DAFTAR HARGA SATUAN BAHAN

KABUOATEN HALMAHERA SELATAN TAHUN 2022

A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

BATU KALI
1 Batu Karang m3 400,000.00
2 Batu pecah 5-7 cm (manual) m3 500,000.00
3 Batu pecah 3-5 cm (manual) m3 500,000.00
4 Batu pecah 2-3 cm (manual) m3 500,000.00
5 Koral Beton m3 700,000.00
6 Bata Merah tebal 5 cm bj 1,700.00
7 Batako kelas 1 buntu bj 5,000.00
8 Limestone m3 500,000.00
9 Pasir Halus m3 500,000.00
10 Pasir pasang m3 400,000.00
11 Pasir beton m3 400,000.00
12 Pasir urug m3 500,000.00
13 Ijuk kg 8,000.00
14 Sirtu m3 475,000.00
15 Tanah urug pilihan m3 350,000.00
16 Air campuran beton ltr 500.00

SEMEN
17 Semen Gresik 50 kg zak 150,000.00
18 MU 450 ( Perekat keramik) 40 kg/zak kg 5,705.00
19 Sement base Zika kg 21,000.00
20 Semen warna kg 30,800.00

ATAP/GENTENG
21 Bubungan Karang Pilang isi 3,5/m bj 10,500.00
22 Atap spandek 0.50 mm m2 179,200.00
23 Bubung stel gel. 0.92 m lbr 50,400.00
24 Alluminium foil solartek 1,2x25x4mm roll 1,610,000.00
25 Ikut Celedu Paras Bh 112,000.00
26 Murda Paras Bh 119,000.00

KERAMIK DAN GRANITE


27 Keramik Platinum 50x50 cm m2 100,800.00
28 Keramik Platinum 25 x 40 motif halus kelas I m2 99,400.00
29 Granite tile Granito ukuran 60 x 60 cm Granito m2 189,000.00

KAYU
30 Kayu kamper balok m3 6,543,000.00
31 Kayu kamper papan m3 4,725,000.00
32 Kayu kruing balok m3 5,400,000.00
33 Plywood 4 mm setara meranti Lbr 4,320,000.00
34 Plywood 9 mm lbr 172,000.00
35 Multiplek 12 mm lbr 229,000.00
36 Kayu kruing papan m3 4,725,000.00
37 Kayu bekesting m3 3,038,650.00
38 Kayu dolken skapolding ls 50,000.00

1 / 89 (Datar Harga Satuan Bahan)


NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
39 Minyak bekisting ltr 43,000.00
40 HPL motif kayu lbr 25,200.00
41 Lem Kayu ltr 50,000.00

SANITAIR
42 Kloset Duduk Toto type CW637J/SW637JP bh 1,782,000.00
43 Washtafel gantung type LW246J+kran type TX129L set 5,013,664.00
44 Kran Air Onda bh 69,800.00
45 Kran Washtafel Biasa Toto type TX129L bh 537,600.00
46 Jet Whaser Toto type THX20NB bh 317,800.00
47 Floor Drain Stainless type TX1EA/TX1EAV1 bh 340,200.00
48 Seal Tape bh 5,600.00
49 Pipa Setara Maspion AW 2 ljr 124,740.00
50 Pipa Setara Maspion AW 3 ljr 231,660.00
51 Pipa Setara Maspion AW 6 ljr 1,246,280.00
52 Tangki Air Profil Tank TDA Kapasitas 3600 lt unt 5,952,800.00
53 Tangki Air Profil Tank Stainless Stell Kapasitas 1500 lt unt 8,330,000.00
54 Pompa Jet Pump Grundfos type JPA 4-54 unt 7,490,000.00
55 Pompa Air submersible Grundfos type SP 3A-22+Panel unt 72,880,000.00
56 Stop kran bh 186,200.00

BESI BETON DAN PAGAR


57 Hollow Galvanis 20x20x1.10 mm btg 119,000.00
58 Hollow Galvanis 30x30x1.10 mm btg 168,000.00
59 Hollow Galvanis 50x50x1.10 mm btg 210,000.00
60 Hollow Galvanis 75x75x2 mm btg 555,800.00
61 Pipa Galvanis 2" m1 110,833.33
62 Pipa Galvanis 1" m1 42,933.33
63 Besi beton kg 27,000.00
64 Besi/baja
Anchor profil
D 25 P=800 mm kg 34,400.00
65 Bolt D 19 HTB A325N bh
66 bh 235,200.00
67 Floor dek 0.75mm m2 210,000.00
68 Besi siku 50 x 50 x 5 mm btg 193,200.00
69 Plat baja 1 mm m2 280,000.00
70 Plat baja 1.2 mm m2 735,000.00
71 Rell pintu baja m1 431,666.67
72 Besi beton Ø 6 polos btg 30,627.72
73 Besi beton Ø 8 polos btg 54,449.28
74 Besi beton Ø 10 polos btg 85,077.00
75 Besi beton Ø 12 polos btg 122,510.88
76 Besi beton Ø 16 polos btg 217,797.12
77 Besi beton Ø 10 ulir btg 99,873.00
78 Besi beton Ø 13 ulir btg 168,785.37
79 Besi beton Ø 16 ulir btg 255,674.88
80 Besi beton Ø 19 ulir btg 360,541.53
81 Besi beton Ø 22 ulir btg 483,385.32
82 Floor dek 0.75mm m2 210,000.00
83 Kawat wiremesh 2 mm m2 97,650.00
84 Wiremess M6 2,1 x 55 roll 399,000.00
85 Wiremess M7 2,1 x 5,6 lbr 623,000.00
86 Wiremesh M8 2,1 x 5,4 lbr 805,000.00

2 / 89 (Datar Harga Satuan Bahan)


NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
87 Kawat beton RRT kg 50,000.00
88 Pengelasan cm 25,000.00
89 Aluminium 4 inch YKK m1 273,000.00
90 Aluminium strip/ jalusi m1 1,000,000.00
91 Rangka C 75068 @ 7 m galvalume btg 257,600.00
92 Reng (butten Ω 30) @ 6 m btg 210,000.00
93 Reng pengikat kuda-kuda @ 6 m btg 210,000.00
94 Pelat strips @ 1 m bh 242,200.00
95 Baut kuda-kuda SDS 6-19 bh 208,600.00
96 Baut reng SDS 6-16 btg 1,400.00
97 Baut listplank Ø 6-70 bh 56,000.00
98 Dinabold Ø 10-65 bh 4,900.00
99 Seling baja 3 mm m1 4,900.00
100 Katrol 32,200,000.00
101 Penggulung dan pengunci seling 1,680,000.00

FINISHING
102 Amplas lbr 10,000.00
103 Kuas untuk mengecat bh 10,000.00
104 Kapi bh 5,000.00
105 Cat menie besi kanzai 1 lt ltr 70,000.00
106 Cat besi kansai property gloss 1 lt ltr 70,000.00
107 Cat Alkali kg 179,200.00
108 Cat dasar Tembok kg 82,950.00
109 Cat tembok Dulux Exterior kg 273,000.00
110 Cat tembok Dulux Interior kg 280,000.00
111 Cat tembok Vinilex kg 144,200.00
112 Waterproofing kg 67,200.00
113 Cat Baja Chromate (anti karat) kg 61,600.00
114 Minyak cat ltr 13,300.00
115 Thiner A Spesial ltr 70,000.00
116 Dempul / Plamir ltr 84,000.00
117 Plamir Kayu kg 63,000.00
118 Lem Fox kg 72,800.00
119 Politur ltr 168,000.00
120 Politur ultra lasur ltr 168,000.00
121 Pre treatment/cleanol F Propan ltr 140,000.00
122 First layer Polycor Propan kg 140,000.00
123 Second layer Pollyfloor Propan kg 140,000.00
124 Finish coat Pollyfloor Propan kg 140,000.00
125 Thinner epoxy ltr 119,000.00

BAHAN LISTRIK
126 Box panel SDP bh 12,110,000.00
127 MCB 6 A Schneider bh 273,000.00
128 MCB 4 A Schneider bh 88,200.00
129 Tiang listrik baja aluminium tinggi 8 m unt 1,671,600.00
130 Lampu dinding LED 16 Watt bh 110,530.00
131 Kap lampu aluminium diameter 18" unt 16,450.00
132 Lampu Philips mercury 400 watt bh 371,000.00
133 Travo Philips bh 60,200.00
134 LED Baret 20 watt Philips bh 1,470,000.00

3 / 89 (Datar Harga Satuan Bahan)


NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
135 LED ceilling plafond 20 watt Philips bh 277,200.00
136 Fitting + Lampu LED 10 watt Philips bh 518,000.00
137 Lampu sorot LED 100 watt Philips bh 1,779,400.00
138 Lampu taman LED 33 watt + rumah + tiang set 1,610,000.00
139 Inbow dos plastik bj 5,460.00
140 Kabel NYM 3 x 2.5 mm m1 22,400.00
141 Kabel NYY ( 4 x 35 ) mm + BC 25 mm m1 2,023,490.00
142 Kabel NYY ( 4 x 16 ) mm + BC 16 mm m2 1,470,000.00
143 Klem 20 mm bj 1,050.00
144 Pipa 20 mm bt 12,500.00
145 Sock 20 mm bj 25,000.00
146 Stop Kontak Clipsal bh 87,000.00
147 Stop Kontak AC Clipsal bh 87,000.00
148 Tee dos 20 mm bh 5,000.00
149 Saklar Single Clipsal bh 25,000.00
150 Saklar Double Clipsal bh 25,000.00
151 Saklar 3 Clipsal bh 33,500.00
152 Isolasi bh 7,500.00
153 Turbine Ventilator Cyclone Type TB-FQ 800 AY Kapasitas 5850 CMH unt 2,124,185.00
154 Blacksem 1" bh 70,000.00
155 Sok Galvanis 1" bh 7,252.00
156 GIP Galvanis 1" bt 977,200.00
157 Kawat BC 50 mm2 m1 105,000.00
158 Klem Begel 1" bh 14,500.00
159 Klem sisir 50 mm2 bh 20,000.00
160 Kotak Kontrol 10 cm x 15 cm bh 1,500,000.00
161 Perluv sok 1" bh 11,000.00
162 Pipa Conduit PVC 3/4" bt 30,500.00
163 Camera Hikvision resolusi 5 MP unt 6,984,600.00
164 Kabel Kyomitsu Coaxial RG6 + Power m1 5,133.33
165 DVR CCTV Hikvison Support Camera 5 MP unt 1,903,790.00
166 HDD WD 4 TB unt 2,184,000.00
167 Power Supply SPC Central 12V 10A unt 224,000.00
168 Monitor LG LED 20" unt 1,820,000.00

KUNCI DAN PENGGANTUNG


169 Engsel pintu bh 82,600.00
170 Engsel jendela ps 53,200.00
171 Kunci + hendle pintu bh 413,000.00
172 Grendel jendela ps 51,800.00
173 Kait angin ps 42,000.00
172 Door closer bh 161,000.00

KACA
173 Kaca Tebal 5 mm m2 496,200.00
174 Glass Block bh 34,000.00
175 Sealant kg 22,500.00

PAKU
176 Paku 10 cm kg 35,000.00
177 Paku kalsiboard kg 35,000.00
178 Paku reng kg 35,000.00

4 / 89 (Datar Harga Satuan Bahan)


NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
179 Paku seng kg 35,000.00
180 Paku list kg 35,000.00
181 Sekrup Kalisiboard kg 35,000.00
182 Paku skrup 3.5" kg 35,000.00
183 Paku skrup bh 5,000.00
184 Screw 6 x 1 bh 5,000.00
185 Paku Beton bh 5,000.00
186 Dinabolt ø 12mm M12 X 75 bh 5,000.00

PLAFOND
187 Gypsum Board (120x240x9) lbr 60,840.00
188 Calsiboard 4.5 mm lbr 61,750.00
188 List Gypsum 5/5 cm m1 39,000.00
189 List Gypsum 7/7 cm m1 71,500.00
190 Textile Tape m1 3,380.00
191 Cornice adhesive kg 71,500.00
192 Hollow Galvanis 40x40x0,35mm btg 182,000.00
193 Hollow Galvanis 20x40x0,35mm btg 157,794.00
194 Siku (Angel) m1 58,500.00
195 Rangka Metal Stud btg 48,750.00

PAVING
196 Paving 20 x 20 cm tebal 8 cm K-300 PC m2 11,000.00
197 Kanstein Jumbo (P:50,L:15,T:30 cm K225) bh 50,000.00

TANAMAN
198 Pohon Jepun / Plumeria Rubra pohon 650,000.00
199 Pohon Tabebuya / Chrysotricha sp pohon 50,000.00
200 Jempiring / Gardenia Jasminioides polybag 13,000.00
201 Kembang Kertas Daun Kecil / Bogenvile small leave polybag 12,000.00
202 Tanaman Rumput Mutiara/Jepang m2 20,000.00

PERALATAN K3
203 Helm Proyek Bh 100,000.00
204 Rompi Proyek Bh 500,000.00
205 Masker Bh 10,000.00
206 Sabuk Penggantung Bh 55,000.00
207 Kaca Mata Pelindung Bh 45,000.00
208 Sarung Tangan Ps 20,000.00
209 Sepatu Proyek Ps 350,000.00
210 Kotak P3K Set 500,000.00
211 Rambu-rambu Set 500,000.00

Direktur
Ternate, 17 Agustus 2022
Penawar,
CV. RIFAGAS CHANTIK GROUP

5 / 89 (Datar Harga Satuan Bahan)


NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
MUHAMMAD RIFAI
Direktur

6 / 89 (Datar Harga Satuan Bahan)


DAFTAR HARGA SATUAN UPAH KAB. HALMAHERA SELATAN TAHUN 2022
PEMBANGUNAN GUDANG MULTIFUNGSI PT. INDONESIA MAS MULIA
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 3 4

1 Mandor Hari 189,000.00


2 Kepala Tukang Lapangan Hari 135,000.00
3 Kepala Tukang Besi Hari 135,000.00
4 Kepala Tukang Batu Hari 135,000.00
5 Kepala Tukang Kayu Hari 135,000.00
6 Kepala Tukang Cat Hari 135,000.00
7 Tukang Batu Hari 126,500.00
8 Tukang Besi Hari 126,500.00
9 Tukang Pipa Hari 113,400.00
10 Tukang Kayu Hari 113,400.00
11 Tukang Cat Hari 113,400.00
12 Tukang Politur Hari 143,533.00
13 Tukang Las Hari 126,500.00
14 Pekerja / Pekerja Tidak Terlatih Hari 100,000.00
15 Tukang Gali Hari 100,000.00
16 Tukang Listrik Hari 100,000.00
17 1 Ttk Instalasi Stop Kontak, Exhaust Fan, Ceiling Fan Titik 250,000.00
18 Biaya Pasang Instalasi penangkal petir Ls 15,000,000.00
19 Biaya pengeboran M1 12,500,000.00
20 Biaya sewa mobil crane Bln 175,000,000.00

Ternate, 17 Agustus 2022


Penawar,
CV. RIFAGAS CHANTIK GROUP

MUHAMMAD RIFAI
Direktur
DAFTAR ANALISA PEKERJAAN TAHUN 2022
PEMBANGUNAN GUDANG MULTIFUNGSI

I. HARGA SATUAN PEKERJAAN PERSIAPAN

II. PENGUKURAN DAN PEMASANGAN 1 M' BOWPLANK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 113,400.00 11,340.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 23,635.00
B. BAHAN
Kayu 5/7 m3 0.012 3,038,650.000 36,463.80
Paku 2”-5” Kg 0.020 35,000.000 700.00
Kayu papan 3/20 m3 0.007 3,038,650.000 21,270.55
JUMLAH HARGA BAHAN 58,434.35

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 82,069.35
E. Overhead & Profit 5% x D 4,103.47
F. Harga Satuan Pekerjaan (D+E) 86,172.82

III 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.6670 100,000.00 666,700.00
Mandor L.04 OH 0.3330 189,000.00 62,937.00
JUMLAH TENAGA KERJA 729,637.00
B. BAHAN
JUMLAH HARGA BAHAN

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 729,637.00
E. Overhead & Profit 5% x D 36,481.85
F. Harga Satuan Pekerjaan (D+E) 766,118.85

IV 1 M2 PENERABASAN SEMAK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 5,945.00
B. BAHAN
JUMLAH HARGA BAHAN

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 5,945.00
E. Overhead & Profit 5% x D 297.25
F. Harga Satuan Pekerjaan (D+E) 6,242.25
V PEMBONGKARAN 1 M' PAGAR BRC EXISTING

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 100,000.00 40,000.00
Mandor L.04 OH 0.0025 189,000.00 472.50
JUMLAH TENAGA KERJA 40,472.50
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,472.50
E. Overhead & Profit 5% x D 2,023.63
F. Harga Satuan Pekerjaan (D+E) 42,496.13

II. HARGA SATUAN PEKERJAAN TANAH

1 1 M3 GALIAN TANAH KERAS DALAM 1 METER

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Mandor L.04 OH 0.0320 189,000.00 6,048.00
JUMLAH TENAGA KERJA 106,048.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 106,048.00
E. Overhead & Profit 5% x D 5,302.40
F. Harga Satuan Pekerjaan (D+E) 111,350.40

2 1 M3 GALIAN TANAH CADAS DALAM 1 METER

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Mandor L.04 OH 0.0600 189,000.00 11,340.00
JUMLAH TENAGA KERJA 161,340.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 161,340.00
E. Overhead & Profit 5% x D 8,067.00
F. Harga Satuan Pekerjaan (D+E) 169,407.00
3 1 M3 URUGAN KEMBALI TANAH GALIAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 100,000.00 50,000.00
Mandor L.04 OH 0.0500 189,000.00 9,450.00
JUMLAH TENAGA KERJA 59,450.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 59,450.00
E. Overhead & Profit 5% x D 2,972.50
F. Harga Satuan Pekerjaan (D+E) 62,422.50

4 1 M3 URUGAN PASIR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 31,890.00
B. BAHAN
Pasir Urug m3 1.200 500,000.000 600,000.00
JUMLAH HARGA BAHAN 600,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 631,890.00
E. Overhead & Profit 5% x D 31,594.50
F. Harga Satuan Pekerjaan (D+E) 663,484.50

5 1 M3 URUGAN LIMESTONE

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 31,890.00
B. BAHAN
Limestone m3 1.200 500,000.000 600,000.00
JUMLAH HARGA BAHAN 600,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 631,890.00
E. Overhead & Profit 5% x D 31,594.50
F. Harga Satuan Pekerjaan (D+E) 663,484.50
6 1 M3 URUGAN TANAH SUBUR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 31,890.00
B. BAHAN
Tanah subur m3 1.200 350,000.000 420,000.00
JUMLAH HARGA BAHAN 420,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 451,890.00
E. Overhead & Profit 5% x D 22,594.50
F. Harga Satuan Pekerjaan (D+E) 474,484.50

III. HARGA SATUAN PEKERJAAN PONDASI

1 1 M3 BATU KARANG CAMP. 1 PC : 5 PS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 126,500.00 94,875.00
Kepala Tukang L.03 OH 0.0750 135,000.00 10,125.00
Mandor L.04 OH 0.0750 189,000.00 14,175.00
JUMLAH TENAGA KERJA 269,175.00
B. BAHAN
Batu karang m3 1.200 400,000.000 480,000.00
Semen Portlan Kg 136.000 3,000.00 408,000.00
Pasir Pasang m3 0.544 400,000.00 217,600.00
JUMLAH HARGA BAHAN 1,105,600.00

C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,374,775.00
E. Overhead & Profit 5% x D 68,738.75
F. Harga Satuan Pekerjaan (D+E) 1,443,513.75

2 1 M3 PASANGAN BATU KOSONG

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7800 100,000.00 78,000.00
Tukang Batu L.02 OH 0.3900 126,500.00 49,335.00
Kepala Tukang L.03 OH 0.0390 135,000.00 5,265.00
Mandor L.04 OH 0.0390 189,000.00 7,371.00
JUMLAH TENAGA KERJA 139,971.00
B. BAHAN
Batu belah m3 1.200 500,000.00 600,000.00
Pasir Urug m3 0.432 500,000.00 216,000.00
JUMLAH HARGA BAHAN 816,000.00

