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 202,484.00
E Jasa 10% 20,248.40
F Harga Satuan Pekerjaan 222,732.40
DIBULATKAN 222,732.00

126. Memasang 1 m’ talang datar/ jurai Galvalum 0,30 mm lebar 70 cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2000 76,000.00 15,200.00
2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0010 114,000.00 114.00
JUMLAH HARGA TENAGA KERJA 38,234.00
B BAHAN
1 Galvalum 0,30 mm lebar 70 cm m' 1.0500 45,000.00 47,250.00
2 Paku 1cm - 2,5cm kg 0.0150 25,000.00 375.00
3 Kayu kruing papan 2/20 m3 0.0150 9,000,000.00 135,000.00

JUMLAH HARGA BAHAN 182,625.00


C PERALATAN
-
JUMLAH HARGA AALAT -
D Jumlah ( A + B +C ) 220,859.00
E Jasa 10% 22,085.90
F Harga Satuan Pekerjaan 242,944.90
DIBULATKAN 242,944.00

127. Memasang 1 m2 Atap pelana rangka atap baja ringan ( Canai dingin ) profil C 75
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2500 76,000.00 19,000.00
2 Tukang besi OH 0.2500 95,000.00 23,750.00
3 Kepala tukang OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 45,742.00
B BAHAN
1 Baja ringan profil C 75 m' 4.5600 25,000.00 114,000.00
2 Reng 35/045 m' 5.0000 15,000.00 75,000.00

JUMLAH HARGA BAHAN 189,000.00


C PERALATAN
1 Acesories % (bahan) 10% 189,000.00 18,900.00
JUMLAH HARGA AALAT 18,900.00
D Jumlah ( A + B +C ) 253,642.00
E Jasa 10% 25,364.20
F Harga Satuan Pekerjaan 279,006.20
DIBULATKAN 279,006.00
128. Memasang 1 m2 Atap jurai/limas rangka atap baja ringan ( Canai dingin ) profil C 75
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.2500 76,000.00 19,000.00
2 Tukang besi OH 0.2500 95,000.00 23,750.00
3 Kepala tukang OH 0.0250 106,000.00 2,650.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 45,742.00
B BAHAN
1 Baja ringan profil C 75 m' 5.2380 25,000.00 130,950.00
2 Reng 35/045 m' 5.0000 15,000.00 75,000.00

JUMLAH HARGA BAHAN 205,950.00


C PERALATAN
1 Acesories % (bahan) 10% 205,950.00 20,595.00
JUMLAH HARGA AALAT 20,595.00
D Jumlah ( A + B +C ) 272,287.00
E Jasa 10% 27,228.70
F Harga Satuan Pekerjaan 299,515.70
DIBULATKAN 299,515.00

129. A.4.2.1.15. Memasang 1 m2 tralis besi strip ( 20 x 3 ) mm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.6700 76,000.00 126,920.00
2022 2 Tukang besi OH 1.6700 95,000.00 158,650.00
3 Kepala tukang OH 0.1670 106,000.00 17,702.00
4 Mandor OH 0.0830 114,000.00 9,462.00
JUMLAH HARGA TENAGA KERJA 312,734.00
B BAHAN
1 Besi strip ( 20 x 3 ) mm kg 6.1770 20,000.00 123,540.00
2 Harga bahan ( Pengelasan & cat ) % (bahan) 30% 123,540.00 37,062.00

JUMLAH HARGA BAHAN 160,602.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 473,336.00
E Jasa 10% 47,333.60
F Harga Satuan Pekerjaan 520,669.60
DIBULATKAN 520,669.00

130. A.4.2.1.8. Memasang 1 m2 pintu lipat (Folding door)


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.4400 76,000.00 33,440.00
2022 2 Tukang besi OH 0.4400 95,000.00 41,800.00
3 Kepala tukang OH 0.0440 106,000.00 4,664.00
4 Mandor OH 0.0220 114,000.00 2,508.00
JUMLAH HARGA TENAGA KERJA 82,412.00
B BAHAN
1 Folding gate 0,8 mm kg 1.0000 550,000.00 550,000.00

JUMLAH HARGA BAHAN 550,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 632,412.00
E Jasa 10% 63,241.20
F Harga Satuan Pekerjaan 695,653.20
DIBULATKAN 695,653.00
131. A.4.2.1.24. Pasang 1 m' kusen pintu/jendela alluminium 4"
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0430 76,000.00 3,268.00
2022 2 Tukang besi OH 0.0430 95,000.00 4,085.00
3 Kepala tukang OH 0.0043 106,000.00 455.80
4 Mandor OH 0.0021 114,000.00 239.40
JUMLAH HARGA TENAGA KERJA 8,048.20
B BAHAN
1 Kusen alluminium 4" Coklat m' 1.1000 110,000.00 121,000.00
2 Sekrup fixer bh 2.0000 900.00 1,800.00
3 Sealant tube 0.0600 35,000.00 2,100.00

