MAHARASHTRA POLLUTION CONTROL BOARD

Minutes of 16th Consent Committee Meeting of 2022-2023 held on 14.09.2022 at 3:00 pm at MPCB, HQ, Sion Mumbai.

The following members of the Consent Committee were present:

1. Shri Ashok A. Shingare, IAS, Member Secretary,


Maharashtra Pollution Control Board, Mumbai – Chairman
2. Shri Y. B. Sontakke, Joint Director (WPC),
Maharashtra Pollution Control Board, Mumbai --Member
3. Shri V. M. Motghare, Joint Director (APC)
Maharashtra Pollution Control Board, Mumbai --Member

Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. Shri R.G.Pethe has not attended the meeting due
to preoccupied schedule. The chairman of the committee granted him leave of absence. The minutes of the 13th Consent Committee meeting of 2022-23 held on
01.08.2022 circulated vide email were confirmed.

The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken.

Sr. Application Industry Name & Decision Consent Section Remarks/ Discussion
No. Unique Address on grant of Granted upto
Number consent
1 MPCB- Mutha Founders Approved commissioning of APC Committee has noted that, application was discussed in 9th CC
CONSENT- Pvt Ltd L-7 Plot Consent to the unit or 5 meeting held on 30/06/2022. As per CC decision show cause was
0000131466 No. L-7, MIDC, Establish years whichever issued on 22/7/2022. Submitted BG of Rs. 2 Lakhs towards
Satara Satara for is earlier installation of secondary fumes extraction systems. Submitted BG of
expansion Rs. 5 lakhs towards O & M of pollution control systems. Submitted
Board resolution as per existing consent conditions. Industry is in
process of installation of secondary fumes extraction system. PO
issued . The work shall be completed within 16 week.

In view of above it was decided to grant consent to establish for


expansion for increase in production quantity for mfg. of C.I. & S.G
– from 1575 MT/m to 2050 MT/M. i.e by 475 MT/Mwith following
conditions.
(i) Forfeit of Bank Guarantee of Rs. 2 lakhs as PP has not
installed secondary fumes extraction systems within time as

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


per earlier consent condition and obtain double Bank
Guarantee.
(ii) PP shall install secondary fumes extraction system within 3
month and submit time bound action plan for installation of
secondary emission control systems with technical
specification within 15 days.
(iii) PP shall submit Bank Guarantee of Rs. 5 lakhs towards O &
M of pollution control systems and compliance of consent
conditions
2 MPCB- Ador Welding Approved Commissioning APC Committee has noted that, application was discussed in 9th CC
CONSENT- Limited S.No - Consent to of the unit or 5 meeting held on 30/06/2022. As per CC decision show cause was
0000132012 147 / 2B+ 3, S.No Establish years whichever issued on 22/7/2022. Now PP has submitted reply. For existing
- 147 / 2B+ 3, for is earlier effluent 4.70 CMD they have provided ETP of capacity 5 CMD
Near Khandoba expansion followed by UF/RO plant and reject is treated in electric evaporator
Mandir, Akurdi to achieve ZLD. Applied for CGWA NOC.
Chowk,
Chinchwad , Pune In view of above it was decided to grant consent to establish for
Haveli expansion for mfg of Stick Welding Electrodes -30000MT/A, RMD
Flux-9000MT/A, FCAW wire-6000MT/A without increased in
effluent load with following conditions,
(i) PP shall provide adequate capacity air pollution control
systems.
(ii) PP shall submit CGWA NOC within 3 months and submit
BG of Rs. 2 lakhs towards compliance of same.
(iii) PP shall submit Bank Guarantee of Rs. 5 Lakhs towards
compliance of consent conditions.
3 MPCB- Cummins Approved Commissioning APC Committee noted that, application was discussed in 9th CC meeting
CONSENT- Generator Consent to of the unit or 5 held on 30/6/2022. As per CC decision show cause was issued on
0000134375 Technologies Establish years whichever 22/7/2022. PP has submitted reply on 02/9/2022 as below,1.
India Pvt. Ltd. G6 for is earlier Provided combine ETP/STP plant and outlet effluent of treated STP
Ranjangaon expansion recycled in process (Paint Booth, Gel coat booth and toilet flushing
MIDC Shirur and remaining used for gardening.2. As per revised consent they
have separated ETP and installation of upgraded
equipment/infrastructure already completed.3. Provided water
curtains with baffle systems for existing gelcoat booth.4. Submitted
BG of Rs. 5 lakhs valid uptot 31/12/2025.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


In viwe of above it was decided to grant consent to establish for
enhancement of production of AC Generator by 2000 Nos/M with
following conditions.
(i) PP shall upgrade ETP and STP separately to achieve ZLD for
industrial effluent and BOD 30 mg/l at STP outlet
(ii) PP shall provide adequate air pollution control systems for
VOCs generating from HRD, gel coat and trickling units
(iii) PP shall submit BG of Rs. 5 lakhs towards compliance of
consent conditions.
4 MPCB- GKN Sinter Not -- APC It was decided to issue show cause notice for refusal of consent to
CONSENT- Metals Private approved establish for following non compliances,
0000137143 Limited C-18 Consent to (i) PP has not submitted Board Resolution and Bank Guarantee
MIDC Establish as per existing consent conditions.
Ahmednagar for (ii) PP has not provided requisite stack monitoring facilities
Ahmednagar expansion (Ladder & Platform) as per consent condition and valid BG
towards compliance of same
5 MPCB- M/S. METRO Approved Commissioning WPC Committee noted that Project Proponent has applied for Consent to
CONSENT- LIFESCAPES Consent to of the unit or Establish for Residential & commercial building construction project
0000137733 Proposed Establish Five years having total plot area 7589.64 Sq.M. & BUA 71176.54 Sq. M. as per
Residential and whichever is EC dt. 10/08/2022. The case was discussed in 11th CC dtd.
Commercial earlier 01/08/2022 and SCN for refusal of consent was issued on 29.08.2022
Development at as PP has started the construction work and completed approximate
Plot No. 18, 25% slab work of 3rd basement ie 2200Sq.M without obtaining C to
Sector: l9D, V E from M. P. C. Board .
Plot No. 18,
Sector: l9D, Committee noted the reply submitted by PP in which stated that first
Village: Vashi, CC received from NMMC on dtd. 23/11/2020 with construction
VASHI Thane BUA of 19804 Sq.m. which is less than 20000 Sq. m. which is not
under purview of EIA Notification. Accordingly started construction
of basements & shore piling. PP has obtained mended CC from
NMMC on dt. 23/12/2021. BUA more than 20,000 Sq.M. as per
architect area statement PP has also uploaded the EC obtained vide
No SIA/MH/MIS/268478/2022 dtd 10.08.2022 for Residential &
commercial building construction project having total plot area
7589.64 Sq.M. & BUA 71176.54 Sq. M

After due deliberation it was decided to grant consent to establish for


Residential & commercial building construction project having total

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


plot area 7589.64 Sq.M. & BUA 71176.54 Sq. M. as per EC dt.
10/08/2022. by imposing following conditions.
(i) PP shall comply with the conditions stipulated in consent
conditions and EC conditions and submit BG of Rs. 10 Lakhs
towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP for
monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and remaining shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
conditions C to E.
6 MPCB- M/s. Windsor Approved Commissioning WPC Committee noted that Project Proponent has applied for revalidation
CONSENT- Shelters Consent to of the unit or of consent to establish with expansion in residential & commercial
0000137138 39/17B+18+18/1,3 Establish 12.04.2027 construction project having total plot area 30147.85 Sq. Mtrs and
9/19, 20, 21, whichever is proposed total Construction BUA 84041.60 SqM. However as per
22,23,24,25(p) earlier specific condition of EC dtd 10.05.2021, the total BUA is 81030.95
39/17B, 39/18, SqM SqM
39/18/1,39/19, 20,
21, PP has obtained consent to establish dtd 12.04.2017 valid till COU
22,23,24,25(p), or 5 Yrs for residential & commercial construction project having
Ambegaon total plot area 30835 Sq. Mtrs and proposed total Construction BUA
Budruk, Tal: 66813.70 SqM as per EC dtd 25.01.2016
Haveli, Dist: Pune PP has obtained revised EC for expansion dtd 10.05.2021 for
Haveli construction project on total plot area of 30147.85 Sq. Mtrs and

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


proposed total construction BUA of 81030.95 SqM with CI of Rs
142 Cr.
The case was discussed in 11th CC meeting dtd 01.08.2022 and SCN
for refusal of consent was issued on 23.08.2022 as PP has not
provided adequate capacity OWC and not submitted water supply
NOC, drainage NOC.
Committee noted the reply submitted by PP on 24.08.2022 and
submitted that PP has proposed to provide OWC of total 1400
capacity. PP has submitted water supply and drainage NOC.