C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 955,971.00
E. Overhead & Profit 5% x D 47,798.55
F. Harga Satuan Pekerjaan (D+E) 1,003,769.55
IV. HARGA SATUAN PEKERJAAN KAYU

1 PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN JENDELA, KAYU KELAS I

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.0000 100,000.00 700,000.00
Tukang kayu L.03 OH 21.0000 113,400.00 2,381,400.00
Kepala Tukang L.03 OH 2.1000 135,000.00 283,500.00
Mandor L.04 OH 0.3500 189,000.00 66,150.00
JUMLAH TENAGA KERJA 3,431,050.00
B. BAHAN
Balok kayu M² 1.1000 6,543,000.00 7,197,300.00
paku 10 cm Kg 1.2500 35,000.000 43,750.00
Lem kayu Kg 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 7,291,050.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 10,722,100.00
E. Overhead & Profit 5% x D 536,105.00
F. Harga Satuan Pekerjaan (D+E) 11,258,205.00

2 PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KAMPER

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUANKOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang kayu L.03 OH 3.0000 113,400.00 340,200.00
Kepala Tukang L.03 OH 0.3000 135,000.00 40,500.00
Mandor L.04 OH 0.0500 189,000.00 9,450.00
JUMLAH TENAGA KERJA 490,150.00
B. BAHAN
Papan kayu kamper M³ 0.0400 4,725,000.00 189,000.00
Lem kayu Kg 0.5000 50,000.00 25,000.00
JUMLAH HARGA BAHAN 214,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 704,150.00
E. Overhead & Profit 5% x D 35,207.50
F. Harga Satuan Pekerjaan (D+E) 739,357.50
3 MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS HPL RANGKAP RANGKA TERTUTUP, KAYU KELAS I
(Lebar Sampai 90 Cm)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang kayu L.03 OH 3.0000 113,400.00 340,200.00
Kepala Tukang L.03 OH 0.3000 135,000.00 40,500.00
Mandor L.04 OH 0.0500 189,000.00 9,450.00
JUMLAH TENAGA KERJA 490,150.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 4,725,000.00 118,125.00
Paku 1-2,5 Cm Kg 0.0300 35,000.00 1,050.00
Lem Kayu Kg 0.5000 50,000.00 25,000.00
Multiplek 12 mm Lbr 1.0000 229,000.00 229,000.00
HPL motif kayu Lbr 1.0000 25,200.00 25,200.00
JUMLAH HARGA BAHAN 398,375.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 888,525.00
E. Overhead & Profit 5% x D 44,426.25
F. Harga Satuan Pekerjaan (D+E) 932,951.25

4 MEMASANG 1 M' PLIN KAYU 10 CM, KAYU KELAS I

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang kayu L.02 OH 0.1000 113,400.00 11,340.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0025 189,000.00 472.50
JUMLAH TENAGA KERJA 18,162.50
B. BAHAN
Papan Kayu Kamper M3 0.0054 4,725,000.00 25,515.00
Paku 5 Cm dan 7 Cm Kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 27,265.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,427.50
E. Overhead & Profit 5% x D 2,271.38
F. Harga Satuan Pekerjaan (D+E) 47,698.88
V. PEKERJAAN ATAP

1 1 M1 PEKERJAAN PASANG ALUMINIUM FOIL

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang kayu L.02 OH 0.0500 113,400.00 5,670.00
Kepala Tukang L.03 OH 0.0050 135,000.00 675.00
Mandor L.04 OH 0.0080 189,000.00 1,512.00
JUMLAH TENAGA KERJA 22,857.00
B. BAHAN
Aluminium foil lbr 1.0500 53,666.67 56,350.00
JUMLAH HARGA BAHAN 56,350.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 79,207.00
E. Overhead & Profit 5% x D 3,960.35
F. Harga Satuan Pekerjaan (D+E) 83,167.35

2 1 M1 PEKERJAAN PASANG KAWAT WIREMESH 2 MM BAWAH ALUMINIUM FOIL

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang kayu L.02 OH 0.0500 113,400.00 5,670.00
Kepala Tukang L.03 OH 0.0050 135,000.00 675.00
Mandor L.04 OH 0.0080 189,000.00 1,512.00
JUMLAH TENAGA KERJA 22,857.00
B. BAHAN
Kawat wiremesh m2 1.1000 97,650.00 107,415.00
JUMLAH HARGA BAHAN 107,415.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 130,272.00
E. Overhead & Profit 5% x D 6,513.60
F. Harga Satuan Pekerjaan (D+E) 136,785.60

3 1 M1 PASANG PENUTUP ATAP SPANDEK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang kayu L.02 OH 0.7500 113,400.00 85,050.00
Kepala Tukang L.03 OH 0.0800 135,000.00 10,800.00
Mandor L.04 OH 0.0060 189,000.00 1,134.00
JUMLAH TENAGA KERJA 111,984.00
B. BAHAN
Aluminium gel tebal 0,50 lbr 1.0500 179,200.00 188,160.00
Paku hak panjang 15 cm Kg 0.0200 35,000.00 700.00
JUMLAH HARGA BAHAN 188,860.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 300,844.00
E. Overhead & Profit 5% x D 15,042.20
F. Harga Satuan Pekerjaan (D+E) 315,886.20
4 1 M1 PASANG BUBUNGAN ATAP SPANDEK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0840 100,000.00 8,400.00
Tukang kayu L.02 OH 0.1250 113,400.00 14,175.00
Kepala Tukang L.03 OH 0.0130 135,000.00 1,755.00
Mandor L.04 OH 0.0040 189,000.00 756.00
JUMLAH TENAGA KERJA 25,086.00
B. BAHAN
Bubung stel gel. 0.92 mm lbr 2.4000 50,400.00 120,960.00
Paku skrup 3,5” bh 6.0000 5,000.00 30,000.00
JUMLAH HARGA BAHAN 150,960.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 176,046.00
E. Overhead & Profit 5% x D 8,802.30
F. Harga Satuan Pekerjaan (D+E) 184,848.30

VI. HARGA SATUAN PEKERJAAN TANAH DAN PASANGAN

1 1 M2 PASANGAN BATAKO CAMP. 1 PC : 4 PS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang batu L.02 OH 0.1000 126,500.00 12,650.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0150 189,000.00 2,835.00
JUMLAH TENAGA KERJA 46,835.00
B. BAHAN
HB-10 m³ 12.5000 5,000.00 62,500.00
Semen portland Kg 12.1300 3,000.00 36,390.00
Pasir pasang m³ 0.3880 400,000.00 155,200.00
Besi angker Ø 8 Kg 0.2800 - -
JUMLAH HARGA BAHAN 254,090.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 300,925.00
E. Overhead & Profit 5% x D 15,046.25
F. Harga Satuan Pekerjaan (D+E) 315,971.25
2 1 M2 PASANGAN BATA MERAH CAMP. 1 PC : 5 PS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang batu L.02 OH 0.1000 126,500.00 12,650.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0150 189,000.00 2,835.00
JUMLAH TENAGA KERJA 46,835.00
B. BAHAN
Bata Merah bh 70.0000 1,700.00 119,000.00
Semen portland Kg 9.6800 3,000.00 29,040.00
Pasir pasang m³ 0.0450 400,000.00 18,000.00
JUMLAH HARGA BAHAN 166,040.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 212,875.00
E. Overhead & Profit 5% x D 10,643.75
F. Harga Satuan Pekerjaan (D+E) 223,518.75

3 MEMASANG 1 BH GLASS BLOCK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Batu L.03 OH 0.1500 126,500.00 18,975.00
Kepala Tukang L.03 OH 0.0150 135,000.00 2,025.00
Mandor L.04 OH 0.0008 189,000.00 151.20
JUMLAH TENAGA KERJA 22,651.20
B. BAHAN
Glass Block Bh 1.0000 34,000.00 34,000.00
JUMLAH HARGA BAHAN 34,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 56,651.20
E. Overhead & Profit 5% x D 2,832.56
F. Harga Satuan Pekerjaan (D+E) 59,483.76

4 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang batu L.02 OH 0.1500 126,500.00 18,975.00
Kepala Tukang L.03 OH 0.0150 135,000.00 2,025.00
Mandor L.04 OH 0.0150 189,000.00 2,835.00
JUMLAH TENAGA KERJA 53,835.00
B. BAHAN
Semen portland kg 5.1840 3,000.00 15,552.00
Pasir pasang m³ 0.0260 400,000.00 10,400.00
JUMLAH HARGA BAHAN 25,952.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 79,787.00
E. Overhead & Profit 5% x D 3,989.35
F. Harga Satuan Pekerjaan (D+E) 83,776.35
5 1 M2 PEKERJAAN ACIAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang batu L.03 OH 0.1000 126,500.00 12,650.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 35,890.00
B. BAHAN
Semen portland Kg 3.2500 3,000.00 9,750.00
JUMLAH HARGA BAHAN 9,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,640.00
E. Overhead & Profit 5% x D 2,282.00
F. Harga Satuan Pekerjaan (D+E) 47,922.00

VII. HARGA SATUAN PEKERJAAN BETON

1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 126,500.00 34,787.50
Kepala Tukang L.03 OH 0.0280 135,000.00 3,780.00
Mandor L.04 OH 0.0830 189,000.00 15,687.00
JUMLAH TENAGA KERJA 219,254.50
B. BAHAN
Semen Portlan Kg 247.000 3,000.00 741,000.00
Pasir Beton m3 0.621 400,000.000 248,285.71
Kerikil (Maks 30mm) m3 0.740 700,000.000 518,000.00
Air Liter 215.000 500.000 107,500.00
JUMLAH HARGA BAHAN 1,614,785.71
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,834,040.21
E. Overhead & Profit 5% x D 91,702.01
F. Harga Satuan Pekerjaan (D+E) 1,925,742.23

2 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 126,500.00 34,787.50
Kepala Tukang L.03 OH 0.0280 135,000.00 3,780.00
Mandor L.04 OH 0.0830 189,000.00 15,687.00
JUMLAH TENAGA KERJA 219,254.50
B. BAHAN
Semen Portlan Kg 299.000 3,000.00 897,000.00
Pasir Beton m3 0.571 400,000.00 228,285.71
Kerikil (Maks 30mm) m3 0.753 700,000.00 527,333.33
Air Liter 215.000 500.00 107,500.00
JUMLAH HARGA BAHAN 1,760,119.05
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,979,373.55
E. Overhead & Profit 5% x D 98,968.68
F. Harga Satuan Pekerjaan (D+E) 2,078,342.23
3 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 126,500.00 34,787.50
Kepala Tukang L.03 OH 0.0280 135,000.00 3,780.00
Mandor L.04 OH 0.0830 189,000.00 15,687.00
JUMLAH TENAGA KERJA 219,254.50
B. BAHAN
Semen Portlan Kg 384.000 3,000.00 1,152,000.00
Pasir Beton m3 0.494 400,000.00 197,714.29
Kerikil (Maks 30mm) m3 0.770 700,000.00 538,740.74
Air Liter 215.000 500.00 107,500.00
JUMLAH HARGA BAHAN 1,995,955.03
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,215,209.53
E. Overhead & Profit 5% x D 110,760.48
F. Harga Satuan Pekerjaan (D+E) 2,325,970.00

4 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 126,500.00 34,787.50
Kepala Tukang L.03 OH 0.0280 135,000.00 3,780.00
Mandor L.04 OH 0.0830 189,000.00 15,687.00
JUMLAH TENAGA KERJA 219,254.50
B. BAHAN
Semen Portlan Kg 413.000 3,000.00 1,239,000.00
Pasir Beton m3 0.486 400,000.00 194,571.43
Kerikil (Maks 30mm) m3 0.756 700,000.00 529,407.41
Air Liter 215.000 500.00 107,500.00
JUMLAH HARGA BAHAN 2,070,478.84
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,289,733.34
E. Overhead & Profit 5% x D 114,486.67
F. Harga Satuan Pekerjaan (D+E) 2,404,220.00
CATATAN
Bobot isi pasir = 1.400 kg/m3, bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

5 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 126,500.00 8,855.00
Kepala Tukang L.03 OH 0.0070 135,000.00 945.00
Mandor L.04 OH 0.0040 189,000.00 756.00
JUMLAH TENAGA KERJA 17,556.00
B. BAHAN
Besi beton (polos/ulir) kg 10.5000 27,000.000 283,500.00
Kawat beton kg 0.1000 50,000.000 5,000.00
JUMLAH HARGA BAHAN 288,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 306,056.00
E. Overhead & Profit 5% x D 15,302.80
F. Harga Satuan Pekerjaan (D+E) 321,358.80
32,135.88

6 1 M2 PASANG WIREMESH M8 1 LAPIS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Besi L.02 OH 0.1000 126,500.00 12,650.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0010 189,000.00 189.00
JUMLAH TENAGA KERJA 24,189.00
B. BAHAN
Wiremesh M8 m2 1.1000 70,987.654 78,086.42
Kawat beton kg 0.0500 50,000.000 2,500.00
JUMLAH HARGA BAHAN 80,586.42
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 104,775.42
E. Overhead & Profit 5% x D 5,238.77
F. Harga Satuan Pekerjaan (D+E) 110,014.19

7 1 M2 PASANG BEKISTING UNTUK SLOOF

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5200 100,000.00 52,000.00
Tukang Kayu L.02 OH 0.2600 113,400.00 29,484.00
Kepala Tukang L.03 OH 0.0260 135,000.00 3,510.00
Mandor L.04 OH 0.0260 189,000.00 4,914.00
JUMLAH TENAGA KERJA 89,908.00
B. BAHAN
Kayu kelas III m3 0.045 3,038,650.00 136,739.25
Paku 5 - 10 cm kg 0.300 35,000.00 10,500.00
Minyak bekisting Liter 0.100 43,000.00 4,300.00
JUMLAH HARGA BAHAN 151,539.25
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 241,447.25
E. Overhead & Profit 5% x D 12,072.36
F. Harga Satuan Pekerjaan (D+E) 253,519.61
8 1 M2 PASANG BEKISTING UNTUK KOLOM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 113,400.00 37,422.00
Kepala Tukang L.03 OH 0.0330 135,000.00 4,455.00
Mandor L.04 OH 0.0330 189,000.00 6,237.00
JUMLAH TENAGA KERJA 114,114.00
B. BAHAN
Kayu kelas III m3 0.040 3,038,650.00 121,546.00
Paku 5 - 12 cm kg 0.400 35,000.00 14,000.00
Minyak bekisting Liter 0.200 43,000.00 8,600.00
Balok kayu kelas II m3 0.015 5,400,000.00 81,000.00
Plywood tebal 9 mm Lbr 0.350 172,000.00 60,200.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 2.000 50,000.00 100,000.00
JUMLAH HARGA BAHAN 385,346.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 499,460.00
E. Overhead & Profit 5% x D 24,973.00
F. Harga Satuan Pekerjaan (D+E) 524,433.00

9 1 M2 PASANG BEKISTING UNTUK BALOK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 113,400.00 37,422.00
Kepala Tukang L.03 OH 0.0330 135,000.00 4,455.00
Mandor L.04 OH 0.0330 189,000.00 6,237.00
JUMLAH TENAGA KERJA 114,114.00
B. BAHAN
Kayu kelas III m3 0.040 3,038,650.00 121,546.00
Paku 5 - 12 cm kg 0.400 35,000.00 14,000.00
Minyak bekisting Liter 0.200 43,000.00 8,600.00
Balok kayu kelas II m3 0.018 5,400,000.00 97,200.00
Plywood tebal 9 mm Lbr 0.350 172,000.00 60,200.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 2.000 50,000.00 100,000.00
JUMLAH HARGA BAHAN 401,546.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 515,660.00
E. Overhead & Profit 5% x D 25,783.00
F. Harga Satuan Pekerjaan (D+E) 541,443.00
10 1 M2 PASANG BEKISTING UNTUK LANTAI MENGGUNAKAN FLOOR DECK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Kayu L.02 OH 0.5000 113,400.00 56,700.00
Kepala Tukang L.03 OH 0.0250 135,000.00 3,375.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 69,800.00
B. BAHAN
Floor dek 0.75 mm m2 1.100 210,000.00 231,000.00
Kayu perancah m3 0.005 3,038,650.00 16,408.71
Paku kg 0.100 35,000.00 3,500.00
Balok Kayu Kelas II m3 0.015 3,038,650.00 45,579.75
Dolken kayu galam ø 8- 10cm panjang 4 m Batang 4.000 50,000.00 200,000.00
JUMLAH HARGA BAHAN 496,488.46
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 566,288.46
E. Overhead & Profit 5% x D 28,314.42
F. Harga Satuan Pekerjaan (D+E) 594,602.88

11 1 M2 PASANG BEKISTING UNTUK LANTAI

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 113,400.00 37,422.00
Kepala Tukang L.03 OH 0.0330 135,000.00 4,455.00
Mandor L.04 OH 0.0330 189,000.00 6,237.00
JUMLAH TENAGA KERJA 114,114.00
B. BAHAN
Kayu Kelas III m3 0.040 3,038,650.00 121,546.00
Paku 5 - 12 cm Kg 0.400 35,000.00 14,000.00
Minyak Bekesting Liter 0.200 43,000.00 8,600.00
Balok Kayu Kelas II m3 0.015 3,038,650.00 45,579.75
Plywood tebal 9 mm Lbr 0.350 172,000.00 60,200.00
Dolken kayu galam ø 8- 10cm panjang 4 m Batang 6.000 50,000.00 300,000.00
JUMLAH HARGA BAHAN 549,925.75
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 664,039.75
E. Overhead & Profit 5% x D 33,201.99
F. Harga Satuan Pekerjaan (D+E) 697,241.74
12 1 M2 PASANG BEKISTING UNTUK TANGGA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 113,400.00 37,422.00
Kepala Tukang L.03 OH 0.0330 135,000.00 4,455.00
Mandor L.04 OH 0.0330 189,000.00 6,237.00
JUMLAH TENAGA KERJA 114,114.00
B. BAHAN
Kayu Kelas III m3 0.030 3,038,650.00 91,159.50
Paku 5 - 12 cm Kg 0.400 35,000.00 14,000.00
Minyak Bekesting Liter 0.150 43,000.00 6,450.00
Balok Kayu Kelas II m3 0.015 3,038,650.00 45,579.75
Plywood tebal 9 mm Lbr 0.350 172,000.00 60,200.00
Dolken kayu galam ø 8- 10cm panjang 4 m Batang 2.000 50,000.00 100,000.00
JUMLAH HARGA BAHAN 317,389.25
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 431,503.25
E. Overhead & Profit 5% x D 21,575.16
F. Harga Satuan Pekerjaan (D+E) 453,078.41

13 1 M2 PASANG FLOOR DECK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang L.02 OH 0.5000 113,400.00 56,700.00
Kepala Tukang L.03 OH 0.0250 135,000.00 3,375.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 69,800.00
B. BAHAN
Floor dek 0.75 mm m2 1.100 210,000.00 231,000.00
Kayu perancah m3 0.005 3,038,650.00 16,408.71
Paku kg 0.100 35,000.00 3,500.00
Balok Kayu Kelas II m3 0.015 3,038,650.00 45,579.75
Dolken kayu galam ø 8- 10cm panjang 4 m btg 4.000 50,000.00 200,000.00
JUMLAH HARGA BAHAN 496,488.46
C. PERALATAN
Alat bantu ls 1.000 10,500.00 10,500.0000
JUMLAH HARGA ALAT 10,500.00

