Activity ID Activity Name Original Duration Start

ONE PRIME TOWER - ALABANG


KEYDATES
0 09-Mar-17 A
OPT-MIL-KD-0001 Project Start
OPT-MIL-KD-0002 Project DD 0 11-Jul-17

OPT-MIL-KD-0003 Project Completion


SITE WORKS COMPLETION DATE
OPT-MIL-STWRKS-Finish Date the Bulk Excavation, Trimmin 0
CONCRETE WORKS COMPLETION DATE
OPT-MIL-CONC-00Finish Date Foundation Area 1 to Area 7 0
0
OPT-MIL-CONC-00Finish Date Concreting Works from B4 to
0
OPT-MIL-CONC-00Finish Date RC Slab Second Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Third Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Fourth Floor Level
OPT-MIL-CONC-00Finish Date RC Slab Fifth Floor Level 0
OPT-MIL-CONC-00Finish Date RC Slab Sixth Floor Level 0
0
OPT-MIL-CONC-00Finish Date RC Slab Seventh Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Eighth Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Ninth Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Tenth Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Eleventh Floor Level
0
OPT-MIL-CONC-00Finish Date RC Slab Roof Floor Level
GENERAL MILESTONE
OPT-MIL-GM-0001 BMW can Start Fitout Works 0 17-Jan-18
OPT-MIL-GM-0002 Topping Off 0 24-Apr-18
0 17-Jun-18
OPT-MIL-GM-0003 Energization
OPT-MIL-GM-0004 Water Tightness 0 20-Jul-18
GENERAL REQUIREMENTS
OPT-GEN-GENREQSDewatering Works 110 01-Jun-17 A
OPT-GEN-GENREQSPreliminaries 540 09-Mar-17 A
ENGINEERING PHASE
CIVIL & STRUCTURAL SHOPDRAWINGS SUBMITTAL & APPROVAL
24 11-Jul-17
OPT-ENGG-CE-000Civil and Structural Shopdrawings Submi
ARCHITECTURAL SHOPDRAWINGS SUBMITTAL & APPROVAL
24 23-Jul-17
OPT-ENGG-ARCHI Architectuiral Shopdrawings Submittal a
MECHANICAL SHOPDRAWINGS SUBMITTAL & APPROVAL
24 6-Aug-17
OPT-ENGG-MECH-Mechanical Shopdrawings Submittal and
ELECTRICAL SHOPDRAWINGS SUBMITTAL & APPROVAL
OPT-ENGG-EE-000Electrical Shopdrawings Submittal and A 24 16-Aug-17
PROCUREMENT PHASE
MATERIALS SUBMITTAL AND APPROVAL
CIVIL & STRUCTURAL MATERIALS SUBMITTAL & APPROVAL
OPT-MAT-MSACECivil and Structural Materials Submittal 14 14-Jul-17
ARCHITECTURAL MATERIALS SUBMITTAL & APPROVAL
OPT-MAT-MSAA Architectuiral Materials Submittal and A 24 26-Jul-17
MECAHINICAL MATERIALS SUBMITTAL & APPROVAL
OPT-MAT-MSAM Mechanical Materials Submittal and App 24 9-Aug-17
ELECTRICAL MATERIALS SUBMITTAL & APPROVAL
OPT-MAT-MSAEEElectrical Materials Submittal and Appro 24 19-Aug-17
ORDER & PURCHASE OF MATERIALS
CIVIL & STRUCTURAL MATERIALS ORDER & PURCHASE
OPT-MAT-ORDCECivil & Structural Materials 14 17-Jul-17
ARCHICTECTURAL MATERIALS ORDER & PURCHASE
OPT-MAT-ORDA Architectural Materials 14 10-Aug-17
MECHANICAL MATERIALS ORDER & PURCHASE
14 24-Aug-17
OPT-MAT-ORDM Mechanical Materials
ELECTRICAL MATERIALS ORDER & PURCHASE
14 3-Sep-17
OPT-MAT-ORDEEElectrical Materials
SHORT LEAD ITEMS MATERIALS
CIVIL & STRUCTURAL MATERIALS
OPT-MAT-SLIMC Civil & Structural Materials 25 20-Jul-17
ARCHICTECTURAL MATERIALS
OPT-MAT-SLIMA Architectural Materials 25 6-Aug-17
MECHANICAL MATERIALS
25 20-Aug-17
OPT-MAT-SLIM Mechanical Materials
ELECTRICAL MATERIALS
OPT-MAT-SLIME Electrical Materials 25 28-Aug-17
LONG LEAD ITEMS MATERIALS
MECHANICAL MATERIALS
OPT-MAT-LLIM Mechanical Materials 75 7-Sep-17
ELECTRICAL MATERIALS
75 17-Sep-17
OPT-MAT-LLIME Electrical Materials
CONSTRUCTION PHASE
SUBSTRUCTURE
110 01-Apr-18 A
OPT-SUB-SUB-000 Excavation Works, Trimming and Disposa
FOUNDATION WORK
AREA 1
1 11-Jul-17
OPT-SUB-FWA1 PCC Blinding for RC Foundation at Area 1
1 12-Jul-17
OPT-SUB-FWA1 Steel Fixing for RC Foundation at Area 1
1 13-Jul-17
OPT-SUB-FWA1 Casting of Concrete for RC Foundation at
OPT-SUB-FWA1 Steel Fixing for Beam at Area 1 2 14-Jul-17
OPT-SUB-FWA1 Steel Fixing and Protection Board for Sla 3 13-Jul-17
OPT-SUB-FWA1 PCC blinding + Casting of Concrete for B 1 16-Jul-17
1 17-Jul-17
OPT-SUB-FWA1 PCC blinding + Casting of Concrete for Sl
AREA 2
1 18-Jul-17
OPT-SUB-FWA2 PCC Blinding for RC Foundation at Area 2
2 19-Jul-17
OPT-SUB-FWA2 Steel Fixing for RC Foundation at Area 2
OPT-SUB-FWA2 Casting of Concrete for RC Foundation at 2 19-Jul-17
OPT-SUB-FWA2 Steel Fixing for Beam at Area 2 2 20-Jul-17
OPT-SUB-FWA2 PCC blinding + Casting of Concrete for B 1 22-Jul-17
OPT-SUB-FWA2 Steel Fixing and Protection Board for Sla 3 21-Jul-17
1 24-Jul-17
OPT-SUB-FWA2 PCC blinding + Casting of Concrete for Sl
AREA 3
1 25-Jul-17
OPT-SUB-FWA3 PCC Blinding for RC Foundation at Area 3
2 26-Jul-17
OPT-SUB-FWA3 Steel Fixing for RC Foundation at Area 3
OPT-SUB-FWA3 Casting of Concrete for RC Foundation at 2 26-Jul-17
OPT-SUB-FWA3 Steel Fixing for Beam at Area 3 2 27-Jul-17
OPT-SUB-FWA3 PCC blinding + Casting of Concrete for B 1 29-Jul-17
OPT-SUB-FWA3 Steel Fixing and Protection Board for Sla 3 28-Jul-17
1 31-Jul-17
OPT-SUB-FWA3 PCC blinding + Casting of Concrete for Sl
AREA 4
1 31-Jul-17
OPT-SUB-FWA4 PCC Blinding for RC Foundation at Area 4
3 1-Aug-17
OPT-SUB-FWA4 Steel Fixing for RC Foundation at Area 4
OPT-SUB-FWA4 Casting of Concrete for RC Foundation at 2 2-Aug-17
OPT-SUB-FWA4 Steel Fixing for Beam at Area 4 2 3-Aug-17
OPT-SUB-FWA4 PCC blinding + Casting of Concrete for B 1 5-Aug-17
OPT-SUB-FWA4 Steel Fixing and Protection Board for Sla 3 4-Aug-17
1 7-Aug-17
OPT-SUB-FWA4 PCC blinding + Casting of Concrete for Sl
AREA 5
1 8-Aug-17
OPT-SUB-FWA5 PCC Blinding for RC Foundation at Area 5
2 9-Aug-17
OPT-SUB-FWA5 Steel Fixing for RC Foundation at Area 5
OPT-SUB-FWA5 Casting of Concrete for RC Foundation at 2 9-Aug-17
OPT-SUB-FWA5 Steel Fixing for Beam at Area 5 2 10-Aug-17
OPT-SUB-FWA5 PCC blinding + Casting of Concrete for B 1 12-Aug-17
OPT-SUB-FWA5 Steel Fixing and Protection Board for Sla 3 11-Aug-17
1 14-Aug-17
OPT-SUB-FWA5 PCC blinding + Casting of Concrete for Sl
AREA 6
1 14-Aug-17
OPT-SUB-FWA6 PCC Blinding for RC Foundation at Area 6
2 15-Aug-17
OPT-SUB-FWA6 Steel Fixing for RC Foundation at Area 6
OPT-SUB-FWA6 Casting of Concrete for RC Foundation at 1 16-Aug-17
OPT-SUB-FWA6 Steel Fixing for Beam at Area 6 2 17-Aug-17
OPT-SUB-FWA6 PCC blinding + Casting of Concrete for B 1 19-Aug-17
OPT-SUB-FWA6 Steel Fixing and Protection Board for Sla 3 17-Aug-17
1 20-Aug-17
OPT-SUB-FWA6 PCC blinding + Casting of Concrete for Sl
AREA 7
1 20-Aug-17
OPT-SUB-FWA7 PCC Blinding for RC Foundation at Area 7
1 21-Aug-17
OPT-SUB-FWA7 Steel Fixing for RC Foundation at Area 7
OPT-SUB-FWA7 Casting of Concrete for RC Foundation at 1 22-Aug-17
OPT-SUB-FWA7 Steel Fixing and Protection Board for Sla 2 22-Aug-17
OPT-SUB-FWA7 Steel Fixing for Beam at Area 7 2 23-Aug-17
OPT-SUB-FWA7 PCC blinding + Casting of Concrete for B 1 25-Aug-17
1 26-Aug-17
OPT-SUB-FWA7 PCC blinding + Casting of Concrete for Sl
BASEMENT 4 FLOOR LEVEL
AREA 1
6 19-Jul-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 6 21-Jul-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 28-Jul-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 7 23-Jul-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 29-Jul-17
1 3-Aug-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 2
6 1-Aug-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 6 3-Aug-17
1 10-Aug-17
OPT-SUB-CLNB Casting of Concrete for RC Column
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 7 5-Aug-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 11-Aug-17
1 16-Aug-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 3
6 15-Aug-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 6 17-Aug-17
OPT-SUB-CLNB Steel Fixing for RC Retaining Wall 5 19-Aug-17
1 24-Aug-17
OPT-SUB-CLNB Casting of Concrete for RC Column
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 23-Aug-17

1 28-Aug-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
BASEMENT 4 FLOOR LEVEL, STAIR & RAMP
OPT-SUB-STR&R Steel Fixing for RC Stair and Ramp at Ba 5 29-Aug-17
OPT-SUB-STR&R Shuttering Works for RC Stair and Ramp 5 31-Aug-17
OPT-SUB-STR&R Casting of Concrete for RC Stair and Ra 1 7-Sep-17
UNDEGROUND WATER TANK
OPT-SUB-UNDER RC Underground Water Tank Constructi 30 31-Jul-17
SUPERSTRUCTURE
BASEMENT 3 FLOOR LEVEL
AREA 1
6 4-Aug-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 4 8-Aug-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 12-Aug-17
5 13-Aug-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 5 14-Aug-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 19-Aug-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 6 16-Aug-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 18-Aug-17
2 22-Aug-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 2
6 17-Aug-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 4 21-Aug-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 25-Aug-17
5 26-Aug-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 5 27-Aug-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 1-Sep-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 6 29-Aug-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 31-Aug-17
2 4-Sep-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 3
5 29-Aug-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 3 2-Sep-17
1 5-Sep-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla
4 6-Sep-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 3 7-Sep-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 10-Sep-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 5 8-Sep-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 9-Sep-17
2 13-Sep-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
BASEMENT 2 FLOOR LEVEL
AREA 1
6 24-Aug-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 4 28-Aug-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 1-Sep-17
5 2-Sep-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 5 3-Sep-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 8-Sep-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 6 5-Sep-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 7-Sep-17
2 11-Sep-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 2
5 6-Sep-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 4 8-Sep-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 12-Sep-17
5 13-Sep-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 4 14-Sep-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 18-Sep-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 5 16-Sep-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 18-Sep-17
1 22-Sep-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 3
5 15-Sep-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 3 19-Sep-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 22-Sep-17
4 23-Sep-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 3 25-Sep-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 28-Sep-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 5 25-Sep-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 27-Sep-17
1 1-Oct-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
BASEMENT 1 FLOOR LEVEL
AREA 1
5 13-Sep-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 4 16-Sep-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 20-Sep-17
5 21-Sep-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 5 22-Sep-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 27-Sep-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 6 24-Sep-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 26-Sep-17
2 30-Sep-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 2
5 23-Sep-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 4 25-Sep-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla 1 29-Sep-17
5 30-Sep-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 4 1-Oct-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 5-Oct-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 5 2-Oct-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 4-Oct-17

1 8-Oct-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
AREA 3
5 2-Oct-17
OPT-SUB-B&SB Steel Fixing for RC Beam and Slab
OPT-SUB-B&SB Shuttering Works for RC Beam and Slab 3 6-Oct-17
1 9-Oct-17
OPT-SUB-B&SB Casting of Concrete for RC Beam and Sla
4 10-Oct-17
OPT-SUB-CLNB Steel Fixing for RC Column
OPT-SUB-CLNB Shuttering Works for RC Column 3 12-Oct-17
OPT-SUB-CLNB Casting of Concrete for RC Column 1 15-Oct-17
OPT-SUB-WAL Steel Fixing for RC Retaining Wall 5 11-Oct-17
OPT-SUB-WAL Shuttering Works for RC Retaining Wall 4 13-Oct-17
1 16-Oct-17
OPT-SUB-WAL Casting of Concrete for RC Retaining Wal
GROUND FLOOR LEVEL
OPT-SUB-B&SGF Steel Fixing for RC Beam and Slab Slab 12 2-Oct-17
OPT-SUB-B&SGF Shuttering Works for RC Beam and Slab 10 6-Oct-17

4 14-Oct-17
OPT-SUB-B&SGF Casting of Concrete for RC Beam and Slab
7 16-Oct-17
OPT-SUPR-CLNG Steel Fixing for RC Column at Ground Flo
OPT-SUPR-CLNG Shuttering Works for RC Column at Gro 7 17-Oct-17
4 22-Oct-17
OPT-SUPR-CLNG Casting of Concrete for RC Column at G
SECOND FLOOR LEVEL
7 24-Oct-17
OPT-SUPR-B&S2 Steel Fixing for RC Beam and Slab Slab at
OPT-SUPR-B&S2 Shuttering Works for RC Beam and Slab a 5 27-Oct-17

3 1-Nov-17
OPT-SUPR-B&S2 Casting of Concrete for RC Beam and Slab
6 3-Nov-17
OPT-SUPR-CLN2FSteel Fixing for RC Column at Second Flo
OPT-SUPR-CLN2FShuttering Works for RC Column at Secon 6 4-Nov-17
2 9-Nov-17
OPT-SUPR-CLN2FCasting of Concrete for RC Column at Sec
THIRD FLOOR LEVEL
OPT-SUPR-B&S3 Steel Fixing for RC Beam and Slab Slab at 7 10-Nov-17
OPT-SUPR-B&S3 Shuttering Works for RC Beam and Slab at 5 14-Nov-17
3 17-Nov-17
OPT-SUPR-B&S3 Casting of Concrete for RC Beam and Slab
6 18-Nov-17
OPT-SUPR-CLN3FSteel Fixing for RC Column at Third Floor
OPT-SUPR-CLN3FShuttering Works for RC Column at Third 6 19-Nov-17
OPT-SUPR-CLN3FCasting of Concrete for RC Column at Thi 3 23-Nov-17
FOURTH FLOOR LEVEL
OPT-SUPR-B&S4 Steel Fixing for RC Beam and Slab Slab at 7 24-Nov-17
OPT-SUPR-B&S4 Shuttering Works for RC Beam and Slab a 5 28-Nov-17