After due deliberation, it was decided to grant revalidation of consent


to establish with expansion in residential & commercial construction
project having total plot area 30147.85 Sq. Mtrs and proposed total
Construction BUA 81030.95 SqM. as per specific condition of EC
dtd 10.05.2021 by imposing following conditions.
(i) PP shall comply with the conditions stipulated in
Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to E conditions.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(ix) The PP shall submit penal fees as earlier Consent to Establish
was valid till 12.04.2022 and PP has applied on 29.04.2022.
7 MPCB- Yerwada Approved Commissioning WPC It was decided to grant Consent to Establish for construction project
CONSENT- Developers Pvt. Consent to of the unit or five having total plot area 9014 Sq.Mtrs. & proposed total Construction
0000136639 Ltd CTS No. Establish years whichever BUA 117583.0 Sq.Mtrs by imposing following conditions.
1968+1969 is earlier
Yerwada Pune city (i) PP shall obtain Environmental Clearance for the proposed
activity. PP shall not take any effective steps towards the
construction without obtaining EC.
(ii) PP shall comply with the conditions stipulated in
Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(iii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iv) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(v) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(vi) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vii) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(viii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(ix) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to E conditions.
8 MPCB- Mohatadevi Sugar Approved Commissioning WPC Committee noted that the industry has applied for Consent to
CONSENT- Mills & Agro Ltd Consent to of the unit or Establish for sugar unit of capacity-2500 TCD.
0000123701 Gut No. 490 & Establish Five years Committee further noted that Industry proposed to provide ETP of
Gut No. 612 Part whichever is 250 CMD consisting of Primary and secondary treatment system &
1, At Post Matori, earlier Boiler of capacity of 110.0 TPH.
Shirur Kasar It was decided to issue Consent to establish with B.G. of Rs.5.0
Lakhs towards compliance of consent condition.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


9 MPCB- Avni DM Green Approved Commissioning ROHQ Committee noted that Industry has applied for Consent to Establish
CONSENT- Energy Private Consent to of the unit or with requisite fee for Biogas/CNG (Bio-Methanation Plant) by using
0000140953 Limited Gut No Establish Five years anaerobic fermentation process (50 MT/Day) on plot area of
462, 463, 464, 466 whichever is 20153.54 Sq. mtrs and built-up area of 3000.0 Sq. Mtrs.
Moshi Kachara earlier The proposed facility will be located at existing MSW site of PCMC
Depo, Sector No 5 at Gat No. 462, At- Moshi, Tal- Haveli, Dist- Pune i. e. on Land
Haveli owned by Pimpri Chinchwad Municipal Corporation. The PCMC
has issued work order to the industry vide letter dated 21.03.2022
regarding installation of Biogas Project from Hotel waste/Food
Waste/ Wet waste on DBCT basis.
The Raw Material will be used as Food Waste/Wet Waste collected
from Hotels, Resorts, Canteens, Hostels, and Institutes etc. The
Mfg process involves unit operations Sorting. Shredding,
Hydrolysis, anaerobic digestion followed by Gas generation,
purification and compression in cylinder cascade.
After due deliberation, committee recommended for grant of consent
to establish for Biogas/CNG (Bio-Methanation Plant) by using
anaerobic fermentation process (50 MT/Day).
10 MPCB- Charms Not -- WPC Project Proponent has applied for Consent to Establish for
CONSENT- Developers S No approved Construction of Residential projects having total plot area is
0000141250 89/1(A), 95/1(A), Consent to 35496.07 sq.m and total Construction BUA 53088.99 sq.m.
95/2, 95/10 Establish
Titwala Kalyan It was decided to issue SCN for Refusal Consent to Establish due
to following Non-Compliance:
(i) PP has started Construction Activity without obtaining
Environment Clearance.
(ii) PP has not uploaded any documents whether their project
previously under 20,000 Sq.mtr BUA and then decided for
expansion.
11 MPCB- M/S ANANTA Approved Commissioning WPC Committee noted that, Project Proponent has applied for
CONSENT- LANDMARKS Revalidatio of the unit or Revalidation of Consent to Establish with expansion for Residential
0000141313 PVT. LTD. n of valid up to: Development projects having total plot area is 33730.00 Sqm and
S.NOS. 113/1(Pt.), Consent to 14/08/2024 total increased Construction BUA 150023.60 Sqm to 151727.01
113/2B, 113/3, Establish Sqm
113/4,113/5,113/6, with PP has obtained Consent to Establish dtd. 14.08.2019 for total plot
113/7,113/8,113/9 expansion area 26900.00 Sqm to 33730.00 Sqm & Construction BUA 92303.4
/2,113/10, 113/111 Sqm to 150023.60 Sqm.
THANE THANE

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


PP has Obtained Environmental Clearance dt.04.10.2019 for total
Plot area 33730.00 Sqm, total construction BUA 143318.00 Sqm.

After due deliberation, it is was decided to grant of Revalidation of


Consent to Establish with Expansion for Residential Development
projects having total plot area is 33730.00 Sqm and total increased
Construction BUA 150023.60 Sqm to 151727.01 Sqm, by imposing
following terms and conditions as under :

(i) PP shall obtain Environmental Clearance for proposed


Consent to establish expansion construction project and PP
shall not take any effective steps towards Consent to
Establish expansion construction project. PP shall comply
with the conditions stipulated in consent conditions and
submit BG of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance
of C to E conditions.
12 MPCB- M/s. Mayuresh Approved Commissioning WPC Committee noted that Project Proponent has applied for Consent to
CONSENT- Real Estate and consent to of the unit or Establish for expansion for Residential & commercial building
0000140983 Management Pvt. Establish Five years construction project on Total plot area 5969.10 Sq. Mtr. and
Ltd. Plot 75 & 76

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


Sector 15 Plot 75 whichever is construction BUA Total 41905. 333 Sq.M (As per approved plan and
& 76 Sector 15, earlier Architect area statement)
CBD Belapur, After due deliberation it was decided to grant consent to establish
Navi Mumbai, for Residential & commercial building construction project having
Maharashtra, Total plot area 5969.10 Sq. Mtr. and construction BUA Total 41905.
400614 Thane 333 Sq.M (As per approved plan and Architect area statement) by
imposing following conditions.
i) PP shall obtain Environmental Clearance for the proposed
activity. PP shall not take any effective steps towards the
construction without obtaining prior EC.
ii) PP shall comply with the conditions stipulated in consent
conditions and submit BG of Rs. 10 Lakhs towards compliance
of the same.
iii) PP shall install online monitoring system to the O/L of STP for
monitoring pH, Flow, BOD, TSS.
iv) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and remaining shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
v) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
vi) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
vii) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
viii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase .
ix) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
conditions C to E.
The consent shall be issued as a overriding effect to the consent to
establish issued vide No. Format1.0/BO/JD(WPC)/UAN
No.00000043603/CE/14th CC-1905000208 dtd 03.05.2019
13 MPCB- M/s. JP Infra Approved Commissioning WPC Committee noted that, Project Proponent has applied for Consent to
CONSENT- Residency Pvt. Consent to of the unit or Establish with Expansion for Construction of Residential projects
0000141751 Ltd. At C.S. No. Establish

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


20/1, 20/2, 31/4, for valid up to: having total plot area is 16910.00 sq.m and total Construction BUA
30/7(pt), 30/8(pt), expansion 25/03/2026 100403.33 sq.m
31/6 Village PP has obtained Consent to Establish dtd. 25.03.2021 for total plot
Ghodbunder, Mira area 16910.00 Sqm & Construction BUA 72364.12 Sqm.
road East, Dist. PP has obtained EC dtd. 26.03.2019 for total plot area 16910 Sqm
Thane, & Total Construction BUA 81464.47 Sqm.
Maharashtra PP has obtained EC dtd. 20.07.2020 for total plot area 16910.00 Sqm
Thane & total Construction BUA 72364.12 Sqm
PP has obtained EC dt.01.06.2022 for total Plot area 16910.00 Sqm,
total construction BUA 100403.33 Sqm.
After due deliberation, It was decided to grant of Consent to
Establish with Expansion for Construction of Residential projects
having total plot area is 16910.00 sq.m and total Construction BUA
100403.33 sq.m As per EC dt.01.06.2022, by imposing following
terms and conditions as under :

(i) PP shall comply with the conditions stipulated in Environment


Clearance & consent conditions and submit BG of Rs. 10
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to E conditions.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


This Consent to Establish with Expansion is issued with overriding
effect over earlier C to E dt: 25/03/2021

14 MPCB- Rajarambapu Patil Approved Commissioning WPC Committee noted that Industry has applied for consent to Establish
CONSENT- sahakari sakar Consent to of the unit or for expansion from 9000 MT/M to 16500 MT/M (2500 TCD to 4500
0000141608 Karkhana Ltd. Establish Five years TCD) Sugar unit.
Wategon surul whichever is
unit 2 Gat earlier After due deliberation, it was decided to grant consent to Establish
no.1064-1073 for expansion from 9000 MT/M to 16500 MT/M (2500 TCD to 4500
Wategon walwa TCD) Sugar unit by imposing following conditions

