MR For CP
MR For CP
MR For CP
Order N.
Facility Name Location Scale Sheet of Sheets
ZUBAIR OIL FIELD - GENERAL ONSHORE 1 of 9
Document Title Supersedes N.
Superseded by N.
MATERIAL REQUISITION FOR Cathodic Protection MATERIAL Plant area Plant unit
REVISION HISTORY
INDEX
1- GENERAL……………………………………………………………………………………………………………… 4
2- APPLICABLE DOCUMENTS…………………………………………………………………………………….. 5
3- SUPPLIER DOCUMENTS REQUIRED………………………………………………………………………………………………………………
6
4- NOTES………………………………………………………………………………………………………………. 7
5- ITEMS TO BE SUPPLIED BY SUPPLIER………………………………………………………………………………………………………………
8
6- VENDOR DOCUMENT LIST……………………………………………………………………………………………………….
9
See Sheets 5
TECHNICAL DOCUMENTS
See Sheet 6
QUALITY DOCUMENTS
QUALITY SYSTEM DEFINITION:
WHEN APPLICABLE, THE SUPPLIER SHALL ADOPT A QUALITY MANAGEMENT SYSTEM IN ACCORDANCE WITH THE FOLLOWING:
ISO 9001: 2015 / UNI-EN ISO 9001: 2015 APPLICABLE NON APPLICABLE
Q1 ISO 9001 CERTIFICATE 1D
Splicing and Terminals Cable Data Sheets with all data requested in
MR and attached documents: Data Sheets with design data, material
qualities, quantities, thickness, weights, nozzles list / size / rating /
8 quantity, accessories, equipment's setting plan with overall 1D 1APO 1D 4BDE 4P + 1D X
dimensions, nozzles orientation, anchor bolts distribution / type /
number, supports distribution, foundation loads (wind, thermal
expansion, etc).
12 Reference List 1D X
QUALITY DOCUMENTS
See page 4
MANAGEMENT DOCUMENTS
APPLICABLE DOCUMENTS
Item Company Doc. no. Rev Contractor Doc. no. Rev. DESCRIPTION
CONTRACTOR TECHNICAL DOCUMENTS
13
14
15
16
17
ENI STANDARD
18
20 05497.VAR.ELE.SPC Construction methods for electrical material for tropical climates (tropicalization)
24
25
26
27
28
18
19
20
21
NOTES
(*) A step of payment (to be agreed with procurement) shall be subject to the first issue of the document.
(**) If required apply project standard attached to this document
In case of conflict on technical requirements between different standard relevant the same subject, the most stringent criteria shall apply.
Some reference documents mentioned in the project specification, may be not included in this Material Requisition,
because considered of minor impact and not critical for the technical and commercial quotation. However is the bidder
responsability to ask for any further clarification or documentation in case of need.
2. VENDOR Scope of Supply shall be in full compliance with Project Data Sheets and Specifications (as per Page 5 of this M.R.).
Stainless steel Test Station enclosure,AISI 316 minimum 1.5 thick; Type A
10 space 300x250x140mm. provided with non-conductive bottom plate for 32 No
terminal boards installation and support base
Stainless steel Test Station enclosure ,AISI 316 minimum 1.5 thick; Type B
11 space 800x600x300mm. provided with non-conductive bottom plate for 40 No
terminal boards installation and support base
15 Inline splicing kit (2-WAY) 22 No
16 Pin brazing set (N°1300 cartridge-N°1300 ferrule-N°1300 cable lug) 450 No
17 Shunts 0,1 Ω / 100 W with support and screws for fixing 110 No
REV. DATE
(1) Please indicate the Reference Item number shown in the "Vendor Document Required" Section of the MR to which the Document refers to
(1) Indicare l'item number riportato nella sezione "Vendor Document Required" della MR al quale il documento si riferisce
This document is property of eni iraq B.V.
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.