JUMLAH HARGA BAHAN 124,900.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 132,948.20
E Jasa 10% 13,294.82
F Harga Satuan Pekerjaan 146,243.02
DIBULATKAN 146,243.00

132. A.4.2.1.24. Pasang 1 m' kusen pintu/jendela alluminium 3"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0430 76,000.00 3,268.00
2022 2 Tukang besi OH 0.0430 95,000.00 4,085.00
3 Kepala tukang OH 0.0043 106,000.00 455.80
4 Mandor OH 0.0021 114,000.00 239.40
JUMLAH HARGA TENAGA KERJA 8,048.20
B BAHAN
1 Kusen alluminium 3" Coklat m' 1.1000 90,000.00 99,000.00
2 Sekrup fixer bh 2.0000 900.00 1,800.00
3 Sealant tube 0.0600 35,000.00 2,100.00

JUMLAH HARGA BAHAN 102,900.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 110,948.20
E Jasa 10% 11,094.82
F Harga Satuan Pekerjaan 122,043.02
DIBULATKAN 122,043.00

133. A.4.2.1.25. Pasang 1 m2 daun pintu allumunium strip lebar 8 cm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0850 76,000.00 6,460.00
2022 2 Tukang besi OH 0.0850 95,000.00 8,075.00
3 Kepala tukang OH 0.0085 106,000.00 901.00
4 Mandor OH 0.0042 114,000.00 478.80
JUMLAH HARGA TENAGA KERJA 15,914.80
B BAHAN
1 Profil alluminium Coklat m' 4.4000 70,000.00 308,000.00
2 Allumunium strip m' 14.6000 20,000.00 292,000.00

JUMLAH HARGA BAHAN 600,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 615,914.80
E Jasa 10% 61,591.48
F Harga Satuan Pekerjaan 677,506.28
DIBULATKAN 677,506.00
134. A.4.2.1.26. Pasang 1 m2 daun pintu kaca rangka allumunium
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0850 76,000.00 6,460.00
2022 2 Tukang besi OH 0.0850 95,000.00 8,075.00
3 Kepala tukang OH 0.0090 106,000.00 954.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 16,059.00
B BAHAN
1 Profil pintu alluminium Coklat m' 4.4000 100,000.00 440,000.00
2 Profil kaca m' 4.5000 10,000.00 45,000.00
3 Sealant tube 0.2700 35,000.00 9,450.00

JUMLAH HARGA BAHAN 494,450.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 510,509.00
E Jasa 10% 51,050.90
F Harga Satuan Pekerjaan 561,559.90
DIBULATKAN 561,559.00

135. A.4.2.1.26. Pasang 1 m2 daun jendela kaca rangka allumunium


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0850 76,000.00 6,460.00
2022 2 Tukang besi OH 0.0850 95,000.00 8,075.00
3 Kepala tukang OH 0.0090 106,000.00 954.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 16,059.00
B BAHAN
1 Profil jendela alluminium Coklat m' 4.4000 70,000.00 308,000.00
2 Profil kaca m' 4.5000 10,000.00 45,000.00
3 Sealant tube 0.2700 35,000.00 9,450.00

JUMLAH HARGA BAHAN 362,450.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 378,509.00
E Jasa 10% 37,850.90
F Harga Satuan Pekerjaan 416,359.90
DIBULATKAN 416,359.00

136. A.4.6.2.2. Pasang 1 Buah Kunci tanam biasa


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0100 76,000.00 760.00
2022 2 Tukang kayu OH 0.5000 104,000.00 52,000.00
3 Kepala tukang OH 0.0500 106,000.00 5,300.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 58,630.00
B BAHAN
1 Kunci tanam biasa m' 1.0000 225,000.00 225,000.00

JUMLAH HARGA BAHAN 225,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 283,630.00
E Jasa 10% 28,363.00
F Harga Satuan Pekerjaan 311,993.00
DIBULATKAN 311,993.00
137. A.4.6.2.5. Pasang 1 buah Engsel Pintu
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0150 76,000.00 1,140.00
2022 2 Tukang kayu OH 0.1500 104,000.00 15,600.00
3 Kepala tukang OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0008 114,000.00 91.20
JUMLAH HARGA TENAGA KERJA 18,421.20
B BAHAN
1 Engsel pintu m' 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 43,421.20
E Jasa 10% 4,342.12
F Harga Satuan Pekerjaan 47,763.32
DIBULATKAN 47,763.00

138. A.4.6.2.6. Pasang 1 buah Engsel jendela kupu - kupu


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0100 76,000.00 760.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0005 114,000.00 57.00
JUMLAH HARGA TENAGA KERJA 12,277.00
B BAHAN
1 Engsel jendela m' 1.0000 20,000.00 20,000.00