D. Jumlah (A + B + C) 576,788.46
E. Overhead & Profit 5% x D 28,839.42
F. Harga Satuan Pekerjaan (D+E) 605,627.88
14 MEMBUAT 1 M1 KOLOM PRAKTIS BETON BERTULANG 11 X 11 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1800 100,000.00 18,000.00
Tukang Batu L.02 OH 0.0200 126,500.00 2,530.00
Tukang Kayu L.02 OH 0.0200 113,400.00 2,268.00
Tukang Besi L.02 OH 0.0200 126,500.00 2,530.00
Kepala Tukang L.03 OH 0.0060 135,000.00 810.00
Mandor L.04 OH 0.0090 189,000.00 1,701.00
JUMLAH TENAGA KERJA 27,839.00
B. BAHAN
Kayu kelas III m3 0.0020 3,038,650.000 6,077.30
Paku 5 - 12 cm kg 0.010 35,000.00 350.00
Minyak bekisting Liter 0.100 43,000.00 4,300.00
Besi beton polos kg 3.000 27,000.000 81,000.00
Kawat beton kg 0.450 50,000.000 22,500.00
Semen Portland kg 4.000 3,000.00 12,000.00
Pasir beton m3 0.006 400,000.00 2,400.00
Kerikil m3 0.009 700,000.00 6,300.00
JUMLAH HARGA BAHAN 134,927.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 162,766.30
E. Overhead & Profit 5% x D 8,138.32
F. Harga Satuan Pekerjaan (D+E) 170,904.62

15 MEMBUAT 1 M1 BALOK PRAKTIS BETON BERTULANG 10 X 15 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2970 100,000.00 29,700.00
Tukang Batu L.02 OH 0.0330 126,500.00 4,174.50
Tukang Kayu L.02 OH 0.0330 113,400.00 3,742.20
Tukang Besi L.02 OH 0.0330 126,500.00 4,174.50
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0150 189,000.00 2,835.00
JUMLAH TENAGA KERJA 45,976.20
B. BAHAN
Kayu kelas III m3 0.0030 3,038,650.000 9,115.95
Paku 5 - 12 cm kg 0.020 35,000.000 700.00
Minyak bekisting Liter 0.150 43,000.000 6,450.00
Besi beton polos kg 3.600 27,000.000 97,200.00
Kawat beton kg 0.050 50,000.000 2,500.00
Semen Portland kg 5.500 3,000.000 16,500.00
Pasir beton m3 0.009 400,000.000 3,600.00
Kerikil m3 0.015 700,000.000 10,500.00
JUMLAH HARGA BAHAN 146,565.95
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 192,542.15
E. Overhead & Profit 5% x D 9,627.11
F. Harga Satuan Pekerjaan (D+E) 202,169.26
VIII. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 PEMASANGAN 1 M2 GRANITE TILE 60 X 60 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7000 100,000.00 70,000.00
Tukang batu L.02 OH 0.3500 126,500.00 44,275.00
Kepala Tukang L.03 OH 0.0350 135,000.00 4,725.00
Mandor L.04 OH 0.0350 189,000.00 6,615.00
JUMLAH TENAGA KERJA 125,615.00
B. BAHAN
Granite tile 60 X 60 Bh 3.0556 63,000.00 192,500.00
Semen portlandd Kg 10.0000 3,000.00 30,000.00
Pasir pasang M³ 0.0450 400,000.00 18,000.00
Semen warna Kg 1.5000 30,800.00 46,200.00
JUMLAH HARGA BAHAN 286,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 412,315.00
E. Overhead & Profit 5% x D 20,615.75
F. Harga Satuan Pekerjaan (D+E) 432,930.75

2 MEMASANG 1 M' PLIN GRANITE 10 X 60 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0900 100,000.00 9,000.00
Tukang batu L.02 OH 0.0900 126,500.00 11,385.00
Kepala Tukang L.03 OH 0.0090 135,000.00 1,215.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 22,545.00
B. BAHAN
Granite tile 60 X 60 Bh 1.7000 11,385.54 19,355.42
Semen portlandd Kg 1.1400 3,000.00 3,420.00
Pasir pasang M³ 0.1000 400,000.00 40,000.00
Semen warna Kg 0.0030 30,800.00 92.40
JUMLAH HARGA BAHAN 62,867.82
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,412.82
E. Overhead & Profit 5% x D 4,270.64
F. Harga Satuan Pekerjaan (D+E) 89,683.46
3 1 M2 PASANG LANTAI KERAMIK 50 X 50 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7000 100,000.00 70,000.00
Tukang batu L.02 OH 0.3500 126,500.00 44,275.00
Kepala Tukang L.03 OH 0.0350 135,000.00 4,725.00
Mandor L.04 OH 0.0350 189,000.00 6,615.00
JUMLAH TENAGA KERJA 125,615.00
B. BAHAN
Keramik 50x50 cm m2 1.0500 100,800.00 105,840.00
Semen Portlan Kg 10.0000 3,000.00 30,000.00
Pasir pasang M³ 0.0450 400,000.00 18,000.00
Semen warna Kg 0.5000 30,800.00 15,400.00
JUMLAH HARGA BAHAN 169,240.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 294,855.00
E. Overhead & Profit 5% x D 14,742.75
F. Harga Satuan Pekerjaan (D+E) 309,597.75

4 1 M1 PASANG PLIN KERAMIK 10X50 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0900 100,000.00 9,000.00
Tukang batu L.02 OH 0.0900 126,500.00 11,385.00
Kepala Tukang L.03 OH 0.0090 135,000.00 1,215.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 22,545.00
B. BAHAN
Keramik 50x50 cm Bh 1.0500 25,200.00 26,460.00
Semen Portland Kg 1.1400 3,000.00 3,420.00
Pasir Pasang M³ 0.1000 400,000.00 40,000.00
Semen warna/semen grouting Kg 0.0030 30,800.00 92.40
JUMLAH HARGA BAHAN 69,972.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 92,517.40
E. Overhead & Profit 5% x D 4,625.87
F. Harga Satuan Pekerjaan (D+E) 97,143.27

5 1 M2 PASANG DINDING KERAMIK 25 X 40 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
Tukang batu L.02 OH 0.4500 126,500.00 56,925.00
Kepala Tukang L.03 OH 0.0450 135,000.00 6,075.00
Mandor L.04 OH 0.0450 189,000.00 8,505.00
JUMLAH TENAGA KERJA 161,505.00
B. BAHAN
Keramik 25 x 40 cm Bh 10.8000 9,940.00 107,352.00
semen instan/perekat keramik Kg 7.3333 5,705.00 41,836.48
Semen warna/semen grouting Kg 0.0130 30,800.00 400.40
JUMLAH HARGA BAHAN 149,588.88
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 311,093.88
E. Overhead & Profit 5% x D 15,554.69
F. Harga Satuan Pekerjaan (D+E) 326,648.57
6 1 M2 PASANG EPOXY LANTAI TEBAL 1500 MICRON

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Tukang Cat L.02 OH 0.0750 126,500.00 9,487.50
Mandor L.04 OH 0.0350 189,000.00 6,615.00
JUMLAH TENAGA KERJA 16,102.50
B. BAHAN
Pre treatment /cleanol F Ltr 0.3000 140,000.00 42,000.00
First layer Polycor Kg 0.2500 140,000.00 35,000.00
Second layer Pollyfloor Kg 1.7500 140,000.00 245,000.00
Finish coat Pollyfloor Kg 1.0000 140,000.00 140,000.00
Thinner epoxy Ltr 0.2500 119,000.00 29,750.00
JUMLAH HARGA BAHAN 491,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 507,852.50
E. Overhead & Profit 5% x D 25,392.63
F. Harga Satuan Pekerjaan (D+E) 533,245.13

7 1 M2 PASANGAN DINDING PEMISAH GYPSUM RANGKA METAL STUD

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.6000 113,400.00 68,040.00
Kepala Tukang L.03 OH 0.0600 135,000.00 8,100.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 98,030.00
B. BAHAN
Gypsumboard 9 mm Lbr 0.7280 60,840.00 44,291.52
Metal stud Btg 0.7500 48,750.00 36,562.50
Screw 6 x 1 Bh 15.0000 5,000.00 75,000.00
Compound Gypsum Bh 1.5000 71,500.00 107,250.00
Dinabold Ø 10 - 65 Kg 1.0000 5,000.00 5,000.00
JUMLAH HARGA BAHAN 268,104.02
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 366,134.02
E. Overhead & Profit 5% x D 18,306.70
F. Harga Satuan Pekerjaan (D+E) 384,440.72
IX. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

1 1 M2 PASANG LANGIT-LANGIT GYPSUM RANGKA HOLLOW

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 100,000.00 40,000.00
Tukang kayu L.02 OH 0.2000 113,400.00 22,680.00
Kepala Tukang L.03 OH 0.0200 135,000.00 2,700.00
Mandor L.04 OH 0.0200 189,000.00 3,780.00
JUMLAH TENAGA KERJA 69,160.00
B. BAHAN
Gypsumboard 9 mm Lbr 0.3640 60,840.00 22,145.76
Textile Tape M' 0.1000 3,380.00 338.00
Cornice adhesive Kg 0.2780 71,500.00 19,877.00
Hollow Galvanis 40x40x0,35mm M' 1.5000 39,448.50 59,172.75
Hollow Galvanis 20x40x0,35mm M' 2.5000 45,500.00 113,750.00
Rangka penggantung 20x40x0,35mm M' 3.9000 45,500.00 177,450.00
Siku (Angel) M' 1.6700 58,500.00 97,695.00
Screw 6 x 1 Bh 15.0000 5,000.00 75,000.00
Paku beton Bh 5.0000 5,000.000 25,000.00
JUMLAH HARGA BAHAN 590,428.51
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 659,588.51
E. Overhead & Profit 5% x D 32,979.43
F. Harga Satuan Pekerjaan (D+E) 692,567.94

2 1 M2 PASANG LANGIT-LANGIT KALSIBOARD RANGKA HOLLOW

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 100,000.00 40,000.00
Tukang kayu L.02 OH 0.2000 113,400.00 22,680.00
Kepala Tukang L.03 OH 0.0200 135,000.00 2,700.00
Mandor L.04 OH 0.0200 189,000.00 3,780.00
JUMLAH TENAGA KERJA 69,160.00
B. BAHAN
Kalsiboard 4.5 mm Lbr 0.3640 61,750.00 22,477.00
Textile Tape M' 0.1000 3,380.00 338.00
Cornice adhesive Kg 0.2780 71,500.00 19,877.00
Hollow Galvanis 40x40x0,35mm M' 1.5000 39,448.50 59,172.75
Hollow Galvanis 20x40x0,35mm M' 2.5000 45,500.00 113,750.00
Rangka penggantung 20x40x0,35mm M' 3.9000 45,500.00 177,450.00
Siku (Angel) M' 1.6700 58,500.00 97,695.00
Screw 6 x 1 Bh 15.0000 5,000.00 75,000.00
Paku beton Bh 5.0000 5,000.00 25,000.00
JUMLAH HARGA BAHAN 590,759.75
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 659,919.75
E. Overhead & Profit 5% x D 32,995.99
F. Harga Satuan Pekerjaan (D+E) 692,915.74
3 1 M' PEKERJAAN PASANGAN LIST PLAPOND GYPSUM 5/5 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang kayu L.02 OH 0.0500 113,400.00 5,670.00
Kepala Tukang L.03 OH 0.0050 135,000.00 675.00
Mandor L.04 OH 0.0030 189,000.00 567.00
JUMLAH TENAGA KERJA 11,912.00
B. BAHAN
List gypsum 5/5 cm m1 1.0500 39,000.00 40,950.00
JUMLAH HARGA BAHAN 40,950.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 52,862.00
E. Overhead & Profit 5% x D 2,643.10
F. Harga Satuan Pekerjaan (D+E) 55,505.10

4 1 M' PEKERJAAN PASANGAN LIST PLAPOND GYPSUM 7/7 CM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang kayu L.02 OH 0.0500 113,400.00 5,670.00
Kepala Tukang L.03 OH 0.0050 135,000.00 675.00
Mandor L.04 OH 0.0030 189,000.00 567.00
JUMLAH TENAGA KERJA 11,912.00
B. BAHAN
List gypsum 5/5 cm m1 1.0500 71,500.00 75,075.00
JUMLAH HARGA BAHAN 75,075.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 86,987.00
E. Overhead & Profit 5% x D 4,349.35
F. Harga Satuan Pekerjaan (D+E) 91,336.35

X. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

1 PEMASANGAN 1 M1 KUSEN ALUMINIUM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0430 100,000.00 4,300.00
Tukang Besi L.02 OH 0.0430 126,500.00 5,439.50
Kepala Tukang L.03 OH 0.0043 135,000.00 580.50
Mandor L.04 OH 0.0021 189,000.00 396.90
JUMLAH TENAGA KERJA 10,716.90
B. BAHAN
Profil alumunium m 1.0000 273,000.00 273,000.00
Skrup fixer bh 2.0000 350.00 700.00
Sealant Tube 0.0600 22,500.00 1,350.00
JUMLAH HARGA BAHAN 275,050.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 285,766.90
E. Overhead & Profit 5% x D 14,288.35
F. Harga Satuan Pekerjaan (D+E) 300,055.25
2 PEMASANGAN 1 M2 PINTU ALUMINIUM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0850 100,000.00 8,500.00
Tukang Besi L.02 OH 0.0850 126,500.00 10,752.50
Kepala Tukang L.03 OH 0.0085 135,000.00 1,147.50
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 21,345.00
B. BAHAN
Profil alumunium m 5.4000 273,000.00 1,474,200.00
Sealant tube 0.2700 22,500.00 6,075.00
JUMLAH HARGA BAHAN 1,480,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,501,620.00
E. Overhead & Profit 5% x D 75,081.00
F. Harga Satuan Pekerjaan (D+E) 1,576,701.00

1 KG PASANG BESI PROFIL

HARGA SATUAN JUMLAH HARGA


URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang las L.03 OH 0.0600 126,500.00 7,590.00
Kepala Tukang L.03 OH 0.0060 135,000.00 810.00
Mandor L.04 OH 0.0030 189,000.00 567.00
JUMLAH TENAGA KERJA 14,967.00
B. BAHAN
Besi profil Kg 1.1500 34,400.00 39,560.00
JUMLAH HARGA BAHAN 39,560.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,527.00
E. Overhead & Profit 5% x D 2,726.35
F. Harga Satuan Pekerjaan (D+E) 57,253.35

2 1 BH PASANG ANCHOR D 25 P=800 MM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang las L.03 OH 0.1000 126,500.00 12,650.00
Kepala Tukang L.03 OH 0.0300 135,000.00 4,050.00
Mandor L.04 OH 0.0300 189,000.00 5,670.00
JUMLAH TENAGA KERJA 32,370.00
B. BAHAN
Anchor D 25 P=800 mm Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Alat bantu % 0.3000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 32,370.00
E. Overhead & Profit 5% x D 1,618.50
F. Harga Satuan Pekerjaan (D+E) 33,988.50
3 1 BH PASANG BOLT D 19 HTB A325N

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang besi L.03 OH 0.0100 126,500.00 1,265.00
Kepala Tukang L.03 OH 0.0010 135,000.00 135.00
Mandor L.04 OH 0.0010 189,000.00 189.00
JUMLAH TENAGA KERJA 2,589.00
B. BAHAN
Bolt D 19 HTB A325N Bh 1.0000 235,200.00 235,200.00
JUMLAH HARGA BAHAN 235,200.00
C. PERALATAN
Alat bantu % 0.2000 235,200.00 47,040.00
JUMLAH HARGA ALAT 47,040.00

D. Jumlah (A + B + C) 284,829.00
E. Overhead & Profit 5% x D 14,241.45
F. Harga Satuan Pekerjaan (D+E) 299,070.45

4 1 M2 PASANG REILLING DARI BESI HOLLOW FINISH CAT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 100,000.00 50,000.00
Tukang las L.02 OH 1.0000 126,500.00 126,500.00
Tukang cat L.03 OH 0.5000 113,400.00 56,700.00
Kepala Tukang L.03 OH 0.3500 135,000.00 47,250.00
Mandor L.04 OH 0.0500 189,000.00 9,450.00
JUMLAH TENAGA KERJA 289,900.00
B. BAHAN
Besi hollow 2x2 btg 0.5500 119,000.00 65,450.00
Besi hollow 3x3 btg 0.4500 168,000.00 75,600.00
Besi hollow 5x5 btg 0.3500 210,000.00 73,500.00
Pengelasan cm 25.0000 25,000.00 625,000.00
Cat menie kg 0.2000 70,000.00 14,000.00
Cat finish kg 0.3500 70,000.00 24,500.00
JUMLAH HARGA BAHAN 878,050.00
C. PERALATAN
Alat bantu % 0.1500 878,050.00 131,707.50
JUMLAH HARGA ALAT 131,707.50

D. Jumlah (A + B + C) 1,299,657.50
E. Overhead & Profit 5% x D 64,982.88
F. Harga Satuan Pekerjaan (D+E) 1,364,640.38
5 PEMBUATAN DAN PEMASANGAN 1 M2 TUTUP GROUND TANK DARI PLAT BESI

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9500 100,000.00 95,000.00
Tukang las biasa L.02 OH 0.9500 126,500.00 120,175.00
Tukang cat L.02 OH 0.6500 113,400.00 73,710.00
Kepala Tukang L.03 OH 0.0950 135,000.00 12,825.00
Mandor L.04 OH 0.0300 189,000.00 5,670.00
JUMLAH TENAGA KERJA 307,380.00
B. BAHAN
Besi siku L 50.50.5 btg 0.4500 193,200.00 86,940.00
Besi pelat baja 1 mm m2 1.1000 280,000.00 308,000.00
Kawat las kg 0.0500 25,000.00 1,250.00
Cat menie besi Ltr 0.0500 70,000.00 3,500.00
Cat Kg 0.0750 70,000.00 5,250.00
Kuas buah 0.0500 10,000.00 500.00
JUMLAH HARGA BAHAN 405,440.00

C. PERALATAN
Alat bantu % 0.1500 405,440.00 60,816.00
JUMLAH HARGA ALAT 60,816.00

D. Jumlah (A + B + C) 773,636.00
E. Overhead & Profit 5% x D 38,681.80
F. Harga Satuan Pekerjaan (D+E) 812,317.80

6 PEMBUATAN DAN PEMASANGAN 1 M2 PINTU BAJA RANGKA BESI HOLLOW

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9500 100,000.00 95,000.00
Tukang las biasa L.02 OH 0.9500 126,500.00 120,175.00
Tukang cat L.02 OH 0.6500 113,400.00 73,710.00
Kepala Tukang L.03 OH 0.0950 135,000.00 12,825.00
Mandor L.04 OH 0.0300 189,000.00 5,670.00
JUMLAH TENAGA KERJA 307,380.00
B. BAHAN
Besi hollow 3x3 btg 0.7000 168,000.00 117,600.00
Besi hollow 7.5x7.5 btg 0.8000 555,800.00 444,640.00
Besi pelat baja 1.2 mm m2 1.1000 735,000.00 808,500.00
Besi rell m1 1.1000 431,666.67 474,833.33
Kawat las kg 0.0700 25,000.00 1,750.00
Cat menie besi Ltr 0.0500 70,000.00 3,500.00
Cat Kg 0.1000 70,000.00 7,000.00
Kuas buah 0.0500 10,000.00 500.00
JUMLAH HARGA BAHAN 1,858,323.33

C. PERALATAN
Alat bantu % 0.1500 1,858,323.33 278,748.50
JUMLAH HARGA ALAT 278,748.50

D. Jumlah (A + B + C) 2,444,451.83
E. Overhead & Profit 5% x D 122,222.59
F. Harga Satuan Pekerjaan (D+E) 2,566,674.43
7 PEMBUATAN DAN PEMASANGAN 1 M1 TANGGA DARI PIPA GALVANIS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9500 100,000.00 95,000.00
Tukang las biasa L.02 OH 0.9500 126,500.00 120,175.00
Tukang cat L.02 OH 0.6500 113,400.00 73,710.00
Kepala Tukang L.03 OH 0.0950 135,000.00 12,825.00
Mandor L.04 OH 0.0300 189,000.00 5,670.00
JUMLAH TENAGA KERJA 307,380.00
B. BAHAN
Pipa galvanis 2" m1 2.2500 10,000.00 22,500.00
Pipa galvanis 1" m1 1.3500 10,000.00 13,500.00
Kawat las kg 0.0650 25,000.00 1,625.00
Cat menie besi Ltr 0.0500 70,000.00 3,500.00
Cat Kg 0.1000 70,000.00 7,000.00
Kuas buah 0.0500 10,000.00 500.00
JUMLAH HARGA BAHAN 48,625.00