3 1-Dec-17
OPT-SUPR-B&S4 Casting of Concrete for RC Beam and Slab
6 2-Dec-17
OPT-SUPR-CLN4FSteel Fixing for RC Column at Fourth Floo
OPT-SUPR-CLN4FShuttering Works for RC Column at Fourt 6 4-Dec-17
OPT-SUPR-CLN4FCasting of Concrete for RC Column at Fou 3 8-Dec-17
FIFTH FLOOR LEVEL
OPT-SUPR-B&S5 Steel Fixing for RC Beam and Slab Slab at 7 9-Dec-17
OPT-SUPR-B&S5 Shuttering Works for RC Beam and Slab at 5 13-Dec-17
3 16-Dec-17
OPT-SUPR-B&S5 Casting of Concrete for RC Beam and Slab
6 17-Dec-17
OPT-SUPR-CLN5FSteel Fixing for RC Column at Fifth Floor
OPT-SUPR-CLN5FShuttering Works for RC Column at Fifth 6 19-Dec-17
OPT-SUPR-CLN5FCasting of Concrete for RC Column at Fift 3 24-Dec-17
SIXTH FLOOR LEVEL
OPT-SUPR-B&S6 Steel Fixing for RC Beam and Slab Slab at 7 25-Dec-17
OPT-SUPR-B&S6 Shuttering Works for RC Beam and Slab at 5 29-Dec-17
3 1-Jan-18
OPT-SUPR-B&S6 Casting of Concrete for RC Beam and Slab
6 2-Jan-18
OPT-SUPR-CLN6FSteel Fixing for RC Column at Sixth Floor
OPT-SUPR-CLN6FShuttering Works for RC Column at Sixth 6 5-Jan-18
OPT-SUPR-CLN6FCasting of Concrete for RC Column at Six 3 10-Jan-18
SEVENTH FLOOR LEVEL
OPT-SUPR-B&S7 Steel Fixing for RC Beam and Slab Slab at 7 11-Jan-18
OPT-SUPR-B&S7 Shuttering Works for RC Beam and Slab a 5 16-Jan-18
3 20-Jan-18
OPT-SUPR-B&S7 Casting of Concrete for RC Beam and Slab
6 21-Jan-18
OPT-SUPR-CLN7FSteel Fixing for RC Column at Seventh Flo
OPT-SUPR-CLN7FShuttering Works for RC Column at Seven 6 24-Jan-18
OPT-SUPR-CLN7FCasting of Concrete for RC Column at Sev 3 30-Jan-18
EIGHTH FLOOR LEVEL
OPT-SUPR-B&S8 Steel Fixing for RC Beam and Slab Slab at 7 31-Jan-18
OPT-SUPR-B&S8 Shuttering Works for RC Beam and Slab at 5 4-Feb-18
3 8-Feb-18
OPT-SUPR-B&S8 Casting of Concrete for RC Beam and Slab
6 9-Feb-18
OPT-SUPR-CLN8FSteel Fixing for RC Column at Eighth Floo
OPT-SUPR-CLN8FShuttering Works for RC Column at Eighth 6 11-Feb-18
OPT-SUPR-CLN8FCasting of Concrete for RC Column at Eig 3 16-Feb-18
NINTH FLOOR LEVEL
OPT-SUPR-B&S9 Steel Fixing for RC Beam and Slab Slab at 7 17-Feb-18
OPT-SUPR-B&S9 Shuttering Works for RC Beam and Slab at 5 21-Feb-18
3 25-Feb-18
OPT-SUPR-B&S9 Casting of Concrete for RC Beam and Slab
6 26-Feb-18
OPT-SUPR-CLN9FSteel Fixing for RC Column at Ninth Floor
OPT-SUPR-CLN9FShuttering Works for RC Column at Ninth 6 1-Mar-18
OPT-SUPR-CLN9FCasting of Concrete for RC Column at Nin 3 6-Mar-18
TENTH FLOOR LEVEL
OPT-SUPR-B&S1 Steel Fixing for RC Beam and Slab Slab at 7 7-Mar-18
OPT-SUPR-B&S1 Shuttering Works for RC Beam and Slab a 5 11-Mar-18
3 15-Mar-18
OPT-SUPR-B&S1 Casting of Concrete for RC Beam and Slab
6 16-Mar-18
OPT-SUPR-CLN1 Steel Fixing for RC Column at Tenth Floor
OPT-SUPR-CLN1 Shuttering Works for RC Column at Tenth 6 18-Mar-18
OPT-SUPR-CLN1 Casting of Concrete for RC Column at Ten 3 23-Mar-18
ELEVENT FLOOR LEVEL
OPT-SUPR-B&S1 Steel Fixing for RC Beam and Slab Slab at 7 24-Mar-18
OPT-SUPR-B&S1 Shuttering Works for RC Beam and Slab a 5 29-Mar-18
3 2-Apr-18
OPT-SUPR-B&S1 Casting of Concrete for RC Beam and Slab
6 3-Apr-18
OPT-SUPR-CLN1 Steel Fixing for RC Column at Eleventh F
OPT-SUPR-CLN1 Shuttering Works for RC Column at Eleve 6 5-Apr-18
OPT-SUPR-CLN1 Casting of Concrete for RC Column at Ele 3 11-Apr-18
ROOF FLOOR LEVEL
OPT-SUPR-B&SR Steel Fixing for RC Beam and Slab Slab at 7 12-Apr-18
OPT-SUPR-B&SR Shuttering Works for RC Beam and Slab a 7 15-Apr-18
4 21-Apr-18
OPT-SUPR-B&SR Casting of Concrete for RC Beam and Slab
SHEAR WALL, ELEVATOR SHAFT
BASEMENT 4 FLOOR LEVEL
10 8-Aug-17
OPT-SUB-SWES Steel Fixing for RC Wall at Basemen 4 Flo
OPT-SUB-SWES Shuttering Works for RC Wall at Basemen 8 13-Aug-17
OPT-SUB-SWES Casting of Concrete for RC Wall at Basem 5 19-Aug-17
BASEMENT 3 FLOOR LEVEL
12 26-Aug-17
OPT-SUB-SWES Steel Fixing for RC Wall at Basemen 3 Flo
OPT-SUB-SWES Shuttering Works for RC Wall at Basemen 10 31-Aug-17
5 8-Sep-17
OPT-SUB-SWES Casting of Concrete for RC Wall at Basem
BASEMENT 2 FLOOR LEVEL
12 13-Sep-17
OPT-SUB-SWES Steel Fixing for RC Wall at Basemen 2 Flo
OPT-SUB-SWES Shuttering Works for RC Wall at Basemen 10 20-Sep-17
5 28-Sep-17
OPT-SUB-SWES Casting of Concrete for RC Wall at Base
BASEMENT 1 FLOOR LEVEL
12 30-Sep-17
OPT-SUB-SWES Steel Fixing for RC Wall at Basemen 1 Flo
OPT-SUB-SWES Shuttering Works for RC Wall at Basemen 10 7-Oct-17
5 15-Oct-17
OPT-SUB-SWES Casting of Concrete for RC Wall at Basem
GROUND FLOOR LEVEL
12 12-Oct-17
OPT-SUPR-WA Steel Fixing for RC Wall at Ground Floor
OPT-SUPR-WA Shuttering Works for RC Wall at Ground F 10 19-Oct-17
5 27-Oct-17
OPT-SUPR-WA Casting of Concrete for RC Wall at Groun
SECOND FLOOR LEVEL
12 24-Oct-17
OPT-SUPR-WAL Steel Fixing for RC Wall at Second Floor
OPT-SUPR-WAL Shuttering Works for RC Wall at Second F 10 31-Oct-17
5 8-Nov-17
OPT-SUPR-WAL Casting of Concrete for RC Wall at Secon
THIRD FLOOR LEVEL
12 5-Nov-17
OPT-SUPR-WAL Steel Fixing for RC Wall at Third Floor Lev
OPT-SUPR-WAL Shuttering Works for RC Wall at Third Flo 10 12-Nov-17
5 20-Nov-17
OPT-SUPR-WAL Casting of Concrete for RC Wall at Third
FOURTH FLOOR LEVEL
12 20-Nov-17
OPT-SUPR-WAL Steel Fixing for RC Wall at Fourth Floor L
OPT-SUPR-WAL Shuttering Works for RC Wall at Fourth F 10 27-Nov-17
5 5-Dec-17
OPT-SUPR-WAL Casting of Concrete for RC Wall at Fourth
FIFTH FLOOR LEVEL
12 2-Dec-17
OPT-SUPR-WAL Steel Fixing for RC Wall at Fifth Floor Lev
OPT-SUPR-WAL Shuttering Works for RC Wall at Fifth Flo 10 11-Dec-17
5 19-Dec-17
OPT-SUPR-WAL Casting of Concrete for RC Wall at Fifth F
SIXTH FLOOR LEVEL
12 14-Dec-17
OPT-SUPR-WAL Steel Fixing for RC Wall at Sixth Floor Lev
OPT-SUPR-WAL Shuttering Works for RC Wall at Sixth Flo 10 21-Dec-17
5 29-Dec-17
OPT-SUPR-WAL Casting of Concrete for RC Wall at Sixth F
SEVENTH FLOOR LEVEL
12 26-Dec-17
OPT-SUPR-WAL Steel Fixing for RC Wall at Seventh Floor
OPT-SUPR-WAL Shuttering Works for RC Wall at Seventh 10 2-Jan-18
5 10-Jan-18
OPT-SUPR-WAL Casting of Concrete for RC Wall at Sevent
EIGHTH FLOOR LEVEL
12 7-Jan-18
OPT-SUPR-WAL Steel Fixing for RC Wall at Eighth Floor L
OPT-SUPR-WAL Shuttering Works for RC Wall at Eighth F 10 14-Jan-18
5 22-Jan-18
OPT-SUPR-WAL Casting of Concrete for RC Wall at Eighth
NINTH FLOOR LEVEL
12 19-Jan-18
OPT-SUPR-WAL Steel Fixing for RC Wall at Ninth Floor Le
OPT-SUPR-WAL Shuttering Works for RC Wall at Ninth Fl 10 26-Jan-18
5 3-Feb-18
OPT-SUPR-WAL Casting of Concrete for RC Wall at Ninth
TENTH FLOOR LEVEL
12 31-Jan-18
OPT-SUPR-WAL Steel Fixing for RC Wall at Tenth Floor Le
OPT-SUPR-WAL Shuttering Works for RC Wall at Tenth Fl 10 7-Feb-18
5 15-Feb-18
OPT-SUPR-WAL Casting of Concrete for RC Wall at Tenth
ELEVENT FLOOR LEVEL
OPT-SUPR-WAL Steel Fixing for RC Wall at Eleventh Floor 12 12-Feb-18
OPT-SUPR-WAL Shuttering Works for RC Wall at Eleventh 10 19-Feb-18
5 27-Feb-18
OPT-SUPR-WAL Casting of Concrete for RC Wall at Eleven
STAIR CONSTRUCTION
BASEMENT 3 FLOOR LEVEL, STAIR & RAMP
5 2-Oct-17
OPT-SUB-STRB3 Steel Fixing for RC Stair and Ramp
OPT-SUB-STRB3 Shuttering Works for RC Stair and Ramp 5 4-Oct-17
OPT-SUB-STRB3 Casting of Concrete for RC Stair and Ram 1 11-Oct-17
BASEMENT 2 FLOOR LEVEL, STAIR & RAMP
5 12-Oct-17
OPT-SUB-STRB2 Steel Fixing for RC Stair and Ramp
OPT-SUB-STRB2 Shuttering Works for RC Stair and Ramp 5 14-Oct-17
OPT-SUB-STRB2 Casting of Concrete for RC Stair and 1 21-Oct-17
BASEMENT 1 FLOOR LEVEL, STAIR & RAMP
5 18-Oct-17
OPT-SUB-STRB1 Steel Fixing for RC Stair
OPT-SUB-STRB1 Shuttering Works for RC Stair 5 20-Oct-17
OPT-SUB-STRB1 Casting of Concrete for RC Stair 1 27-Oct-17
GROUND FLOOR LEVEL, STAIR
5 4-Nov-17
OPT-SUPR-STR Steel Fixing for RC Stair
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 6-Nov-17
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 13-Nov-17
SECOND FLOOR LEVEL, STAIR
5 20-Nov-17
OPT-SUPR-STR Steel Fixing for RC Stair
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 22-Nov-17
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 29-Nov-17
THIRD FLOOR LEVEL, STAIR
5 4-Dec-17
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 6-Dec-17
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 13-Dec-17
FOURTH FLOOR LEVEL, STAIR
5 19-Dec-17
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 21-Dec-17
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 28-Dec-17
FIFTH FLOOR LEVEL, STAIR
5 4-Jan-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 6-Jan-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 13-Jan-18
SIXTH FLOOR LEVEL, STAIR
5 23-Jan-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 25-Jan-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 1-Feb-18
SEVENTH FLOOR LEVEL, STAIR
5 11-Feb-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 13-Feb-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 20-Feb-18
EIGHT FLOOR LEVEL, STAIR
5 28-Feb-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 2-Mar-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 9-Mar-18
NINTH FLOOR LEVEL, STAIR
5 18-Mar-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 20-Mar-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 27-Mar-18
TENTH FLOOR LEVEL, STAIR
5 5-Apr-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 7-Apr-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 14-Apr-18
ELEVENT FLOOR LEVEL, STAIR
5 25-Apr-18
OPT-SUPR-STR Steel Fixing for RC Stair and Ramp
OPT-SUPR-STR Shuttering Works for RC Stair and Ramp 5 27-Apr-18
OPT-SUPR-STR Casting of Concrete for RC Stair and Ram 1 4-May-18
INTERIOR FINISHES
BASEMENT 4 FLOOR LEVEL
WALLS
MASONRY WORKS

14 18-Oct-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
12 1-Nov-17
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 13-Nov-17
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 29-Nov-17
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 8-Jan-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


THERMAL MOIST PROTECTION
OPT-IFIN-TM Waterproofing on Retaining Floor / Wall 21 22-Oct-17
TILING WORKS
14 18-Nov-17
OPT-IFIN-TILB Ceramic Wall Tiles at Wet Areas
OPT-IFIN-TILB Elevator Facade Wall Tiles 14 21-Nov-17
METAL WORKS
OPT-IFIN-ME Stair Railing, Ladder Run, Column Guard 14 17-Dec-17
DOORS INSTALLATION
16 13-Nov-17
OPT-IFIN-DRS Door Frame and Subframe fixing
16 29-Nov-17
OPT-IFIN-DRS Door Leaf Installation
8 15-Dec-17
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 18-Nov-17
OPT-IFIN-WI Glazing 12 2-Dec-17
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 13-Dec-17
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 27-Dec-17
FLOORS
THERMAL MOIST PROTECTION
8 2-Dec-17
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A
TILING WORKS
16 1-Dec-17
OPT-IFIN-TILB Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TILB Ceramic Floor Tiles at Wet Areas 12 10-Dec-17
16 10-Dec-17
OPT-IFIN-TILB Non Skid Tiles at Ramp
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 3-Dec-17
CURBS / GUTTER
18 13-Nov-17
OPT-IFIN-CRB Curbs and Gutter
ROAD MARKING
10 1-Dec-17
OPT-IFIN-RDB Road Marking
WHEEL STOPPER
10 1-Nov-17
OPT-IFIN-WS Wheel Stopper
CONCRETE POWER TROWEL FINISH
OPT-IFIN-CO Smooth Floor Concrete Finish 14 25-Oct-17
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 15-Dec-17
OPT-IFIN-CM First Coat Painting 14 29-Dec-17
12 22-Jan-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 29-Nov-17
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 13-Dec-17
BASEMENT 3 FLOOR LEVEL
WALLS
MASONRY WORKS