(i) Industry shall submit the BG of Rs 5 Lakhs towards compliance


of consent conditions
15 MPCB- M/s Pam Approved Commissioning WPC Committee noted that, Project Proponent has applied for
CONSENT- Infrastructures Revalidatio of the unit or Revalidation of Consent to Establish Expansion for Residential with
0000137021 S.No 1(H.No 1 to n of valid up to: shop line Project having total plot area is 26800.00 Sqm and total
8), S. NO 2 (H. Consent to 27/04/2026 Construction BUA 82984.13 Sqm
No. 1 to 5), S. No Establish PP has obtained Consent to Establish dtd. 27.04.2017 for total Plot
1 (H.No 1 to 8), S. with area 26800.00 Sqm & total Construction BUA 42463.93 Sqm.
NO 2 (H. No. 1 to expansion PP has obtained Renewal of Consent to Operate (Part) dtd.
5), CTS . No. 04.09.2020 for total plot area 26800.00 Sqm, construction completed
54(pt) Village BUA 17819.66 Sqm & Out of total Construction BUA 42463.93
–Malonde Tal: Sqm.
Vasai, Dist- PP has Obtained Environmental Clearance dt.26.07.2016 for total
Palghar Vasai Plot area 26800.00 Sqm, total construction BUA 52530.83 Sqm.
PP has obtained Environment Clearance dtd. 04.05.2022 for total
plot area 26800.00 Sqm, & total Construction BUA 82984.13 Sqm.

After due deliberation, it was decided to grant Revalidation of


Consent to Establish Expansion for Residential with shop line
Project having total plot area is 26800.00 Sqm and total Construction
BUA 82984.13 Sqm As per EC dt.04.05.2022, by imposing
following terms and conditions :-

(i) PP shall comply with the conditions stipulated in


Environment Clearance & consent conditions and submit
BG of Rs. 10 Lakhs towards compliance of the same.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall
be utilized on land for gardening and connected to the
sewerage system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance
of C to E conditions.
(ix) PP shall submit Penal Fees of Rs 1,63,833/- ( Rs. One Lakhs
Sixty Three Thousand Eight hundred thirty three Rupees)
(5 times of one term consent fees x no. of years of
Violation ) towards Project proponent has not applied for
Revalidation of Consent to establish within validity period
of previous Consent to Establish vide dt: 22/04/2017
which was valid up to 22/04/2022 to MPC Board and
The Penal fees shall be submitted by project proponent
through online e- payment gateway on line consent
application portal.

Consent shall be issued after submission of additional consent


fees towards difference in increase in capital investment and
penal fees
16 MPCB- Shiv Approved Commissioning WPC Committee noted that Project Proponent has applied for Consent to
CONSENT- Constructions S. Consent to of the project or Establish for Expansion in Proposed Residential and Commercial
0000141034 No. 12, Punawale, Establish five years Project having total plot area 17914.82 Sq.Mtrs. & proposed total
Taluka-Mulshi, for whichever is Construction BUA 72653.33 Sq.Mtrs
Dist-Pune. S. No. expansion earlier

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


12, Punawale, PP has obtained Revalidation of Consent to Establish dtd.
Taluka-Mulshi, 25.03.2021 which valid up to COU or 5 years for Construction
Dist-Pune. Project having total plot area 17914.82 Sq.Mtrs, Proposed
HAVELI Construction BUA 70356.14 Sq.Mtrs, as per EC dtd 27.10.2020.
Further PP has applied for revised Environment Clearance vide
proposal no. SIA/MH/MIS/ 277145/2022

After due deliberation, it was decided to grant Consent to Establish


for Expansion in Proposed Residential and Commercial Project
having total plot area 17914.82 Sq.Mtrs. & proposed total
Construction BUA 72653.33 Sq.Mtrs by imposing following
conditions.
(i) PP shall obtain Environmental Clearance for the proposed
expansion in construction project. PP shall not take any
effective steps towards the expansion in construction without
obtaining EC.
(ii) PP shall comply with the conditions stipulated in
Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(iii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iv) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(v) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(vi) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vii) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(viii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(ix) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to E conditions.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


The consent shall be issued with overriding effect on earlier Consent
to establish dtd. 25.03.2021
17 MPCB- Mahalaxmi City Approved Commissioning WPC Committee noted that PP had applied for Consent to Establish (Part)
CONSENT- 56/1,2,3,4,5 & 64 Consent to of the unit or for Proposed Residential Building Construction Project on plot area
0000138732 Mahalaxmi City, Establish Five years 53300.00 Sq.mtr and proposed Construction BUA 49273.570 Sq.mtr
Kh. No. 56, whichever is out of total BUA-97895.968 Sq.Mtrs. further noted that PP had
Bokhara, Koradi earlier obtained CtoE on 16.08.2013 which is not invalid, PP obtained E.C.
Road, Nagpur Dtd- dtd. 09.12.2021 having plot area 53300.00 Sq.mtr and proposed
Bokhara, Nagpur BUA 97895.968 Sq.mtr, PP applied with change in name and also
(Rural) noted that construction done upto 19000 Sq.mtrs and given 80 %
occupancy.
After due deliberations, it was decided to grant consent to Establish
(Part) with following conditions.
(i) PP shall comply with the conditions stipulated in
Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area.
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase.
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance
of conditions C to E.
The consent shall be issued after submission of Penal fees and ROC
for name change.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


1 MPCB- G. K. Wonders S. Approved 31.08.2023 WPC Committee noted that Project Proponent has applied for 1st part
CONSENT- No. 47/2, 49/1+2J Consent to Consent to operate for residential and commercial construction
0000114385 (P), 52/1 To Operate project having total plot area 33246.99 Sq. mtr and part completed
52/23. Wakad, construction BUA of 33260.64 Sq. mtr out of total Construction
Pune Project - BUA 59054.75 sq. mtr as per EC dtd 05.11.2015.
Atlanta 1, S. No. PP has obtained consent to establish dtd 12.08.2015 for construction
47/2, 49/1+2J (P), project having total plot area 51100.0 SqM. and total Construction
52/1 To 52/23. BUA 84835.68 sq. mtr with CI of Rs 150.97 Cr. PP has now
Wakad, Pune submitted that the actual plot area was 33246 M2 & Built-up area as
Mulshi per EC was 59054.75 SqM
The case was discussed in 12th CC meeting and SCN for refusal of
consent was issued. PP has submitted reply to SCN.
The case was discussed in 17th CC meeting dtd 08.03.2022 and it
was decided to call EC compliance report.
Accordingly, SRO Pimpri Chinchwad has submitted EC compliance
report on 05.09.2022.
SRO has also submitted that PP has submitted revised EC dtd
16.12.2021 for construction project on total plot area of 25433.88
SqM and construction BUA of 56846.76 SqM.

After due deliberation, it was decided to grant consent to


operate(part-I) for residential construction project having total plot
area 25433.88 Sq. mtr and part completed construction BUA of
33260.64 Sq. mtr out of total Construction BUA 56846.76 SqM.as
per EC dtd 16.12.2021 by imposing following conditions.
(i) PP shall comply with the conditions stipulated in
Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions.
(ix) PP shall pay lapse consent fees since 2018 and penal fees as
per Board Circular as PP has not obtained consent to operate
since 2018.
2 MPCB- Classic Promoters Approved 31.08.2024 WPC Committee noted that Project Proponent has applied for consent to
CONSENT- & Builders Pvt. Consent to operate for Residential & Commercial construction project having
0000100530 Ltd. (Mudra) S. Operate total plot area 11970.9 sq.mt. and total construction BUA of
No. 685/1, C.T.S. 48701.15 sq.mt., as per EC dt. 23.07.2019.
No. 1760 Pune PP has obtained Consent to Establish dtd 15.07.2020 valid till 5yrs
Satara Road, for Residential & Commercial construction project having having
Bibvewadi, Pune - total plot area 11970.9 sq.mt. and total construction BUA of
411 037 Haveli, 48701.15 sq.mt. as per EC dtd. 23.07.2019.
Pune City The case was discussed in 13th CC meeting and SCN for refusal of
consent was issued on 15.12.2021 as PP has given possession of
building A, B, C and commercial complex without consent to
operate, PP has not submitted details of BG as per consent to
establish, PP has not paid fees for consent to establish on increased
CI from Rs 61.40 Cr to Rs 200 Cr.

Committee noted the reply submitted by PP on 20.12.2021 wherein


PP has sinbmitted that initially, the building A & B did not falls under
purview of EIA notification 2006 hence started construction and
given occupancy as per sanction obtained from PMC for completed
buildings. Further PP has submitted BG of Rs 10 lakhs as per C to E.
PP will pay fees in increased CI from Rs 61.40 Cr to Rs 200 cr during
establishment.