C. PERALATAN
Alat bantu % 0.5000 48,625.00 24,312.50
JUMLAH HARGA ALAT 24,312.50

D. Jumlah (A + B + C) 380,317.50
E. Overhead & Profit 5% x D 19,015.88
F. Harga Satuan Pekerjaan (D+E) 399,333.38

8 1 M2 MEMASANG RANGKA KUDA - KUDA BAJA RINGAN C 75

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Besi L.02 OH 0.4500 126,500.00 56,925.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0500 189,000.00 9,450.00
JUMLAH TENAGA KERJA 87,725.00
B. BAHAN
Rangka C 75068 @ 7 m galvalume Btg 0.4559 257,600.00 117,449.73
Reng (butten Ω 30) @ 6 m Btg 0.6179 210,000.00 129,755.59
Reng pengikat kuda-kuda @ 6 m Btg 0.0673 210,000.00 14,126.62
Pelat strips @ 1 m Bh 0.1694 242,200.00 41,033.46
Baut kuda-kuda SDS 6-19 Bh 35.0001 208,600.00 7,301,025.99
Baut reng SDS 6-16 Btg 20.0000 1,400.00 28,000.00
Baut listplank Ø 6-70 Bh 0.9468 56,000.00 53,018.41
Dinabold Ø 10-65 Bh 0.9468 4,900.00 4,639.11
Material dan alat bantu % 0.0450 1,190,700.00 53,581.50
JUMLAH HARGA BAHAN 7,742,630.41

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 7,830,355.41
E. Overhead & Profit 5% x D 391,517.77
F. Harga Satuan Pekerjaan (D+E) 8,221,873.18
XI. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

1 PEMASANGAN 1 BUAH KUNCI TANAM BIASA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang kayu L.02 OH 0.5000 113,400.00 56,700.00
Kepala Tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 65,395.00
B. BAHAN
Kunci tanam biasa Bh 1.0000 413,000.00 413,000.00
JUMLAH HARGA BAHAN 413,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 478,395.00
E. Overhead & Profit 5% x D 23,919.75
F. Harga Satuan Pekerjaan (D+E) 502,314.75

2 PEMASANGAN 1 BUAH ENGSEL PINTU

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang kayu L.02 OH 0.1500 113,400.00 17,010.00
Kepala Tukang L.03 OH 0.0150 135,000.00 2,025.00
Mandor L.04 OH 0.0008 189,000.00 151.20
JUMLAH TENAGA KERJA 20,686.20
B. BAHAN
Engsel pintu Bh 1.0000 82,600.00 82,600.00
JUMLAH HARGA BAHAN 82,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 103,286.20
E. Overhead & Profit 5% x D 5,164.31
F. Harga Satuan Pekerjaan (D+E) 108,450.51

3 PEMASANGAN 1 BUAH ENGSEL JENDELA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang kayu L.02 OH 0.1000 113,400.00 11,340.00
Kepala Tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0005 189,000.00 94.50
JUMLAH TENAGA KERJA 13,784.50
B. BAHAN
Engsel Bh 1.0000 53,200.00 53,200.00
JUMLAH HARGA BAHAN 53,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,984.50
E. Overhead & Profit 5% x D 3,349.23
F. Harga Satuan Pekerjaan (D+E) 70,333.73
4 PEMASANGAN 1 BUAH GRENDEL JENDELA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang kayu L.02 OH 0.2000 113,400.00 22,680.00
Kepala Tukang L.03 OH 0.0200 135,000.00 2,700.00
Mandor L.04 OH 0.0005 189,000.00 94.50
JUMLAH TENAGA KERJA 26,474.50
B. BAHAN
Grendel jendela Bh 1.0000 51,800.00 51,800.00
JUMLAH HARGA BAHAN 51,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 78,274.50
E. Overhead & Profit 5% x D 3,913.73
F. Harga Satuan Pekerjaan (D+E) 82,188.23

5 PEMASANGAN 1 BUAH KAIT ANGIN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang kayu L.02 OH 0.1500 113,400.00 17,010.00
Kepala Tukang L.03 OH 0.0150 135,000.00 2,025.00
Mandor L.04 OH 0.0080 189,000.00 1,512.00
JUMLAH TENAGA KERJA 22,047.00
B. BAHAN
Kait angin Bh 1.0000 42,000.00 42,000.00
JUMLAH HARGA BAHAN 42,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,047.00
E. Overhead & Profit 5% x D 3,202.35
F. Harga Satuan Pekerjaan (D+E) 67,249.35

6 MEMASANG 1 BH DOOR CLOSER

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang kayu L.03 OH 0.5000 113,400.00 56,700.00
Kepala Tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0030 189,000.00 567.00
JUMLAH TENAGA KERJA 69,017.00
B. BAHAN
Door closer Bh 1.0000 161,000.00 161,000.00
JUMLAH HARGA BAHAN 161,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 230,017.00
E. Overhead & Profit 5% x D 11,500.85
F. Harga Satuan Pekerjaan (D+E) 241,517.85
7 1 M2 PASANG KACA 5 MM

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1600 100,000.00 16,000.00
Tukang Kaca L.02 OH 0.1600 126,500.00 20,240.00
Kepala Tukang L.03 OH 0.1600 135,000.00 21,600.00
Mandor L.04 OH 0.0080 189,000.00 1,512.00
JUMLAH TENAGA KERJA 59,352.00
B. BAHAN
Kaca 5 mm m2 1.1000 496,200.00 545,820.00
JUMLAH HARGA BAHAN 545,820.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 605,172.00
E. Overhead & Profit 5% x D 30,258.60
F. Harga Satuan Pekerjaan (D+E) 635,430.60

XII. HARGA SATUAN PEKERJAAN PENGECATAN

1 1 M2 PENGECATAN TEMBOK BARU DULUX INTERIOR


(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.0630 113,400.00 7,144.20
Kepala Tukang L.03 OH 0.0063 135,000.00 850.50
Mandor L.04 OH 0.0025 189,000.00 472.50
JUMLAH TENAGA KERJA 10,467.20
B. BAHAN
Plamir Kg 0.1000 84,000.00 8,400.00
Cat dasar Kg 0.1000 82,950.00 8,295.00
Cat Penutup 2x Kg 0.2600 144,200.00 37,492.00
JUMLAH HARGA BAHAN 54,187.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,654.20
E. Overhead & Profit 5% x D 3,232.71
F. Harga Satuan Pekerjaan (D+E) 67,886.91
2 1 M2 PENGECATAN TEMBOK BARU EXTERIOR EX. DULUX WEATHERSIELD
(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.0630 113,400.00 7,144.20
Kepala Tukang L.03 OH 0.0063 135,000.00 850.50
Mandor L.04 OH 0.0025 189,000.00 472.50
JUMLAH TENAGA KERJA 10,467.20
B. BAHAN
Plamir Kg 0.1000 84,000.00 8,400.00
Cat Alkali Kg 0.1000 179,200.00 17,920.00
Cat Penutup 2x ex.dulux Kg 0.5200 273,000.00 141,960.00
JUMLAH HARGA BAHAN 168,280.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 178,747.20
E. Overhead & Profit 5% x D 8,937.36
F. Harga Satuan Pekerjaan (D+E) 187,684.56

3 PELABURAN 1 M2 BIDANG KAYU DENGAN POLITUR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0400 100,000.00 4,000.00
Tukang cat L.02 OH 0.0600 113,400.00 6,804.00
Kepala tukang L.03 OH 0.0160 135,000.00 2,160.00
Mandor L.04 OH 0.0030 189,000.00 567.00
JUMLAH TENAGA KERJA 13,531.00
B. BAHAN
Politur Ltr 0.1500 168,000.00 25,200.00
Politur jadi Ltr 0.3720 168,000.00 62,496.00
Amplas Lbr 2.0000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 107,696.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 121,227.00
E. Overhead & Profit 5% x D 6,061.35
F. Harga Satuan Pekerjaan (D+E) 127,288.35

4 1 M2 PENGECATAN DINDING DENGAN WATERPROOFING

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.0630 113,400.00 7,144.20
Kepala Tukang L.03 OH 0.0600 135,000.00 8,100.00
Mandor L.04 OH 0.0300 189,000.00 5,670.00
JUMLAH TENAGA KERJA 22,914.20
B. BAHAN
Waterproofing Kg 0.1800 67,200.00 12,096.00
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 12,296.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 35,210.20
E. Overhead & Profit 5% x D 1,760.51
F. Harga Satuan Pekerjaan (D+E) 36,970.71
5 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang cat L.02 OH 0.1500 113,400.00 17,010.00
Kepala tukang L.03 OH 0.0150 135,000.00 2,025.00
Mandor L.04 OH 0.0080 189,000.00 1,512.00
JUMLAH TENAGA KERJA 35,547.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.2000 61,600.00 12,320.00
Minyak Cat Kg 0.1000 13,300.00 1,330.00
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 13,850.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 49,397.00
E. Overhead & Profit 5% x D 2,469.85
F. Harga Satuan Pekerjaan (D+E) 51,866.85

XIII. HARGA SATUAN PEKERJAAN SANITASI

1 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0360 100,000.00 3,600.00
Tukang pipa L.02 OH 0.0600 126,500.00 7,590.00
Kepala tukang L.03 OH 0.0060 135,000.00 810.00
Mandor L.04 OH 0.0020 189,000.00 378.00
JUMLAH TENAGA KERJA 12,378.00
B. BAHAN
Pipa PVC Bh 1.2000 20,790.00 24,948.00
Perlengkapan % 0.3500 7,276.50 7,276.50
JUMLAH HARGA BAHAN 32,224.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 44,602.50
E. Overhead & Profit 5% x D 2,230.13
F. Harga Satuan Pekerjaan (D+E) 46,832.63

2 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00
Tukang pipa L.02 OH 0.0900 126,500.00 11,385.00
Kepala tukang L.03 OH 0.0090 135,000.00 1,215.00
Mandor L.04 OH 0.0030 189,000.00 567.00
JUMLAH TENAGA KERJA 18,567.00
B. BAHAN
Pipa PVC Bh 1.2000 20,790.00 24,948.00
Perlengkapan % 0.3500 7,276.50 7,276.50
JUMLAH HARGA BAHAN 32,224.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,791.50
E. Overhead & Profit 5% x D 2,539.58
F. Harga Satuan Pekerjaan (D+E) 53,331.08
3 MEMASANG 1 M1 PIPA PVC TYPE AW f 3"

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0810 100,000.00 8,100.00
Tukang pipa L.02 OH 0.1350 126,500.00 17,077.50
Kepala tukang L.03 OH 0.0135 135,000.00 1,822.50
Mandor L.04 OH 0.0040 189,000.00 756.00
JUMLAH TENAGA KERJA 27,756.00
B. BAHAN
Pipa PVC Bh 1.2000 38,610.00 46,332.00
Perlengkapan % 0.3500 13,513.50 13,513.50
JUMLAH HARGA BAHAN 59,845.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 87,601.50
E. Overhead & Profit 5% x D 4,380.08
F. Harga Satuan Pekerjaan (D+E) 91,981.58

4 MEMASANG 1 BUAH KLOSET DUDUK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 3.3000 100,000.00 330,000.00
Tukang batu L.02 OH 1.1000 126,500.00 139,150.00
Kepala tukang L.03 OH 0.0010 135,000.00 135.00
Mandor L.04 OH 0.1600 189,000.00 30,240.00
JUMLAH TENAGA KERJA 499,525.00
B. BAHAN
Kloset duduk Bh 1.0000 1,782,000.00 1,782,000.00
Perlengkapan % 6% dr harga kloset 106,920.00 106,920.00
JUMLAH HARGA BAHAN 1,888,920.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,388,445.00
E. Overhead & Profit 5% x D 119,422.25
F. Harga Satuan Pekerjaan (D+E) 2,507,867.25

5 MEMASANG 1 BUAH KRAN WASHTAFEL BIASA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang batu L.02 OH 0.1000 126,500.00 12,650.00
Kepala tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 15,945.00
B. BAHAN
Kran Washtafel Bh 1.0000 537,600.00 537,600.00
Seal tape Bh 0.0250 5,600.00 140.00
JUMLAH HARGA BAHAN 537,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 553,685.00
E. Overhead & Profit 5% x D 27,684.25
F. Harga Satuan Pekerjaan (D+E) 581,369.25
6 MEMASANG 1 BUAH WASHTAFEL GANTUNG LENGKAP ACCESORIS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Tukang batu L.02 OH 1.4500 126,500.00 183,425.00
Kepala tukang L.03 OH 0.1500 135,000.00 20,250.00
Mandor L.04 OH 0.1000 189,000.00 18,900.00
JUMLAH TENAGA KERJA 342,575.00
B. BAHAN
Washtafel Bh 1.0000 5,013,664.00 5,013,664.00
Perlengkapan % 5% dr harga washtafel 250,683.20 250,683.20
JUMLAH HARGA BAHAN 5,264,347.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 5,606,922.20
E. Overhead & Profit 5% x D 280,346.11
F. Harga Satuan Pekerjaan (D+E) 5,887,268.31

7 MEMASANG 1 BUAH JET WHASER

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang batu L.02 OH 0.1000 126,500.00 12,650.00
Kepala tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 15,945.00
B. BAHAN
Jet Whaser Bh 1.0000 317,800.00 317,800.00
Seal tape Bh 0.0250 5,600.00 140.00
JUMLAH HARGA BAHAN 317,940.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 333,885.00
E. Overhead & Profit 5% x D 16,694.25
F. Harga Satuan Pekerjaan (D+E) 350,579.25

8 MEMASANG 1 BUAH KRAN AIR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang batu L.02 OH 0.1000 126,500.00 12,650.00
Kepala tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 15,945.00
B. BAHAN
Kran air Bh 1.0000 69,800.00 69,800.00
Seal tape Bh 0.0250 5,600.00 140.00
JUMLAH HARGA BAHAN 69,940.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,885.00
E. Overhead & Profit 5% x D 4,294.25
F. Harga Satuan Pekerjaan (D+E) 90,179.25
9 MEMASANG 1 BUAH FLOORDRAIN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang batu L.02 OH 0.1000 126,500.00 12,650.00
Kepala tukang L.03 OH 0.0100 135,000.00 1,350.00
Mandor L.04 OH 0.0050 189,000.00 945.00
JUMLAH TENAGA KERJA 15,945.00
B. BAHAN
Floor drain Bh 1.0000 340,200.00 340,200.00
JUMLAH HARGA BAHAN 340,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 356,145.00
E. Overhead & Profit 5% x D 17,807.25
F. Harga Satuan Pekerjaan (D+E) 373,952.25

10 PEMBUATAN 1 UNIT SEPTICTANK DAN RESAPAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. PEKERJAAN
Galian tanah m3 4.284 161,340.00 691,180.56
Pas. Batako m2 27.940 300,925.00 8,407,844.50
Plesteran m2 27.940 79,787.00 2,229,248.78
Acian m2 27.940 45,640.00 1,275,181.60
Beton K-150 m3 0.582 1,979,373.55 1,151,995.40
Besi Beton kg 50.920 30,605.60 1,558,437.15
Ring Praktis m1 4.000 192,542.15 770,168.60
Batu Karang m3 1.248 400,000.00 499,200.00
Ijuk kg 25.000 8,000.00 200,000.00
Pipa Galvanis 1'' m1 4.000 46,832.63 187,330.50
16,970,587.10

Perlengkapan % 0.3000 16,970,587.10 5,091,176.13


5,091,176.13

D. Jumlah (A + B + C) 22,061,763.23
E. Overhead & Profit 5% x D 1,103,088.16
F. Harga Satuan Pekerjaan (D+E) 23,164,851.39
XIV. HARGA SATUAN PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang listrik L.02 OH 0.0200 100,000.00 2,000.00
Kepala tukang L.03 OH 0.1000 135,000.00 13,500.00
Mandor L.04 OH 0.1000 189,000.00 18,900.00
JUMLAH TENAGA KERJA 39,400.00
B. BAHAN
Kabel NYM 2 x 2,5 mm m 8.0000 22,400.00 179,200.00
Pipa Clipsal 20 mm hitam btng 3.0000 12,500.00 37,500.00
Tee dos clipsal 20 mm bh 2.0000 5,000.00 10,000.00
Sock clipsal 20 mm hitam bh 3.0000 25,000.00 75,000.00
Isolasi bh 0.5000 7,500.00 3,750.00
Inbow dos plastik clipsal E 157 P bh 1.0000 5,460.00 5,460.00
Klem bh 10.0000 1,050.00 10,500.00
JUMLAH HARGA BAHAN 321,410.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 360,810.00
E. Overhead & Profit 5% x D 18,040.50
F. Harga Satuan Pekerjaan (D+E) 378,850.50

2 PEMASANGAN 1 M1 KABEL POWER POMPA AIR/LAMPU

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.0450 100,000.00 4,500.00
Tukang listrik L.02 OH 0.0450 100,000.00 4,500.00
Kepala tukang L.03 OH 0.0125 135,000.00 1,687.50
Mandor L.04 OH 0.0060 189,000.00 1,134.00
JUMLAH TENAGA KERJA 11,821.50
B. BAHAN
Kabel NYM 3 x 2,5 mm m 1.2000 22,400.00 26,880.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 28,755.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,576.50
E. Overhead & Profit 5% x D 2,028.83
F. Harga Satuan Pekerjaan (D+E) 42,605.33

3 PEMASANGAN 1 BH BOX PANEL MCB

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang listrik L.02 OH 1.0000 100,000.00 100,000.00
Kepala tukang L.03 OH 1.0000 135,000.00 135,000.00
JUMLAH TENAGA KERJA 240,000.00
B. BAHAN
Box panel bh 1.0000 12,110,000.00 12,110,000.00
JUMLAH HARGA BAHAN 12,110,000.00
C. PERALATAN
Alat bantu % 0.1000 12,110,000.00 1,211,000.00
JUMLAH HARGA ALAT 1,211,000.00

D. Jumlah (A + B + C) 13,561,000.00
E. Overhead & Profit 5% x D 678,050.00
F. Harga Satuan Pekerjaan (D+E) 14,239,050.00
4 PEMASANGAN 1 M1 KABEL POWER UDARA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Kabel Twisted 2x10 mm m 1.1000 1,470,000.00 1,617,000.00
JUMLAH HARGA BAHAN 1,617,000.00
C. PERALATAN
Alat bantu % 0.5000 1,648,475.00 824,237.50
JUMLAH HARGA ALAT 824,237.50

D. Jumlah (A + B + C) 2,472,712.50
E. Overhead & Profit 5% x D 123,635.63
F. Harga Satuan Pekerjaan (D+E) 2,596,348.13

5 PEMASANGAN 1 UNIT TIANG LISTRIK 8 METER

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. BAHAN
Tiang listrik Unt 1.0000 1,671,600.00 1,671,600.00
JUMLAH TENAGA KERJA 1,671,600.00
B. PERALATAN
Alat bantu % 5.0000 83,580.00 83,580.00
JUMLAH HARGA BAHAN 83,580.00

C. ONGKOS PASANG % 15.0000 250,740.00 250,740.00


JUMLAH HARGA ALAT 250,740.00
D. PEKERJAAN SENDI
Galian m3 0.5760 161,340.00 92,931.84
Beton K-150 m3 0.5760 1,979,373.55 1,140,119.16
Pas. Batako m3 1.1200 300,925.00 337,036.00
Plesteran m2 1.1200 79,787.00 89,361.44
Acian m2 1.1200 45,640.00 51,116.80
Cat m2 1.1200 178,747.20 200,196.86
1,910,762.11
D. Jumlah (A + B + C+D) 3,916,682.11
E. Overhead & Profit 5% x D 195,834.11
F. Harga Satuan Pekerjaan (D+E) 4,112,516.21