JUMLAH HARGA BAHAN 20,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 32,277.00
E Jasa 10% 3,227.70
F Harga Satuan Pekerjaan 35,504.70
DIBULATKAN 35,504.00

139. A.4.6.2.8. Pasang 1 buah spring knip untuk jendela


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0150 76,000.00 1,140.00
2022 2 Tukang kayu OH 0.1500 104,000.00 15,600.00
3 Kepala tukang OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 19,242.00
B BAHAN
1 Spring knip m' 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 44,242.00
E Jasa 10% 4,424.20
F Harga Satuan Pekerjaan 48,666.20
DIBULATKAN 48,666.00
140. A.4.6.2.9. Pasang 1 buah Kait angin jendela
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0150 76,000.00 1,140.00
2022 2 Tukang kayu OH 0.1500 104,000.00 15,600.00
3 Kepala tukang OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 19,242.00
B BAHAN
1 Kait angin jendela m' 1.0000 7,500.00 7,500.00

JUMLAH HARGA BAHAN 7,500.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 26,742.00
E Jasa 10% 2,674.20
F Harga Satuan Pekerjaan 29,416.20
DIBULATKAN 29,416.00

141. A.4.6.2.9. Pasang 1 buah Kait angin pintu


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0150 76,000.00 1,140.00
2022 2 Tukang kayu OH 0.1500 104,000.00 15,600.00
3 Kepala tukang OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 19,242.00
B BAHAN
1 Kait angin pintu m' 1.0000 10,000.00 10,000.00

JUMLAH HARGA BAHAN 10,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 29,242.00
E Jasa 10% 2,924.20
F Harga Satuan Pekerjaan 32,166.20
DIBULATKAN 32,166.00

142. A.4.6.2.11. Pasang 1 buah grendel untuk jendela


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0200 76,000.00 1,520.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0010 114,000.00 114.00
JUMLAH HARGA TENAGA KERJA 24,554.00
B BAHAN
1 Grendel jendela m' 1.0000 6,000.00 6,000.00

JUMLAH HARGA BAHAN 6,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 30,554.00
E Jasa 10% 3,055.40
F Harga Satuan Pekerjaan 33,609.40
DIBULATKAN 33,609.00
143. A.4.6.2.11. Pasang 1 buah grendel untuk pintu
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0200 76,000.00 1,520.00
2022 2 Tukang kayu OH 0.2000 104,000.00 20,800.00
3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0010 114,000.00 114.00
JUMLAH HARGA TENAGA KERJA 24,554.00
B BAHAN
1 Grendel pintu m' 1.0000 10,000.00 10,000.00

JUMLAH HARGA BAHAN 10,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 34,554.00
E Jasa 10% 3,455.40
F Harga Satuan Pekerjaan 38,009.40
DIBULATKAN 38,009.00

144. Pasang 1 bh handle jendela


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0100 76,000.00 760.00
2022 2 Tukang kayu OH 0.1000 104,000.00 10,400.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 12,790.00
B BAHAN
1 Handle jendela m' 1.0000 7,000.00 7,000.00

JUMLAH HARGA BAHAN 7,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 19,790.00
E Jasa 10% 1,979.00
F Harga Satuan Pekerjaan 21,769.00
DIBULATKAN 21,769.00

145. A.4.6.2.17. Pasang 1 m2 kaca polos tebal 5 mm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0150 76,000.00 1,140.00
2022 2 Tukang kayu OH 0.1500 104,000.00 15,600.00
3 Kepala tukang OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0008 114,000.00 91.20
JUMLAH HARGA TENAGA KERJA 18,421.20
B BAHAN
1 Kaca polos tebal 5 mm m2 1.1000 90,000.00 99,000.00
2 Silicon Sealant 300 ml tube 0.0500 35,000.00 1,750.00

JUMLAH HARGA BAHAN 100,750.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 119,171.20
E Jasa 10% 11,917.12
F Harga Satuan Pekerjaan 131,088.32
DIBULATKAN 131,088.00
146. A.4.6.2.18. Pasang 1 m2 kaca polos tebal 8 mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0170 76,000.00 1,292.00
2022 2 Tukang kayu OH 0.1700 104,000.00 17,680.00
3 Kepala tukang OH 0.0170 106,000.00 1,802.00
4 Mandor OH 0.0009 114,000.00 102.60
JUMLAH HARGA TENAGA KERJA 20,876.60
B BAHAN
1 Kaca polos tebal 8 mm m2 1.1000 150,000.00 165,000.00
2 Silicon Sealant 300 ml tube 0.0700 35,000.00 2,450.00

JUMLAH HARGA BAHAN 167,450.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 188,326.60
E Jasa 10% 18,832.66
F Harga Satuan Pekerjaan 207,159.26
DIBULATKAN 207,159.00