14 1-Nov-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
14 15-Nov-17
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 29-Nov-17
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 15-Dec-17
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 24-Jan-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


THERMAL MOIST PROTECTION
OPT-IFIN-TM Integral Waterproofing on Retaining Wal 21 5-Nov-17
TILING WORKS
14 4-Dec-17
OPT-IFIN-TILB Ceramic Wall Tiles at Wet Areas
OPT-IFIN-TILB Tile Installation at Elevator Facade 14 9-Dec-17
METAL WORKS
OPT-IFIN-ME Stair Railing, Separator Beam, and othe 14 2-Jan-18
DOORS INSTALLATION
16 29-Nov-17
OPT-IFIN-DRS Door Frame and Subframe fixing
16 15-Dec-17
OPT-IFIN-DRS Door Leaf Installation
8 31-Dec-17
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 4-Dec-17
OPT-IFIN-WI Glazing 12 18-Dec-17
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 29-Dec-17
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 12-Jan-18
FLOORS
THERMAL MOIST PROTECTION
8 18-Dec-17
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A
TILING WORKS
16 17-Dec-17
OPT-IFIN-TILB Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TILB Ceramic Floor Tiles at Wet Areas 12 26-Dec-17
16 26-Dec-17
OPT-IFIN-TILB Non Skid Tiles at Ramp
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 19-Dec-17
CURBS / GUTTER
18 29-Nov-17
OPT-IFIN-CRB Curbs and Gutter
ROAD MARKING
10 17-Dec-17
OPT-IFIN-RDB Road Marking
WHEEL STOPPER
10 15-Nov-17
OPT-IFIN-WS Wheel Stopper
CONCRETE POWER TROWEL FINISH
OPT-IFIN-CO Smooth Floor Concrete Finish 14 6-Nov-17
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 31-Dec-17
OPT-IFIN-CM First Coat Painting 14 14-Jan-18

12 7-Feb-18
OPT-IFIN-CM Final Coat Painting
GYPSUM CEILING
14 15-Dec-17
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 29-Dec-17
BASEMENT 2 FLOOR LEVEL
WALLS
MASONRY WORKS

14 15-Nov-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
14 29-Nov-17
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 13-Dec-17
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 29-Dec-17
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 7-Feb-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


THERMAL MOIST PROTECTION
OPT-IFIN-TM Integral Waterproofing on Retaining Wal 21 19-Nov-17
TILING WORKS
14 18-Dec-17
OPT-IFIN-TILB Ceramic Wall Tiles at Wet Areas
OPT-IFIN-TILB Tile Installation at Elevator Facade 14 23-Dec-17
METAL WORKS
OPT-IFIN-ME Stair Railing, Separator Beam, and othe 14 16-Jan-18
DOORS INSTALLATION
16 13-Dec-17
OPT-IFIN-DRS Door Frame and Subframe fixing
16 29-Dec-17
OPT-IFIN-DRS Door Leaf Installation
8 14-Jan-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 18-Dec-17
OPT-IFIN-WI Glazing 12 1-Jan-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 12-Jan-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 26-Jan-18
FLOORS
THERMAL MOIST PROTECTION
8 1-Jan-18
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A
TILING WORKS
16 31-Dec-17
OPT-IFIN-TILB Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TILB Ceramic Floor Tiles at Wet Areas 12 9-Jan-18
16 9-Jan-18
OPT-IFIN-TILB Non Skid Tiles at Ramp
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 2-Jan-18
CURBS / GUTTER
18 13-Dec-17
OPT-IFIN-CRB Curbs and Gutter
ROAD MARKING
10 31-Dec-17
OPT-IFIN-RDB Road Marking
WHEEL STOPPER
10 29-Nov-17
OPT-IFIN-WS Wheel Stopper
CONCRETE POWER TROWEL FINISH
OPT-IFIN-CO Smooth Floor Concrete Finish 14 20-Nov-17
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 14-Jan-18
OPT-IFIN-CM First Coat Painting 14 28-Jan-18

12 21-Feb-18
OPT-IFIN-CM Final Coat Painting
GYPSUM CEILING
14 29-Dec-17
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 12-Jan-18
BASEMENT 1 FLOOR LEVEL
WALLS
MASONRY WORKS

14 25-Nov-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
14 9-Dec-17
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 23-Dec-17
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 8-Jan-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 17-Feb-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


THERMAL MOIST PROTECTION
OPT-IFIN-TM Integral Waterproofing on Retaining Wal 21 29-Nov-17
TILING WORKS
14 28-Dec-17
OPT-IFIN-TILB Ceramic Wall Tiles at Wet Areas
OPT-IFIN-TILB Tile Installation at Elevator Facade 14 2-Jan-18
METAL WORKS
OPT-IFIN-ME Stair Railing, Separator Beam, and othe 14 26-Jan-18
DOORS INSTALLATION
16 23-Dec-17
OPT-IFIN-DRS Door Frame and Subframe fixing
16 8-Jan-18
OPT-IFIN-DRS Door Leaf Installation
8 24-Jan-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 28-Dec-17
OPT-IFIN-WI Glazing 12 11-Jan-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 22-Jan-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 5-Feb-18
FLOORS
THERMAL MOIST PROTECTION
8 11-Jan-18
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A
TILING WORKS
16 10-Jan-18
OPT-IFIN-TILB Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TILB Ceramic Floor Tiles at Wet Areas 12 19-Jan-18
16 19-Jan-18
OPT-IFIN-TILB Non Skid Tiles at Ramp
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 12-Jan-18
CURBS / GUTTER
18 23-Dec-17
OPT-IFIN-CRB Curbs and Gutter
ROAD MARKING
10 10-Jan-18
OPT-IFIN-RD Road Marking
WHEEL STOPPER
10 9-Dec-17
OPT-IFIN-WS Wheel Stopper
CONCRETE POWER TROWEL FINISH
OPT-IFIN-CO Smooth Floor Concrete Finish 14 30-Nov-17
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 24-Jan-18
OPT-IFIN-CM First Coat Painting 14 7-Feb-18

12 5-Mar-18
OPT-IFIN-CM Final Coat Painting
GYPSUM CEILING
14 8-Jan-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 22-Jan-18
GROUND FLOOR LEVEL
WALLS
MASONRY WORKS
12 5-Dec-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
12 17-Dec-17
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

12 29-Dec-17
OPT-IFIN-PNT Surface Preparation Application at Wet /
12 17-Jan-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas
10 10-Feb-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


THERMAL MOIST PROTECTION
OPT-IFIN-TM Wall Waterproofing 14 3-Jan-18
METAL WORKS
5 28-Jan-18
OPT-IFIN-ME Stair Railing
OPT-IFIN-ME Beam Separator and Other Metal Works 10 31-Jan-18
DOORS INSTALLATION
10 29-Dec-17
OPT-IFIN-DRS Door Frame and Subframe fixing
10 10-Jan-18
OPT-IFIN-DRS Door Leaf Installation
8 29-Jan-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 3-Jan-18
OPT-IFIN-WI Glazing 12 17-Jan-18
FLOORS
TILING WORKS
14 12-Jan-18
OPT-IFIN-TILG Ceramic Floor Tiles at Dry Areas
CURBS
OPT-IFIN-CRB Curbs Installation 14 14-Jan-18
SPECIALTY WORK
OPT-IFIN-SPC Recption Counter 18 17-Jan-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 29-Jan-18
OPT-IFIN-CM First Coat Painting 14 12-Feb-18
12 26-Feb-18
OPT-IFIN-CM Final Coat Painting
SECOND FLOOR LEVEL
WALLS
MASONRY WORKS
14 15-Dec-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
14 29-Dec-17
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK
14 12-Jan-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
14 26-Jan-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

12 7-Mar-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL2 Ceramic Wall Tiles at Wet Areas 14 17-Jan-18
METAL WORKS
5 13-Feb-18
OPT-IFIN-ME Stair Railing
OPT-IFIN-ME Separator Beam and other Metal Works 10 18-Feb-18
DOORS INSTALLATION
10 12-Jan-18
OPT-IFIN-DRS Door Frame and Subframe fixing
10 26-Jan-18
OPT-IFIN-DRS Door Leaf Installation
8 9-Feb-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 17-Jan-18
OPT-IFIN-WIN Glazing 12 31-Jan-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 9-Feb-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 23-Feb-18
FLOORS
CURBS
OPT-IFIN-CRB Curbstone Installation 8 31-Jan-18
TILING WORKS
14 28-Jan-18
OPT-IFIN-TIL2 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL2 Non Skid Tiles at Ramp 12 8-Feb-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 30-Jan-18
SPECIALTY WORK
OPT-IFIN-SPC Reception Area 18 2-Feb-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 9-Feb-18
OPT-IFIN-CM First Coat Painting 14 23-Feb-18

12 19-Mar-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 26-Jan-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 9-Feb-18
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 29-Jan-18
OPT-IFIN-ACO Ceiling Closure, Final Fix 12 12-Feb-18
THIRD FLOOR LEVEL
WALLS
MASONRY WORKS
16 22-Dec-17
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 7-Jan-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 23-Jan-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 8-Feb-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 4-Mar-18
OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas
METAL WORKS
OPT-IFIN-ME Stair Railing and other Metal Works 5 26-Feb-18
DOORS INSTALLATION
16 23-Jan-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 8-Feb-18
OPT-IFIN-DRS Door Leaf Installation
8 24-Feb-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 28-Jan-18
OPT-IFIN-WIN Glazing 12 11-Feb-18
FLOORS
TILING WORKS
OPT-IFIN-TIL3 Cement Floor Finish 16 10-Feb-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 12-Feb-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 24-Feb-18
OPT-IFIN-CM First Coat Painting 14 10-Mar-18

12 31-Mar-18

OPT-IFIN-CM Final Coat Painting


FOURTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 23-Jan-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 8-Feb-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 24-Feb-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 12-Mar-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 21-Apr-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL4 Ceramic Wall Tiles at Wet Areas 14 1-Mar-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 30-Mar-18
DOORS INSTALLATION
16 24-Feb-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 12-Mar-18
OPT-IFIN-DRS Door Leaf Installation
8 28-Mar-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 1-Mar-18
OPT-IFIN-WIN Glazing 12 15-Mar-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 26-Mar-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 9-Apr-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 15-Mar-18
TILING WORKS
16 14-Mar-18
OPT-IFIN-TIL4 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL4 Ceramic Floor Tiles at Wet Areas 12 23-Mar-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 16-Mar-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 19-Mar-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 28-Mar-18
OPT-IFIN-CM First Coat Painting 14 11-Apr-18

12 5-May-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 12-Mar-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 26-Mar-18
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 15-Mar-18
OPT-IFIN-ACO Ceiling Closure, Final Fix 12 29-Mar-18
FIFTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 2-Feb-18
OPT-IFIN-MA Masonry Works for Wet / Dry Areas
PLASTERING WORKS
16 18-Feb-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 6-Mar-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 22-Mar-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 1-May-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL5 Ceramic Wall Tiles at Wet Areas 14 11-Mar-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 9-Apr-18
DOORS INSTALLATION
16 6-Mar-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 22-Mar-18
OPT-IFIN-DRS Door Leaf Installation
8 7-Apr-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 11-Mar-18
OPT-IFIN-WIN Glazing 12 25-Mar-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 5-Apr-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 19-Apr-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 25-Mar-18
TILING WORKS
16 24-Mar-18
OPT-IFIN-TIL5 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL5 Ceramic Floor Tiles at Wet Areas 12 2-Apr-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 26-Mar-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 29-Mar-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 7-Apr-18
OPT-IFIN-CM First Coat Painting 14 21-Apr-18

12 17-May-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 22-Mar-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
12 5-Apr-18
OPT-IFIN-GYP Ceiling Closure, Final Fix
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 25-Mar-18
12 8-Apr-18
OPT-IFIN-ACO Ceiling Closure, Final Fix
SIXTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 12-Feb-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 28-Feb-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 16-Mar-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 1-Apr-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 11-May-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL6 Ceramic Wall Tiles at Wet Areas 14 21-Mar-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 19-Apr-18
DOORS INSTALLATION
16 16-Mar-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 1-Apr-18
OPT-IFIN-DRS Door Leaf Installation
8 17-Apr-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION (EXTERIOR)
OPT-IFIN-WIN Window Frame and Subframe fixing 14 21-Mar-18
OPT-IFIN-WIN Glazing 12 4-Apr-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 15-Apr-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 29-Apr-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 4-Apr-18
TILING WORKS
16 3-Apr-18
OPT-IFIN-TIL6 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL6 Ceramic Floor Tiles at Wet Areas 12 12-Apr-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 5-Apr-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 8-Apr-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 17-Apr-18
OPT-IFIN-CM First Coat Painting 14 1-May-18

12 29-May-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 1-Apr-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 15-Apr-18
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 4-Apr-18
OPT-IFIN-ACO Ceiling Closure, Final Fix 12 18-Apr-18
SEVENTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 22-Feb-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 10-Mar-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 26-Mar-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 11-Apr-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas
14 21-May-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL7 Ceramic Wall Tiles at Wet Areas 14 31-Mar-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 29-Apr-18
DOORS INSTALLATION
16 26-Mar-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 11-Apr-18
OPT-IFIN-DRS Door Leaf Installation
8 27-Apr-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 31-Mar-18
OPT-IFIN-WIN Glazing 12 14-Apr-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 25-Apr-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 9-May-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 14-Apr-18
TILING WORKS
16 13-Apr-18
OPT-IFIN-TIL7 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL7 Ceramic Floor Tiles at Wet Areas 12 22-Apr-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 15-Apr-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 18-Apr-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 27-Apr-18
OPT-IFIN-CM First Coat Painting 14 11-May-18

12 10-Jun-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 11-Apr-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 25-Apr-18
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 14-Apr-18
OPT-IFIN-ACO Ceiling Closure, Final Fix 12 28-Apr-18
EIGHTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 4-Mar-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 20-Mar-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 5-Apr-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 21-Apr-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 31-May-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL8 Ceramic Wall Tiles at Wet Areas 14 10-Apr-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 9-May-18
DOORS INSTALLATION
16 5-Apr-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 21-Apr-18
OPT-IFIN-DRS Door Leaf Installation
8 7-May-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 10-Apr-18
OPT-IFIN-WIN Glazing 12 24-Apr-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 5-May-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 19-May-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 24-Apr-18
TILING WORKS
16 23-Apr-18
OPT-IFIN-TIL8 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL8 Ceramic Floor Tiles at Wet Areas 12 2-May-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 25-Apr-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 28-Apr-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 7-May-18
OPT-IFIN-CM First Coat Painting 14 21-May-18

12 22-Jun-18
OPT-IFIN-CM Final Coat Painting
GYPSUM CEILING
14 21-Apr-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 5-May-18
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 24-Apr-18
OPT-IFIN-ACO Ceiling Closure, Final Fix 12 8-May-18
NINTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 20-Mar-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 5-Apr-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 21-Apr-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 7-May-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 16-Jun-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL9 Ceramic Wall Tiles at Wet Areas 14 26-Apr-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 25-May-18
DOORS INSTALLATION
16 21-Apr-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 7-May-18
OPT-IFIN-DRS Door Leaf Installation
8 23-May-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WIN Window Frame and Subframe fixing 14 26-Apr-18
OPT-IFIN-WIN Glazing 12 10-May-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 21-May-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 4-Jun-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 10-May-18
TILING WORKS
16 9-May-18
OPT-IFIN-TIL9 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL9 Ceramic Floor Tiles at Wet Areas 12 18-May-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 11-May-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 14-May-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 23-May-18
OPT-IFIN-CM First Coat Painting 14 6-Jun-18