6 PEMASANGAN 1 SET CAMERA CCTV

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. BAHAN
Camera resolusi 5 MP Unt 8.0000 6,984,600.00 55,876,800.00
Kabel Coaxial RG6 + Power m1 360.0000 5,133.33 1,848,000.00
DVR CCTV Support Camera 5 MP Unt 1.0000 1,903,790.00 1,903,790.00
HDD 4 TB Unt 1.0000 2,184,000.00 2,184,000.00
Power Supply Central 12V 10A Unt 1.0000 224,000.00 224,000.00
Monitor LED 20" Unt 1.0000 1,820,000.00 1,820,000.00
JUMLAH TENAGA KERJA 63,856,590.00
B. PERALATAN
Alat bantu % 0.1000 63,856,590.00 6,385,659.00
JUMLAH HARGA BAHAN 6,385,659.00
C. ONGKOS PASANG % 0.2000 63,856,590.00 12,771,318.00
JUMLAH HARGA ALAT 12,771,318.00

D. Jumlah (A + B + C) 83,013,567.00
E. Overhead & Profit 5% x D 4,150,678.35
F. Harga Satuan Pekerjaan (D+E) 87,164,245.35
7 PEMBUATAN DAN PEMASANGAN 1 UNIT SELING DAN KATROL LAMPU GUDANG

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang besi L.02 OH 0.5000 126,500.00 63,250.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 99,725.00
B. BAHAN
Seling 3 mm m1 21.0000 4,900.00 102,900.00
Katrol bh 2.0000 32,200,000.00 64,400,000.00
Penggulung dan pengunci seling bh 1.0000 1,680,000.00 1,680,000.00
JUMLAH HARGA BAHAN 66,182,900.00
C. PERALATAN
Alat bantu % 0.1000 66,182,900.00 6,618,290.00
JUMLAH HARGA ALAT 6,618,290.00

D. Jumlah (A + B + C) 72,900,915.00
E. Overhead & Profit 5% x D 3,645,045.75
F. Harga Satuan Pekerjaan (D+E) 76,545,960.75

8 PEMASANGAN 1 BH LAMPU GUDANG

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Lampu mercuri 400 watt bh 1.0000 371,000.00 371,000.00
Travo bh 1.0000 60,200.00 60,200.00
Kap lampu bh 1.0000 16,450.00 16,450.00
JUMLAH HARGA BAHAN 447,650.00
C. PERALATAN
Alat bantu % 0.3000 447,650.00 134,295.00
JUMLAH HARGA ALAT 134,295.00

D. Jumlah (A + B + C) 613,420.00
E. Overhead & Profit 5% x D 30,671.00
F. Harga Satuan Pekerjaan (D+E) 644,091.00

9 PEMASANGAN 1 BH LAMPU LED CEILLING PLAFOND 20 WATT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
LED ceilling 20 watt bh 1.0000 277,200.00 277,200.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 279,075.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 310,550.00
E. Overhead & Profit 5% x D 15,527.50
F. Harga Satuan Pekerjaan (D+E) 326,077.50
10 PEMASANGAN 1 BH LAMPU LED BARET 20 WATT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
LED Baret bh 1.0000 1,470,000.00 1,470,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 1,471,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,503,350.00
E. Overhead & Profit 5% x D 75,167.50
F. Harga Satuan Pekerjaan (D+E) 1,578,517.50

11 PEMASANGAN 1 SET FITTING + LAMPU LED 10 WATT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Fitting plafond + lampu LED 10 watt bh 1.0000 518,000.00 518,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 519,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 551,350.00
E. Overhead & Profit 5% x D 27,567.50
F. Harga Satuan Pekerjaan (D+E) 578,917.50

12 PEMASANGAN 1 BH LAMPU DINDING (LAMPU KAPAL) LED 16 WATT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Lampu dinding bh 1.0000 110,530.00 110,530.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 112,405.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 143,880.00
E. Overhead & Profit 5% x D 7,194.00
F. Harga Satuan Pekerjaan (D+E) 151,074.00
13 PEMASANGAN 1 BH LAMPU SOROT LED 100 WATT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Lampu sorot bh 1.0000 1,779,400.00 1,779,400.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 1,781,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,812,750.00
E. Overhead & Profit 5% x D 90,637.50
F. Harga Satuan Pekerjaan (D+E) 1,903,387.50

14 PEMASANGAN 1 SET LAMPU TAMAN LED 33 WATT + RUMAH + TIANG

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Lampu taman+rumah+tiang bh 1.0000 1,610,000.00 1,610,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
Beton tiang m3 0.0200 1,979,373.55 39,587.47
JUMLAH HARGA BAHAN 1,651,462.47
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,682,937.47
E. Overhead & Profit 5% x D 84,146.87
F. Harga Satuan Pekerjaan (D+E) 1,767,084.34

15 PEMASANGAN 1 BH SAKLAR TUNGGAL

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Saklar tunggal bh 1.0000 25,000.00 25,000.00
Mangkok listrik bh 1.0000 25,000.00 25,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 51,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 83,350.00
E. Overhead & Profit 5% x D 4,167.50
F. Harga Satuan Pekerjaan (D+E) 87,517.50
16 PEMASANGAN 1 BH SAKLAR GANDA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Saklar ganda bh 1.0000 25,000.00 25,000.00
Mangkok listrik bh 1.0000 25,000.00 25,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 51,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 83,350.00
E. Overhead & Profit 5% x D 4,167.50
F. Harga Satuan Pekerjaan (D+E) 87,517.50

17 PEMASANGAN 1 BH SAKLAR 3

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Saklar 3 bh 1.0000 33,500.00 33,500.00
Mangkok listrik bh 1.0000 25,000.00 25,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 60,375.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 91,850.00
E. Overhead & Profit 5% x D 4,592.50
F. Harga Satuan Pekerjaan (D+E) 96,442.50

18 PEMASANGAN 1 BH STOP KONTAK

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Stop kontak bh 1.0000 87,000.00 87,000.00
Mangkok listrik bh 1.0000 25,000.00 25,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 113,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 145,350.00
E. Overhead & Profit 5% x D 7,267.50
F. Harga Satuan Pekerjaan (D+E) 152,617.50
19 PEMASANGAN 1 BH STOP KONTAK AC

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang listrik L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0250 189,000.00 4,725.00
JUMLAH TENAGA KERJA 31,475.00
B. BAHAN
Stop kontak AC bh 1.0000 87,000.00 87,000.00
Mangkok listrik bh 1.0000 25,000.00 25,000.00
Isolasi bh 0.2500 7,500.00 1,875.00
JUMLAH HARGA BAHAN 113,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 145,350.00
E. Overhead & Profit 5% x D 7,267.50
F. Harga Satuan Pekerjaan (D+E) 152,617.50

20 PEMASANGAN 1 UNIT TURBINE VENTILATOR TURBINE

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Ongkos Pasang 35 % harga bahan % 0.3500 2,124,185.00 743,464.75
JUMLAH TENAGA KERJA 743,464.75
B. BAHAN
Turbine Ventilator Cyclone bh 1.0000 2,124,185.00 2,124,185.00
Bahan Bantu 5 % harga bahan % 0.0500 2,124,185.00 106,209.25
JUMLAH HARGA BAHAN 2,230,394.25
C. PERALATAN
Alat Bantu 5 % harga bahan % 0.0500 2,124,185.00 106,209.25
JUMLAH HARGA ALAT 106,209.25
D. Jumlah (A + B + C) 3,080,068.25
E. Overhead & Profit 5% x D 154,003.41
F. Harga Satuan Pekerjaan (D+E) 3,234,071.66

21 PEMASANGAN 1 UNIT PENANGKAL PETIR (1 BLITZEM+3 TOMBAK+PIT BOX CONTROL)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. BIAYA PASANG
Biaya Pasang Instalasi ls 1.0000 15,000,000.00 15,000,000.00
Biaya pengeboran m1 6.0000 12,500,000.00 75,000,000.00
JUMLAH TENAGA KERJA 90,000,000.00
B. BAHAN
Blacksem 1" bh 4.0000 70,000.00 280,000.00
Sok Galvanis 1" bh 4.0000 7,252.00 29,008.00
GIP Galvanis 1" bt 3.0000 977,200.00 2,931,600.00
Kawat BC 50 mm2 m1 42.5000 105,000.00 4,462,500.00
Klem Begel 1" bh 6.0000 14,500.00 87,000.00
Klem sisir 50 mm2 bh 3.0000 20,000.00 60,000.00
Kotak Kontrol 10 cm x 15 cm bh 1.0000 1,500,000.00 1,500,000.00
Perluv sok 1" bh 1.0000 11,000.00 11,000.00
Pipa Conduit PVC 3/4" bt 10.0000 30,500.00 305,000.00
Pit box control Unt 1.0000 27,000,000.00 27,000,000.00
JUMLAH HARGA BAHAN 36,666,108.00
C. PERALATAN
Alat bantu ls 1.0000 45,000,000.00 45,000,000.00
JUMLAH HARGA ALAT 45,000,000.00

D. Jumlah (A + B + C) 171,666,108.00
E. Overhead & Profit 5% x D 8,583,305.40
F. Harga Satuan Pekerjaan (D+E) 180,249,413.40
XV. HARGA SATUAN PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 20/20 CM TEBAL 8 CM K-300

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 100,000.00 50,000.00
Tukang Batu L.02 OH 0.5000 126,500.00 63,250.00
Kepala Tukang L.03 OH 0.0500 135,000.00 6,750.00
Mandor L.04 OH 0.0013 189,000.00 245.70
JUMLAH TENAGA KERJA 120,245.70
B. BAHAN
Paving 20 x 20 cm tebal 8 cm m2 1.0100 11,000.00 11,110.00
Pasir urug m3 0.0500 500,000.00 25,000.00
JUMLAH HARGA BAHAN 36,110.00

C. PERALATAN % 10.0000 3,611.00


JUMLAH HARGA ALAT 3,611.00

D. Jumlah (A + B + C) 159,966.70
E. Overhead & Profit 5% x D 7,998.34
F. Harga Satuan Pekerjaan (D+E) 167,965.04

2 1 M1 PASANGAN KANSTIN BETON

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODESATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.9500 100,000.00 95,000.00
Tukang Batu L.02 OH 0.3500 126,500.00 44,275.00
Kepala Tukang L.03 OH 0.0350 135,000.00 4,725.00
Mandor L.04 OH 0.0950 189,000.00 17,955.00
JUMLAH TENAGA KERJA 161,955.00
B. BAHAN
Kanstein m1 2.0000 50,000.00 100,000.00
Semen 50 kg zak 0.4500 3,000.00 1,350.00
JUMLAH HARGA BAHAN 101,350.00

C. PERALATAN ls 1.0000 2,500.00 2,500.00


JUMLAH HARGA ALAT 2,500.00

D. Jumlah (A + B + C) 265,805.00
E. Overhead & Profit 5% x D 13,290.25
F. Harga Satuan Pekerjaan (D+E) 279,095.25

3 PENANAMAN 1 POHON JEPUN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. ONGKOS TANAM
10% dari harga tanaman % 0.1000 65,000.00 65,000.00
JUMLAH ONGKOS TANAM 65,000.00
B. BAHAN
Jepun Bh 1.0000 650,000.00 650,000.00
JUMLAH HARGA BAHAN 650,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 715,000.00
E. Overhead & Profit 5% x D 35,750.00
F. Harga Satuan Pekerjaan (D+E) 750,750.00
4 PENANAMAN 1 POHON TABEBUYA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. ONGKOS TANAM
10% dari harga tanaman % 0.1000 5,000.00 5,000.00
JUMLAH ONGKOS TANAM 5,000.00
B. BAHAN
Tabebuya Bh 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,000.00
E. Overhead & Profit 5% x D 2,750.00
F. Harga Satuan Pekerjaan (D+E) 57,750.00

5 PENANAMAN 1 POHON JEMPIRING

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. ONGKOS TANAM
10% dari harga tanaman % 0.1000 1,300.00 1,300.00
JUMLAH ONGKOS TANAM 1,300.00
B. BAHAN
Jempiring Bh 1.0000 13,000.00 13,000.00
JUMLAH HARGA BAHAN 13,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,300.00
E. Overhead & Profit 5% x D 715.00
F. Harga Satuan Pekerjaan (D+E) 15,015.00

6 PENANAMAN 1 POHON KEMBANG KERTAS

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. ONGKOS TANAM
10% dari harga tanaman % 0.1000 1,200.00 1,200.00
JUMLAH ONGKOS TANAM 1,200.00
B. BAHAN
Kembang Kertas Bh 1.0000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 12,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,200.00
E. Overhead & Profit 5% x D 660.00
F. Harga Satuan Pekerjaan (D+E) 13,860.00
7 PENANAMAN 1 M2 RUMPUT MUTIARA/JEPANG

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. ONGKOS TANAM
10% dari harga tanaman % 0.1000 2,000.00 2,000.00
JUMLAH ONGKOS TANAM 2,000.00
B. BAHAN
Rumput Mutiara/Jepang m2 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 22,000.00
E. Overhead & Profit 5% x D 1,100.00
F. Harga Satuan Pekerjaan (D+E) 23,100.00

XVI. HARGA SATUAN PEKERJAAN LAIN-LAIN (TAMBAHAN)

1 PEMASANGAN 1 UNIT TANGKI AIR KAPASITAS 3600 LT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 3.0000 100,000.00 300,000.00
Tukang pipa L.02 OH 3.0000 113,400.00 340,200.00
Kepala tukang L.03 OH 0.2000 135,000.00 27,000.00
Mandor L.04 OH 0.0200 189,000.00 3,780.00
JUMLAH TENAGA KERJA 670,980.00
B. BAHAN
Tangki Air Kapasitas 3600 ltr unit 1.0000 5,952,800.00 5,952,800.00
Accesoris pipa lot 35 % dari tangki 2,083,480.00 2,083,480.00
JUMLAH HARGA BAHAN 8,036,280.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,707,260.00
E. Overhead & Profit 5% x D 435,363.00
F. Harga Satuan Pekerjaan (D+E) 9,142,623.00

2 PEMASANGAN 1 UNIT TANGKI AIR KAPASITAS 1350 LT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 3.0000 100,000.00 300,000.00
Tukang pipa L.02 OH 3.0000 113,400.00 340,200.00
Kepala tukang L.03 OH 0.2000 135,000.00 27,000.00
Mandor L.04 OH 0.0200 189,000.00 3,780.00
JUMLAH TENAGA KERJA 670,980.00
B. BAHAN
Tangki Air Kapasitas 1350 ltr unit 1.0000 8,330,000.00 8,330,000.00
Accesoris pipa lot 35 % dari tangki 2,915,500.00 2,915,500.00
JUMLAH HARGA BAHAN 11,245,500.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,916,480.00
E. Overhead & Profit 5% x D 595,824.00
F. Harga Satuan Pekerjaan (D+E) 12,512,304.00
3 PEMASANGAN 1 UNIT POMPA AIR PENDORONG

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang pipa L.02 OH 1.0000 113,400.00 113,400.00
Kepala tukang L.03 OH 0.1000 135,000.00 13,500.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 228,790.00
B. BAHAN
Pompa air unit 1.0000 7,490,000.00 7,490,000.00
Accesoris pipa lot 35 % dari pompa 2,621,500.00 2,621,500.00
JUMLAH HARGA BAHAN 10,111,500.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 10,340,290.00
E. Overhead & Profit 5% x D 517,014.50
F. Harga Satuan Pekerjaan (D+E) 10,857,304.50

4 PEMASANGAN 1 UNIT POMPA AIR SUBMERSIBLE

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang pipa L.02 OH 1.0000 113,400.00 113,400.00
Kepala tukang L.03 OH 0.1000 135,000.00 13,500.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 228,790.00
B. BAHAN
Pompa Submersible unit 1.0000 72,880,000.00 72,880,000.00
Pas pipa Dia 1 1/5" m1 90.0000 46,832.63 4,214,936.25
JUMLAH HARGA BAHAN 77,094,936.25

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,323,726.25
E. Overhead & Profit 5% x D 3,866,186.31
F. Harga Satuan Pekerjaan (D+E) 81,189,912.56

5 1 M1 PEKERJAAN SUMUR BOR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN KODE KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.0000 100,000.00 200,000.00
Tukang pipa L.02 OH 2.0000 113,400.00 226,800.00
Kepala tukang L.03 OH 0.1000 135,000.00 13,500.00
Mandor L.04 OH 0.0100 189,000.00 1,890.00
JUMLAH TENAGA KERJA 442,190.00
B. BAHAN
Cassing Pipa PVC AW 6" m 1.2000 207,713.33 249,256.00
Accesoris pipa lot 10 % pipa 24,925.60 24,925.60
JUMLAH HARGA BAHAN 274,181.60
C. PERALATAN
Alat bantu 15% dari ongkos kerja 66,328.50
JUMLAH HARGA ALAT 66,328.50

D. Jumlah (A + B + C) 782,700.10
E. Overhead & Profit 5% x D 39,135.01
F. Harga Satuan Pekerjaan (D+E) 821,835.11
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
PEMBANGUNAN GUDANG MULTIFUNGSI PT. INDONESIA MAS MULIA

NO URAIAN PEKERJAAN HARGA

1 2 3
I. HARGA SATUAN PEKERJAAN PERSIAPAN
II. PENGUKURAN DAN PEMASANGAN 1 M' BOWPLANK Rp. 86,172.82
III 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH Rp. 766,118.85
IV 1 M2 PENERABASAN SEMAK Rp. 6,242.25
V PEMBONGKARAN 1 M' PAGAR BRC EXISTING Rp. 42,496.13

II. HARGA SATUAN PEKERJAAN TANAH


1 1 M3 GALIAN TANAH KERAS DALAM 1 METER Rp. 111,350.40
2 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 169,407.00
3 1 M3 URUGAN KEMBALI TANAH GALIAN Rp. 62,422.50
4 1 M3 URUGAN PASIR Rp. 663,484.50
5 1 M3 URUGAN LIMESTONE Rp. 663,484.50
6 1 M3 URUGAN TANAH SUBUR Rp. 474,484.50

III. HARGA SATUAN PEKERJAAN PONDASI


1 1 M3 BATU KARANG CAMP. 1 PC : 5 PS Rp. 1,443,513.75
2 1 M3 PASANGAN BATU KOSONG Rp. 1,003,769.55

IV. HARGA SATUAN PEKERJAAN KAYU


1 PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN JENDELA, KAYU KELAS I Rp. 11,258,205.00
2 PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KAMPER Rp. 739,357.50
MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS HPL RANGKAP RANGKA TERTUTUP, KAYU
3 KELAS I (Lebar Sampai 90 Cm) Rp. 932,951.25
4 MEMASANG 1 M' PLIN KAYU 10 CM, KAYU KELAS I Rp. 47,698.88

V. PEKERJAAN ATAP
1 1 M1 PEKERJAAN PASANG ALUMINIUM FOIL Rp. 83,167.35
2 1 M1 PEKERJAAN PASANG KAWAT WIREMESH 2 MM BAWAH ALUMINIUM FOIL Rp. 136,785.60
3 1 M1 PASANG PENUTUP ATAP SPANDEK Rp. 315,886.20
4 1 M1 PASANG BUBUNGAN ATAP SPANDEK Rp. 184,848.30

VI. HARGA SATUAN PEKERJAAN TANAH DAN PASANGAN


1 1 M2 PASANGAN BATAKO CAMP. 1 PC : 4 PS Rp. 315,971.25
2 1 M2 PASANGAN BATA MERAH CAMP. 1 PC : 5 PS Rp. 223,518.75
3 MEMASANG 1 BH GLASS BLOCK Rp. 59,483.76
4 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 83,776.35
5 1 M2 PEKERJAAN ACIAN Rp. 47,922.00

VII. HARGA SATUAN PEKERJAAN BETON


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87 Rp. 1,925,742.23
2 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72 Rp. 2,078,342.23
3 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56 Rp. 2,325,970.00
4 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52 Rp. 2,404,220.00
5 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 321,358.80
PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 32,135.88
6 1 M2 PASANG WIREMESH M8 1 LAPIS Rp. 110,014.19

52 / 89 - (Rekap Daftar Harga)