147. A.4.6.2.20. Pasang 1 m2 kaca cermin tebal 3 mm


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0150 76,000.00 1,140.00
2022 2 Tukang kayu OH 0.1500 104,000.00 15,600.00
3 Kepala tukang OH 0.0150 106,000.00 1,590.00
4 Mandor OH 0.0080 114,000.00 912.00
JUMLAH HARGA TENAGA KERJA 19,242.00
B BAHAN
1 Kaca cermin tebal 3 mm m2 1.1000 140,000.00 154,000.00

JUMLAH HARGA BAHAN 154,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 173,242.00
E Jasa 10% 17,324.20
F Harga Satuan Pekerjaan 190,566.20
DIBULATKAN 190,566.00

148. A.5.1.1.1. Memasang 1 buah Closet Duduk / Monoblock


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.5000 76,000.00 38,000.00
2022 2 Tukang batu OH 1.1000 95,000.00 104,500.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.1600 114,000.00 18,240.00
JUMLAH HARGA TENAGA KERJA 161,800.00
B BAHAN
1 Closet duduk unit 1.0000 2,000,000.00 2,000,000.00
2 Perlengkapan ls 6% 2,000,000.00 120,000.00

JUMLAH HARGA BAHAN 2,120,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 2,281,800.00
E Jasa 10% 228,180.00
F Harga Satuan Pekerjaan 2,509,980.00
DIBULATKAN 2,509,980.00
149. A.5.1.1.2. Memasang 1 buah closet jongkok Keramik
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.0000 76,000.00 76,000.00
2022 2 Tukang batu OH 1.5000 95,000.00 142,500.00
3 Kepala tukang OH 0.1500 106,000.00 15,900.00
4 Mandor OH 0.1600 114,000.00 18,240.00
JUMLAH HARGA TENAGA KERJA 252,640.00
B BAHAN
1 Closet jongkok unit 1.0000 250,000.00 250,000.00
2 Pasangan bata 1pc : 3ps m2 0.0360 134,716.00 4,849.78

JUMLAH HARGA BAHAN 254,849.78


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 507,489.78
E Jasa 10% 50,748.98
F Harga Satuan Pekerjaan 558,238.75
DIBULATKAN 558,238.00

150. A.5.1.1.5. Memasang 1 buah Wastafel


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 1.2000 76,000.00 91,200.00
2022 2 Tukang batu OH 1.4500 95,000.00 137,750.00
3 Kepala tukang OH 0.1500 106,000.00 15,900.00
4 Mandor OH 0.0600 114,000.00 6,840.00
JUMLAH HARGA TENAGA KERJA 251,690.00
B BAHAN
1 Wastafel lengkap unit 1.2000 550,000.00 660,000.00
2 Semen portland kg 6.0000 1,350.00 8,100.00
3 Pasir pasang m3 0.0100 300,000.00 3,000.00

JUMLAH HARGA BAHAN 671,100.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 922,790.00
E Jasa 10% 92,279.00
F Harga Satuan Pekerjaan 1,015,069.00
DIBULATKAN 1,015,069.00

151. A.5.1.1.8. Memasang 1 buah bak mandi batu bata volume 0,30 m3
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 6.0000 76,000.00 456,000.00
2022 2 Tukang batu OH 3.0000 95,000.00 285,000.00
3 Kepala tukang OH 0.3000 106,000.00 31,800.00
4 Mandor OH 0.0300 114,000.00 3,420.00
JUMLAH HARGA TENAGA KERJA 776,220.00
B BAHAN
1 Bata merah bh 150.0000 800.00 120,000.00
2 Semen Portland kg 120.0000 1,350.00 162,000.00
3 Pasir Pasang m3 0.3000 300,000.00 90,000.00
4 Keramik 20 x 20 bh 110.0000 3,200.00 352,000.00
JUMLAH HARGA BAHAN 724,000.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 1,500,220.00
E Jasa 10% 150,022.00
F Harga Satuan Pekerjaan 1,650,242.00
DIBULATKAN 1,650,242.00
152. A.5.1.1.17. Memasang 1 buah bak kontrol pasangan bata 45 x 45 x 50 cm dengan tutup plat beton
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 3.2000 76,000.00 243,200.00
2022 2 Tukang batu OH 1.1500 95,000.00 109,250.00
3 Kepala tukang OH 0.0110 106,000.00 1,166.00
4 Mandor OH 0.0160 114,000.00 1,824.00
JUMLAH HARGA TENAGA KERJA 355,440.00
B BAHAN
1 Bata merah bh 70.0000 800.00 56,000.00
2 Semen portland kg 77.0000 1,350.00 103,950.00
3 Pasir pasang m3 0.1300 300,000.00 39,000.00
4 Pasir beton m3 0.0900 300,000.00 27,000.00
5 Split 2/3 m3 0.0200 275,000.00 5,500.00
6 Baja tulangan kg 2.6000 16,215.00 42,159.00
JUMLAH HARGA BAHAN 273,609.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 629,049.00
E Jasa 10% 62,904.90
F Harga Satuan Pekerjaan 691,953.90
DIBULATKAN 691,953.00