12 4-Jul-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 7-May-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 21-May-18
ACOUSTICAL CEILING
OPT-IFIN-ACO Ceiling Frame (Grid), First Fix 14 10-May-18
OPT-IFIN-ACO Ceiling Closure, Final Fix 12 24-May-18
TENTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 5-Apr-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 21-Apr-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 7-May-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 23-May-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 2-Jul-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL1 Ceramic Wall Tiles at Wet Areas 14 12-May-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 10-Jun-18
DOORS INSTALLATION
16 7-May-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 23-May-18
OPT-IFIN-DRS Door Leaf Installation
8 8-Jun-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 12-May-18
OPT-IFIN-WI Glazing 12 26-May-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 6-Jun-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 20-Jun-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 26-May-18
TILING WORKS
16 25-May-18
OPT-IFIN-TIL1 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL1 Ceramic Floor Tiles at Wet Areas 12 3-Jun-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 27-May-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 30-May-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 8-Jun-18
OPT-IFIN-CM First Coat Painting 14 22-Jun-18

12 18-Jul-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 23-May-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 6-Jun-18
ACOUSTICAL CEILING
OPT-IFIN-AC Ceiling Frame (Grid), First Fix 14 26-May-18
OPT-IFIN-AC Ceiling Closure, Final Fix 12 9-Jun-18
ELEVENTH FLOOR LEVEL
WALLS
MASONRY WORKS
16 15-Apr-18
OPT-IFIN-MA Masonry Works for Wet Areas
PLASTERING WORKS
16 1-May-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

16 17-May-18
OPT-IFIN-PNT Surface Preparation Application at Wet /
16 2-Jun-18
OPT-IFIN-PNT First Coat Painting at Wet / Dry Areas

14 12-Jul-18

OPT-IFIN-PNT Final Coat Painting at Wet / Dry Areas


TILING WORKS
OPT-IFIN-TIL1 Ceramic Wall Tiles at Wet Areas 14 22-May-18
METAL WORKS
OPT-IFIN-ME Stair Railing 5 20-Jun-18
DOORS INSTALLATION
16 17-May-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 2-Jun-18
OPT-IFIN-DRS Door Leaf Installation
8 18-Jun-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 22-May-18
OPT-IFIN-WI Glazing 12 5-Jun-18
DRY PARTITION WORKS
OPT-IFIN-DRY Dry Partition Studs and Frames Fixing, Fir 14 16-Jun-18
OPT-IFIN-DRY Dry Partiton Closure, Final Fix 12 30-Jun-18
FLOORS
THERMAL MOIST PROTECTION
OPT-IFIN-TM Wet Area Water Proofing at Wet / Dry A 8 5-Jun-18
TILING WORKS
16 4-Jun-18
OPT-IFIN-TIL1 Ceramic Floor Tiles at Dry Areas
OPT-IFIN-TIL1 Ceramic Floor Tiles at Wet Areas 12 13-Jun-18
EPOXY COATING AT STAIR AREA
OPT-IFIN-EPO Epoxy Coating at Stair Area 14 6-Jun-18
SPECIALTY WORK
OPT-IFIN-SPC Counter Top Installation and Joinery Wo 18 9-Jun-18
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 18-Jun-18
OPT-IFIN-CM First Coat Painting 14 2-Jul-18

12 3-Aug-18

OPT-IFIN-CM Final Coat Painting


GYPSUM CEILING
14 2-Jun-18
OPT-IFIN-GYP Ceiling Frame (Grid), First Fix
OPT-IFIN-GYP Ceiling Closure, Final Fix 12 16-Jun-18
ACOUSTICAL CEILING
OPT-IFIN-AC Ceiling Frame (Grid), First Fix 14 5-Jun-18
OPT-IFIN-AC Ceiling Closure, Final Fix 12 19-Jun-18
ROOF FLOOR LEVEL
WALLS
MASONRY WORKS
OPT-IFIN-MA Masonry Works for Wet Areas 14 1-May-18
PLASTERING WORKS
14 15-May-18
OPT-IFIN-PST Plastering Works at Wet / Dry Areas
PAINTING WORK

14 29-May-18
OPT-IFIN-PN Surface Preparation Application at Wet /
14 12-Jun-18
OPT-IFIN-PN First Coat Painting at Wet / Dry Areas

12 8-Jul-18

OPT-IFIN-PN Final Coat Painting at Wet / Dry Areas


METAL WORKS
5 12-Jun-18
OPT-IFIN-ME Separator Beam
DOORS INSTALLATION
16 29-May-18
OPT-IFIN-DRS Door Frame and Subframe fixing
16 14-Jun-18
OPT-IFIN-DRS Door Leaf Installation
8 30-Jun-18
OPT-IFIN-DRS Door Hardware Installation
WINDOW INSTALLATION
OPT-IFIN-WI Window Frame and Subframe fixing 14 3-Jun-18
OPT-IFIN-WI Glazing 12 17-Jun-18
FLOORS
THERMAL MOIST PROTECTION
12 12-Jun-18
OPT-IFIN-TM Roof WaterProofing
ROOF DECK FLOORING
12 24-Jun-18
OPT-IFIN-RDF Rubberized Flooring Finish
CEILING
CEMENT PLASTERED FINISH
OPT-IFIN-CM Surface Preparation Application 14 26-Jun-18
OPT-IFIN-CM First Coat Painting 14 10-Jul-18

12 15-Aug-18
OPT-IFIN-CM Final Coat Painting
EXTERIOR FINISHES
CURTAIN WALL (FRAME + GLASS)
43 18-Oct-17
OPT-XFIN-CRTGF Curtain Wall (Frame + Glass) - Ground Fl
OPT-XFIN-CRT2F Curtain Wall (Frame + Glass) - Second Fl 38 2-Nov-17
OPT-XFIN-CRT3F Curtain Wall (Frame + Glass) - Third Floo 31 25-Nov-17
OPT-XFIN-CRT4F Curtain Wall (Frame + Glass) - Fourth Flo 31 9-Dec-17
OPT-XFIN-CRT5F Curtain Wall (Frame + Glass) - Fifth Floor 31 26-Dec-17
OPT-XFIN-CRT6F Curtain Wall (Frame + Glass) - Sixth Floor 31 9-Jan-18
OPT-XFIN-CRT7F Curtain Wall (Frame + Glass) - Seventh Fl 31 26-Jan-18
OPT-XFIN-CRT8F Curtain Wall (Frame + Glass) - Eight Floor 31 9-Feb-18
OPT-XFIN-CRT9F Curtain Wall (Frame + Glass) - Ninth Floo 31 23-Feb-18
OPT-XFIN-CRT10 Curtain Wall (Frame + Glass) - Tenth Floo 31 9-Mar-18
OPT-XFIN-CRT11 Curtain Wall (Frame + Glass) - Eleventh F 31 9-Apr-18
ALUMINUM COMPOSITE PANEL CLADDING (FRAME + ACP CLADDING)
OPT-XFIN-ALUGF Aluminum Composite Panel - Ground Flo 43 17-Nov-17
OPT-XFIN-ALU2F Aluminum Composite Panel - Second Floo 36 1-Dec-17
OPT-XFIN-ALU3F Aluminum Composite Panel - Third Floor 36 20-Dec-17
OPT-XFIN-ALU4F Aluminum Composite Panel - Fourth Floo 36 2-Jan-18
OPT-XFIN-ALU5F Aluminum Composite Panel - Fifth Floor 36 18-Jan-18
OPT-XFIN-ALU6F Aluminum Composite Panel - Sixth Floor 36 1-Feb-18
OPT-XFIN-ALU7F Aluminum Composite Panel - Seventh Flo 36 16-Feb-18
OPT-XFIN-ALU8F Aluminum Composite Panel - Eight Floor 36 1-Mar-18
OPT-XFIN-ALU9F Aluminum Composite Panel - Ninth Floor 36 18-Mar-18
OPT-XFIN-ALU10 Aluminum Composite Panel - Tenth Floor 36 2-Apr-18
OPT-XFIN-ALU11 Aluminum Composite Panel - Eleventh Fl 36 19-Apr-18
OPT-XFIN-ALURD Aluminum Composite Panel - Roof Floor 37 4-May-18
MEP WORKS
PLUMBING WORKS (DRAINAGE & WATER SUPPLY)
BASEMENT 4, MECHANICAL ROOM AND ROOF FLOOR
SECOND FIX

25 4-Dec-17
OPT-MECH-S Water Transfer Pump Installation and Pi
25 11-Dec-17
OPT-MECH-S Water Booster Pump Installation and Pip
OPT-MECH-S Overhead Water Tank and Connection 25 16-May-18
FINAL FIX
OPT-MECH-FI Pumps and Equipments Installation 5 5-Jan-18
TESTING AND PRE-COMMISSIONING
7 10-Jan-18
OPT-MECH-T Pre-commission Water Transfer and Boo
OPT-MECH-T Pre-commission of OVerhead Water Tank 7 10-Jun-18
COMMISSIONING & HANDING OVER
7 17-Jun-18
OPT-MECH-C Test and Commissioning of Water Trans
BASEMENT 4 FLOOR LEVEL
EMBEDDED ON CONCRETE (SUBSTRUCTURE)
10 29-Jul-17
OPT-MECH-E Embedding Pipe in Concrete Slab
10 1-Aug-17
OPT-MECH-E Underground Piping
10 20-Aug-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
FIRST FIX

10 28-Oct-17
OPT-MECH-FI Cutting and Chasing in Block Wall
10 2-Nov-17
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 29-Jul-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 20-Aug-17
OPT-MECH-S Horizontal Water Supply Piping
10 2-Nov-17
OPT-MECH-S Vertical (Riser) Drainage Piping
10 2-Nov-17
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 12-Nov-17
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 12-Nov-17
OPT-MECH-S Water Supply Pipe Leakage Testing

4 22-Nov-17

OPT-MECH-S Floor Drain (Trap) Fixing


4 27-Nov-17
OPT-MECH-S Water Heater Installation
4 27-Nov-17
OPT-MECH-S Shower Tray Installation
FINAL FIX

7 1-Dec-17
OPT-MECH-FI Sanitary Ware Installation
7 1-Dec-17
OPT-MECH-FI Sanitary Fixture Fixing
TESTING AND PRE-COMMISSIONING

7 8-Dec-17
OPT-MECH-T Flushing and Checking Leaks in Water Su
7 8-Dec-17
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 8-Dec-17
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
BASEMENT 3 FLOOR LEVEL
EMBEDDED ON CONCRETE
10 3-Sep-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 3-Sep-17
OPT-MECH-E Embedding Pipe in Concrete Slab

10 6-Sep-17
OPT-MECH-E Underground Piping
FIRST FIX

10 11-Nov-17
OPT-MECH-FI Cutting and Chasing in Block Wall
10 16-Nov-17
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 3-Sep-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 3-Sep-17
OPT-MECH-S Horizontal Water Supply Piping
10 16-Nov-17
OPT-MECH-S Vertical (Riser) Drainage Piping
10 16-Nov-17
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 26-Nov-17
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 26-Nov-17
OPT-MECH-S Water Supply Pipe Leakage Testing

4 6-Dec-17

OPT-MECH-S Floor Drain (Trap) Fixing


4 11-Dec-17
OPT-MECH-S Water Heater Installation
4 11-Dec-17
OPT-MECH-S Shower Tray Installation
FINAL FIX
7 15-Dec-17
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 7 15-Dec-17
TESTING AND PRE-COMMISSIONING

7 22-Dec-17

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 22-Dec-17
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 22-Dec-17
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
BASEMENT 2 FLOOR LEVEL
EMBEDDED ON CONCRETE
10 13-Sep-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 13-Sep-17
OPT-MECH-E Embedding Pipe in Concrete Slab

10 16-Sep-17
OPT-MECH-E Underground Piping
FIRST FIX
10 26-Sep-17
OPT-MECH-FI Cutting and Chasing in Block Wall
10 1-Oct-17
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 13-Sep-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 13-Sep-17
OPT-MECH-S Horizontal Water Supply Piping
10 1-Oct-17
OPT-MECH-S Vertical (Riser) Drainage Piping
10 1-Oct-17
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 11-Oct-17
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 11-Oct-17
OPT-MECH-S Water Supply Pipe Leakage Testing

4 21-Oct-17

OPT-MECH-S Floor Drain (Trap) Fixing


4 26-Oct-17
OPT-MECH-S Water Heater Installation
4 26-Oct-17
OPT-MECH-S Shower Tray Installation
FINAL FIX
7 30-Oct-17
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 7 30-Oct-17
TESTING AND PRE-COMMISSIONING
7 6-Nov-17

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 6-Nov-17
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 6-Nov-17
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
BASEMENT 1 FLOOR LEVEL
EMBEDDED ON CONCRETE
10 23-Sep-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 23-Sep-17
OPT-MECH-E Embedding Pipe in Concrete Slab
10 26-Sep-17
OPT-MECH-E Underground Piping
FIRST FIX
10 6-Oct-17
OPT-MECH-FI Cutting and Chasing in Block Wall
10 11-Oct-17
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 23-Sep-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 23-Sep-17
OPT-MECH-S Horizontal Water Supply Piping
10 11-Oct-17
OPT-MECH-S Vertical (Riser) Drainage Piping
10 11-Oct-17
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 21-Oct-17
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 21-Oct-17
OPT-MECH-S Water Supply Pipe Leakage Testing

4 31-Oct-17

OPT-MECH-S Floor Drain (Trap) Fixing


4 5-Nov-17
OPT-MECH-S Water Heater Installation
4 5-Nov-17
OPT-MECH-S Shower Tray Installation
FINAL FIX
7 9-Nov-17
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 7 9-Nov-17
TESTING AND PRE-COMMISSIONING

7 16-Nov-17

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 16-Nov-17
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 16-Nov-17
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
FOURTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 16-Nov-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 16-Nov-17
OPT-MECH-E Embedding Pipe in Concrete Slab

10 19-Nov-17
OPT-MECH-E Underground Piping
FIRST FIX

10 4-Feb-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 9-Feb-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 16-Nov-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 16-Nov-17
OPT-MECH-S Horizontal Water Supply Piping
10 9-Feb-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 9-Feb-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 19-Feb-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 19-Feb-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 1-Mar-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 6-Mar-18
OPT-MECH-S Water Heater Installation
4 6-Mar-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
7 10-Mar-18
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 7 10-Mar-18
TESTING AND PRE-COMMISSIONING

7 17-Mar-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 17-Mar-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 17-Mar-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
FIFTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 1-Dec-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 1-Dec-17
OPT-MECH-E Embedding Pipe in Concrete Slab

10 4-Dec-17
OPT-MECH-E Underground Piping
FIRST FIX

10 14-Feb-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 19-Feb-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 1-Dec-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 1-Dec-17
OPT-MECH-S Horizontal Water Supply Piping
10 19-Feb-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 19-Feb-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 1-Mar-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 1-Mar-18
OPT-MECH-S Water Supply Pipe Leakage Testing
4 11-Mar-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 16-Mar-18
OPT-MECH-S Water Heater Installation
4 16-Mar-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 20-Mar-18
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 5 20-Mar-18
TESTING AND PRE-COMMISSIONING