The case was discussed in 17th CC meeting dtd 08.03.2022 and it


was decided to call EC compliance report. Accordingly SRO Pune-I
has submitted EC compliance report.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


After due deliberation, it was decided to grant consent to operate for
Residential & Commercial construction project having total plot area
11970.9 sq.mt. and total construction BUA of 48701.15 sq.mt., as
per EC dt. 23.07.2019 by imposing following condition.

(i) PP shall comply with the conditions stipulated in


Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions.
The consent shall be issued after submission of consent fees on
increased CI.
3 MPCB- AGN Venture, Approved 31.08.2025 WPC Committee noted that Project Proponent has applied for Consent to
CONSENT- Eagle Developers Consent to operate (Part) for residential and commercial construction project
0000122192 and Bosale Parmar Operate having total plot area of 30300.00 Sq.Mtrs and completed
Properties "The (Part) Construction BUA 19416.78 Sq.Mtrs out of total construction BUA
Mpire" Survey 88382.88 Sq.Mtrs as per specific condition of EC dtd.31.03.2020.
No. 236, Hissa Project Proponent has obtained Consent to Establish dtd. 04.10.2019
No. valid up to COU or 5 Years having total plot area 23200 Sq.Mtrs &
Construction BUA 40476.11 Sq.Mtrs as per EC dtd 25.11.2017.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


5A/1+5B/1+5B/2 PP further obtained Consent to Establish for expansion dtd.
Phursungi Haveli 23.06.2020 valid up to COU or 5 Years having total plot area
30300.00 Sq.Mtrs & Construction BUA 47906.77 Sq.Mtrs.
Project Proponent has obtained Environmental Clearance dated
31/03/2020 for plot area of 30300.00 Sq.Mtrs and total Construction
BUA 88,382.88 Sq.Mtrs as per specific condition.

The case was discussed in 18th CC meeting dtd 08.03.2022 and it


was decided to call EC compliance report. Accordingly SRO Pune-I
has submitted EC compliance report on 05.09.2022.

After due deliberation, it was decided to grant Consent to operate


(Part) for residential and commercial construction project having
total plot area of 30300.00 Sq.Mtrs and completed Construction
BUA 19416.78 Sq.Mtrs out of total construction BUA 88382.88
Sq.Mtrs as per specific condition of EC dtd.31.03.2020 by imposing
following conditions.

(i) PP shall comply with the conditions stipulated in Environment


Clearance & consent conditions and submit BG of Rs. 10
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions.
4 MPCB- M/s Shree Approved 31.08.2023 WPC Committee noted that Project Proponent has applied for Consent to
CONSENT- Sonigara Realcon Consent to operate (part-I) for Construction of Residential & Commercial
0000124940 S.No 21/3A, Operate project having total plot area of 34250.00 Sq.Mtrs and completed
21/2B, (Part-I) Construction BUA 43912.75 Sq.Mtrs out of total construction BUA
21/3B/4A/1/2/1, 140257.999 Sq. Mtrs, as per EC dtd. 02.02.2019.
21/3B/4A/1/3, PP has obtained Consent to Establish dtd. 17.05.2021 for
21/4B/1, 21/4B/2, construction project having total plot area of 34250.00 Sq.Mtrs and
21/4B/3, 21/4B/4, total Construction BUA 140257.999 Sq.Mtrs, as per CI Rs. 368.00
21/4B/2, S.No Cr.
21/3A, 21/2B, PP has obtained Environmental clearance dtd 02.02.2019 for
21/3B/4A/1/2/1, construction project having plot area of 34250.00 Sq.Mtrs and total
21/3B/4A/1/3, Construction BUA 140257.999 Sq.Mtrs.
21/4B/1, 21/4B/2, The case was discussed in 21th CC meeting dtd 19.03.2022 and it
21/4B/3, 21/4B/4, was decided to call EC compliance report accordingly SRO PC has
21/4B/2, 21/4C, submitted EC compliance report.
21/4D/5A, 21/5B, After due debarkation, it was decided to grant Consent to operate
22/2, 39/3,Near (part-I) for Construction of Residential & Commercial project
Bank Of India, having total plot area of 34250.00 Sq.Mtrs and completed
Dange Chowk, Construction BUA 43912.75 Sq.Mtrs out of total construction BUA
Thergaon , Pune. 140257.999 Sq. Mtrs, as per EC dtd. 02.02.2019 by imposing
Mulshi following conditions.
(i) PP shall comply with the conditions stipulated in Environment
Clearance & consent conditions and submit BG of Rs. 10
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions.
5 MPCB- Lohia Jain Approved 31.08.2023 WPC Committee noted that Project Proponent has applied for Consent to
CONSENT- Housing Company Consent to Operate (part-II) for residential construction project having total plot
0000128177 S. No. 52/1B+ Operate area of 53831.40 Sq.Mtrs and completed Construction BUA
1C+2(p+) +3+ 4 (Part-II) 107223.04 Sq.Mtrs out of total construction BUA 148124.31 Sq.
& Sr. No. Mtrs, as per EC dtd. 29.09.2017.
53/1+2+4a+4b+6( PP has obtained Consent to Establish dtd 29.01.2019 which valid up
P)+9b+10+11+12 to COU for construction project having total plot area of 53841.40
&53/8, Plot:- 1, S. Sq.Mtrs and total Construction BUA 148124.31 Sq.Mtrs as per EC
No 55/2, S. No. dtd. 29.09.2017.
52/1B+ 1C+2(p+) The case was discussed in 2nd Consent Committee Meeting held on
+3+ 4 & Sr. No. 23.05.2022 and Show Cause Notice for refusal of consent was
53/1+2+4a+4b+6( issued on 08.06.2022 as PP has not submitted compliance
P)+9b+10+11+12 Environmental Clearance conditions and the JVA are exceeding the
&53/8, Plot:- 1, S. standards.
No 55/2, Bavdhan Committee noted the reply submitted by PP on 23.06.2022 and
Khurd, Tal- submitted EC compliance report. PP further submitted that the STP
Haveli, Dist – was on trial run hence the results were not meeting the standards.
Pune- 411021 Now the STP is functional to give desired results. Committee also
Haveli noted the SRO has submitted EC compliance report.
After due deliberation, it was decided to grant Consent to Operate
(part-II) for construction of residential project having total plot area
of 53831.40 Sq.Mtrs and complete Construction BUA 107223.04
Sq.Mtrs out of total construction BUA 148124.31 Sq. Mtrs, as per
EC dtd. 29.09.2017 by imposing following condition
(i) PP shall comply with the conditions stipulated in
Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions
6 MPCB- Pranav Vikas Approved 31/05/2023 APC Committee has noted that, application was discussed in 9th CC
CONSENT- India Pvt Ltd Plot 1st consent meeting held on 30/06/2022. As per CC decision vide letter dtd.
0000128165 No E-85 Industrial to operate 22/7/2022 show cause was issued. PP has submitted reply as below,
Area Shirur for 1. Tread effluent generation is 0.54 CMD for that provided ETP of
expansion capacity 10 CMD. Treated effluent use in washroom and domestic
with applications. 2. Industry is in process of installation of Dual Media
existing Filter and ultra filtration unit for ZLD and work wil completed within
consent to next 6 months.3. Provided stack monitoring system for all stack
operate except one stack and stack monitoring facility provided within next
three months. 4. Provided scrubber systems to 7 tank process. 5.
Hazardous waste regularly, every month is disposing to CHWTSDF,
Manifest copies enclosed.6. Submitted Bank Guarantee of Rs. 5
lakhs valid upto 31/8/2025.7. Submitted plot subletting permission
granted by MIDC on 02/12/2019 valid upto 18/6/2022.
After due deliberation, it was decided to grant renewal of consent to
operate with 1st consent to operate for expansion with following
conditions,
(i) Forfeiting of 50% existing Bank Guarantee submitted in
existing consent as s PP has not comply with consent
conditions i.e ZLD and not provided stack monitoring

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


systems and submit double Bank Guarantee of Rs. 7.50
lakhs towards compliance of consent conditions.
(ii) PP shall upgrade ETP by installation of Dual Media Filter
and ultra-filtration unit for ZLD within 2 months.
(iii) PP shall provide stack monitoring systems to all stack within
1 months.
(iv) PP shall submit valid plot subletting permission of MIDC
within 1 months.
7 MPCB- Pushpak Approved 31/08/2023 WPC Committee noted that, Project Proponent has applied 1st Consent to
CONSENT- Developers - Plot 1st Consent Operate (Part) for Construction Rehab Building Project having total
0000131175 bearing No. 315, to Operate plot area is 11,390.68 Sqm and Completed Construction BUA
T.P.S NO. 1, (part-I) 30,637.96 Sqm & Out of Total construction BUA area 1,27,313.84
Panchpakhadi, Sqm.
Thane (W) Thane SRO Thane -I dt: 06/09/2022 has submitted verification report on
compliance of Environmental clearance conditions
After due deliberations , it was decided to grant of 1st Consent to
Operate (Part) for Construction Rehab Building Project having total
plot area is 11,390.68 Sqm and Completed Construction BUA
30,637.96 Sqm & Out of Total construction BUA area 1,27,313.84
Sqm as per EC dt: 18/07/2016, by imposing following terms and
conditions :