NO URAIAN PEKERJAAN HARGA

1 2 3
7 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 253,519.61
8 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 524,433.00
9 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 541,443.00
10 1 M2 PASANG BEKISTING UNTUK LANTAI MENGGUNAKAN FLOOR DECK Rp. 594,602.88
11 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 697,241.74
12 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 453,078.41
13 1 M2 PASANG FLOOR DECK Rp. 605,627.88
14 MEMBUAT 1 M1 KOLOM PRAKTIS BETON BERTULANG 11 X 11 CM Rp. 170,904.62
15 MEMBUAT 1 M1 BALOK PRAKTIS BETON BERTULANG 10 X 15 CM Rp. 202,169.26

VIII. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


1 PEMASANGAN 1 M2 GRANITE TILE 60 X 60 CM Rp. 432,930.75
2 MEMASANG 1 M' PLIN GRANITE 10 X 60 CM Rp. 89,683.46
3 1 M2 PASANG LANTAI KERAMIK 50 X 50 CM Rp. 309,597.75
4 1 M1 PASANG PLIN KERAMIK 10X50 CM Rp. 97,143.27
5 1 M2 PASANG DINDING KERAMIK 25 X 40 CM Rp. 326,648.57
6 1 M2 PASANG EPOXY LANTAI TEBAL 1500 MICRON Rp. 533,245.13
7 1 M2 PASANGAN DINDING PEMISAH GYPSUM RANGKA METAL STUD Rp. 384,440.72

IX. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 1 M2 PASANG LANGIT-LANGIT GYPSUM RANGKA HOLLOW Rp. 692,567.94
2 1 M2 PASANG LANGIT-LANGIT KALSIBOARD RANGKA HOLLOW Rp. 692,915.74
3 1 M' PEKERJAAN PASANGAN LIST PLAPOND GYPSUM 5/5 CM Rp. 55,505.10
4 1 M' PEKERJAAN PASANGAN LIST PLAPOND GYPSUM 7/7 CM Rp. 91,336.35

X. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


1 PEMASANGAN 1 M1 KUSEN ALUMINIUM Rp. 300,055.25
2 PEMASANGAN 1 M2 PINTU ALUMINIUM Rp. 1,576,701.00
#NAME? 1 KG PASANG BESI PROFIL Rp. 57,253.35
2 1 BH PASANG ANCHOR D 25 P=800 MM Rp. 33,988.50
3 1 BH PASANG BOLT D 19 HTB A325N Rp. 299,070.45
4 1 M2 PASANG REILLING DARI BESI HOLLOW FINISH CAT Rp. 1,364,640.38
5 PEMBUATAN DAN PEMASANGAN 1 M2 TUTUP GROUND TANK DARI PLAT BESI Rp. 812,317.80
6 PEMBUATAN DAN PEMASANGAN 1 M2 PINTU BAJA RANGKA BESI HOLLOW Rp. 2,566,674.43
7 PEMBUATAN DAN PEMASANGAN 1 M1 TANGGA DARI PIPA GALVANIS Rp. 399,333.38
8 1 M2 MEMASANG RANGKA KUDA - KUDA BAJA RINGAN C 75 Rp. 8,221,873.18

XI. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 PEMASANGAN 1 BUAH KUNCI TANAM BIASA Rp. 502,314.75
2 PEMASANGAN 1 BUAH ENGSEL PINTU Rp. 108,450.51
3 PEMASANGAN 1 BUAH ENGSEL JENDELA Rp. 70,333.73
4 PEMASANGAN 1 BUAH GRENDEL JENDELA Rp. 82,188.23
5 PEMASANGAN 1 BUAH KAIT ANGIN Rp. 67,249.35
6 MEMASANG 1 BH DOOR CLOSER Rp. 241,517.85
7 1 M2 PASANG KACA 5 MM Rp. 635,430.60

XII. HARGA SATUAN PEKERJAAN PENGECATAN


1 1 M2 PENGECATAN TEMBOK BARU DULUX INTERIOR Rp. 67,886.91
(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

53 / 89 - (Rekap Daftar Harga)


NO URAIAN PEKERJAAN HARGA

1 2 3
2 1 M2 PENGECATAN TEMBOK BARU EXTERIOR EX. DULUX WEATHERSIELD Rp. 187,684.56
(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
3 PELABURAN 1 M2 BIDANG KAYU DENGAN POLITUR Rp. 127,288.35
4 1 M2 PENGECATAN DINDING DENGAN WATERPROOFING Rp. 36,970.71
5 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA Rp. 51,866.85

XIII. HARGA SATUAN PEKERJAAN SANITASI


1 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp. 46,832.63
2 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 53,331.08
3 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" Rp. 91,981.58
4 MEMASANG 1 BUAH KLOSET DUDUK Rp. 2,507,867.25
5 MEMASANG 1 BUAH KRAN WASHTAFEL BIASA Rp. 581,369.25
6 MEMASANG 1 BUAH WASHTAFEL GANTUNG LENGKAP ACCESORIS Rp. 5,887,268.31
7 MEMASANG 1 BUAH JET WHASER Rp. 350,579.25
8 MEMASANG 1 BUAH KRAN AIR Rp. 90,179.25
9 MEMASANG 1 BUAH FLOORDRAIN Rp. 373,952.25
10 PEMBUATAN 1 UNIT SEPTICTANK DAN RESAPAN Rp. 23,164,851.39

XIV. HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 378,850.50
2 PEMASANGAN 1 M1 KABEL POWER POMPA AIR/LAMPU Rp. 42,605.33
3 PEMASANGAN 1 BH BOX PANEL MCB Rp. 14,239,050.00
4 PEMASANGAN 1 M1 KABEL POWER UDARA Rp. 2,596,348.13
5 PEMASANGAN 1 UNIT TIANG LISTRIK 8 METER Rp. 4,112,516.21
6 PEMASANGAN 1 SET CAMERA CCTV Rp. 87,164,245.35
7 PEMBUATAN DAN PEMASANGAN 1 UNIT SELING DAN KATROL LAMPU GUDANG Rp. 76,545,960.75
8 PEMASANGAN 1 BH LAMPU GUDANG Rp. 644,091.00
9 PEMASANGAN 1 BH LAMPU LED CEILLING PLAFOND 20 WATT Rp. 326,077.50
10 PEMASANGAN 1 BH LAMPU LED BARET 20 WATT Rp. 1,578,517.50
11 PEMASANGAN 1 SET FITTING + LAMPU LED 10 WATT Rp. 578,917.50
12 PEMASANGAN 1 BH LAMPU DINDING (LAMPU KAPAL) LED 16 WATT Rp. 151,074.00
13 PEMASANGAN 1 BH LAMPU SOROT LED 100 WATT Rp. 1,903,387.50
14 PEMASANGAN 1 SET LAMPU TAMAN LED 33 WATT + RUMAH + TIANG Rp. 1,767,084.34
15 PEMASANGAN 1 BH SAKLAR TUNGGAL Rp. 87,517.50
16 PEMASANGAN 1 BH SAKLAR GANDA Rp. 87,517.50
17 PEMASANGAN 1 BH SAKLAR 3 Rp. 96,442.50
18 PEMASANGAN 1 BH STOP KONTAK Rp. 152,617.50
19 PEMASANGAN 1 BH STOP KONTAK AC Rp. 152,617.50
20 PEMASANGAN 1 UNIT TURBINE VENTILATOR TURBINE Rp. 3,234,071.66
21 PEMASANGAN 1 UNIT PENANGKAL PETIR (1 BLITZEM+3 TOMBAK+PIT BOX CONTROL) Rp. 180,249,413.40

XV. HARGA SATUAN PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 20/20 CM TEBAL 8 CM K-300 Rp. 167,965.04
2 1 M1 PASANGAN KANSTIN BETON Rp. 279,095.25
3 PENANAMAN 1 POHON JEPUN Rp. 750,750.00
4 PENANAMAN 1 POHON TABEBUYA Rp. 57,750.00
5 PENANAMAN 1 POHON JEMPIRING Rp. 15,015.00
6 PENANAMAN 1 POHON KEMBANG KERTAS Rp. 13,860.00
7 PENANAMAN 1 M2 RUMPUT MUTIARA/JEPANG Rp. 23,100.00

54 / 89 - (Rekap Daftar Harga)


NO URAIAN PEKERJAAN HARGA

1 2 3

XVI. HARGA SATUAN PEKERJAAN LAIN-LAIN (TAMBAHAN)


1 PEMASANGAN 1 UNIT TANGKI AIR KAPASITAS 3600 LT Rp. 9,142,623.00
2 PEMASANGAN 1 UNIT TANGKI AIR KAPASITAS 1350 LT Rp. 12,512,304.00
3 PEMASANGAN 1 UNIT POMPA AIR PENDORONG Rp. 10,857,304.50
4 PEMASANGAN 1 UNIT POMPA AIR SUBMERSIBLE Rp. 81,189,912.56
5 1 M1 PEKERJAAN SUMUR BOR Rp. 821,835.11

55 / 89 - (Rekap Daftar Harga)


DAFTAR KUANTITAS DAN HARGA (DKH)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME
Rp. Rp.

I. PEKERJAAN PERSIAPAN
1 Persiapan perlengkapan kesehatan dan keselamatan kerja (K3)
-Helm Proyek 26.00 Bh 100,000.00 2,600,000.00
-Rompi Proyek (Safety Rompi) 26.00 Bh 500,000.00 13,000,000.00
-Masker Proyek 26.00 Bh 10,000.00 260,000.00
-Sabuk Penggantung (Safety Belt) 20.00 Bh 55,000.00 1,100,000.00
-Kaca Mata Las 10.00 Bh 45,000.00 450,000.00
-Sarung Tangan Safety 26.00 Ps 20,000.00 520,000.00
-Sepatu Proyek (Safety Boot) 26.00 Ps 350,000.00 9,100,000.00
-Kotak P3K 1.00 Set 500,000.00 500,000.00
-Rambu-rambu 1.00 Set 500,000.00 500,000.00
2 Pek. Penerabasan semak area lahan 2,392.00 M2 6,242.25 14,931,462.00
3 Pek. Pembongkaran bangunan existing 69.00 M3 766,118.85 52,862,200.65
4 Pek. Cut dan fill area bangunan 358.80 M3 111,350.40 39,952,523.52
5 Pek. Pembongkaran pagar BRC existing 60.00 M1 42,496.13 2,549,767.50
6 Pek. Pengukuran dan bowplank 185.00 M1 86,172.82 15,941,971.24
7 Pek. Sewa mobil Crane 1.00 Bln 175,000,000.00 175,000,000.00
329,267,924.91
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian tanah pondasi menerus 15.45 M3 169,407.00 2,617,338.15
2 Pek. Galian tanah pondasi setempat 121.09 M3 169,407.00 20,513,493.63
3 Pek. Galian tanah sloof dan saluran 51.32 M3 169,407.00 8,693,967.24
4 Pek. Galian tanah ground tank 24.51 M3 169,407.00 4,152,165.57
5 Pek. Urugan kembali pondasi 20.48 M3 62,422.50 1,278,412.80
6 Pek. Urugan pasir bawah pondasi, sloof dan saluran 28.98 M3 663,484.50 19,227,780.81
7 Pek. Urugan pasir bawah lantai dan ground tank 139.48 M3 663,484.50 92,542,818.06
8 Pek. Urugan limestone peninggian lantai 272.82 M3 663,484.50 181,011,841.29
9 Pek. Urugan tanah subur 29.48 M3 474,484.50 13,987,803.06
344,025,620.61
III. PEKERJAAN PONDASI
1 Pek. Pasangan Batu kosong 1.80 M3 1,003,769.55 1,806,785.19
2 Pek. Pasangan Pondasi batu karang 1 : 5 7.32 M3 1,443,513.75 10,566,520.65
12,373,305.84
IV. PEKERJAAN BETON
1 Pekerjaan beton lantai kerja K-100 86.25 M3 1,925,742.23 166,095,266.91
2 Pekerjaan beton pondasi setempat 150/150
- Pek. Bekisting batako 27.00 M2 315,971.25 8,531,223.75
- Pek. Pembesian 1,978.11 Kg 32,135.88 63,568,305.59
- Pek. Beton K-250 16.20 M3 2,325,970.00 37,680,714.05
3 Pekerjaan beton pondasi setempat tower
- Pek. Bekisting batako 3.00 M2 315,971.25 947,913.75
- Pek. Pembesian 378.16 Kg 32,135.88 12,152,504.38
- Pek. Beton K-250 3.60 M3 2,325,970.00 8,373,492.01
4 Pekerjaan beton kolom pedestal 50/50
- Pek. Bekisting kayu 2 kali pakai 46.20 M2 314,659.80 14,537,282.76
- Pek. Pembesian 842.87 Kg 32,135.88 27,086,369.18
- Pek. Beton K-250 5.78 M3 2,325,970.00 13,444,106.62
5 Pekerjaan beton kolom pedestal dan tower 30/30
- Pek. Bekisting kayu 2 kali pakai 54.72 M2 314,659.80 17,218,184.26
- Pek. Pembesian 834.26 Kg 32,135.88 26,809,679.25
- Pek. Beton K-250 4.10 M3 2,325,970.00 9,536,477.01
6 Pekerjaan beton sloof 25/40
- Pek. Bekisting 2 kali pakai 362.82 M2 152,111.77 55,189,191.48
- Pek. Pembesian 9,519.58 Kg 32,135.88 305,920,080.53
- Pek. Beton K-250 45.35 M3 2,325,970.00 105,482,739.63
7 Pekerjaan beton sloof 20/30

56 /89 (DKH)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
Rp. Rp.

- Pek. Bekisting 2 kali pakai 226.91 M2 152,111.77 34,515,681.16


- Pek. Pembesian 4,884.74 Kg 32,135.88 156,975,418.47
- Pek. Beton K-250 22.69 M3 2,325,970.00 52,776,259.36
8 Pekerjaan beton balok 20/30
- Pek. Bekisting 9.60 M2 541,443.00 5,197,852.80
- Pek. Pembesian 143.94 Kg 32,135.88 4,625,638.57
- Pek. Beton K-250 0.72 M3 2,325,970.00 1,674,698.40
9 Pekerjaan beton plat lantai 1
- Pek. Pembesian Wiremesh M-8 1,530.00 M2 110,014.19 168,321,711.83
- Pek. Beton K-250 163.69 M3 2,325,970.00 380,738,029.75
10 Pekerjaan beton tangga
- Pek. Bekisting 17.00 M2 453,078.41 7,702,333.01
- Pek. Pembesian 289.64 Kg 32,135.88 9,307,836.28
- Pek. Beton K-250 2.25 M3 2,325,970.00 5,233,432.51
11 Pekerjaan beton plat lantai 2
- Pek. Bekisting floor deck 59.50 M2 594,602.88 35,378,871.54
- Pek. Pembesian Wiremesh M-8 59.50 M2 110,014.19 6,545,844.35
- Pek. Beton K-250 7.90 M3 2,325,970.00 18,375,163.02
12 Pekerjaan beton plat lantai tower dan atap rumah pompa
- Pek. Bekisting 10.11 M2 697,241.74 7,049,113.97
- Pek. Pembesian Wiremesh M-8 8.07 M2 110,014.19 887,814.52
- Pek. Beton K-250 0.90 M3 2,325,970.00 2,093,373.00
13 Pekerjaan beton RAMP
- Pek. Pembesian Wiremesh M-8 97.20 M2 110,014.19 10,693,379.34
- Pek. Beton K-250 4.86 M3 2,325,970.00 11,304,214.21
14 Pekerjaan beton lantai ground tank
- Pek. Pembesian Wiremesh M-8 8.41 M2 110,014.19 925,219.34
- Pek. Beton K-250 0.84 M3 2,325,970.00 1,953,814.80
15 Pekerjaan beton saluran dan plat penutup saluran
- Pek. Bekisting 2 kali pakai 171.93 M2 152,111.77 26,152,576.19
- Pek. Pembesian (saluran) 968.84 Kg 32,135.88 31,134,525.98
- Pek. Pembesian Wiremesh M-8 (penutup saluran) 22.87 M2 110,014.19 2,516,024.54
- Pek. Beton K-150 21.16 M3 2,078,342.23 43,977,721.48
16 Pekerjaan beton kolom praktis 446.50 M1 170,904.62 76,308,910.60
17 Pekerjaan beton ring praktis 183.20 M1 202,169.26 37,037,407.97
2,011,976,398.15
V. PEKERJAAN PASANGAN, PLESTERAN DAN ACIAN
1 Pas. Dinding Batako 1 : 5 1,082.78 M2 315,971.25 342,127,350.08
2 Pek. Pasang glass block 405.00 Bh 59,483.76 24,090,922.80
3 Pek. Plesteran 1 : 5 2,134.37 M2 83,776.35 178,809,728.15
4 Pek. Acian 2,180.03 M2 47,922.00 104,471,397.66
649,499,398.68
VI. PEKERJAAN PLAFOND LANTAI DAN DINDING
1 Pek. Finish epoxy lantai gudang tebal 1500 micron 1,505.16 M2 533,245.13 802,619,232.35
2 Pek. Pasang dinding kalsiboard rangka hollow 313.76 M2 692,915.74 217,409,241.80
3 Pek. Pasang plafond gypsum rangka hollow 44.54 M2 692,567.94 30,846,975.85
4 Pek. Pasang list plafond gypsum 7/7 cm 33.80 M2 91,336.35 3,087,168.63
5 Pek. Pasang list plafond gypsum 5/5 cm 12.80 M2 55,505.10 710,465.28
6 Pek. Pasang granite tile 60/60 cm 81.95 M2 432,930.75 35,478,674.96
7 Pek. Pasang plin granite 10/60 cm 29.20 M1 89,683.46 2,618,757.11
8 Pek. Pasang keramik lantai KM 50/50 cm 5.00 M2 309,597.75 1,547,988.75
9 Pek. Pasang keramik dinding KM 25/40 cm 34.31 M2 326,648.57 11,207,312.45
1,105,525,817.17
VII. PEKERJAAN KUSEN DAN PENGGANTUNG
1 Pek. Pasang kusen aluminium 39.06 M2 300,055.25 11,720,157.87
2 Pek. Pasang daun pintu aluminium KM 2.94 M2 1,576,701.00 4,635,500.94
3 Pek. Pasang daun pintu multiplek lapis HPL 3.15 M2 932,951.25 2,938,796.44
4 Pek. Pasang daun jendela aluminium kaca 3.36 M2 1,576,701.00 5,297,715.36
5 Pek. Pasang kaca 5 mm 4.95 M2 635,430.60 3,145,381.47
6 Pek. Pasang engsel pintu 10.00 Bh 108,450.51 1,084,505.10
7 Pek. Pasang engsel jendela 8.00 Bh 70,333.73 562,669.80
8 Pek. Pasang grendel jendela 4.00 Bh 82,188.23 328,752.90

57 /89 (DKH)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
Rp. Rp.