7 25-Mar-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 25-Mar-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 25-Mar-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
SIXTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 17-Dec-17
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 17-Dec-17
OPT-MECH-E Embedding Pipe in Concrete Slab
10 20-Dec-17
OPT-MECH-E Underground Piping
FIRST FIX

10 24-Feb-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 1-Mar-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 17-Dec-17
OPT-MECH-S Horizontal Drainage Supply Piping
10 17-Dec-17
OPT-MECH-S Horizontal Water Supply Piping
10 1-Mar-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 1-Mar-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 11-Mar-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 11-Mar-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 21-Mar-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 26-Mar-18
OPT-MECH-S Water Heater Installation
4 26-Mar-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 30-Mar-18
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 5 30-Mar-18
TESTING AND PRE-COMMISSIONING

7 4-Apr-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 4-Apr-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 4-Apr-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
SEVENTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 5-Jan-18
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 5-Jan-18
OPT-MECH-E Embedding Pipe in Concrete Slab
10 8-Jan-18
OPT-MECH-E Underground Piping
FIRST FIX

10 6-Mar-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 11-Mar-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 5-Jan-18
OPT-MECH-S Horizontal Drainage Supply Piping
10 5-Jan-18
OPT-MECH-S Horizontal Water Supply Piping
10 11-Mar-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 11-Mar-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 21-Mar-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 21-Mar-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 31-Mar-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 5-Apr-18
OPT-MECH-S Water Heater Installation
4 5-Apr-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 9-Apr-18
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 5 9-Apr-18
TESTING AND PRE-COMMISSIONING

7 14-Apr-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 14-Apr-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 14-Apr-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
EIGHTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 24-Jan-18
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 24-Jan-18
OPT-MECH-E Embedding Pipe in Concrete Slab
10 27-Jan-18
OPT-MECH-E Underground Piping
FIRST FIX

10 16-Mar-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 21-Mar-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 24-Jan-18
OPT-MECH-S Horizontal Drainage Supply Piping
10 24-Jan-18
OPT-MECH-S Horizontal Water Supply Piping
10 21-Mar-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 21-Mar-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 31-Mar-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 31-Mar-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 10-Apr-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 15-Apr-18
OPT-MECH-S Water Heater Installation
4 15-Apr-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 19-Apr-18
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 5 19-Apr-18
TESTING AND PRE-COMMISSIONING

7 24-Apr-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 24-Apr-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 24-Apr-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
NINTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 10-Feb-18
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 10-Feb-18
OPT-MECH-E Embedding Pipe in Concrete Slab
10 13-Feb-18
OPT-MECH-E Underground Piping
FIRST FIX

10 1-Apr-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 6-Apr-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 10-Feb-18
OPT-MECH-S Horizontal Drainage Supply Piping
10 10-Feb-18
OPT-MECH-S Horizontal Water Supply Piping
10 6-Apr-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 6-Apr-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 16-Apr-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 16-Apr-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 26-Apr-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 1-May-18
OPT-MECH-S Water Heater Installation
4 1-May-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 5-May-18
OPT-MECH-FI Sanitary Ware Installation
OPT-MECH-FI Sanitary Fixture Fixing 5 5-May-18
TESTING AND PRE-COMMISSIONING

7 10-May-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 10-May-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 10-May-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
TENTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 28-Feb-18
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 28-Feb-18
OPT-MECH-E Embedding Pipe in Concrete Slab
10 3-Mar-18
OPT-MECH-E Underground Piping
FIRST FIX
10 17-Apr-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 22-Apr-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 28-Feb-18
OPT-MECH-S Horizontal Drainage Supply Piping
10 28-Feb-18
OPT-MECH-S Horizontal Water Supply Piping
10 22-Apr-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 22-Apr-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 2-May-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 2-May-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 12-May-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 17-May-18
OPT-MECH-S Water Heater Installation
4 17-May-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 21-May-18
OPT-MECH-F Sanitary Ware Installation
OPT-MECH-F Sanitary Fixture Fixing 5 21-May-18
TESTING AND PRE-COMMISSIONING

7 26-May-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 26-May-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 26-May-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
ELEVENTH FLOOR LEVEL
EMBEDDED ON CONCRETE
10 18-Mar-18
OPT-MECH-E Putting of Sleeves in Concrete Slab
10 18-Mar-18
OPT-MECH-E Embedding Pipe in Concrete Slab
10 21-Mar-18
OPT-MECH-E Underground Piping
FIRST FIX

10 27-Apr-18
OPT-MECH-FI Cutting and Chasing in Block Wall
10 2-May-18
OPT-MECH-FI Putting of Pipe, Water Supply in Block Wa
SECOND FIX
10 18-Mar-18
OPT-MECH-S Horizontal Drainage Supply Piping
10 18-Mar-18
OPT-MECH-S Horizontal Water Supply Piping
10 2-May-18
OPT-MECH-S Vertical (Riser) Drainage Piping
10 2-May-18
OPT-MECH-S Vertical (Riser) Water Supply Piping
10 12-May-18
OPT-MECH-S Drainage Pipe Water Leakage Testing
10 12-May-18
OPT-MECH-S Water Supply Pipe Leakage Testing

4 22-May-18

OPT-MECH-S Floor Drain (Trap) Fixing


4 27-May-18
OPT-MECH-S Water Heater Installation
4 27-May-18
OPT-MECH-S Shower Tray Installation
FINAL FIX
5 31-May-18
OPT-MECH-F Sanitary Ware Installation
OPT-MECH-F Sanitary Fixture Fixing 5 31-May-18
TESTING AND PRE-COMMISSIONING

7 5-Jun-18

OPT-MECH-T Flushing and Checking Leaks in Water Su


7 5-Jun-18
OPT-MECH-T Flushing and Checking Leaks in Drainage
7 5-Jun-18
OPT-MECH-T Simutaneous Flow Test on Drainage Pipe
BASEMENT 1, GROUND FLOOR LEVEL TO THIRD FLOOR LEVEL ROUGH INS ONLY
OPT-MECH-F& Basement 1, First and Second Fix Plumb 14 16-Oct-17
14 30-Oct-17
OPT-MECH-F& Ground Floor Level, First and Second Fi
OPT-MECH-F&S Third Floor Level, First and Second Fix 14 12-Nov-17
14 13-Nov-17
OPT-MECH-F&S Second Floor Level, First and Second Fi
HVAC WORKS
FIRST FIX, (DUCT HANGER AND SUPPORT)

18 18-Oct-17
OPT-MECH-FFB Heat Ventillation and A/C Works First Fi
18 5-Nov-17
OPT-MECH-FFB Heat Ventillation and A/C Works First Fi
OPT-MECH-FFB Heat Ventillation and A/C Works First Fi 18 23-Nov-17
OPT-MECH-FFB Heat Ventillation and A/C Works First Fi 18 11-Dec-17
18 29-Dec-17
OPT-MECH-FFG Heat Ventillation and A/C Works First Fix
18 16-Jan-18
OPT-MECH-FF2 Heat Ventillation and A/C Works First Fix
OPT-MECH-FF3 Heat Ventillation and A/C Works First Fix, 18 3-Feb-18
18 19-Feb-18
OPT-MECH-FF4 Heat Ventillation and A/C Works First Fix
18 9-Mar-18
OPT-MECH-FF5 Heat Ventillation and A/C Works First Fix,
18 27-Mar-18
OPT-MECH-FF6 Heat Ventillation and A/C Works First Fix,
18 14-Apr-18
OPT-MECH-FF7 Heat Ventillation and A/C Works First Fix
18 2-May-18
OPT-MECH-FF8 Heat Ventillation and A/C Works First Fix
18 20-May-18
OPT-MECH-FF9 Heat Ventillation and A/C Works First Fix,
18 7-Jun-18
OPT-MECH-FF1 Heat Ventillation and A/C Works First Fix
18 25-Jun-18
OPT-MECH-FF1 Heat Ventillation and A/C Works First Fix
OPT-MECH-FFR Heat Ventillation and A/C Works First Fix 18 13-Jul-18
SECOND FIX, (DUCTING SUPPLY, RETURN, FRESH AND EXHAUST, DUCT RISER, DUCT AND PIPE CONNECTION
18 5-Nov-17
OPT-MECH-SFB Heat Ventillation and A/C Works Second
18 23-Nov-17
OPT-MECH-SFB Heat Ventillation and A/C Works Second
18 11-Dec-17
OPT-MECH-SFB Heat Ventillation and A/C Works Second
OPT-MECH-SFB Heat Ventillation and A/C Works Second 18 29-Dec-17
18 16-Jan-18
OPT-MECH-SFG Heat Ventillation and A/C Works Second
OPT-MECH-SF2 Heat Ventillation and A/C Works Second F 18 26-Jan-18
18 13-Feb-18
OPT-MECH-SF3 Heat Ventillation and A/C Works Second F
OPT-MECH-SF4 Heat Ventillation and A/C Works Second F 18 1-Mar-18
OPT-MECH-SF5 Heat Ventillation and A/C Works Second Fi 18 19-Mar-18
OPT-MECH-SF6 Heat Ventillation and A/C Works Second F 18 6-Apr-18
OPT-MECH-SF7 Heat Ventillation and A/C Works Second 18 24-Apr-18
OPT-MECH-SF8 Heat Ventillation and A/C Works Second 18 12-May-18
OPT-MECH-SF9 Heat Ventillation and A/C Works Second F 18 30-May-18
OPT-MECH-SF1 Heat Ventillation and A/C Works Second 18 17-Jun-18
OPT-MECH-SF1 Heat Ventillation and A/C Works Second 18 5-Jul-18
OPT-MECH-SFR Heat Ventillation and A/C Works Second 18 23-Jul-18
THIRD FIX (EQUIPMENT AND INSTALLATION)
18 23-Nov-17
OPT-MECH-TFB Heat Ventillation and A/C Works Third Fi
OPT-MECH-TFB Heat Ventillation and A/C Works Third Fi 18 11-Dec-17
18 29-Dec-17
OPT-MECH-TFB Heat Ventillation and A/C Works Third Fi
OPT-MECH-TFB Heat Ventillation and A/C Works Third Fi 18 16-Jan-18

18 19-Mar-18
OPT-MECH-TF4 Heat Ventillation and A/C Works Third Fix
18 6-Apr-18
OPT-MECH-TF5 Heat Ventillation and A/C Works Third Fix
18 24-Apr-18
OPT-MECH-TF6 Heat Ventillation and A/C Works Third Fix
18 12-May-18
OPT-MECH-TF7 Heat Ventillation and A/C Works Third Fi
18 30-May-18
OPT-MECH-TF8 Heat Ventillation and A/C Works Third Fix
18 17-Jun-18
OPT-MECH-TF9 Heat Ventillation and A/C Works Third Fix
18 5-Jul-18
OPT-MECH-TF1 Heat Ventillation and A/C Works Third Fix
18 23-Jul-18
OPT-MECH-TF1 Heat Ventillation and A/C Works Third Fix
18 10-Aug-18
OPT-MECH-TFR Heat Ventillation and A/C Works Third Fix
FIRE FIGHTING WORKS
BASEMENT 4 FLOOR LEVEL
FIRST FIX
10 23-Oct-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 2-Nov-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 5-Nov-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 9-Nov-17

5 19-Nov-17
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Fire and Jockey Pump Installation 5 24-Nov-17
12 24-Nov-17
OPT-MECH-TF Sprinkler Fixing
12 26-Nov-17
OPT-MECH-TF Fire Hose Cabinet Fixing
12 28-Nov-17
OPT-MECH-TF Fire Hose Reel Fixing
12 30-Nov-17
OPT-MECH-TF Fire Extinguisher Fixing

12 5-Dec-17
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
7 17-Dec-17
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh
COMMISSIONING & HANDING OVER
OPT-MECH-C Commisisoning Fire Fighting System 7 24-Dec-17
BASEMENT 3 FLOOR LEVEL
FIRST FIX
10 2-Nov-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 12-Nov-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 15-Nov-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 19-Nov-17

5 29-Nov-17
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 4-Dec-17
OPT-MECH-TF Fire Hose Cabinet Fixing 12 6-Dec-17
OPT-MECH-TF Fire Hose Reel Fixing 12 8-Dec-17
OPT-MECH-TF Fire Extinguisher Fixing 12 10-Dec-17
12 15-Dec-17
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 27-Dec-17
COMMISSIONING & HANDING OVER
7 3-Jan-18
OPT-MECH-C Commisisoning Fire Fighting System
BASEMENT 2 FLOOR LEVEL
FIRST FIX
10 12-Nov-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 22-Nov-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 25-Nov-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 29-Nov-17

5 9-Dec-17
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 14-Dec-17
OPT-MECH-TF Fire Hose Cabinet Fixing 12 16-Dec-17
OPT-MECH-TF Fire Hose Reel Fixing 12 18-Dec-17
OPT-MECH-TF Fire Extinguisher Fixing 12 20-Dec-17

12 25-Dec-17
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 6-Jan-18
COMMISSIONING & HANDING OVER
OPT-MECH-C Commisisoning Fire Fighting System 7 13-Jan-18
BASEMENT 1 FLOOR LEVEL
FIRST FIX
OPT-MECH-FF Fire Fighting Hangers and Supports 10 22-Nov-17
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 2-Dec-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 5-Dec-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 9-Dec-17

5 19-Dec-17
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 24-Dec-17
OPT-MECH-TF Fire Hose Cabinet Fixing 12 26-Dec-17
OPT-MECH-TF Fire Hose Reel Fixing 12 28-Dec-17
OPT-MECH-TF Fire Extinguisher Fixing 12 30-Dec-17

12 4-Jan-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 16-Jan-18
COMMISSIONING & HANDING OVER
OPT-MECH-C Commisisoning Fire Fighting System 7 23-Jan-18
GROUND FLOOR LEVEL
FIRST FIX
10 13-Nov-17
OPT-MECH-F Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-S Fire Fighting Piping 10 23-Nov-17
OPT-MECH-S Fire Fighting Pipe Riser 12 26-Nov-17
OPT-MECH-S Fire Fighting Accessories Fixing 10 30-Nov-17

5 10-Dec-17
OPT-MECH-S Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-T Sprinkler Fixing 12 15-Dec-17
OPT-MECH-T Fire Hose Cabinet Fixing 12 17-Dec-17
OPT-MECH-T Fire Hose Reel Fixing 12 19-Dec-17
OPT-MECH-T Fire Extinguisher Fixing 12 21-Dec-17

12 26-Dec-17
OPT-MECH-T Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 7-Jan-18
COMMISSIONING & HANDING OVER
OPT-MECH-C Commisisoning Fire Fighting System 7 14-Jan-18
SECOND FLOOR LEVEL
FIRST FIX
10 23-Nov-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 3-Dec-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 6-Dec-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 10-Dec-17

5 20-Dec-17
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 25-Dec-17
OPT-MECH-TF Fire Hose Cabinet Fixing 12 27-Dec-17
OPT-MECH-TF Fire Hose Reel Fixing 12 29-Dec-17
OPT-MECH-TF Fire Extinguisher Fixing 12 31-Dec-17

12 5-Jan-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 17-Jan-18
COMMISSIONING & HANDING OVER
7 24-Jan-18
OPT-MECH-C Commisisoning Fire Fighting System
THIRD FLOOR LEVEL
FIRST FIX
10 3-Dec-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 13-Dec-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 16-Dec-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 20-Dec-17

5 30-Dec-17
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 4-Jan-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 6-Jan-18
OPT-MECH-TF Fire Hose Reel Fixing 12 8-Jan-18
OPT-MECH-TF Fire Extinguisher Fixing 12 10-Jan-18