(i) PP shall comply with the conditions stipulated in


Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring for parameters pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall
be utilized on land for gardening and connected to the
sewerage system provided by local body.
(iv) Project Proponent shall operate and maintain Organic waste
digester with composting facility or Biogas digester with
composting facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(vi) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance
of conditions of EC clearance and C to O
8 MPCB- Unique Shanti Approved 31/08/2023 WPC Committee noted that, Project Proponent has applied first Consent to
CONSENT- Neminath 1st Consent operate for residential project of redevelopment under MHADA
0000134948 Developers LLP - to Operate Scheme having total plot area is 12665.50 Sqm and Total
Old Survey (part-I) construction BUA area 32554.96 Sqm As per EC dt. 30.07.2021
216,221,222 (pt.), SRO Thane -II dt: 25/07/2022 has submitted verification report on
New Survey No. compliance of Environmental clearance conditions.
48, 53, 54, Hissa
No. 2, Penkarpada After due deliberations, it was decided to grant first Consent to
Mira Road. Thane operate for residential project of redevelopment under MHADA
Scheme having total plot area is 12665.50 Sqm and Total
construction BUA area 32554.96 Sqm, As per EC dt. 30.07.2021, by
imposing following terms and conditions as under :

(i) PP shall comply with the conditions stipulated in Environment


Clearance & consent conditions and submit BG of Rs. 10
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring for parameters pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate and maintain Organic waste
digester with composting facility or Biogas digester with
composting facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area.
(vi) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
conditions of EC clearance and C to O
9 MPCB- M/s. Viva Swastik Approved 31/08/2024 WPC Committee noted that, Project Proponent has applied for 3rd Consent
CONSENT- Developers S. 1st Consent to Operate (Part-II) for Residential/ Township Building Project
0000137857 No.242, S. No to Operate having total plot area is 80,110.00 Sq.mtrs and Completed
246, H.No.1,2 & (part-I)

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


S. Construction BUA 50,538.03 Sq.mtrs & Out of Total construction
No.247,248,249,2 BUA area 1,48,018.27 Sq.mtrs, As per EC dt. 26/12/2014
56 S. No.242, S. SRO Thane -II vide dt: 10/08/2022 has submitted verification report
No. 246, H.No.1,2 on compliance of Environmental clearance conditions
& S.
No.247,248,249,2 After due deliberations:- it was decided to grant of 3rd Consent to
56 Village. Operate (Part-II) for Residential/ Township Building Project having
Nilemore, Tal. total plot area is 80,110.00 Sq.mtrs and Completed Construction
Vasai, Dist. BUA 50,538.03 Sq.mtrs & Out of Total construction BUA area
Palghar, Vasai 1,48,018.27 Sq.mtrs as per EC dt: 26/12/2014 , by imposing
following terms and conditions :

(i) PP shall comply with the conditions stipulated in Environment


Clearance & consent conditions and submit BG of Rs. 10
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring for parameters pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate and maintain Organic waste
digester with composting facility or Biogas digester with
composting facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area.
(vi) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
conditions of EC clearance and C to O

10 MPCB- MAHARASHTR Not -- ROHQ Committee noted that PP has applied for consent to operate for
CONSENT- A ENVIRO approved hazardous waste rotary incinerator of capacity 7200 MT/A i. e. 1
0000138999 POWER Consent to T/hr.
LIMITED CHW- Operate
01 Mandwa Existing consent is valid up to 28/2/2026 for secured landfill (60000
Village, Butibori, MT/A). Board has granted Consent to establish on 24/4/2019 for
MIDC HINGNA installation of incinerator having capacity 2150 MT/Annum. There

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


after MEPL has obtained EC modification for conversion of PGVR
(Plasma gas verification reactor) incinerator of 3 Ton/Hr. to 1
Ton/Hr. (New rotary incinerator) on dtd. 19/7/2019.
At present only secured land filling of HW waste is going on at the
Butibori for which consent is granted for capacity 60000
Ton/Annum. SLF-2 activity is in operation.SLF-1 activity is closed
& SLF-3 is ready for operation.
Previously MEPL had installed 3 Ton/hr. Plasma based incinerator
for the destruction of incinerator hazardous waste. This incinerator
located in MIDC Butibori was not in operation since many years and
accordingly incinerable hazardous waste was transported to Pune
unit for disposal.
Presently facility has stored incinerable waste of quantity 14142.307
T in HW storage shed.

After due deliberation, Committee decided to issue Show Cause


Notice as facility has stored 14142.307 MT HW at the storage shed
and not submitted plan for disposal of this hazardous waste.
11 MPCB- OC Specialities Approved 30.06.2024 AST Committee noted that industry has for Consent to 1st Operate for
CONSENT- Pvt. Ltd. Plot No. Consent to expansion for increase in quantity of existing 14 Nos of products
0000139938 E-16, E- 17 , E-18 1st Operate & deletion of 09 nos. of products & addition of 12 Nos
, E-22 & OS -23 for of API products.
Chincholi MIDC Expansion Industry has obtained renewal of consent vide dtd 28/04/2021 valid
Mohol by up to 30/06/2024 for mfg. of 23 Nos of API products to the tune of
amalgamati 38.7 MT/D. Industry has further obtained C to E for Expansion vide
on with dtd 24/04/2022 for increase in quantity of existing 14 Nos of
existing products & deletion of 09 nos. of products & addition of 12 Nos of
consent. API products. Industry has obtained EC from MoEF&CC, GoI vide
dated 17/12/2021 for proposed expansion.
After due deliberation, it was decided to grant Consent to 1st Operate
for expansion for increase in quantity of existing 14 Nos of products
& deletion of 09 nos. of products & addition of 12 Nos
of API products by imposing following conditions.
(i) Industry shall comply with conditions stipulated EC granted
vide dated 17.12.2021.
(ii) Industry shall achieve ZLD by the way of RO, Stripper, MEE
& ATFD and shall install web camera with night vision

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


capability and flow meters in the channel/drain carrying
effluent.
(iii) Industry shall ensure OCEMS system (24 x7) monitoring
system for stack emissions for measurement of flue gas
discharge and the pollutant concentration and the data to be
connected to CPCB and MPCB server.
(iv) Industry shall renew the existing Bank Guarantees.
12 MPCB- M/s. Interglobe Approved 31/08/2024 WPC Project Proponent has applied for 1st Consent to Operate for ‘Hotel
CONSENT- Hotels Pvt. 1st Consent Commercial & Restaurant Activity (Without Swimming Pool &
0000135393 Ltd.Final Plot No to Operate Laundry Activity)- with 186 rooms
2,TPS No 1, (Part)
Village It was decided to grant 1st Consent to Operate for ‘Hotel Activity &
Panchpakhadi Tal Restaurant, (Without Swimming Pool & Laundry Activity) with
& Dist. Pokhran R 186 rooms having Total plot Area : 3272.30 sq.mtrs and Total
Final Plot No Construction BUA : 9739.35 sq.mtrs by imposing following terms
2,TPS No 1, and conditions :
Village
Panchpakhadi (i) Project proponent shall submit Bank Guarantee of Rs. 5
Pokhran Road lakhs towards operation & maintenance of pollution control
No.1 THANE system.
13 MPCB- Vedant Nakshatra Not --- WPC Project Proponent has applied for 1st Consent to Operate (Part-II) for
CONSENT- (Residential approved Construction of Industrial cum Residential project having total plot
0000132218 Project) on plot 1st Consent area is 26450.00 Sqm and Completed Construction BUA 11474.59
bearing S.No. 70, to Operate Sqm & Out of Total construction BUA area 36461.47 Sqm,
H.No.1(pt) & (part-II) It was decided to issue SCN for Refusal of 1st Consent to Operate
H.No.5(pt) of (part-II) due to following non compliances :
villag S.No. 70, (i) PP has not obtained Revalidated Consent to Establish for
H.No.1(pt) & Residential Project from MPC Board.
H.No.5(pt) S.No. (ii) (ii) The PP has not submitted compliance report of
70, H.No.1(pt) & Environmental Clearance conditions which shall be
H.No.5(pt) of verified by SRO/RO MPCB.
village-Kulgaon,
Tal-Ambernath,
Dist.-Thane
Ambernath
1 MPCB- M/s. Marvel Edge Approved 31.08.2023 WPC Committee noted that Project Proponent has applied for Renewal of
CONSENT- Realtors Pvt. Ltd. Renewal of Consent to operate for commercial construction project having total
0000122187 "Marvel Edge Consent

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(SBH - Viman plot area of 41919 Sq. Mtrs and completed Construction BUA
Nagar) CTS No. 123096.24 Sq.Mtrs as per EC dtd. 31.03.2020.
109, S. No.
207/1A Lohgaon, PP has obtained Consent to Operate granted vide No. Format
S. No. 33/2/A/l 1.0/BO/ROHQ/CR/PN24967-14/CC-11712 dtd. 04.09.2015 which
Wadgaon Sheri, valid up to 31.01.2017 for constuction project on total plot area
Pune - 411014 41919 Sq.Mtrs and Total Construction BUA 123096.24 Sq.Mtrs.
Viman Nagar
Lohegaon Pune The case was discussed in 16th CC meeting dtd 30.12.2021 and SCN
City for refusal of consent was issued on 10.02.2022 as PP has not
submitted architect certificate for completed BUA of 123096.24
Sq.Mtrs, not obtained revalidation of C to E dtd 09.04.2010, not
submitted details of Bank Guarantees as per earlier consent to
establish and consent to operate and not submitted CA certificate
showing capital investment

Committee noted the reply submitted by PP on 17.02.2022 along


with architect certificate and CA certificate. PP further submitted that
PP has completed total BUA is 123096.24 Sq. Mtr hence not applied
for revalidation of C to E.