153. A.5.1.1.18. Memasang 1 buah bak kontrol pasangan bata 60 x 60 x 65 cm dengan tutup plat beton
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 3.2000 76,000.00 243,200.00
2022 2 Tukang batu OH 1.1500 95,000.00 109,250.00
3 Kepala tukang OH 0.0110 106,000.00 1,166.00
4 Mandor OH 0.0160 114,000.00 1,824.00
JUMLAH HARGA TENAGA KERJA 355,440.00
B BAHAN
1 Bata merah bh 123.0000 800.00 98,400.00
2 Semen portland kg 114.0000 1,350.00 153,900.00
3 Pasir pasang m3 0.1840 300,000.00 55,200.00
4 Pasir beton m3 0.1200 300,000.00 36,000.00
5 Split 2/3 m3 0.0330 275,000.00 9,075.00
6 Baja tulangan kg 4.8500 16,215.00 78,642.75
JUMLAH HARGA BAHAN 431,217.75
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 786,657.75
E Jasa 10% 78,665.78
F Harga Satuan Pekerjaan 865,323.53
DIBULATKAN 865,323.00

154. A.5.1.1.25. Memasang 1 m' pipa PVC tipe AW Ø 1/2"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0360 76,000.00 2,736.00
2022 2 Tukang batu OH 0.0600 95,000.00 5,700.00
3 Kepala tukang OH 0.0060 106,000.00 636.00
4 Mandor OH 0.0020 114,000.00 228.00
JUMLAH HARGA TENAGA KERJA 9,300.00
B BAHAN
1 Pipa PVC AW Ø 1/2" bh 1.2000 8,000.00 9,600.00
2 Harga bahan (Perlengkapan) bh 35% 9,600.00 3,360.00

JUMLAH HARGA BAHAN 12,960.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 22,260.00
E Jasa 10% 2,226.00
F Harga Satuan Pekerjaan 24,486.00
DIBULATKAN 24,486.00
155. A.5.1.1.26. Memasang 1 m' pipa PVC tipe AW Ø 3/4"
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0360 76,000.00 2,736.00
2022 2 Tukang batu OH 0.0600 95,000.00 5,700.00
3 Kepala tukang OH 0.0060 106,000.00 636.00
4 Mandor OH 0.0020 114,000.00 228.00
JUMLAH HARGA TENAGA KERJA 9,300.00
B BAHAN
1 Pipa PVC AW Ø 3/4" bh 1.2000 12,500.00 15,000.00
2 Harga bahan (Perlengkapan) bh 35% 15,000.00 5,250.00

JUMLAH HARGA BAHAN 20,250.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 29,550.00
E Jasa 10% 2,955.00
F Harga Satuan Pekerjaan 32,505.00
DIBULATKAN 32,505.00

156. A.5.1.1.27. Memasang 1 m' pipa PVC tipe AW Ø 1"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0360 76,000.00 2,736.00
2022 2 Tukang batu OH 0.0600 95,000.00 5,700.00
3 Kepala tukang OH 0.0060 106,000.00 636.00
4 Mandor OH 0.0020 114,000.00 228.00
JUMLAH HARGA TENAGA KERJA 9,300.00
B BAHAN
1 Pipa PVC AW Ø 1" bh 1.2000 28,000.00 33,600.00
2 Harga bahan (Perlengkapan) bh 35% 33,600.00 11,760.00

JUMLAH HARGA BAHAN 45,360.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 54,660.00
E Jasa 10% 5,466.00
F Harga Satuan Pekerjaan 60,126.00
DIBULATKAN 60,126.00

157. A.5.1.1.29. Memasang 1 m' pipa PVC tipe AW Ø 2"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0540 76,000.00 4,104.00
2022 2 Tukang batu OH 0.0900 95,000.00 8,550.00
3 Kepala tukang OH 0.0090 106,000.00 954.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 13,950.00
B BAHAN
1 Pipa PVC AW Ø 2" bh 1.2000 35,000.00 42,000.00
2 Harga bahan (Perlengkapan) bh 35% 42,000.00 14,700.00

JUMLAH HARGA BAHAN 56,700.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 70,650.00
E Jasa 10% 7,065.00
F Harga Satuan Pekerjaan 77,715.00
DIBULATKAN 77,715.00
158. A.5.1.1.31. Memasang 1 m' pipa PVC tipe AW Ø 3"
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0810 76,000.00 6,156.00
2022 2 Tukang batu OH 0.1350 95,000.00 12,825.00
3 Kepala tukang OH 0.0135 106,000.00 1,431.00
4 Mandor OH 0.0040 114,000.00 456.00
JUMLAH HARGA TENAGA KERJA 20,868.00
B BAHAN
1 Pipa PVC AW Ø 3" bh 1.2000 60,000.00 72,000.00
2 Harga bahan (Perlengkapan) bh 35% 72,000.00 25,200.00