12 15-Jan-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 27-Jan-18
COMMISSIONING & HANDING OVER
7 3-Feb-18
OPT-MECH-C Commisisoning Fire Fighting System
FOURTH FLOOR LEVEL
FIRST FIX
10 13-Dec-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 23-Dec-17
OPT-MECH-SF Fire Fighting Pipe Riser 12 26-Dec-17
OPT-MECH-SF Fire Fighting Accessories Fixing 10 30-Dec-17
5 9-Jan-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 14-Jan-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 16-Jan-18
OPT-MECH-TF Fire Hose Reel Fixing 12 18-Jan-18
OPT-MECH-TF Fire Extinguisher Fixing 12 20-Jan-18

12 25-Jan-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 6-Feb-18
COMMISSIONING & HANDING OVER
7 13-Feb-18
OPT-MECH-C Commisisoning Fire Fighting System
FIFTH FLOOR LEVEL
FIRST FIX
10 23-Dec-17
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 2-Jan-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 5-Jan-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 9-Jan-18

5 19-Jan-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 24-Jan-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 26-Jan-18
OPT-MECH-TF Fire Hose Reel Fixing 12 28-Jan-18
OPT-MECH-TF Fire Extinguisher Fixing 12 30-Jan-18

12 4-Feb-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 16-Feb-18
COMMISSIONING & HANDING OVER
7 23-Feb-18
OPT-MECH-C Commisisoning Fire Fighting System
SIXTH FLOOR LEVEL
FIRST FIX
10 2-Jan-18
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 12-Jan-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 15-Jan-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 19-Jan-18

5 29-Jan-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 3-Feb-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 5-Feb-18
OPT-MECH-TF Fire Hose Reel Fixing 12 7-Feb-18
OPT-MECH-TF Fire Extinguisher Fixing 12 9-Feb-18

12 14-Feb-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 26-Feb-18
COMMISSIONING & HANDING OVER
7 5-Mar-18
OPT-MECH-C Commisisoning Fire Fighting System
SEVENTH FLOOR LEVEL
FIRST FIX
10 12-Jan-18
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 22-Jan-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 25-Jan-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 29-Jan-18

5 8-Feb-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 13-Feb-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 15-Feb-18
OPT-MECH-TF Fire Hose Reel Fixing 12 17-Feb-18
OPT-MECH-TF Fire Extinguisher Fixing 12 19-Feb-18

12 24-Feb-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 8-Mar-18
COMMISSIONING & HANDING OVER
7 15-Mar-18
OPT-MECH-C Commisisoning Fire Fighting System
EIGHTH FLOOR LEVEL
FIRST FIX
10 22-Jan-18
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 1-Feb-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 4-Feb-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 8-Feb-18

5 18-Feb-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 23-Feb-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 25-Feb-18
OPT-MECH-TF Fire Hose Reel Fixing 12 27-Feb-18
OPT-MECH-TF Fire Extinguisher Fixing 12 1-Mar-18

12 6-Mar-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 18-Mar-18
COMMISSIONING & HANDING OVER
7 25-Mar-18
OPT-MECH-C Commisisoning Fire Fighting System
NINTH FLOOR LEVEL
FIRST FIX
10 25-Apr-18
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 5-May-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 8-May-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 12-May-18

5 22-May-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-TF Sprinkler Fixing 12 27-May-18
OPT-MECH-TF Fire Hose Cabinet Fixing 12 29-May-18
OPT-MECH-TF Fire Hose Reel Fixing 12 31-May-18
OPT-MECH-TF Fire Extinguisher Fixing 12 2-Jun-18

12 7-Jun-18
OPT-MECH-TF Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 19-Jun-18
COMMISSIONING & HANDING OVER
7 26-Jun-18
OPT-MECH-C Commisisoning Fire Fighting System
TENTH FLOOR LEVEL
FIRST FIX
10 5-May-18
OPT-MECH-FF Fire Fighting Hangers and Supports
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 15-May-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 18-May-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 22-May-18

5 1-Jun-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-T Sprinkler Fixing 12 6-Jun-18
OPT-MECH-T Fire Hose Cabinet Fixing 12 8-Jun-18
OPT-MECH-T Fire Hose Reel Fixing 12 10-Jun-18
OPT-MECH-T Fire Extinguisher Fixing 12 12-Jun-18

12 17-Jun-18
OPT-MECH-T Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 29-Jun-18
COMMISSIONING & HANDING OVER
7 6-Jul-18
OPT-MECH-C Commisisoning Fire Fighting System
ELEVENTH FLOOR LEVEL
FIRST FIX
OPT-MECH-FF Fire Fighting Hangers and Supports 10 15-May-18
SECOND FIX
OPT-MECH-SF Fire Fighting Piping 10 25-May-18
OPT-MECH-SF Fire Fighting Pipe Riser 12 28-May-18
OPT-MECH-SF Fire Fighting Accessories Fixing 10 1-Jun-18

5 11-Jun-18
OPT-MECH-SF Fire Fighting Pipe Testing
THIRD FIX
OPT-MECH-T Sprinkler Fixing 12 16-Jun-18
OPT-MECH-T Fire Hose Cabinet Fixing 12 18-Jun-18
OPT-MECH-T Fire Hose Reel Fixing 12 20-Jun-18
OPT-MECH-T Fire Extinguisher Fixing 12 22-Jun-18
12 27-Jun-18
OPT-MECH-T Fire Blanket Fixing
TESTING AND PRE-COMMISSIONING
OPT-MECH-T Testing and Pre-Commisisoning Fire Figh 7 9-Jul-18
COMMISSIONING & HANDING OVER
7 16-Jul-18
OPT-MECH-C Commisisoning Fire Fighting System
ELECTRICAL WORKS
FIRST FIX, (FIX CONDUITS AND BOXES)
18 20-Oct-17
OPT-ELEC-FFB4 Electrical Works First Fix, Basement 4Flo
18 7-Nov-17
OPT-ELEC-FFB3 Electrical Works First Fix, Basement 3 Fl
OPT-ELEC-FFB2 Electrical Works First Fix, Basement 2 Fl 18 25-Nov-17
OPT-ELEC-FFB1 Electrical Works First Fix, Basement 1 Flo 18 13-Dec-17
18 31-Dec-17
OPT-ELEC-FFGF Electrical Works First Fix, Ground Floor
OPT-ELEC-FF2F Electrical Works Fix, Second Floor Level 18 18-Jan-18
OPT-ELEC-FF3F Electrical Works First Fix, Third Floor Lev 18 5-Feb-18
OPT-ELEC-FF4F Electrical Works First Fix, Fourth Floor L 18 28-Feb-18
OPT-ELEC-FF5F Electrical Works First Fix, Fifth Floor Lev 18 28-Mar-18
OPT-ELEC-FF6F Electrical Works First Fix, Sixth Floor Lev 18 15-Apr-18
OPT-ELEC-FF7F Electrical Works First Fix, Seventh Floor 18 3-May-18
18 21-May-18
OPT-ELEC-FF8F Electrical Works First Fix, Eighth Floor L
18 8-Jun-18
OPT-ELEC-FF9F Electrical Works First Fix, Ninth Floor Le
18 26-Jun-18
OPT-ELEC-FF10 Electrical Works First Fix, Tenth Floor L
18 9-Jul-18
OPT-ELEC-FF11 Electrical Works First Fix, Eleventh Floo
OPT-ELEC-FFRD Electrical Works First Fix, Roof Floor Lev 18 22-Jul-18
SECOND FIX, (CABLES, WIRES, DB, SMDB, MAIN PANLE BOARD, CABLE TRAY, EARTHING SYSTEM...)
OPT-ELEC-SFB4 Electrical WorksSecond Fix, Basement 4F 18 7-Nov-17
18 25-Nov-17
OPT-ELEC-SFB3 Electrical Works Second Fix, Basement 3
OPT-ELEC-SFB2 Electrical Works Second Fix, Basement 2 18 13-Dec-17
OPT-ELEC-SFB1 Electrical Works Second Fix, Basement 1 18 31-Dec-17
18 18-Jan-18
OPT-ELEC-SFGF Electrical Works Second Fix, Ground Flo
18 5-Feb-18
OPT-ELEC-SF2F Electrical Works Second Fix, Second Floo
18 23-Feb-18
OPT-ELEC-SF3F Electrical Works Second Fix, Third Floor
OPT-ELEC-SF4F Electrical Works Second Fix, Fourth Floo 18 10-Mar-18
OPT-ELEC-SF5F Electrical Works Second Fix, Fifth Floor 18 7-Apr-18
OPT-ELEC-SF6F Electrical Works Second Fix, Sixth Floor 18 25-Apr-18
OPT-ELEC-SF7F Electrical Works Second Fix, Seventh Fl 18 13-May-18
OPT-ELEC-SF8F Electrical Works Second Fix, Eighth Floo 18 31-May-18
OPT-ELEC-SF9F Electrical Works Second Fix, Ninth Floo 18 18-Jun-18
OPT-ELEC-SF10 Electrical Works Second Fix, Tenth Floo 18 1-Jul-18
OPT-ELEC-SF11 Electrical Works Second Fix, Eleventh F 18 14-Jul-18
OPT-ELEC-SFRD Electrical Works Second Fix, Roof Floor 18 17-Jul-18
THIRD FIX (WIRING DEVICES AND FIXTURES)
18 1-Dec-17
OPT-ELEC-TFB4 Electrical Works Third Fix and Equipmen
OPT-ELEC-TFB3 Electrical Works Third Fix, Basement 3 F 18 13-Dec-17
OPT-ELEC-TFB2 Electrical Works Third Fix, Basement 2 F 18 31-Dec-17
OPT-ELEC-TFB1 Electrical Works Third Fix, Basement 1 F 18 18-Jan-18
18 7-Apr-18
OPT-ELEC-TF4F Electrical Works Third Fix, Fourth Floor
18 25-Apr-18
OPT-ELEC-TF5F Electrical Works Third Fix, Fifth Floor Le
18 13-May-18
OPT-ELEC-TF6F Electrical Works Third Fix, Sixth Floor Le
18 31-May-18
OPT-ELEC-TF7F Electrical Works Third Fix, Seventh Floor
18 18-Jun-18
OPT-ELEC-TF8F Electrical Works Third Fix, Eighth Floor L
18 6-Jul-18
OPT-ELEC-TF9F Electrical Works Third Fix, Ninth Floor L
18 19-Jul-18
OPT-ELEC-TF10 Electrical Works Third Fix, Tenth Floor L
14 1-Aug-18
OPT-ELEC-TF11 Electrical Works Third Fix, Eleventh Flo
16 10-Aug-18
OPT-ELEC-TFRD Electrical Works Third Fix and Equipment
VERTICAL SUPPORT INSTALLATION

60 1-Apr-18
OPT-MECH-VSI-00 Rail Hosting and Alignment
OPT-MECH-VSI-00 Entrance Sill and Jamb Fixing 30 6-May-18
OPT-MECH-VSI-00 Grouting of Entrance Frames 25 16-May-18
OPT-MECH-VSI-00 Machine Work (Mechanical and Electrica 45 10-Jun-18
OPT-MECH-VSI-00 Hoist Trunking and Wiring 25 10-Jul-18
OPT-MECH-VSI-00 Fixing of Entrance Door 25 20-Jul-18
OPT-MECH-VSI-00 Removal of Scaffolding 21 3-Aug-18
HANDING OVER

31 31-Jul-18

OPT-HO-HNDNGOVFinal Testing and Commissioning


OPT-HO-HNDNGOVQA/QC Closeout 31 31-Jul-18
31 31-Jul-18
OPT-HO-HNDNGOVSnagging and Desnagging
1

LOGIC
Finish Activity Count Incomplete Task Dangling Task Activity % Complete

1299 1278 5
MILESTONE AND
100% TASK
9-Mar-17 A 1 100%
1 0%

30-Aug-18 1 0%

31-Jul-17 1 0%

26-Aug-17 1 0%
17-Oct-17 1 0%

3-Nov-17 1 0%

19-Nov-17 1 0%

3-Dec-17 1 0%
18-Dec-17 1 0%
3-Jan-18 1 0%
22-Jan-18 1 0%

10-Feb-18 1 0%

27-Feb-18 1 0%

17-Mar-18 1 0%
4-Apr-18 1 0%

24-Apr-18 1 0%

1 0%
1 0%
1 0%
1 0%

1-Aug-17 1 1 80%
30-Aug-18 1 1 23%

3-Aug-17 1 1 0%

15-Aug-17 1 1 0%

29-Aug-17 1 1 0%

8-Sep-17 1 1 0%

27-Jul-17 1 1 0%

18-Aug-17 1 1 0%

1-Sep-17 1 1 0%

11-Sep-17 1 1 0%

30-Jul-17 1 1 0%

23-Aug-17 1 1 0%

6-Sep-17 1 1 0%
16-Sep-17 1 1 0%

13-Aug-17 1 1 0%

30-Aug-17 1 1 0%

13-Sep-17 1 1 0%

21-Sep-17 1 1 0%

20-Nov-17 1 1 0%

30-Nov-17 1 1 0%

31-Jul-17 1 1 81%

11-Jul-17 1 1 0%

12-Jul-17 1 1 0%

13-Jul-17 1 1 0%
15-Jul-17 1 1 0%
15-Jul-17 1 1 0%
16-Jul-17 1 1 0%
17-Jul-17 1 1 0%

18-Jul-17 1 1 0%

20-Jul-17 1 1 0%
20-Jul-17 1 1 0%
21-Jul-17 1 1 0%
22-Jul-17 1 1 0%
23-Jul-17 1 1 0%
24-Jul-17 1 1 0%

25-Jul-17 1 1 0%

27-Jul-17 1 1 0%
27-Jul-17 1 1 0%
28-Jul-17 1 1 0%
29-Jul-17 1 1 0%
30-Jul-17 1 1 0%
31-Jul-17 1 1 0%

31-Jul-17 1 1 0%

3-Aug-17 1 1 0%
3-Aug-17 1 1 0%
4-Aug-17 1 1 0%
5-Aug-17 1 1 0%
6-Aug-17 1 1 0%
7-Aug-17 1 1 0%

8-Aug-17 1 1 0%

10-Aug-17 1 1 0%
10-Aug-17 1 1 0%
11-Aug-17 1 1 0%
12-Aug-17 1 1 0%
13-Aug-17 1 1 0%
14-Aug-17 1 1 0%

14-Aug-17 1 1 0%

16-Aug-17 1 1 0%
16-Aug-17 1 1 0%
18-Aug-17 1 1 0%
19-Aug-17 1 1 0%
19-Aug-17 1 1 0%
20-Aug-17 1 1 0%

20-Aug-17 1 1 0%

21-Aug-17 1 1 0%
22-Aug-17 1 1 0%
23-Aug-17 1 1 0%
24-Aug-17 1 1 0%
25-Aug-17 1 1 0%
26-Aug-17 1 1 0%

24-Jul-17 1 1 0%
26-Jul-17 1 1 0%
28-Jul-17 1 1 0%
29-Jul-17 1 1 0%
1-Aug-17 1 1 0%
3-Aug-17 1 1 0%

6-Aug-17 1 1 0%
8-Aug-17 1 1 0%
10-Aug-17 1 1 0%
11-Aug-17 1 1 0%
14-Aug-17 1 1 0%
16-Aug-17 1 1 0%

20-Aug-17 1 1 0%
22-Aug-17 1 1 0%
23-Aug-17 1 1 0%
24-Aug-17 1 1 0%
26-Aug-17 1 1 0%

28-Aug-17 1 1 0%
2-Sep-17 1 1 0%
4-Sep-17 1 1 0%
7-Sep-17 1 1 0%

29-Aug-17 1 1 0%

9-Aug-17 1 1 0%
11-Aug-17 1 1 0%
12-Aug-17 1 1 0%
17-Aug-17 1 1 0%
18-Aug-17 1 1 0%
19-Aug-17 1 1 0%
21-Aug-17 1 1 0%
21-Aug-17 1 1 0%
23-Aug-17 1 1 0%