The case was discussed in 21st CC meeting and accordingly Personal


Hearing was extended to PP before Joint Director, (WPC), MPC
Board, Mumbai on 11.08.2022 through Video Conference. It was
noted that SRO has submitted EC compliance report.
After due deliberation, it was decided to grant Renewal of Consent
to operate for commercial construction project having total plot area
of 41919.00 Sq. Mtrs and total Construction BUA 123096.24
Sq.Mtrs as per EC dtd. 31.03.2020 by imposing following
conditions.
(i) PP shall comply with the conditions stipulated in Environment
Clearance & consent conditions and submit BG of Rs. 25
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase.
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions
(ix) PP shall pay penal fees as per Board circular as PP has not
obtained renewal of consent after 31.01.2017.
2 MPCB- The Dharamsi Approved 31.02.2024 AST Committee noted that it is an existing unit and Applied for Renewal
CONSENT- Morarji Chemical Renewal of consent along with consent to 1st Operate for Modernization,
0000129156 Co. Ltd. Plot No with Automation and Relocation of Plant -2, 3 and 6 in same premises.
105 MIDC Dhatav amalgamati The JVS analysis results at ETP outlet dtd. 23.03.2021 &
Roha on to C to 23.02.2022 are exceeding. Unit has obtained C to E for the
E Modernization, Automation and Relocation of plant -2,3 & 5 within
same premises on 02.07.2022.
After due deliberations and discussions, it was decided to grant the
renewal of consent to Operate with amalgamation of Consent to 1st
Operate for the Modernization of the plant with following
conditions.
(i) Industry shall ensure disposal of Hazardous Waste /By-
products to the Actual user having permissions under Rule 9 of
Hazardous and other Waste (M & TM) Rules, 2016.
(ii) The existing Bank Guarantee of Rs.10.0 Lakh shall be forfeited
towards exceeding JVS analysis results and shall obtain the
double amount of BG towards compliance of O & M of PCS
and consent conditions.
(iii) Industry shall comply to the Boards Circular dtd. 05.02.2020
towards use of clean fuel.
(iv) Industry shall comply with direction issued to CETP on
22.01.2021, regarding installation of two-way SCADA, Auto-

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


sampler, Non-Return Valve (NRV) with positive discharge to
CETP chamber.
(v) The industry shall ensure connectivity of continuous online
monitoring system to the Board server & data to be transmitted
directly from Data Logger to the Board server.
3 MPCB- Vinay S. Agrawal Approved 31/10/2023 WPC Committee noted that Project Proponent has applied for Renewal
CONSENT- Developers S. No. Renewal of and amalgamation of Consent to operate Part I & II for MMRDA
0000119969 45/4, 45/8b, 45/9, consent rental housing project. Total plot area 36,190 sq. mtr, & total
45/11(pt), construction BUA 2,57,267 Sq.M (109209+148058) out of
45/18(pt) Village 2,98,216.86 sq. mtr. The case was discussed in 23rd CC meeting dtd
Shioter Raichur, 19/03/2022 & 21/03/2022 and SCN for refusal of consent was issued
Panvel Matheran on 13.04.2022 as PP has not submitted the BG’s ,not submitted the
Road sukapur new Architect area statement, not applied for renewal ,not submitted the
panvel Panvel undertaking regarding compliance of C to O and EC
conditions.
Committee noted the reply submitted by PP with all relevant
documents. The case was again discussed in 4th CC meeting dtd
24/05/2022 and SCN for refusal of consent was issued on 24/06/2022
as PP has not submitted the EC compliance report verified by SRO .

Committee noted the reply submitted by PP and also noted that SRO
Raigad I, has submitted the EC compliance verification report and
stated that PP is complied with EC condition.
After due deliberation, it was decided to grant Renewal and
amalgamation of Consent to operate Part I & II for MMRDA
rental housing project. Total plot area 36,190 sq. mtr, & total
construction BUA 2,57,267 Sq.M (109209+148058) out of
2,98,216.86 sq. mtr. by imposing following conditions.
(i) PP shall comply with the conditions stipulated in consent
conditions and EC and shall submit BG of Rs. 10 Lakhs
towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and remaining shall
be utilized on land for gardening and connected to the
sewerage system provided by local body.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility effectively.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
conditions C to O & EC.

The consent shall be issued after submission of penal fees as pp has


applied for renewal of consent 15 months delay.
4 MPCB- Kalpataru Approved 31.01.2025 WPC Committee noted that Project Proponent has applied for Renewal of
CONSENT- Properties (Thane) Renewal of Consent to Operate (Part) for residential construction project having
0000128041 Pvt.Ltd 112 to Consent total plot area of 214879.95 Sq. Mtrs and completed Construction
114,115/2,116 BUA 31484.94 Sq. Mtrs out of total construction BUA 80523.81Sq.
(P),133/1, Mtrs as per EC dtd 17.02.2014
133/2,134 &135 PP has obtained Revalidation of Consent to Establish dtd.
Kunenama Maval 01.07.2020 valid up to COU or 5 years, for construction project
having total plot are 214879.95 Sq.Mtrs, & total construction BUA
80523.81 Sq.Mtrs, with CI Rs. 546.31 Cr. PP has obtained consent
to operate (part-I) dtd. 19.03.2021, which valid up to 31.01.2022 for
construction project having total plot area 214879.95 Sq.Mtrs, for
construction BUA of 31484.94 Sq.Mtrs, Out of 80523.81 Sq.Mtrs,
with CI rs. 245.17 Cr.

The case was discussed in 3rd CC meeting dtd 24.05.2022 and SCN
for refusal of consent was issued on 08.06.2022 as the CI is increased
from Rs 245.17 Cr to Rs 260.59 Cr. PP has not paid fees on increased
Cim and PP ahs not submitted Environmental Clearance compliance
report.

The case was discussed in 8th CC meeting dtd 30.06.2022


accordingly, hearing was extended to PP on 11.08.2022 before JD
WPC. Committee noted the reply submitted by PP and compliance
report submitted by SRO.
After due deliberation, it was decided to grant Renewal of Consent
to Operate (Part) for residential construction project having total plot
area of 214879.95 Sq. Mtrs and completed Construction BUA

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


31484.94 Sq. Mtrs out of total construction BUA 80523.81Sq. Mtrs
as per EC dtd 17.02.2014 by imposing following conditions.
(i) PP shall comply with the conditions stipulated in Environment
Clearance & consent conditions and submit BG of Rs. 10
Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall operate Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area
(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase.
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
C to O conditions.
The consent shall be issued after submission of fees on increased CI.
5 MPCB- Lupin Ltd Plot Not -- AST Committee Noted that PP has applied for the Renewal of consent to
CONSENT- No.6A & 6B approved operate with increase in C.I. Committee also noted that Industry has
0000130634 Sector -17 SEZ Renewal installed ETP of capacity 475 CMD followed by RO (capacity 230
MIHAN notified with CMD), MEE (capacity 75 CMD) & ATFD. The treated effluent
area, Nagpur increase in partly -211.7 CMD is recycled in the utilities and partly 88 CMD is
441108 Nagpur C.I used on land for gardening. The Board has issued PD on 25.03.2021
for switching F.O fuel to cleaner fuel. Industry has applied for
change in fuel from FO to LSHS.
Industry has installed D.G Sets (4 Nos. x 2500 KVA each, 2 Nos x
750 KVA each & 1 No x 500 KVA) total 7 D.G sets of 12,000 KVA
with acoustic enclose and adequate stack heights.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


After due deliberations and discussions, it was decided to call the
PP for presentation as industry has installed 7 D.G sets of 12,000
KVA, along with compliance of consent conditions and the
directions issued.
6 MPCB- M/s Remi Approved 30/6/2024 APC Committee noted that Show Cause Notice for Refusal of Renewal
CONSENT- Edelstahl Tubulars Renewal of of Consent to Operate was issued on 22/07/2022. Committee further
0000133716 Limited Plot No: Consent noted that PP has submitted reply to the SCN, vide dtd. 04/08/2022.
N-211 MIDC
Tarapur Palghar It was decided to grant Renewal of Consent to Operate by extending
existing BG of Rs. 20 Lakh submitted towards O & M of pollution
control systems.