9 Pek. Pasang kait angin jendela 8.00 Bh 67,249.35 537,994.80


10 Pek. Pasang door closer 1.00 Bh 241,517.85 241,517.85
11 Pek. Pasang kunci+hendle pintu 3.00 Bh 502,314.75 1,506,944.25
12 Pek. Pasang reiling hollow tangga dan teras 29.79 M2 1,364,640.38 40,652,636.77
13 Pek. Pasang pintu hollow rumah pompa 0.85 M2 1,364,640.38 1,159,944.32
14 Pek. Pasang baja penutup ground tank 8.41 M2 812,317.80 6,831,592.70
80,644,110.57
VIII. PEKERJAAN BAJA DAN ATAP
1 Pek. Baja H-beam 400x400x13x21 mm (kolom) 17,578.40 Kg 57,253.35 1,006,422,287.64
2 Pek.
Pek.Baja
BajaIWF
H-beam 250X250x9x14
600x200x8x13 mm (kolom)
mm (castellated) 941.20 Kg 57,253.35 53,886,853.02
3 Pek. Baja IWF 450X150X6.5X9 mm (castellated) 3,907.20 Kg 57,253.35 223,700,289.12
4 3,739.00 Kg 57,253.35 214,070,275.65
5 Pek.
Pek.Baja
BajaIWF
IWF396X199x6x11
450x200x9x14 mm
mm (plat
(kuda-kuda)
lantai) 19,152.00 Kg 57,253.35 1,096,516,159.20
6 Pek. Baja IWF 298X149X5.5X8 mm (top ring) 1,847.33 Kg 57,253.35 105,765,831.06
7 Pek. Baja IWF 298X149x5.5x8 mm (skur) 1,632.00 Kg 57,253.35 93,437,467.20
8 Pek. Baja IWF 198X99x4.5x7 mm (plat lantai) 1,129.60 Kg 57,253.35 64,673,384.16
9 282.10 Kg 57,253.35 16,151,170.04
10 Pek.
Pek.Baja
Bajagording
IWF 198X99x4.5x7 mm (tangga)
CNP 200x75x20X3.2 mm 411.32 Kg 57,253.35 23,549,447.92
11 Pek. Trekstang ∅10 mm 11,094.34 Kg 57,253.35 635,188,131.04
12 Pek. Kait angin ∅10 mm 432.78 Kg 57,253.35 24,778,104.81
13 Pek. Baja plate 6 mm 251.53 Kg 57,253.35 14,400,935.13
14 Pek. Baja plate 9 mm 2,630.01 Kg 57,253.35 150,576,883.03
15 Pek. Baja plate 13 mm 716.54 Kg 57,253.35 41,024,315.41
16 368.26 Kg 57,253.35 21,084,118.67
17 Pek. Baja plate 15 mm 115.87 Kg 57,253.35 6,633,945.66
18 Pek.
Pek.Anchor
Baja plate
D 2525P=800
mm mm 1,020.50 Kg 57,253.35 58,427,043.68
19 Pek. Bolt D 19 HTB A325N 240.00 Bh 33,988.50 8,157,240.00
20 1,416.00 Bh 299,070.45 423,483,757.20
21 Pek. Pasang pintu baja gudang 83.00 M2 2,566,674.43 213,033,977.28
22 Pek. Pasang tangga besi tower 10.50 M1 399,333.38 4,193,000.44
23 Pek. Pasang tangga besi groundtank 8.00 M1 399,333.38 3,194,667.00
24 Pek. Kuda-kuda baja ringan profil C 5.29 M2 8,221,873.18 43,493,709.11
25 Pek. Penutup atap spandek 2,009.42 M2 315,886.20 634,748,048.00
26 Pek. Bubungan atap spandek 60.40 M1 184,848.30 11,164,837.32
27 Pek. Lapisan aluminium foil 2,001.92 M2 83,167.35 166,494,381.31
28 Pek. Lapisan kawat wiremesh bawah aluminium foil 2,001.92 M2 136,785.60 273,833,828.35
5,632,084,088.44
IX. PEKERJAAN LISTRIK
1 Pek. Pasang kabel power udara 200.00 M1 2,596,348.13 519,269,625.00
2 Pek. Pasang tiang listrik kabel power 4.00 Unt 4,112,516.21 16,450,064.85
3 Pek. Pasang panel MCB 1.00 Unt 14,239,050.00 14,239,050.00
4 Pek. Pasang intalasi titik lampu 45.00 Ttk 378,850.50 17,048,272.50
5 Pek. Pasang intalasi stop kontak 4.00 Ttk 378,850.50 1,515,402.00
6 Pek. Pasang intalasi stop kontak AC 2.00 Ttk 378,850.50 757,701.00
7 Pek. Pasang lampu LED ceiling plafond 20 Watt 8.00 Bh 326,077.50 2,608,620.00
8 Pek. Pasang lampu LED 10 Watt+fitting 2.00 Bh 578,917.50 1,157,835.00
9 Pek. Pasang lampu gudang Mercury 400 watt 18.00 Bh 644,091.00 11,593,638.00
10 Pek. Pasang lampu baret LED 20 watt 2.00 Bh 1,578,517.50 3,157,035.00
11 Pek. Pasang lampu dinding LED 16 watt 2.00 Bh 151,074.00 302,148.00
12 Pek. Pasang lampu sorot LED 100 watt 5.00 Bh 1,903,387.50 9,516,937.50
13 Pek. Pasang lampu taman LED 33 Watt +rumah+tiang 8.00 Set 1,767,084.34 14,136,674.76
14 Pek. Pasang kabel tambahan lampu gudang 90.00 M1 42,605.33 3,834,479.25
15 Pek. Pasang sling dan katrol lampu gudang 18.00 Unt 76,545,960.75 1,377,827,293.50
16 Pek. Pasang saklar tunggal 2.00 Bh 87,517.50 175,035.00
17 Pek. Pasang saklar ganda 8.00 Bh 87,517.50 700,140.00
18 Pek. Pasang saklar 3 7.00 Bh 96,442.50 675,097.50
19 Pek. Pasang stop kontak 4.00 Bh 152,617.50 610,470.00
20 Pek. Pasang stop kontak AC 2.00 Bh 152,617.50 305,235.00
21 Pek. Pasang kamera CCTV 1.00 Set 87,164,245.35 87,164,245.35
22 Pek. Pasang turbine ventilator cyclone 20.00 Bh 3,234,071.66 64,681,433.25
23 Pek. Pasang penangkal petir (3 tombak) 1.00 Unt 180,249,413.40 180,249,413.40
2,327,975,845.86

58 /89 (DKH)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
Rp. Rp.

X. PEKERJAAN SANITAIR
1 Pek. Pasang intalasi air pipa PVC AW 1/2" 16.00 M1 46,832.63 749,322.00
2 Pek. Pasang intalasi air pipa PVC AW 1" 24.00 M1 46,832.63 1,123,983.00
3 Pek. Pasang intalasi air pipa PVC AW 2" 28.00 M1 53,331.08 1,493,270.10
4 Pek. Pasang intalasi air pipa PVC AW 3" 24.00 M1 91,981.58 2,207,557.80
5 Pek. Pasang washtafel gantung+kran 1.00 Set 5,887,268.31 5,887,268.31
6 Pek. Pasang kloset duduk 2.00 Bh 2,507,867.25 5,015,734.50
7 Pek. Pasang jetwhaser 2.00 Bh 350,579.25 701,158.50
8 Pek. Pasang kran air 3.00 Bh 90,179.25 270,537.75
9 Pek. Pasang floor drain 2.00 Bh 373,952.25 747,904.50
10 Pek. Septictank 1.00 Unt 23,164,851.39 23,164,851.39
41,361,587.85
XI. PEKERJAAN PENGECATAN
1 Pek. Pengecatan baja Zinchromate 2,196.38 M2 51,866.85 113,919,312.00
2 Pek. Pengecatan dinding baru Dulux Interior 1,213.66 M2 67,886.91 82,391,627.19
3 Pek. Pengecatan dinding baru Dulux Weathershield 1,437.00 M2 187,684.56 269,702,712.72
4 Pek. Pengecatan plafond baru Dulux Interior 44.54 M2 67,886.91 3,023,682.97
469,037,334.89
XII. PEKERJAAN LANDSCAPE
1 Pek. Paving 20x20 tebal 8 cm K-300 683.85 M2 167,965.04 114,862,889.18
2 Pek. Pasang kanstin beton 116.00 M1 279,095.25 32,375,049.00
3 Pek. Penanaman Pohon Tabebuya/Chrysotricha sp 5.00 Pohon 57,750.00 288,750.00
4 Pek. Penanaman Pohon Jepun/Plumeria Rubra 4.00 Pohon 750,750.00 3,003,000.00
5 Pek. Penanaman Jempiring/Gardenia jasminioides 25.00 Pohon 15,015.00 375,375.00
6 Pek. Penanaman Kembang Kertas Daun Kecil/Bogenvile small leave 14.00 Pohon 13,860.00 194,040.00
7 Pek. Penanaman Rumput Jepang 35.00 M2 23,100.00 808,500.00
151,907,603.18
XIII. PEKERJAAN TANGKI AIR, SUMUR BOR DAN POMPA AIR
1 Pek. Pasang tangki air plastik kapasitas 3600 ltr (ground tank) 1.00 Unt 9,142,623.00 9,142,623.00
2 Pek. Pasang stainless stell kapasitas 1500 ltr (tower) 1.00 Unt 12,512,304.00 12,512,304.00
3 Pek. Pasang instalasi air bersih pipa PVC AW 2" 32.00 M1 53,331.08 1,706,594.40
4 Pek. Pasang instalasi listrik pompa air Kabel NYM 3 x 2,5 mm 90.00 M1 42,605.33 3,834,479.25
5 Pek. Sumur bor + cassing pipa PVC AW 6" 85.00 M1 821,835.11 69,855,983.93
6 Pek. Pasang pompa submersible Grundfos 1.00 Unt 81,189,912.56 81,189,912.56
7 Pek. Pasang pompa air pendorong 1.00 Unt 10,857,304.50 10,857,304.50
189,099,201.64
TOTAL PEKERJAAN GUDANG 13,344,778,237.79

59 /89 (DKH)
REKAPITULASI
PEMBANGUNAN GUDANG MULTIFUNGSI TAHUN 2022

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)

I. PEKERJAAN PERSIAPAN Rp 329,267,924.91

II. PEKERJAAN TANAH DAN PASIR Rp 344,025,620.61

III. PEKERJAAN PONDASI Rp 12,373,305.84

IV. PEKERJAAN BETON Rp 2,011,976,398.15

V. PEKERJAAN PASANGAN, PLESTERAN DAN ACIAN Rp 649,499,398.68

VI. PEKERJAAN PLAFOND LANTAI DAN DINDING Rp 1,105,525,817.17

VII. PEKERJAAN KUSEN DAN PENGGANTUNG Rp 80,644,110.57

VIII. PEKERJAAN BAJA DAN ATAP Rp 5,632,084,088.44

IX. PEKERJAAN LISTRIK Rp 2,327,975,845.86

X. PEKERJAAN SANITAIR Rp 41,361,587.85

XI. PEKERJAAN PENGECATAN Rp 469,037,334.89

XII. PEKERJAAN LANDSCAPE Rp 151,907,603.18

XIII. PEKERJAAN TANGKI AIR, SUMUR BOR DAN POMPA AIR Rp 189,099,201.64

JUMLAH HARGA Rp 13,344,778,237.79


PPN 10% Rp 1,334,477,823.78
JUMLAH HARGA Rp 14,679,256,061.57
DIBULATKAN Rp 14,679,256,000.00
Terbilang :
Empat Belas Milyar Enam Ratus Tujuh Puluh Sembilan Juta Dua Ratus Lima Puluh Enam Ribu
Rupiah,--

Ternate, 17 Agustus 2022


Penawar,
CV. RIFAGAS CHANTIK GROUP

MUHAMMAD RIFAI
Direktur
PROGRAM TERBILANG
Bilangan 14,679,256,000.00
Trilyun -
Ratus Milyar -
Puluhan Milyar 14,000,000,000.00
Ratus Juta 600,000,000.00
Puluhan Juta 79,000,000.00
Ratus Ribu 200,000.00
Puluhan Ribu 56,000.00
Ratusan -
Puluhan -
Rupiah -
Sen -
-

Cek Bilangan 14,679,256,000.00


Terbilang:
Hasil (akan keluar otomatis).
Empat Belas Milyar Enam Ratus Tujuh Puluh Sembilan Juta Dua Ratus Lima Puluh Enam Ribu Rupiah,--
16800000000