22-Aug-17 1 1 0%
24-Aug-17 1 1 0%
25-Aug-17 1 1 0%
30-Aug-17 1 1 0%
31-Aug-17 1 1 0%
1-Sep-17 1 1 0%
3-Sep-17 1 1 0%
3-Sep-17 1 1 0%
5-Sep-17 1 1 0%

2-Sep-17 1 1 0%
4-Sep-17 1 1 0%
5-Sep-17 1 1 0%

9-Sep-17 1 1 0%
9-Sep-17 1 1 0%
10-Sep-17 1 1 0%
12-Sep-17 1 1 0%
12-Sep-17 1 1 0%
14-Sep-17 1 1 0%

29-Aug-17 1 1 0%
31-Aug-17 1 1 0%
1-Sep-17 1 1 0%
6-Sep-17 1 1 0%
7-Sep-17 1 1 0%
8-Sep-17 1 1 0%
10-Sep-17 1 1 0%
10-Sep-17 1 1 0%
12-Sep-17 1 1 0%

10-Sep-17 1 1 0%
11-Sep-17 1 1 0%
12-Sep-17 1 1 0%
17-Sep-17 1 1 0%
17-Sep-17 1 1 0%
18-Sep-17 1 1 0%
20-Sep-17 1 1 0%
21-Sep-17 1 1 0%
22-Sep-17 1 1 0%

19-Sep-17 1 1 0%
21-Sep-17 1 1 0%
22-Sep-17 1 1 0%
26-Sep-17 1 1 0%
27-Sep-17 1 1 0%
28-Sep-17 1 1 0%
29-Sep-17 1 1 0%
30-Sep-17 1 1 0%
1-Oct-17 1 1 0%

17-Sep-17 1 1 0%
19-Sep-17 1 1 0%
20-Sep-17 1 1 0%
25-Sep-17 1 1 0%
26-Sep-17 1 1 0%
27-Sep-17 1 1 0%
29-Sep-17 1 1 0%
29-Sep-17 1 1 0%
1-Oct-17 1 1 0%

27-Sep-17 1 1 0%
28-Sep-17 1 1 0%
29-Sep-17 1 1 0%
4-Oct-17 1 1 0%
4-Oct-17 1 1 0%
5-Oct-17 1 1 0%
6-Oct-17 1 1 0%
7-Oct-17 1 1 0%

8-Oct-17 1 1 0%

6-Oct-17 1 1 0%
8-Oct-17 1 1 0%
9-Oct-17 1 1 0%

13-Oct-17 1 1 0%
14-Oct-17 1 1 0%
15-Oct-17 1 1 0%
15-Oct-17 1 1 0%
16-Oct-17 1 1 0%
16-Oct-17 1 1 0%

13-Oct-17 1 1 0%
15-Oct-17 1 1 0%

17-Oct-17 1 1 0%

22-Oct-17 1 1 0%
23-Oct-17 1 1 0%
25-Oct-17 1 1 0%

30-Oct-17 1 1 0%
31-Oct-17 1 1 0%

3-Nov-17 1 1 0%

8-Nov-17 1 1 0%
9-Nov-17 1 1 0%
10-Nov-17 1 1 0%

16-Nov-17 1 1 0%
18-Nov-17 1 1 0%
19-Nov-17 1 1 0%

23-Nov-17 1 1 0%
24-Nov-17 1 1 0%
25-Nov-17 1 1 0%

30-Nov-17 1 1 0%
2-Dec-17 1 1 0%

3-Dec-17 1 1 0%

7-Dec-17 1 1 0%
9-Dec-17 1 1 0%
10-Dec-17 1 1 0%

15-Dec-17 1 1 0%
17-Dec-17 1 1 0%
18-Dec-17 1 1 0%

22-Dec-17 1 1 0%
24-Dec-17 1 1 0%
26-Dec-17 1 1 0%

31-Dec-17 1 1 0%
2-Jan-18 1 1 0%
3-Jan-18 1 1 0%

7-Jan-18 1 1 0%
10-Jan-18 1 1 0%
12-Jan-18 1 1 0%

17-Jan-18 1 1 0%
20-Jan-18 1 1 0%
22-Jan-18 1 1 0%

26-Jan-18 1 1 0%
29-Jan-18 1 1 0%
1-Feb-18 1 1 0%

6-Feb-18 1 1 0%
8-Feb-18 1 1 0%
10-Feb-18 1 1 0%

14-Feb-18 1 1 0%
16-Feb-18 1 1 0%
18-Feb-18 1 1 0%

23-Feb-18 1 1 0%
25-Feb-18 1 1 0%
27-Feb-18 1 1 0%
3-Mar-18 1 1 0%
6-Mar-18 1 1 0%
8-Mar-18 1 1 0%

13-Mar-18 1 1 0%
15-Mar-18 1 1 0%
17-Mar-18 1 1 0%

21-Mar-18 1 1 0%
23-Mar-18 1 1 0%
25-Mar-18 1 1 0%

30-Mar-18 1 1 0%
2-Apr-18 1 1 0%
4-Apr-18 1 1 0%

8-Apr-18 1 1 0%
10-Apr-18 1 1 0%
13-Apr-18 1 1 0%

18-Apr-18 1 1 0%
21-Apr-18 1 1 0%
24-Apr-18 1 1 0%

17-Aug-17 1 1 0%
20-Aug-17 1 1 0%
23-Aug-17 1 1 0%

6-Sep-17 1 1 0%
9-Sep-17 1 1 0%
12-Sep-17 1 1 0%

24-Sep-17 1 1 0%
29-Sep-17 1 1 0%
2-Oct-17 1 1 0%

11-Oct-17 1 1 0%
16-Oct-17 1 1 0%
19-Oct-17 1 1 0%

23-Oct-17 1 1 0%
28-Oct-17 1 1 0%
31-Oct-17 1 1 0%

4-Nov-17 1 1 0%
9-Nov-17 1 1 0%
12-Nov-17 1 1 0%

16-Nov-17 1 1 0%
21-Nov-17 1 1 0%
24-Nov-17 1 1 0%

1-Dec-17 1 1 0%
6-Dec-17 1 1 0%
9-Dec-17 1 1 0%

13-Dec-17 1 1 0%
20-Dec-17 1 1 0%
23-Dec-17 1 1 0%

25-Dec-17 1 1 0%
30-Dec-17 1 1 0%
2-Jan-18 1 1 0%
6-Jan-18 1 1 0%
11-Jan-18 1 1 0%
14-Jan-18 1 1 0%

18-Jan-18 1 1 0%
23-Jan-18 1 1 0%
26-Jan-18 1 1 0%

30-Jan-18 1 1 0%
4-Feb-18 1 1 0%
7-Feb-18 1 1 0%

11-Feb-18 1 1 0%
16-Feb-18 1 1 0%
19-Feb-18 1 1 0%

23-Feb-18 1 1 0%
28-Feb-18 1 1 0%
3-Mar-18 1 1 0%

6-Oct-17 1 1 0%
8-Oct-17 1 1 0%
11-Oct-17 1 1 0%

16-Oct-17 1 1 0%
18-Oct-17 1 1 0%
21-Oct-17 1 1 1 0%

22-Oct-17 1 1 0%
24-Oct-17 1 1 0%
27-Oct-17 1 1 0%

8-Nov-17 1 1 0%
10-Nov-17 1 1 0%
13-Nov-17 1 1 0%

24-Nov-17 1 1 0%
26-Nov-17 1 1 0%
29-Nov-17 1 1 0%

8-Dec-17 1 1 0%
10-Dec-17 1 1 0%
13-Dec-17 1 1 0%

23-Dec-17 1 1 0%
25-Dec-17 1 1 0%
28-Dec-17 1 1 0%

8-Jan-18 1 1 0%
10-Jan-18 1 1 0%
13-Jan-18 1 1 0%

27-Jan-18 1 1 0%
29-Jan-18 1 1 0%
1-Feb-18 1 1 0%

15-Feb-18 1 1 0%
17-Feb-18 1 1 0%
20-Feb-18 1 1 0%

4-Mar-18 1 1 0%
6-Mar-18 1 1 0%
9-Mar-18 1 1 0%
22-Mar-18 1 1 0%
24-Mar-18 1 1 0%
27-Mar-18 1 1 0%