Consent shall be issued after obtaining additional fees of Rs. 15000/-


towards C to E for increase in capital investment.
7 MPCB- NRB Bearings Ltd Approved 31/05/2025 APC Committee noted that Show Cause Notice for Refusal of Renewal of
CONSENT- Plot No. E - 40 Renewal of Consent to Operate was issued on 22/07/2022. Committee further
0000135831 MIDC Consent to noted that PP has submitted reply to the SCN, vide dtd. 25/07/2022
Chikalthana, Operate. & revised reply on 02/09/2022.
Aurangabad
It was decided to grant of Renewal of Consent to by imposing
following conditions –
(i) BG of Rs. 1.0 Lakh out of Rs. 7.5 lakh submitted towards O
& M of pollution control systems shall be forfeited & PP
shall submit top-up BG of Rs. 2.0 Lakh hence total BG of
Rs. 8.5 shall be towards O & M of pollution control systems.
Consent is issued without prejudice to the order passed or being
passed by the Hon’ble NGT, Principal Bench, New Delhi in O.A.
1038/2018.
8 MPCB- SCHNEIDER Approved 30/4/2025 APC Committee noted that Show Cause Notice for Refusal of Renewal
CONSENT- ELECTRIC Renewal of of Consent to Operate was issued on 26/08/2022. Committee further
0000135897 INDIA PVT LTD Consent noted that PP has submitted reply to the SCN, vide dtd. 30/08/2022
PLOT NO A- 600 & revised reply on 08/09/2022.
TTC
INDUSTRIAL It was decided to grant of Renewal of Consent with revised water
AREA, SHIL - budget i.e. Dom. consumption 75 CMD & sewage generation 60
MAHAPE ROAD, CMD & by imposing following condition

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


NAVI MUMBAI (i) PP shall extend existing BG of Rs. 5.0 Lakh submitted towards
THANE O & M of pollution control systems.
9 MPCB- M/s. MAYFAIR Approved 31/08/2024 WPC Committee noted that, Project Proponent has applied for Renewal of
CONSENT- HOUSING as Renewal of consent to operate (Part-I) for Residential Cum Commercial
0000138268 mentioned in 1st Consent Building Project having Total Plot Area is 88378.37 Sq.mtrs and
location of unit to Operate Total Construction BUA 50407.63 Sq.mtrs, & Out of Total
S.No 195 H.No. (Part-I) Construction BUA 2,14,859.22 Sq.mtrs
1& 2, S. No 196 SRO Thane -II MPC Board vide dt: 21/08/2022 has submitted
H.No.1D, S.No. verification report on compliance of Environmental clearance
211 H.No. 11/1/3 conditions.
& 14/1 S.No.212
H.No.1, 3, 4, After due deliberations, it was decided to grant of Renewal of
8/1,8/2,S. No.213, consent to operate (Part-I) for Residential Cum Commercial
214,215,216, S. Building Project having Total Plot Area is 88378.37 Sq.mtrs and
No.223, H.No.1, 2 Total Construction BUA 50407.63 Sq.mtrs, & Out of Total
& 3, S.No.224, H. Construction BUA 2,14,859.22 Sq.mtrs as per EC dt: 31/03/2020 ,
No.1 to 18, S. No. by imposing following terms and conditions:
225, H. No.1, 3/1
,3/2,5,6,8 S.No. (i) PP shall comply with the conditions stipulated in Environment
226 H.No. 3/2, S. Clearance & consent conditions and submit BG of Rs. 10
No.227, H. Lakhs towards compliance of the same.
No.1,2/1,2/2,3,4,5, (ii) PP shall install online monitoring system to the O/L of STP
S. No. 228, H. for monitoring for parameters pH, Flow, BOD, TSS.
No.3/2 Village (iii) The treated domestic effluent shall be 60 % recycled for
Bolinj, Virar secondary purpose such as toilet flushing, air conditioning,
West, Taluka- cooling tower make up, firefighting etc. and reaming shall be
Vasai, Dist- utilized on land for gardening and connected to the sewerage
Palghar, system provided by local body.
Maharashtra. (iv) Project Proponent shall operate and maintain Organic waste
Vasai digester with composting facility or Biogas digester with
composting facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area.
(vi) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance of
conditions of EC clearance and C to O

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


10 MPCB- Siddhi Real Estate Approved Commissioning WPC Committee noted that, Project Proponent has applied for
CONSENT- Developers, Thane Revalidatio of the unit or Revalidation of Consent to Establish for Construction of Residential
0000138928 n of Valid up to: Cum Commercial projects having Total Plot Area is 2,58,535.04
Consent to 25/05/2027 Sqm and total Construction BUA 4,66,648.09 Sqm As per EC
Establish dt.10.12.2015.
PP has obtained Consent to Establish vide dt: 27/09/2010 for Total
Plot Area 2,58,535.04 Sqm & Total Construction BUA 4,66,648.09
Sqm.
PP has Obtained Revalidation of C to E dt: 15/07/2021 for Total
Plot Area 2,58,535.04 Sqm & Total Construction BUA 4,66,648.09
Sqm which was valid up to: 25/05/2022

PP has obtained Environment Clearance dt: 25/05/2010 and


obtained Revalidation in Environment Clearance granted dtd.
10.12.2015 for Total Plot Area is 2,58,535.04 Sqm and total
Construction BUA 4,66,648.09 Sqm

After due deliberations, it was decided to grant Revalidation of


consent to Establish for Construction of Residential Cum
Commercial projects having total plot area is 2,58,535.04 Sqm and
total Construction BUA 4,66,648.09 sq.m As per EC dt.10.12.2015
by imposing following terms and conditions as under :

(i) PP shall comply with the conditions stipulated in


Environment Clearance & consent conditions and submit BG
of Rs. 10 Lakhs towards compliance of the same.
(ii) PP shall install online monitoring system to the O/L of STP
for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and reaming shall be
utilized on land for gardening and connected to the sewerage
system provided by local body.
(iv) Project Proponent shall provide Organic waste digester with
composting facility or Bio-gas digester with composting
facility.
(v) Project Proponent shall make provision of charging port for
Electric vehicles in at least 40% total available parking area

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(vi) PP shall comply with the provision of Construction &
Demolition Waste management Rules 2016.
(vii) Project Proponent shall take adequate measures to control
noise and dust emissions during construction phase
(viii) Project Proponent shall submit an affidavit in Board's
prescribed format within 15 days regarding the compliance
of C to E conditions.
11 MPCB- M/s. Menon Approved 31/05/2025 APC It was decided to grant plain renewal of consent Mfg. Cast Iron Rings
CONSENT- Piston Rings Pvt. Renewal of and SG/Steel Castings – 1030 MT/M with following conditions,
0000136820 Ltd. Survey No. Consent (i) PP shall submit Board Resolution as they carry out expansion
197/A Sambhapur activities with increased in capital investment without
- Kasarwadi Road, obtaining prior permission of the Board and in future they
Vill. Top will not do such violations of the environmental laws and
Hatkanangale submit BG of Rs. 2 lakhs towards compliance of same
(ii) PP shall extend existing BG submitted towards O & M of
PCS and compliance of consent conditions
12 MPCB- Renewal of Approved Commissioning PSO Committee noted that PP has applied for Revalidation of Consent to
CONSENT- Consent to Combined of the project or Establish for hospital building/construction project on 16.06.2022
0000140330 Establish with Bio Consent & five years for change in beds from 100 to 105 Nos. as per EC dtd 13/08/2015
Medical Waste BMW whichever is and Change in DG set capacity from 2500 KVA & 2000 KVA to
Authorization for Authorizati earlier 2000 KVA X 2 Nos.
Raptakos Brett & on , PP has obtained EC vide No. F.No.21-169/2014-IA.III on
Co. Ltd. ' S.No. Revalidatio 13/08/2015.
217, H.No. n of PP obtained Consent to Establish for 100 beds on 10.08.2016.
1,2,S.No.219, Consent to
Applicant has applied for revalidation of consent to establish
S.No. 220, H.No. Establish
1,3,5, S.No. 222, application on 16.06.2022 delayed by 10 months.
S.No. 225, H.No.
1,2,3,4,5, S.No. After due deliberation CC decided to grant Revalidation of Consent
226, H.No. to Establish with one term Consent to Establish fee and applicable
1,2,3,4,5, Penal fee
S.No.227,
S.No.228, H.No.4
at Village
Majiwade, Thane
13 MPCB- Rajarambapu Patil Approved 31/07/2023 WPC Committee noted that the industry has applied for C to R for 2500
CONSENT- Sahakari Sakhar Renewal of TCD Sugar crushing and 12 MW Co-gen unit.
0000141228 Karakhana Ltd. consent

