In P02a Big STR DRS 0054 - 2178
In P02a Big STR DRS 0054 - 2178
In P02a Big STR DRS 0054 - 2178
: IN 2A/01 Indore
DISCIPLINE: STR DOCUMENT TYPE: Document Review Sheet (DRS ) Issue Comment Status by The Engineer
DATE: 06-Apr-23
SUBJECT: FCR for repair methodology of rebar cut during Bearing installation
Document references
Comment Status by The
No. Initials Reviewers Comments (GC) Issue Contractors/Suppliers Answers Closure Date
Engineer
Doc / Rev Clause Page No:
Cutting and welding of rebars is not allowed, therefore the proposed methodology is not
1 SMJ/MRK General Major
accepted. The same was already conveyed through mail dated: 16-02-2023
Please note that as per GCC Sub Clause 3.2; any acceptance, agreement, approval, check, certificate, comment, consent, disapproval, examination, inspection, instruction, Notice, No-objection, record(s) of meeting, permission, proposal, record, reply, report, request, Review, test, valuation, or similar act (including the absence
of any such act) by the Engineer, the Engineer's Representative or any assistant shall not relieve the Contractor from any duty, obligation or responsibility the Contractor has under or in connection with the Contract.
S.M.Jampani PBR Chief Structural Expert NAME: Simon Fourie Name Name
arthik
Date: 2023.04.06
Sign Sign
18:06:31 +05'30'