JUMLAH HARGA BAHAN 97,200.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 118,068.00
E Jasa 10% 11,806.80
F Harga Satuan Pekerjaan 129,874.80
DIBULATKAN 129,874.00

159. A.5.1.1.32. Memasang 1 m' pipa PVC tipe AW Ø 4"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0810 76,000.00 6,156.00
2022 2 Tukang batu OH 0.1350 95,000.00 12,825.00
3 Kepala tukang OH 0.0135 106,000.00 1,431.00
4 Mandor OH 0.0040 114,000.00 456.00
JUMLAH HARGA TENAGA KERJA 20,868.00
B BAHAN
1 Pipa PVC AW Ø 4" bh 1.2000 90,000.00 108,000.00
2 Harga bahan (Perlengkapan) bh 35% 108,000.00 37,800.00

JUMLAH HARGA BAHAN 145,800.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 166,668.00
E Jasa 10% 16,666.80
F Harga Satuan Pekerjaan 183,334.80
DIBULATKAN 183,334.00

170. A.5.1.1.35. Memasang 1 buah kran Ø 3/4"


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0100 76,000.00 760.00
2022 2 Tukang batu OH 0.4000 95,000.00 38,000.00
3 Kepala tukang OH 0.0400 106,000.00 4,240.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 43,570.00
B BAHAN
1 Kran Ø 3/4" bh 1.0000 40,000.00 40,000.00
2 Seal tape bh 0.0250 8,000.00 200.00

JUMLAH HARGA BAHAN 40,200.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 83,770.00
E Jasa 10% 8,377.00
F Harga Satuan Pekerjaan 92,147.00
DIBULATKAN 92,147.00
171. A.5.1.1.35. Memasang 1 buah kran Ø 1/2"
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0100 76,000.00 760.00
2016 2 Tukang batu OH 0.4000 95,000.00 38,000.00
3 Kepala tukang OH 0.0400 106,000.00 4,240.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 43,570.00
B BAHAN
1 Kran Ø 1/2" bh 1.0000 35,000.00 35,000.00
2 Seal tape bh 0.0250 8,000.00 200.00

JUMLAH HARGA BAHAN 35,200.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 78,770.00
E Jasa 10% 7,877.00
F Harga Satuan Pekerjaan 86,647.00
DIBULATKAN 86,647.00

172. A.5.1.1.36. Memasang 1 buah floor drain


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0100 76,000.00 760.00
2022 2 Tukang batu OH 0.1000 95,000.00 9,500.00
3 Kepala tukang OH 0.0100 106,000.00 1,060.00
4 Mandor OH 0.0050 114,000.00 570.00
JUMLAH HARGA TENAGA KERJA 11,890.00
B BAHAN
1 Floor drain Stainless ONDA bh 1.0000 40,000.00 40,000.00

JUMLAH HARGA BAHAN 40,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 51,890.00
E Jasa 10% 5,189.00
F Harga Satuan Pekerjaan 57,079.00
DIBULATKAN 57,079.00

173. A.4.7.1.1. 1 m2 Mengikis/mengerok permukaan cat lama


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.1500 76,000.00 11,400.00
2016 4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 11,742.00
B BAHAN
1 Soda api bh 0.0500 30,000.00 1,500.00

JUMLAH HARGA BAHAN 1,500.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 13,242.00
E Jasa 10% 1,324.20
F Harga Satuan Pekerjaan 14,566.20
DIBULATKAN 14,566.00
174. A.4.7.1.4. 1 m2 Mengecat bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
AHSP 1 Pekerja OH 0.0700 76,000.00 5,320.00
2016 2 Tukang cat OH 0.0090 95,000.00 855.00
3 Kepala tukang OH 0.0060 106,000.00 636.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 7,153.00
B BAHAN
1 Cat meni kayu kg 0.2000 25,000.00 5,000.00
2 Plamur kayu kg 0.1500 25,000.00 3,750.00
3 Cat dasar kg 0.1700 75,000.00 12,750.00
4 Cat penutup kg 0.2600 75,000.00 19,500.00
5 Kuas bh 0.0100 12,500.00 125.00
6 Minyak cat kg 0.0300 26,000.00 780.00
7 Ampelas lembar 0.2000 10,000.00 2,000.00
JUMLAH HARGA BAHAN 43,905.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 51,058.00
E Jasa 10% 5,105.80
F Harga Satuan Pekerjaan 56,163.80
DIBULATKAN 56,163.00