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


Rajaramnagar Site After due deliberation it was decided to grant the renewal of the
Wategaon - Surul, consent for 2500 TCD sugar and 12 MW Co-gen unit with the
Tal - Walwa, D condition of renewal of existing BG’s
Gat no. 1064 -
1073 Wategaon
Surul Walwa
14 MPCB- Athani Sugars Approved 31/07/2025 WPC Committee noted that the industry has applied for C to R for 2500
CONSENT- Limited Renewal of TCD Sugar crushing
0000141297 Bhudargad Unit consent
Gat No's - After due deliberation it was decided to grant the renewal of the
110,112,124,125,1 consent for 2500 TCD Sugar crushing by imposing the following
26,127,129,130/A, conditions:-
133 Anturli (i) The 5 lakh BG shall be forfeited as industry has not
(Tambale) provided OCEMS to Boiler stack .
Bhudargad (ii) Industry shall provide the OCEMS to boiler stack before
starting the crushing.
The consent shall be issued after submission of additional fees of
Rs 15000/- for consent to establish for increase in CI.
15 MPCB- ANURAJ Approved 31.07.2023 WPC It was decided to grant renewal of consent to operate for 2500 TCD
CONSENT- SUGARS LTD Renewal of sugar industry by imposing following conditions.
0000140810 GUT NO 786 A/P Consent (i) From the existing bank guarantee of Rs 5.0 Lakhs, Rs 2.5
YAWAT (PUNE Lakhs shall be forfeited as the JVS are exceeded the standards.
SOLAPUR Industry shall submit bak Guarantee of Rs 5.0 Lakhs to make
ROAD BACK total BG fo Rs 7.5 Lakhs towards compliance of consent
SIDE HOTEL conditions and O & M of PCS.
KANCHAN) (ii) Industry shall submit consent fees on increased CI
DAUND
16 MPCB- MOIL LIMITED - Approved 30/6/2025 APC Application was discussed in 9th Consent Committee meeting held
CONSENT- Munsar Renewal of on 30/06/2022. As per CC decision vide letter dtd. 22/7/2022 show
0000137002 Manganese Ore consent to cause was issued. Vide letter dtd. 26/07/2022 received on 18/8/2022
Mine 73, 76, 104, operate PP has submitted reply as below,1. The CI increased by Rs. 52.13 Cr
95, 96 etc mainly plant & machinery and building.2. Mine is operate through
VILLAGE - underground method as per EC. 3. Fixed water sprinklers have been
MUNSAR, POST provided previously to the crusher area for arresting dust. work order
KHAIRI allotted to third party agency. New fixed water sprinklers will be
BIJEWADA completed within 3 months. 4. Work order for ETP issued and work
RAMTEK will be completed within 3 months.5. Installation of CAAQMS will

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


be completed within 3 months. 6. Obtained CGWA NOC on
17/10/2020 valid upto 16/10/2022.

In view of it was decided to grant renewal of consent with following


conditions.
(i) PP shall submit Board resolution towards increased CI by
Rs. 52.13 Cr towards plant & machinery without prior
consent and submit BG of Rs. 2 Lakhs.
(ii) PP shall install ETP within 3 months and submit Bank
Guarantee of Rs. 2 Lakhs for compliance
(iii) PP shall install adequate air pollution control system to
crusher and screen within 2 months.
(iv) PP shall install 3 CAAQMS within 3 month.
(v) PP shall extend existing Bank Guarantee submitted towards
compliance of consent conditions.
17 MPCB- Maharashtra Rajya Not --- WPC Industry has applied for Renewal of Consent to Operate with
CONSENT- Sahakari Dudh Approved Increase in Production capacity and with increase in capital
0000141704 Mahasangh Renewal of investment for manufacturing Milk dairy product & pasteurization &
Maryadit , Consent to packing of milk.
Mahanand Dairy Operate
Unit No.12,Aarey It was decided to issue SCN for Refusal of Renewal of Consent to
milk colony Operate due to following non-compliances :
Western Express (i) Industry has not submitted Bank Guarantee as per previous
Highway,unit Consent condition to MPC Board.
No.12,Aarey Milk (ii) Industry has increased production capacities of three
Colony,Goregaon products- Butter Milk is increased by 92.17 KL/M, Floured
East, Mumbai ; Milk40.10 KL/M, and Lassi 30.65 KL/M without obtaining
400065 Borivali consent to establish from MPC Board.
(iii) Industry has not submitted Justification towards increase in
capital investment from from Rs. 69.75 Crs to Rs. 86.06 Crs
i.e increase in CI of Rs. 16.32 Crs) to MPC Board.
18 MPCB- M/s. Hamlet Approved 30.06.2027 WPC Committee noted that PP had applied renewal of consent for IT
CONSENT- Construction Renewal & ITEs Activity for plot area 32968.61 Sq.Mtrs and BUA-
0000141231 (India) Pvt. Ltd. of 60907.01 Sq.Mtrs.
CTS No. 1406 Consent Earlier the case was discussed in 13th CC meeting dtd-
A/28A of 01.08.2022 and SCN for refusal of consent was issued on
Village Malad

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


(S) Prism Tower, 23.08.2022 as PP has not submitted BG and applied with
Building No. 4, increased CI
CTS No. 1406 Committee noted the reply submitted by PP wherein PP has
A/28A of submitted that the increase in cost of fixed assets is an account
Village Malad to additions to Plant & Machinery & increase in Capital
(S), Mindspace, Working-Progress.
Malad (West), After due deliberation, it was decided to issued renewal of
Mumbai - consent with following conditions.
400064 Borivali (i) PP shall comply with the conditions stipulated in
consent conditions and EC conditions shall extend BG
of Rs. 10 Lakhs towards compliance of the same &
extend the existing B.G. of Rs.2.0 Lakhs obtained
towards compliance of OWC.
(ii) PP shall install online monitoring system to the O/L of
STP for monitoring pH, Flow, BOD, TSS.
(iii) The treated domestic effluent shall be 60 % recycled for
secondary purpose such as toilet flushing, air
conditioning, cooling tower make up, firefighting etc.
and reaming shall be utilized on land for gardening and
connected to the sewerage system provided by local
body.
(iv) Project Proponent shall operate Organic waste digester
with composting facility or Bio-gas digester with
composting facility effectively.
(v) Project Proponent shall make provision of charging port
for Electric vehicles in at least 40% total available
parking area
Consent shall be issued after obtaining requisite consent
fees
19 MPCB- M/s. Ritnand Approved 30/06/2023 WPC It was decided to grant Renewal of Consent for Education
CONSENT- Balved Renewal Complex & Hostel Building having Total plot area is 110790
0000141516 Education of Sq.m. and Total construction BUA is 105966 sq.m. by
Foundation & Consent imposing following conditions:
Amity Global
Varsity Pvt. Ltd.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


"Amity (i) PP shall comply with the conditions stipulated in C to R
Educational and submit BG of Rs. 10 Lakhs towards compliance of
Complex the same.
S.No.161/2B/1, (ii) PP shall install online monitoring system to the O/L of
166/1B, 166/2, STP for monitoring pH, SS BOD and flow.
166/3, 166/4B, (iii) The treated domestic effluent shall be 60 % recycled for
166/5, 167/2, secondary purpose such as toilet flushing, air
167/3, 167/4, conditioning, cooling tower make up, firefighting etc.
168/1, 168/2A, and reaming shall be utilized on land for gardening and
& OTHERS connected to the sewerage system provided by local body
Village-Bhatan, (iv) Project Proponent shall operate and maintain Organic
Post-Somatane waste digester with composting facility or Biogas
Panvel digester with composting facility.

20 MPCB- Ashti Sugar Approved 31.07.2023 WPC It was decided to grant renewal of consent to operate for 2500
CONSENT- Limited 195/1, Renewal TCD sugar industry with Co gen plant by imposing following
0000143207 195/2, 195/3, of consent conditions.
196/1/A, to operate (i) Industry shall renew the bank Guarantee of Rs 5.0 Lakhs
196/1/B, 196/2 towards compliance of consent conditions and O & M of
A/P-Ashti Mohol PCS.
(ii) Industry shall submit consent fees on increased CI

Table Agenda.

Sr. Application Industry Name & Decision Consent Section Remarks/ Discussion
No. Unique Address on grant of granted
Number consent upto
1 MPCB- M/s. M. V. K. Agro Approved 31.07.2023 WPC Committee noted that it is an application for
CONSENT- Food Product Limited, Renewal of Renewal of Consent with expansion for Sugar
0000142119 GUT NO. 42, 42/1, Consent. unit having capacity-2500 TCD.
Kusum Nagar, Committee further noted that earlier PP had
Waghalwada, Tal-Umri obtained consent to establish for 1250 TCD sugar
,Dist-Nanded. unit & existing Sugar unit of 1250 TCD.

Establish/Operate/Renewal 16th CC Meeting 14.09.2022


It was decided grant renewal of consent with
expansion for total 2500 TCD by forfeiture of
50.0% B.G. towards exceeding JVS results and
with top B.G.