ILANG
-
1 Satu 10.00
2 Dua 20.00
Empat Belas Milyar 3 Tiga 30.00
Enam Ratus 4 Empat 40.00
Tujuh Puluh Sembilan Juta 5 Lima 50.00
Dua Ratus 6 Enam 60.00
Lima Puluh Enam Ribu 7 Tujuh 70.00
8 Delapan 80.00
9 Sembilan 90.00
Rupiah,-- 10 Sepuluh 100.00
11 Sebelas 200.00
12 Dua Belas 300.00
13 Tiga Belas 400.00
ok! 14 Empat Bela 500.00
15 Lima Belas 600.00
uta Dua Ratus Lima Puluh Enam Ribu Rupiah,-- 16 Enam Bela 700.00
17 Tujuh Bela 800.00
18 Delapan Be 900.00
19 Sembilan B 1,000.00
20 Dua Puluh 2,000.00
21 Dua Puluh 3,000.00
22 Dua Puluh 4,000.00
23 Dua Puluh 5,000.00
24 Dua Puluh 6,000.00
25 Dua Puluh 7,000.00
26 Dua Puluh 8,000.00
27 Dua Puluh 9,000.00
28 Dua Puluh 10,000.00
29 Dua Puluh 11,000.00
30 Tiga Puluh 12,000.00
31 Tiga Puluh 13,000.00
32 Tiga Puluh 14,000.00
33 Tiga Puluh 15,000.00
34 Tiga Puluh 16,000.00
35 Tiga Puluh 17,000.00
36 Tiga Puluh 18,000.00
37 Tiga Puluh 19,000.00
38 Tiga Puluh 20,000.00
39 Tiga Puluh 21,000.00
40 Empat Pulu 22,000.00
41 Empat Pulu 23,000.00
42 Empat Pulu 24,000.00
43 Empat Pulu 25,000.00
44 Empat Pulu 26,000.00
45 Empat Pulu 27,000.00
46 Empat Pul 28,000.00
47 Empat Pulu 29,000.00
48 Empat Pulu 30,000.00
49 Empat Pulu 31,000.00
50 Lima Puluh 32,000.00
51 Lima Puluh 33,000.00
52 Lima Puluh 34,000.00
53 Lima Puluh 35,000.00
54 Lima Puluh 36,000.00
55 Lima Puluh 37,000.00
56 Lima Puluh 38,000.00
57 Lima Puluh 39,000.00
58 Lima Puluh 40,000.00
59 Lima Puluh 41,000.00
60 Enam Pulu 42,000.00
61 Enam Puluh 43,000.00
62 Enam Pulu 44,000.00
63 Enam Puluh 45,000.00
64 Enam Pulu 46,000.00
65 Enam Puluh 47,000.00
66 Enam Pulu 48,000.00
67 Enam Puluh 49,000.00
68 Enam Puluh 50,000.00
69 Enam Puluh 51,000.00
70 Tujuh Pulu 52,000.00
71 Tujuh Pulu 53,000.00
72 Tujuh Pulu 54,000.00
73 Tujuh Puluh 55,000.00
74 Tujuh Pulu 56,000.00
75 Tujuh Pulu 57,000.00
76 Tujuh Pulu 58,000.00
77 Tujuh Pulu 59,000.00
78 Tujuh Pulu 60,000.00
79 Tujuh Pulu 61,000.00
80 Delapan Pu 62,000.00
81 Delapan Pu 63,000.00
82 Delapan Pu 64,000.00
83 Delapan Pu 65,000.00
84 Delapan Pu 66,000.00
85 Delapan Pu 67,000.00
86 Delapan Pu 68,000.00
87 Delapan Pu 69,000.00
88 Delapan Pu 70,000.00
89 Delapan Pu 71,000.00
90 Sembilan P 72,000.00
91 Sembilan P 73,000.00
92 Sembilan P 74,000.00
93 Sembilan P 75,000.00
94 Sembilan P 76,000.00
95 Sembilan P 77,000.00
96 Sembilan P 78,000.00
97 Sembilan P 79,000.00
98 Sembilan P 80,000.00
99 Sembilan P 81,000.00
82,000.00
83,000.00
84,000.00
85,000.00
86,000.00
87,000.00
88,000.00
89,000.00
90,000.00
91,000.00
92,000.00
93,000.00
94,000.00
95,000.00
96,000.00
97,000.00
98,000.00
99,000.00
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
2,000,000.00
3,000,000.00
4,000,000.00
5,000,000.00
6,000,000.00
7,000,000.00
8,000,000.00
9,000,000.00
10,000,000.00
11,000,000.00
12,000,000.00
13,000,000.00
14,000,000.00
15,000,000.00
16,000,000.00
17,000,000.00
18,000,000.00
19,000,000.00
20,000,000.00
21,000,000.00
22,000,000.00
23,000,000.00
24,000,000.00
25,000,000.00
26,000,000.00
27,000,000.00
28,000,000.00
29,000,000.00
30,000,000.00
31,000,000.00
32,000,000.00
33,000,000.00
34,000,000.00
35,000,000.00
36,000,000.00
37,000,000.00
38,000,000.00
39,000,000.00
40,000,000.00
41,000,000.00
42,000,000.00
43,000,000.00
44,000,000.00
45,000,000.00
46,000,000.00
47,000,000.00
48,000,000.00
49,000,000.00
50,000,000.00
51,000,000.00
52,000,000.00
53,000,000.00
54,000,000.00
55,000,000.00
56,000,000.00
57,000,000.00
58,000,000.00
59,000,000.00
60,000,000.00
61,000,000.00
62,000,000.00
63,000,000.00
64,000,000.00
65,000,000.00
66,000,000.00
67,000,000.00
68,000,000.00
69,000,000.00
70,000,000.00
71,000,000.00
72,000,000.00
73,000,000.00
74,000,000.00
75,000,000.00
76,000,000.00
77,000,000.00
78,000,000.00
79,000,000.00
80,000,000.00
81,000,000.00
82,000,000.00
83,000,000.00
84,000,000.00
85,000,000.00
86,000,000.00
87,000,000.00
88,000,000.00
89,000,000.00
90,000,000.00
91,000,000.00
92,000,000.00
93,000,000.00
94,000,000.00
95,000,000.00
96,000,000.00
97,000,000.00
98,000,000.00
99,000,000.00
100,000,000.00
200,000,000.00
300,000,000.00
400,000,000.00
500,000,000.00
600,000,000.00
700,000,000.00
800,000,000.00
900,000,000.00
1,000,000,000.00
2,000,000,000.00
3,000,000,000.00
4,000,000,000.00
5,000,000,000.00
6,000,000,000.00
7,000,000,000.00
8,000,000,000.00
9,000,000,000.00
10,000,000,000.00
11,000,000,000.00
12,000,000,000.00
13,000,000,000.00
14,000,000,000.00
15,000,000,000.00
16,000,000,000.00
17,000,000,000.00
18,000,000,000.00
19,000,000,000.00
20,000,000,000.00
21,000,000,000.00
22,000,000,000.00
23,000,000,000.00
24,000,000,000.00
25,000,000,000.00
26,000,000,000.00
27,000,000,000.00
28,000,000,000.00
29,000,000,000.00
30,000,000,000.00
31,000,000,000.00
32,000,000,000.00
33,000,000,000.00
34,000,000,000.00
35,000,000,000.00
36,000,000,000.00
37,000,000,000.00
38,000,000,000.00
39,000,000,000.00
40,000,000,000.00
41,000,000,000.00
42,000,000,000.00
43,000,000,000.00
44,000,000,000.00
45,000,000,000.00
46,000,000,000.00
47,000,000,000.00
48,000,000,000.00
49,000,000,000.00
50,000,000,000.00
51,000,000,000.00
52,000,000,000.00
53,000,000,000.00
54,000,000,000.00
55,000,000,000.00
56,000,000,000.00
57,000,000,000.00
58,000,000,000.00
59,000,000,000.00
60,000,000,000.00
61,000,000,000.00
62,000,000,000.00
63,000,000,000.00
64,000,000,000.00
65,000,000,000.00
66,000,000,000.00
67,000,000,000.00
68,000,000,000.00
69,000,000,000.00
70,000,000,000.00
71,000,000,000.00
72,000,000,000.00
73,000,000,000.00
74,000,000,000.00
75,000,000,000.00
76,000,000,000.00
77,000,000,000.00
78,000,000,000.00
79,000,000,000.00
80,000,000,000.00
81,000,000,000.00
82,000,000,000.00
83,000,000,000.00
84,000,000,000.00
85,000,000,000.00
86,000,000,000.00
87,000,000,000.00
88,000,000,000.00
89,000,000,000.00
90,000,000,000.00
91,000,000,000.00
92,000,000,000.00
93,000,000,000.00
94,000,000,000.00
95,000,000,000.00
96,000,000,000.00
97,000,000,000.00
98,000,000,000.00
99,000,000,000.00
100,000,000,000.00
200,000,000,000.00
300,000,000,000.00
400,000,000,000.00
500,000,000,000.00
600,000,000,000.00
700,000,000,000.00
800,000,000,000.00
900,000,000,000.00
1,000,000,000,000.00
2,000,000,000,000.00
3,000,000,000,000.00
4,000,000,000,000.00
5,000,000,000,000.00
6,000,000,000,000.00
7,000,000,000,000.00
8,000,000,000,000.00
9,000,000,000,000.00
10,000,000,000,000.00
Rupiah,-- - Sen
Sepuluh 0.01 Satu
Dua Puluh 0.01 Satu
Tiga Puluh 0.01 Satu
Empat Puluh 0.01 Satu
Lima Puluh 0.01 Satu
Enam Puluh 0.02 Dua
Tujuh Puluh 0.02 Dua
Delapan Puluh 0.02 Dua
Sembilan Puluh 0.02 Dua
Seratus 0.02 Dua
Dua Ratus 0.02 Dua
Tiga Ratus 0.02 Dua
Empat Ratus 0.02 Dua
Lima Ratus 0.02 Dua
Enam Ratus 0.02 Dua
Tujuh Ratus 0.03 Tiga
Delapan Ratus 0.03 Tiga
Sembilan Ratus 0.03 Tiga
Seribu 0.03 Tiga
Dua Ribu 0.03 Tiga
Tiga Ribu 0.03 Tiga
Empat Ribu 0.03 Tiga
Lima Ribu 0.03 Tiga
Enam Ribu 0.03 Tiga
Tujuh Ribu 0.03 Tiga
Delapan Ribu 0.04 Empat
Sembilan Ribu 0.04 Empat
Sepuluh Ribu 0.04 Empat
Sebelas Ribu 0.04 Empat
Dua Belas Ribu 0.04 Empat
Tiga Belas Ribu 0.04 Empat
Empat Belas Ribu 0.04 Empat
Lima Belas Ribu 0.04 Empat
Enam Belas Ribu 0.04 Empat
Tujuh Belas Ribu 0.04 Empat
Delapan Belas Ribu 0.05 Lima
Sembilan Belas Ribu 0.05 Lima
Dua Puluh Ribu 0.05 Lima
Dua Puluh Satu Ribu 0.05 Lima
Dua Puluh Dua Ribu 0.05 Lima
Dua Puluh Tiga Ribu 0.05 Lima
Dua Puluh Empat Ribu 0.05 Lima
Dua Puluh Lima Ribu 0.05 Lima
Dua Puluh Enam Ribu 0.05 Lima
Dua Puluh Tujuh Ribu 0.05 Lima
Dua Puluh Delapan Ribu 0.06 Enam
Dua Puluh Sembilan Ribu 0.06 Enam
Tiga Puluh Ribu 0.06 Enam
Tiga Puluh Satu Ribu 0.06 Enam
Tiga Puluh Dua Ribu 0.06 Enam
Tiga Puluh Tiga Ribu 0.06 Enam
Tiga Puluh Empat Ribu 0.06 Enam
Tiga Puluh Lima Ribu 0.06 Enam
Tiga Puluh Enam Ribu 0.06 Enam
Tiga Puluh Tujuh Ribu 0.06 Enam
Tiga Puluh Delapan Ribu 0.07 Tujuh
Tiga Puluh Sembilan Ribu 0.07 Tujuh
Empat Puluh Ribu 0.07 Tujuh
Empat Puluh Satu Ribu 0.07 Tujuh
Empat Puluh Dua Ribu 0.07 Tujuh
Empat Puluh Tiga Ribu 0.07 Tujuh
Empat Puluh Empat Ribu 0.07 Tujuh
Empat Puluh Lima Ribu 0.07 Tujuh
Empat Puluh Enam Ribu 0.07 Tujuh
Empat Puluh Tujuh Ribu 0.07 Tujuh
Empat Puluh Delapan Ribu 0.08 Delapan
Empat Puluh Sembilan Ribu 0.08 Delapan
Lima Puluh Ribu 0.08 Delapan
Lima Puluh Satu Ribu 0.08 Delapan
Lima Puluh Dua Ribu 0.08 Delapan
Lima Puluh Tiga Ribu 0.08 Delapan
Lima Puluh Empat Ribu 0.08 Delapan
Lima Puluh Lima Ribu 0.08 Delapan
Lima Puluh Enam Ribu 0.08 Delapan
Lima Puluh Tujuh Ribu 0.08 Delapan
Lima Puluh Delapan Ribu 0.09 Sembilan
Lima Puluh Sembilan Ribu 0.09 Sembilan
Enam Puluh Ribu 0.09 Sembilan
Enam Puluh Satu Ribu 0.09 Sembilan
Enam Puluh Dua Ribu 0.09 Sembilan
Enam Puluh Tiga Ribu 0.09 Sembilan
Enam Puluh Empat Ribu 0.09 Sembilan
Enam Puluh Lima Ribu 0.09 Sembilan
Enam Puluh Enam Ribu 0.09 Sembilan
Enam Puluh Tujuh Ribu 0.09 Sembilan
Enam Puluh Delapan Ribu 0.10 Sepuluh
Enam Puluh Sembilan Ribu 0.10 Sepuluh
Tujuh Puluh Ribu 0.10 Sepuluh
Tujuh Puluh Satu Ribu 0.10 Sepuluh
Tujuh Puluh Dua Ribu 0.10 Sepuluh
Tujuh Puluh Tiga Ribu 0.10 Sepuluh
Tujuh Puluh Empat Ribu 0.10 Sepuluh
Tujuh Puluh Lima Ribu 0.10 Sepuluh
Tujuh Puluh Enam Ribu 0.10 Sepuluh
Tujuh Puluh Tujuh Ribu 0.10 Sepuluh
Tujuh Puluh Delapan Ribu 0.11 Sebelas
Tujuh Puluh Sembilan Ribu 0.11 Sebelas
Delapan Puluh Ribu 0.11 Sebelas
Delapan Puluh Satu Ribu 0.11 Sebelas
Delapan Puluh Dua Ribu 0.11 Sebelas
Delapan Puluh Tiga Ribu 0.11 Sebelas
Delapan Puluh Empat Ribu 0.11 Sebelas
Delapan Puluh Lima Ribu 0.11 Sebelas
Delapan Puluh Enam Ribu 0.11 Sebelas
Delapan Puluh Tujuh Ribu 0.11 Sebelas
Delapan Puluh Delapan Ribu 0.12 Dua Belas
Delapan Puluh Sembilan Ribu 0.12 Dua Belas
Sembilan Puluh Ribu 0.12 Dua Belas
Sembilan Puluh Satu Ribu 0.12 Dua Belas
Sembilan Puluh Dua Ribu 0.12 Dua Belas
Sembilan Puluh Tiga Ribu 0.12 Dua Belas
Sembilan Puluh Empat Ribu 0.12 Dua Belas
Sembilan Puluh Lima Ribu 0.12 Dua Belas
Sembilan Puluh Enam Ribu 0.12 Dua Belas
Sembilan Puluh Tujuh Ribu 0.12 Dua Belas
Sembilan Puluh Delapan Ribu 0.13 Tiga Belas
Sembilan Puluh Sembilan Ribu 0.13 Tiga Belas
Seratus 0.13 Tiga Belas
Dua Ratus 0.13 Tiga Belas
Tiga Ratus 0.13 Tiga Belas
Empat Ratus 0.13 Tiga Belas
Lima Ratus 0.13 Tiga Belas
Enam Ratus 0.13 Tiga Belas
Tujuh Ratus 0.13 Tiga Belas
Delapan Ratus 0.13 Tiga Belas
Sembilan Ratus 0.14 Empat Belas
Satu Juta 0.14 Empat Belas
Dua Juta 0.14 Empat Belas
Tiga Juta 0.14 Empat Belas
Empat Juta 0.14 Empat Belas
Lima Juta 0.14 Empat Belas
Enam Juta 0.14 Empat Belas
Tujuh Juta 0.14 Empat Belas
Delapan Juta 0.14 Empat Belas
Sembilan Juta 0.14 Empat Belas
Sepuluh Juta 0.15 Lima Belas
Sebelas Juta 0.15 Lima Belas
Dua Belas Juta 0.15 Lima Belas
Tiga Belas Juta 0.15 Lima Belas
Empat Belas Juta 0.15 Lima Belas
Lima Belas Juta 0.15 Lima Belas
Enam Belas Juta 0.15 Lima Belas
Tujuh Belas Juta 0.15 Lima Belas
Delapan Belas Juta 0.15 Lima Belas
Sembilan Belas Juta 0.15 Lima Belas
Dua Puluh Juta 0.16 Enam Belas
Dua Puluh Satu Juta 0.16 Enam Belas
Dua Puluh Dua Juta 0.16 Enam Belas
Dua Puluh Tiga Juta 0.16 Enam Belas
Dua Puluh Empat Juta 0.16 Enam Belas
Dua Puluh Lima Juta 0.16 Enam Belas
Dua Puluh Enam Juta 0.16 Enam Belas
Dua Puluh Tujuh Juta 0.16 Enam Belas
Dua Puluh Delapan Juta 0.16 Enam Belas
Dua Puluh Sembilan Juta 0.16 Enam Belas
Tiga Puluh Juta 0.17 Tujuh Belas
Tiga Puluh Satu Juta 0.17 Tujuh Belas
Tiga Puluh Dua Juta 0.17 Tujuh Belas
Tiga Puluh Tiga Juta 0.17 Tujuh Belas
Tiga Puluh Empat Juta 0.17 Tujuh Belas
Tiga Puluh Lima Juta 0.17 Tujuh Belas
Tiga Puluh Enam Juta 0.17 Tujuh Belas
Tiga Puluh Tujuh Juta 0.17 Tujuh Belas
Tiga Puluh Delapan Juta 0.17 Tujuh Belas
Tiga Puluh Sembilan Juta 0.17 Tujuh Belas
Empat Puluh Juta 0.18 Delapan Belas
Empat Puluh Satu Juta 0.18 Delapan Belas
Empat Puluh Dua Juta 0.18 Delapan Belas
Empat Puluh Tiga Juta 0.18 Delapan Belas
Empat Puluh Empat Juta 0.18 Delapan Belas
Empat Puluh Lima Juta 0.18 Delapan Belas
Empat Puluh Enam Juta 0.18 Delapan Belas
Empat Puluh Tujuh Juta 0.18 Delapan Belas
Empat Puluh Delapan Juta 0.18 Delapan Belas
Empat Puluh Sembilan Juta 0.18 Delapan Belas
Lima Puluh Juta 0.19 Sembilan Belas
Lima Puluh Satu Juta 0.19 Sembilan Belas
Lima Puluh Dua Juta 0.19 Sembilan Belas
Lima Puluh Tiga Juta 0.19 Sembilan Belas
Lima Puluh Empat Juta 0.19 Sembilan Belas
Lima Puluh Lima Juta 0.19 Sembilan Belas
Lima Puluh Enam Juta 0.19 Sembilan Belas
Lima Puluh Tujuh Juta 0.19 Sembilan Belas
Lima Puluh Delapan Juta 0.19 Sembilan Belas
Lima Puluh Sembilan Juta 0.19 Sembilan Belas
Enam Puluh Juta 0.20 Dua Puluh
Enam Puluh Satu Juta 0.20 Dua Puluh
Enam Puluh Dua Juta 0.20 Dua Puluh
Enam Puluh Tiga Juta 0.20 Dua Puluh
Enam Puluh Empat Juta 0.20 Dua Puluh
Enam Puluh Lima Juta 0.20 Dua Puluh
Enam Puluh Enam Juta 0.20 Dua Puluh
Enam Puluh Tujuh Juta 0.20 Dua Puluh
Enam Puluh Delapan Juta 0.20 Dua Puluh
Enam Puluh Sembilan Juta 0.20 Dua Puluh
Tujuh Puluh Juta 0.21 Dua Puluh Satu
Tujuh Puluh Satu Juta 0.21 Dua Puluh Satu
Tujuh Puluh Dua Juta 0.21 Dua Puluh Satu
Tujuh Puluh Tiga Juta 0.21 Dua Puluh Satu
Tujuh Puluh Empat Juta 0.21 Dua Puluh Satu
Tujuh Puluh Lima Juta 0.21 Dua Puluh Satu
Tujuh Puluh Enam Juta 0.21 Dua Puluh Satu
Tujuh Puluh Tujuh Juta 0.21 Dua Puluh Satu
Tujuh Puluh Delapan Juta 0.21 Dua Puluh Satu
Tujuh Puluh Sembilan Juta 0.21 Dua Puluh Satu
Delapan Puluh Juta 0.22 Dua Puluh Dua
Delapan Puluh Satu Juta 0.22 Dua Puluh Dua
Delapan Puluh Dua Juta 0.22 Dua Puluh Dua
Delapan Puluh Tiga Juta 0.22 Dua Puluh Dua
Delapan Puluh Empat Juta 0.22 Dua Puluh Dua
Delapan Puluh Lima Juta 0.22 Dua Puluh Dua
Delapan Puluh Enam Juta 0.22 Dua Puluh Dua
Delapan Puluh Tujuh Juta 0.22 Dua Puluh Dua
Delapan Puluh Delapan Juta 0.22 Dua Puluh Dua
Delapan Puluh Sembilan Juta 0.22 Dua Puluh Dua
Sembilan Puluh Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Satu Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Dua Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Tiga Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Empat Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Lima Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Enam Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Tujuh Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Delapan Juta 0.23 Dua Puluh Tiga
Sembilan Puluh Sembilan Juta 0.23 Dua Puluh Tiga
Seratus 0.24 Dua Puluh Empat
Dua Ratus 0.24 Dua Puluh Empat
Tiga Ratus 0.24 Dua Puluh Empat
Empat Ratus 0.24 Dua Puluh Empat
Lima Ratus 0.24 Dua Puluh Empat
Enam Ratus 0.24 Dua Puluh Empat
Tujuh Ratus 0.24 Dua Puluh Empat
Delapan Ratus 0.24 Dua Puluh Empat
Sembilan Ratus 0.24 Dua Puluh Empat
Satu Milyar 0.24 Dua Puluh Empat
Dua Milyar 0.25 Dua Puluh Lima
Tiga Milyar 0.25 Dua Puluh Lima
Empat Milyar 0.25 Dua Puluh Lima
Lima Milyar 0.25 Dua Puluh Lima
Enam Milyar 0.25 Dua Puluh Lima
Tujuh Milyar 0.25 Dua Puluh Lima
Delapan Milyar 0.25 Dua Puluh Lima
Sembilan Milyar 0.25 Dua Puluh Lima
Sepuluh Milyar 0.25 Dua Puluh Lima
Sebelas Milyar 0.25 Dua Puluh Lima
Dua Belas Milyar 0.26 Dua Puluh Enam
Tiga Belas Milyar 0.26 Dua Puluh Enam
Empat Belas Milyar 0.26 Dua Puluh Enam
Lima Belas Milyar 0.26 Dua Puluh Enam
Enam Belas Milyar 0.26 Dua Puluh Enam
Tujuh Belas Milyar 0.26 Dua Puluh Enam
Delapan Belas Milyar 0.26 Dua Puluh Enam
Sembilan Belas Milyar 0.26 Dua Puluh Enam
Dua Puluh Milyar 0.26 Dua Puluh Enam
Dua Puluh Satu Milyar 0.26 Dua Puluh Enam
Dua Puluh Dua Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Tiga Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Empat Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Lima Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Enam Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Tujuh Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Delapan Milyar 0.27 Dua Puluh Tujuh
Dua Puluh Sembilan Milyar 0.27 Dua Puluh Tujuh
Tiga Puluh Milyar 0.27 Dua Puluh Tujuh
Tiga Puluh Satu Milyar 0.27 Dua Puluh Tujuh
Tiga Puluh Dua Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Tiga Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Empat Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Lima Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Enam Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Tujuh Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Delapan Milyar 0.28 Dua Puluh Delapan
Tiga Puluh Sembilan Milyar 0.28 Dua Puluh Delapan
Empat Puluh Milyar 0.28 Dua Puluh Delapan
Empat Puluh Satu Milyar 0.28 Dua Puluh Delapan
Empat Puluh Dua Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Tiga Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Empat Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Lima Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Enam Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Tujuh Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Delapan Milyar 0.29 Dua Puluh Sembilan
Empat Puluh Sembilan Milyar 0.29 Dua Puluh Sembilan
Lima Puluh Milyar 0.29 Dua Puluh Sembilan
Lima Puluh Satu Milyar 0.29 Dua Puluh Sembilan
Lima Puluh Dua Milyar 0.30 Tiga Puluh
Lima Puluh Tiga Milyar 0.30 Tiga Puluh
Lima Puluh Empat Milyar 0.30 Tiga Puluh
Lima Puluh Lima Milyar 0.30 Tiga Puluh
Lima Puluh Enam Milyar 0.30 Tiga Puluh
Lima Puluh Tujuh Milyar 0.30 Tiga Puluh
Lima Puluh Delapan Milyar 0.30 Tiga Puluh
Lima Puluh Sembilan Milyar 0.30 Tiga Puluh
Enam Puluh Milyar 0.30 Tiga Puluh
Enam Puluh Satu Milyar 0.30 Tiga Puluh
Enam Puluh Dua Milyar 0.31 Tiga Puluh Satu
Enam Puluh Tiga Milyar 0.31 Tiga Puluh Satu
Enam Puluh Empat Milyar 0.31 Tiga Puluh Satu
Enam Puluh Lima Milyar 0.31 Tiga Puluh Satu
Enam Puluh Enam Milyar 0.31 Tiga Puluh Satu
Enam Puluh Tujuh Milyar 0.31 Tiga Puluh Satu
Enam Puluh Delapan Milyar 0.31 Tiga Puluh Satu
Enam Puluh Sembilan Milyar 0.31 Tiga Puluh Satu
Tujuh Puluh Milyar 0.31 Tiga Puluh Satu
Tujuh Puluh Satu Milyar 0.31 Tiga Puluh Satu
Tujuh Puluh Dua Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Tiga Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Empat Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Lima Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Enam Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Tujuh Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Delapan Milyar 0.32 Tiga Puluh Dua
Tujuh Puluh Sembilan Milyar 0.32 Tiga Puluh Dua
Delapan Puluh Milyar 0.32 Tiga Puluh Dua
Delapan Puluh Satu Milyar 0.32 Tiga Puluh Dua
Delapan Puluh Dua Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Tiga Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Empat Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Lima Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Enam Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Tujuh Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Delapan Milyar 0.33 Tiga Puluh Tiga
Delapan Puluh Sembilan Milyar 0.33 Tiga Puluh Tiga
Sembilan Puluh Milyar 0.33 Tiga Puluh Tiga
Sembilan Puluh Satu Milyar 0.33 Tiga Puluh Tiga
Sembilan Puluh Dua Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Tiga Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Empat Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Lima Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Enam Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Tujuh Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Delapan Milyar 0.34 Tiga Puluh Empat
Sembilan Puluh Sembilan Milyar 0.34 Tiga Puluh Empat
Seratus 0.34 Tiga Puluh Empat
Dua Ratus 0.34 Tiga Puluh Empat
Tiga Ratus 0.35 Tiga Puluh Lima
Empat Ratus 0.35 Tiga Puluh Lima
Lima Ratus 0.35 Tiga Puluh Lima
Enam Ratus 0.35 Tiga Puluh Lima
Tujuh Ratus 0.35 Tiga Puluh Lima
Delapan Ratus 0.35 Tiga Puluh Lima
Sembilan Ratus 0.35 Tiga Puluh Lima
Satu Trilyun 0.35 Tiga Puluh Lima
Dua Trilyun 0.35 Tiga Puluh Lima
Tiga Trilyun 0.35 Tiga Puluh Lima
Empat Trilyun 0.36 Tiga Puluh Enam
Lima Trilyun 0.36 Tiga Puluh Enam
Enam Trilyun 0.36 Tiga Puluh Enam
Tujuh Trilyun 0.36 Tiga Puluh Enam
Delapan Trilyun 0.36 Tiga Puluh Enam
Sembilan Trilyun 0.36 Tiga Puluh Enam
Sepuluh Trilyun 0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
1.00
1.00
1.00
1.00
1.00

You might also like