175. 1 m2 Mengecatan Bidang Kayu Lama


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
SNI 1 Pekerja OH 0.0700 76,000.00 5,320.00
2002 2 Tukang cat OH 0.0750 95,000.00 7,125.00
3 Kepala tukang OH 0.0075 106,000.00 795.00
4 Mandor OH 0.0025 114,000.00 285.00
JUMLAH HARGA TENAGA KERJA 13,525.00
B BAHAN
1 Plamuur kayu kg 0.1500 25,000.00 3,750.00
2 Cat dasar kg 0.1700 75,000.00 12,750.00
3 Cat penutup kg 0.1700 75,000.00 12,750.00
JUMLAH HARGA BAHAN 29,250.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 42,775.00
E Jasa 10% 4,277.50
F Harga Satuan Pekerjaan 47,052.50
DIBULATKAN 47,052.00

176. A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0200 76,000.00 1,520.00
AHSP 2 Tukang cat OH 0.0630 95,000.00 5,985.00
2016 3 Kepala tukang OH 0.0063 106,000.00 667.80
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 8,514.80
B BAHAN
1 Plamuur tembok kg 0.1000 20,000.00 2,000.00
2 Cat dasar kg 0.1000 25,000.00 2,500.00
3 Cat penutup kg 0.2600 25,000.00 6,500.00

JUMLAH HARGA BAHAN 11,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 19,514.80
E Jasa 10% 1,951.48
F Harga Satuan Pekerjaan 21,466.28
DIBULATKAN 21,466.00
177. A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0280 76,000.00 2,128.00
AHSP 2 Tukang cat OH 0.0420 95,000.00 3,990.00
2016 3 Kepala tukang OH 0.0042 106,000.00 445.20
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 6,905.20
B BAHAN
1 Cat dasar kg 0.1200 25,000.00 3,000.00
2 Cat penutup kg 0.1800 25,000.00 4,500.00

JUMLAH HARGA BAHAN 7,500.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 14,405.20
E Jasa 10% 1,440.52
F Harga Satuan Pekerjaan 15,845.72
DIBULATKAN 15,845.00

178. 03-2842 (6.13) Pengecatan 1 m2 genteng (2 lapis )


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0200 76,000.00 1,520.00
SNI 2 Tukang cat OH 0.2000 95,000.00 19,000.00
2002 3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0100 114,000.00 1,140.00
JUMLAH HARGA TENAGA KERJA 23,780.00
B BAHAN
1 Cat genteng kg 0.1000 70,000.00 7,000.00

JUMLAH HARGA BAHAN 7,000.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 30,780.00
E Jasa 10% 3,078.00
F Harga Satuan Pekerjaan 33,858.00
DIBULATKAN 33,858.00

179. A.4.7.1.16. Pengecacatan 1 m2 permukaan baja dengan meni besi


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0200 76,000.00 1,520.00
AHSP 2 Tukang cat OH 0.2000 95,000.00 19,000.00
2016 3 Kepala tukang OH 0.0200 106,000.00 2,120.00
4 Mandor OH 0.0025 114,000.00 285.00
JUMLAH HARGA TENAGA KERJA 22,925.00
B BAHAN
1 Cat meni besi kg 0.1000 35,000.00 3,500.00
2 Kuas bh 0.0100 12,500.00 125.00

JUMLAH HARGA BAHAN 3,625.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 26,550.00
E Jasa 10% 2,655.00
F Harga Satuan Pekerjaan 29,205.00
DIBULATKAN 29,205.00
180. A.4.7.1.19. Pengecacatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0600 76,000.00 4,560.00
AHSP 2 Tukang cat OH 0.0600 95,000.00 5,700.00
2016 3 Kepala tukang OH 0.0120 106,000.00 1,272.00
4 Mandor OH 0.0030 114,000.00 342.00
JUMLAH HARGA TENAGA KERJA 11,874.00
B BAHAN
1 Cat besi kg 0.3000 65,000.00 19,500.00
2 Kuas bh 0.0100 12,500.00 125.00
3 Thiner ltr 0.0100 25,000.00 250.00
JUMLAH HARGA BAHAN 19,875.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 31,749.00
E Jasa 10% 3,174.90
F Harga Satuan Pekerjaan 34,923.90
DIBULATKAN 34,923.00

181. A.4.7.1.20. Pengecacatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.1875 76,000.00 14,250.00
AHSP 2 Tukang cat OH 0.1875 95,000.00 17,812.50
2016 3 Kepala tukang OH 0.0188 106,000.00 1,987.50
4 Mandor OH 0.0010 114,000.00 111.15
JUMLAH HARGA TENAGA KERJA 34,161.15
B BAHAN
1 Cat dasar kg 0.1100 35,000.00 3,850.00
2 Cat antara kg 0.1700 65,000.00 11,050.00
3 Cat penutup kg 0.0800 65,000.00 5,200.00
4 Kuas bh 0.0100 12,500.00 125.00
5 Minyak cat ltr 0.0100 25,000.00 250.00
JUMLAH HARGA BAHAN 20,475.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 54,636.15
E Jasa 10% 5,463.62
F Harga Satuan Pekerjaan 60,099.77
DIBULATKAN 60,099.00

182. 1 m2 Pengecatan Bidang batu dengan coating


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja OH 0.0400 76,000.00 3,040.00
2 Tukang batu OH 0.0630 95,000.00 5,985.00
3 Kepala tukang OH 0.0630 106,000.00 6,678.00
4 Mandor OH 0.0025 114,000.00 285.00
JUMLAH HARGA TENAGA KERJA 15,988.00
B BAHAN
1 Cat Coating kg 0.3600 90,000.00 32,400.00

JUMLAH HARGA BAHAN 32,400.00


C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 48,388.00
E Jasa 10% 4,838.80
F Harga Satuan Pekerjaan 53,226.80
DIBULATKAN 53,226.00
183. A.6.2.1.1. Pemasangan 1 buah titik lampu
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Upah % bahan 10% 252,000.00 25,200.00
AHSP
2022 JUMLAH HARGA TENAGA KERJA 25,200.00
B BAHAN
1 Pipa listrik 5/8" btg 3.0000 8,000.00 24,000.00
2 Kabel NYA 2,5 mm2 m' 24.0000 7,500.00 180,000.00
3 T Dus bh 3.0000 5,000.00 15,000.00
4 L Bow bh 4.0000 500.00 2,000.00
5 Las Dop bh 3.0000 500.00 1,500.00
6 Klem bh 24.0000 500.00 12,000.00
7 Mangkok bh 1.0000 2,500.00 2,500.00
8 Fitting bh 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 252,000.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 277,200.00
E Jasa 10% 27,720.00
F Harga Satuan Pekerjaan 304,920.00
DIBULATKAN 304,920.00

184. Pemasangan 1 buah titik Stop Kontak dinding


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Upah % bahan 10% 257,000.00 25,700.00

JUMLAH HARGA TENAGA KERJA 25,700.00


B BAHAN
1 Pipa listrik 5/8" btg 3.0000 8,000.00 24,000.00
2 Kabel NYA 2,5 mm2 m' 24.0000 7,500.00 180,000.00
3 T Dus bh 3.0000 5,000.00 15,000.00
4 L Bow bh 4.0000 500.00 2,000.00
5 Las Dop bh 3.0000 500.00 1,500.00
6 Klem bh 24.0000 500.00 12,000.00
7 Mangkok bh 1.0000 2,500.00 2,500.00
8 Stop Kontak dinding bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 257,000.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 282,700.00
E Jasa 10% 28,270.00
F Harga Satuan Pekerjaan 310,970.00
DIBULATKAN 310,970.00

185. Pemasangan 1 buah Titik Instalasi Kotak kontak lantai dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Upah % bahan 10% 453,500.00 45,350.00

JUMLAH HARGA TENAGA KERJA 45,350.00


B BAHAN
1 Pipa Conduit PVC dia. 20 mm2 m' 3.0000 10,000.00 30,000.00
2 Kabel NYM 3x2.5 mm2 m' 3.0000 18,000.00 54,000.00
3 T Dus bh 3.0000 5,000.00 15,000.00
4 L Bow bh 4.0000 500.00 2,000.00
5 Mangkok bh 1.0000 2,500.00 2,500.00
6 Stop Kontak lantai bh 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 453,500.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 498,850.00
E Jasa 10% 49,885.00
F Harga Satuan Pekerjaan 548,735.00
DIBULATKAN 548,735.00
186. Pemasangan 1 buah Titik Instalasi power AC dengan Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Upah % bahan 10% 539,500.00 53,950.00

JUMLAH HARGA TENAGA KERJA 53,950.00


B BAHAN
1 Pipa Conduit PVC dia. 20 mm2 m' 15.0000 10,000.00 150,000.00
2 Kabel NYM 3x2.5 mm2 m' 15.0000 18,000.00 270,000.00
3 T Dus bh 3.0000 5,000.00 15,000.00
4 L Bow bh 4.0000 500.00 2,000.00
5 Mangkok bh 1.0000 2,500.00 2,500.00
6 Stop Kontak AC bh 1.0000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 539,500.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 593,450.00
E Jasa 10% 59,345.00
F Harga Satuan Pekerjaan 652,795.00
DIBULATKAN 652,795.00

187. Pemasangan 1 buah AC 1,5 PK


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
1 Tukang Listrik OH 0.7500 104,000.00 78,000.00
2 Mandor OH 0.5000 114,000.00 57,000.00
JUMLAH HARGA TENAGA KERJA 135,000.00
B BAHAN
1 Air Conditioner Wall Mounted 1,5 PK unit 1.0000 4,500,000.00 4,500,000.00
2 Material Bantu 5% dari bahan % bahan 5% 4,500,000.00 225,000.00
JUMLAH HARGA BAHAN 4,725,000.00
C PERALATAN

JUMLAH HARGA AALAT -


D Jumlah ( A + B +C ) 4,860,000.00
E Jasa 10% 486,000.00
F Harga Satuan Pekerjaan 5,346,000.00