9-Apr-18 1 1 0%
11-Apr-18 1 1 0%
14-Apr-18 1 1 0%

29-Apr-18 1 1 0%
1-May-18 1 1 0%
4-May-18 1 1 1 0%

31-Oct-17 1 1 0%

12-Nov-17 1 1 0%

28-Nov-17 1 1 0%

14-Dec-17 1 1 0%

21-Jan-18 1 1 0%

11-Nov-17 1 1 0%

1-Dec-17 1 1 0%
4-Dec-17 1 1 0%

30-Dec-17 1 1 0%

28-Nov-17 1 1 0%

14-Dec-17 1 1 0%

22-Dec-17 1 1 0%

1-Dec-17 1 1 0%
13-Dec-17 1 1 0%

26-Dec-17 1 1 0%
7-Jan-18 1 1 0%

9-Dec-17 1 1 0%

16-Dec-17 1 1 0%
21-Dec-17 1 1 0%
25-Dec-17 1 1 0%

16-Dec-17 1 1 0%

30-Nov-17 1 1 0%

10-Dec-17 1 1 0%

10-Nov-17 1 1 0%

7-Nov-17 1 1 0%

28-Dec-17 1 1 0%
11-Jan-18 1 1 0%
2-Feb-18 1 1 0%

12-Dec-17 1 1 0%
24-Dec-17 1 1 0%

14-Nov-17 1 1 0%

28-Nov-17 1 1 0%

14-Dec-17 1 1 0%

30-Dec-17 1 1 0%

6-Feb-18 1 1 0%

25-Nov-17 1 1 0%

17-Dec-17 1 1 0%
22-Dec-17 1 1 0%

15-Jan-18 1 1 0%
14-Dec-17 1 1 0%

30-Dec-17 1 1 0%

7-Jan-18 1 1 0%

17-Dec-17 1 1 0%
29-Dec-17 1 1 0%

11-Jan-18 1 1 0%
23-Jan-18 1 1 0%

25-Dec-17 1 1 0%

1-Jan-18 1 1 0%
6-Jan-18 1 1 0%
10-Jan-18 1 1 0%

1-Jan-18 1 1 0%

16-Dec-17 1 1 0%

26-Dec-17 1 1 0%

24-Nov-17 1 1 0%

19-Nov-17 1 1 0%

13-Jan-18 1 1 0%
27-Jan-18 1 1 0%

18-Feb-18 1 1 0%
28-Dec-17 1 1 0%
9-Jan-18 1 1 0%

28-Nov-17 1 1 0%

12-Dec-17 1 1 0%

28-Dec-17 1 1 0%

13-Jan-18 1 1 0%

20-Feb-18 1 1 0%

9-Dec-17 1 1 0%

31-Dec-17 1 1 0%
5-Jan-18 1 1 0%

29-Jan-18 1 1 0%

28-Dec-17 1 1 0%

13-Jan-18 1 1 0%

21-Jan-18 1 1 0%

31-Dec-17 1 1 0%
12-Jan-18 1 1 0%
25-Jan-18 1 1 0%
6-Feb-18 1 1 0%

8-Jan-18 1 1 0%

15-Jan-18 1 1 0%
20-Jan-18 1 1 0%
24-Jan-18 1 1 0%

15-Jan-18 1 1 0%

30-Dec-17 1 1 0%

9-Jan-18 1 1 0%

8-Dec-17 1 1 0%

3-Dec-17 1 1 0%

27-Jan-18 1 1 0%
10-Feb-18 1 1 0%

4-Mar-18 1 1 0%

11-Jan-18 1 1 0%
23-Jan-18 1 1 0%

8-Dec-17 1 1 0%
22-Dec-17 1 1 0%

7-Jan-18 1 1 0%

23-Jan-18 1 1 0%

2-Mar-18 1 1 0%

19-Dec-17 1 1 0%

10-Jan-18 1 1 0%
15-Jan-18 1 1 0%

8-Feb-18 1 1 0%

7-Jan-18 1 1 0%

23-Jan-18 1 1 0%

31-Jan-18 1 1 0%

10-Jan-18 1 1 0%
22-Jan-18 1 1 0%

4-Feb-18 1 1 0%
16-Feb-18 1 1 0%

18-Jan-18 1 1 0%

25-Jan-18 1 1 0%
30-Jan-18 1 1 0%
3-Feb-18 1 1 0%

25-Jan-18 1 1 0%

9-Jan-18 1 1 0%

19-Jan-18 1 1 0%

18-Dec-17 1 1 0%

13-Dec-17 1 1 0%

6-Feb-18 1 1 0%
20-Feb-18 1 1 0%

16-Mar-18 1 1 0%

21-Jan-18 1 1 0%
2-Feb-18 1 1 0%

16-Dec-17 1 1 0%

28-Dec-17 1 1 0%

9-Jan-18 1 1 0%

28-Jan-18 1 1 0%
19-Feb-18 1 1 0%

16-Jan-18 1 1 0%

1-Feb-18 1 1 0%
9-Feb-18 1 1 0%

7-Jan-18 1 1 0%

19-Jan-18 1 1 0%

5-Feb-18 1 1 0%

16-Jan-18 1 1 0%
28-Jan-18 1 1 0%

25-Jan-18 1 1 0%

27-Jan-18 1 1 0%

3-Feb-18 1 1 0%

11-Feb-18 1 1 0%
25-Feb-18 1 1 0%
9-Mar-18 1 1 0%

28-Dec-17 1 1 0%

11-Jan-18 1 1 0%
25-Jan-18 1 1 0%

8-Feb-18 1 1 0%

18-Mar-18 1 1 0%

30-Jan-18 1 1 0%

17-Feb-18 1 1 0%
27-Feb-18 1 1 0%

21-Jan-18 1 1 0%

4-Feb-18 1 1 0%

16-Feb-18 1 1 0%

30-Jan-18 1 1 0%
11-Feb-18 1 1 0%

22-Feb-18 1 1 0%
6-Mar-18 1 1 0%

7-Feb-18 1 1 0%

10-Feb-18 1 1 0%
19-Feb-18 1 1 0%

12-Feb-18 1 1 0%

19-Feb-18 1 1 0%
22-Feb-18 1 1 0%
8-Mar-18 1 1 0%

30-Mar-18 1 1 0%

8-Feb-18 1 1 0%
20-Feb-18 1 1 0%

11-Feb-18 1 1 0%
23-Feb-18 1 1 0%

6-Jan-18 1 1 0%

22-Jan-18 1 1 0%

7-Feb-18 1 1 0%

23-Feb-18 1 1 0%

17-Mar-18 1 1 0%

2-Mar-18 1 1 0%

7-Feb-18 1 1 0%

23-Feb-18 1 1 0%

3-Mar-18 1 1 0%

10-Feb-18 1 1 0%
22-Feb-18 1 1 0%
25-Feb-18 1 1 0%

25-Feb-18 1 1 0%

9-Mar-18 1 1 0%
23-Mar-18 1 1 0%

11-Apr-18 1 1 0%

7-Feb-18 1 1 0%

23-Feb-18 1 1 0%

11-Mar-18 1 1 0%

27-Mar-18 1 1 0%

4-May-18 1 1 0%

14-Mar-18 1 1 0%

3-Apr-18 1 1 0%

11-Mar-18 1 1 0%

27-Mar-18 1 1 0%

4-Apr-18 1 1 0%
14-Mar-18 1 1 0%
26-Mar-18 1 1 0%

8-Apr-18 1 1 0%
20-Apr-18 1 1 0%

22-Mar-18 1 1 0%

29-Mar-18 1 1 0%
3-Apr-18 1 1 0%

29-Mar-18 1 1 0%

5-Apr-18 1 1 0%

10-Apr-18 1 1 0%
24-Apr-18 1 1 0%

16-May-18 1 1 0%

25-Mar-18 1 1 0%
6-Apr-18 1 1 0%

28-Mar-18 1 1 0%
9-Apr-18 1 1 0%

17-Feb-18 1 1 0%

5-Mar-18 1 1 0%

21-Mar-18 1 1 0%
6-Apr-18 1 1 0%

14-May-18 1 1 0%

24-Mar-18 1 1 0%

13-Apr-18 1 1 0%

21-Mar-18 1 1 0%

6-Apr-18 1 1 0%

14-Apr-18 1 1 0%

24-Mar-18 1 1 0%
5-Apr-18 1 1 0%

18-Apr-18 1 1 0%
30-Apr-18 1 1 0%

1-Apr-18 1 1 0%

8-Apr-18 1 1 0%
13-Apr-18 1 1 0%

8-Apr-18 1 1 0%

15-Apr-18 1 1 0%

20-Apr-18 1 1 0%
4-May-18 1 1 0%

28-May-18 1 1 0%
4-Apr-18 1 1 0%

16-Apr-18 1 1 0%

7-Apr-18 1 1 0%
19-Apr-18 1 1 0%

27-Feb-18 1 1 0%

15-Mar-18 1 1 0%

31-Mar-18 1 1 0%

16-Apr-18 1 1 0%

24-May-18 1 1 0%

3-Apr-18 1 1 0%

23-Apr-18 1 1 0%

31-Mar-18 1 1 0%

16-Apr-18 1 1 0%

24-Apr-18 1 1 0%

3-Apr-18 1 1 0%
15-Apr-18 1 1 0%

28-Apr-18 1 1 0%
10-May-18 1 1 0%

11-Apr-18 1 1 0%

18-Apr-18 1 1 0%
23-Apr-18 1 1 0%

18-Apr-18 1 1 0%

25-Apr-18 1 1 0%

30-Apr-18 1 1 0%
14-May-18 1 1 0%

9-Jun-18 1 1 0%

14-Apr-18 1 1 0%
26-Apr-18 1 1 0%

17-Apr-18 1 1 0%
29-Apr-18 1 1 0%

9-Mar-18 1 1 0%

25-Mar-18 1 1 0%

10-Apr-18 1 1 0%

26-Apr-18 1 1 0%
3-Jun-18 1 1 0%

13-Apr-18 1 1 0%

3-May-18 1 1 0%

10-Apr-18 1 1 0%

26-Apr-18 1 1 0%

4-May-18 1 1 0%

13-Apr-18 1 1 0%
25-Apr-18 1 1 0%

8-May-18 1 1 0%
20-May-18 1 1 0%

21-Apr-18 1 1 0%

28-Apr-18 1 1 0%
3-May-18 1 1 0%

28-Apr-18 1 1 0%

5-May-18 1 1 0%

10-May-18 1 1 0%
24-May-18 1 1 0%

21-Jun-18 1 1 0%

24-Apr-18 1 1 0%
6-May-18 1 1 0%

27-Apr-18 1 1 0%
9-May-18 1 1 0%

19-Mar-18 1 1 0%

4-Apr-18 1 1 0%

20-Apr-18 1 1 0%

6-May-18 1 1 0%

13-Jun-18 1 1 0%

23-Apr-18 1 1 0%

13-May-18 1 1 0%

20-Apr-18 1 1 0%

6-May-18 1 1 0%

14-May-18 1 1 0%

23-Apr-18 1 1 0%
5-May-18 1 1 0%

18-May-18 1 1 0%
30-May-18 1 1 0%

1-May-18 1 1 0%
8-May-18 1 1 0%
13-May-18 1 1 0%

8-May-18 1 1 0%

15-May-18 1 1 0%

20-May-18 1 1 0%
3-Jun-18 1 1 0%

3-Jul-18 1 1 0%

4-May-18 1 1 0%
16-May-18 1 1 0%

7-May-18 1 1 0%
19-May-18 1 1 0%

4-Apr-18 1 1 0%

20-Apr-18 1 1 0%

6-May-18 1 1 0%

22-May-18 1 1 0%

29-Jun-18 1 1 0%

9-May-18 1 1 0%
29-May-18 1 1 0%

6-May-18 1 1 0%

22-May-18 1 1 0%

30-May-18 1 1 0%

9-May-18 1 1 0%
21-May-18 1 1 0%

3-Jun-18 1 1 0%
15-Jun-18 1 1 0%

17-May-18 1 1 0%

24-May-18 1 1 0%
29-May-18 1 1 0%

24-May-18 1 1 0%

31-May-18 1 1 0%

5-Jun-18 1 1 0%
19-Jun-18 1 1 0%

15-Jul-18 1 1 0%

20-May-18 1 1 0%
1-Jun-18 1 1 0%

23-May-18 1 1 0%
4-Jun-18 1 1 0%
20-Apr-18 1 1 0%

6-May-18 1 1 0%

22-May-18 1 1 0%

7-Jun-18 1 1 0%

15-Jul-18 1 1 0%

25-May-18 1 1 0%

14-Jun-18 1 1 0%

22-May-18 1 1 0%

7-Jun-18 1 1 0%

15-Jun-18 1 1 0%

25-May-18 1 1 0%
6-Jun-18 1 1 0%

19-Jun-18 1 1 0%
1-Jul-18 1 1 0%

2-Jun-18 1 1 0%

9-Jun-18 1 1 0%
14-Jun-18 1 1 0%

9-Jun-18 1 1 0%
16-Jun-18 1 1 0%

21-Jun-18 1 1 0%
5-Jul-18 1 1 0%

29-Jul-18 1 1 0%

5-Jun-18 1 1 0%
17-Jun-18 1 1 0%

8-Jun-18 1 1 0%
20-Jun-18 1 1 0%

30-Apr-18 1 1 0%

16-May-18 1 1 0%

1-Jun-18 1 1 0%

17-Jun-18 1 1 0%

25-Jul-18 1 1 0%

4-Jun-18 1 1 0%

24-Jun-18 1 1 0%
1-Jun-18 1 1 0%

17-Jun-18 1 1 0%

25-Jun-18 1 1 0%

4-Jun-18 1 1 0%
16-Jun-18 1 1 0%

29-Jun-18 1 1 0%
11-Jul-18 1 1 0%

12-Jun-18 1 1 0%

19-Jun-18 1 1 0%
24-Jun-18 1 1 0%

19-Jun-18 1 1 0%

26-Jun-18 1 1 0%

1-Jul-18 1 1 0%
15-Jul-18 1 1 0%

14-Aug-18 1 1 0%

15-Jun-18 1 1 0%
27-Jun-18 1 1 0%

18-Jun-18 1 1 0%
30-Jun-18 1 1 0%

14-May-18 1 1 0%
28-May-18 1 1 0%

11-Jun-18 1 1 0%

25-Jun-18 1 1 0%

19-Jul-18 1 1 0%

16-Jun-18 1 1 0%

13-Jun-18 1 1 0%

29-Jun-18 1 1 0%

7-Jul-18 1 1 0%

16-Jun-18 1 1 0%
28-Jun-18 1 1 0%

23-Jun-18 1 1 0%

5-Jul-18 1 1 0%

9-Jul-18 1 1 0%
23-Jul-18 1 1 0%

26-Aug-18 1 1 0%

29-Nov-17 1 1 0%
9-Dec-17 1 1 0%
25-Dec-17 1 1 0%
8-Jan-18 1 1 0%
25-Jan-18 1 1 0%
8-Feb-18 1 1 0%
25-Feb-18 1 1 0%
11-Mar-18 1 1 0%
25-Mar-18 1 1 0%
8-Apr-18 1 1 0%
9-May-18 1 1 1 0%

29-Dec-17 1 1 0%
5-Jan-18 1 1 0%
24-Jan-18 1 1 0%
6-Feb-18 1 1 0%
22-Feb-18 1 1 0%
8-Mar-18 1 1 0%
23-Mar-18 1 1 0%
5-Apr-18 1 1 0%
22-Apr-18 1 1 0%
7-May-18 1 1 0%
24-May-18 1 1 0%
9-Jun-18 1 1 1 0%

28-Dec-17 1 1 0%

4-Jan-18 1 1 0%
9-Jun-18 1 1 0%

9-Jan-18 1 1 0%

16-Jan-18 1 1 0%
16-Jun-18 1 1 0%

23-Jun-18 1 1 0%

8-Aug-17 1 1 0%
10-Aug-17 1 1 0%

29-Aug-17 1 1 0%

6-Nov-17 1 1 0%

11-Nov-17 1 1 0%

8-Aug-17 1 1 0%

29-Aug-17 1 1 0%

11-Nov-17 1 1 0%

11-Nov-17 1 1 0%

21-Nov-17 1 1 0%

21-Nov-17 1 1 0%

25-Nov-17 1 1 0%

30-Nov-17 1 1 0%

30-Nov-17 1 1 0%

7-Dec-17 1 1 0%

7-Dec-17 1 1 0%

14-Dec-17 1 1 0%

14-Dec-17 1 1 0%

14-Dec-17 1 1 0%
13-Sep-17 1 1 0%

13-Sep-17 1 1 0%

15-Sep-17 1 1 0%

20-Nov-17 1 1 0%

25-Nov-17 1 1 0%

13-Sep-17 1 1 0%

13-Sep-17 1 1 0%

25-Nov-17 1 1 0%

25-Nov-17 1 1 0%

5-Dec-17 1 1 0%

5-Dec-17 1 1 0%

9-Dec-17 1 1 0%

14-Dec-17 1 1 0%

14-Dec-17 1 1 0%

21-Dec-17 1 1 0%
21-Dec-17 1 1 0%

28-Dec-17 1 1 0%
28-Dec-17 1 1 0%

28-Dec-17 1 1 0%

23-Sep-17 1 1 0%

23-Sep-17 1 1 0%

25-Sep-17 1 1 0%

5-Oct-17 1 1 0%

10-Oct-17 1 1 0%

23-Sep-17 1 1 0%

23-Sep-17 1 1 0%

10-Oct-17 1 1 0%

10-Oct-17 1 1 0%

20-Oct-17 1 1 0%

20-Oct-17 1 1 0%

24-Oct-17 1 1 0%

29-Oct-17 1 1 0%

29-Oct-17 1 1 0%

5-Nov-17 1 1 0%
5-Nov-17 1 1 0%
12-Nov-17 1 1 0%

12-Nov-17 1 1 0%

12-Nov-17 1 1 0%

3-Oct-17 1 1 0%

3-Oct-17 1 1 0%

5-Oct-17 1 1 0%

15-Oct-17 1 1 0%

20-Oct-17 1 1 0%

3-Oct-17 1 1 0%

3-Oct-17 1 1 0%

20-Oct-17 1 1 0%

20-Oct-17 1 1 0%

30-Oct-17 1 1 0%

30-Oct-17 1 1 0%

3-Nov-17 1 1 0%

8-Nov-17 1 1 0%

8-Nov-17 1 1 0%

15-Nov-17 1 1 0%
15-Nov-17 1 1 0%

22-Nov-17 1 1 0%

22-Nov-17 1 1 0%

22-Nov-17 1 1 0%

26-Nov-17 1 1 0%

26-Nov-17 1 1 0%

29-Nov-17 1 1 0%

13-Feb-18 1 1 0%

18-Feb-18 1 1 0%

26-Nov-17 1 1 0%

26-Nov-17 1 1 0%

18-Feb-18 1 1 0%

18-Feb-18 1 1 0%

28-Feb-18 1 1 0%

28-Feb-18 1 1 0%

4-Mar-18 1 1 0%

9-Mar-18 1 1 0%
9-Mar-18 1 1 0%

16-Mar-18 1 1 0%
16-Mar-18 1 1 0%

23-Mar-18 1 1 0%

23-Mar-18 1 1 0%

23-Mar-18 1 1 0%

11-Dec-17 1 1 0%

11-Dec-17 1 1 0%

14-Dec-17 1 1 0%

23-Feb-18 1 1 0%

28-Feb-18 1 1 0%

11-Dec-17 1 1 0%

11-Dec-17 1 1 0%

28-Feb-18 1 1 0%

28-Feb-18 1 1 0%

10-Mar-18 1 1 0%

10-Mar-18 1 1 0%
14-Mar-18 1 1 0%

19-Mar-18 1 1 0%

19-Mar-18 1 1 0%

24-Mar-18 1 1 0%
24-Mar-18 1 1 0%

31-Mar-18 1 1 0%

31-Mar-18 1 1 0%

31-Mar-18 1 1 0%

27-Dec-17 1 1 0%

27-Dec-17 1 1 0%

30-Dec-17 1 1 0%

5-Mar-18 1 1 0%

10-Mar-18 1 1 0%

27-Dec-17 1 1 0%

27-Dec-17 1 1 0%

10-Mar-18 1 1 0%

10-Mar-18 1 1 0%
20-Mar-18 1 1 0%

20-Mar-18 1 1 0%

24-Mar-18 1 1 0%

29-Mar-18 1 1 0%

29-Mar-18 1 1 0%

3-Apr-18 1 1 0%
3-Apr-18 1 1 0%

10-Apr-18 1 1 0%

10-Apr-18 1 1 0%

10-Apr-18 1 1 0%

15-Jan-18 1 1 0%

15-Jan-18 1 1 0%

18-Jan-18 1 1 0%

15-Mar-18 1 1 0%

20-Mar-18 1 1 0%

15-Jan-18 1 1 0%

15-Jan-18 1 1 0%
20-Mar-18 1 1 0%

20-Mar-18 1 1 0%

30-Mar-18 1 1 0%

30-Mar-18 1 1 0%

3-Apr-18 1 1 0%

8-Apr-18 1 1 0%

8-Apr-18 1 1 0%

13-Apr-18 1 1 0%
13-Apr-18 1 1 0%

20-Apr-18 1 1 0%

20-Apr-18 1 1 0%

20-Apr-18 1 1 0%

3-Feb-18 1 1 0%

3-Feb-18 1 1 0%

6-Feb-18 1 1 0%

25-Mar-18 1 1 0%

30-Mar-18 1 1 0%
3-Feb-18 1 1 0%

3-Feb-18 1 1 0%

30-Mar-18 1 1 0%

30-Mar-18 1 1 0%

9-Apr-18 1 1 0%

9-Apr-18 1 1 0%

13-Apr-18 1 1 0%

18-Apr-18 1 1 0%

18-Apr-18 1 1 0%

23-Apr-18 1 1 0%
23-Apr-18 1 1 0%

30-Apr-18 1 1 0%

30-Apr-18 1 1 0%

30-Apr-18 1 1 0%

20-Feb-18 1 1 0%

20-Feb-18 1 1 0%

23-Feb-18 1 1 0%

10-Apr-18 1 1 0%
15-Apr-18 1 1 0%

20-Feb-18 1 1 0%

20-Feb-18 1 1 0%

15-Apr-18 1 1 0%

15-Apr-18 1 1 0%

25-Apr-18 1 1 0%

25-Apr-18 1 1 0%

29-Apr-18 1 1 0%

4-May-18 1 1 0%

4-May-18 1 1 0%

9-May-18 1 1 0%
9-May-18 1 1 0%

16-May-18 1 1 0%

16-May-18 1 1 0%

16-May-18 1 1 0%

10-Mar-18 1 1 0%

10-Mar-18 1 1 0%

13-Mar-18 1 1 0%
26-Apr-18 1 1 0%

1-May-18 1 1 0%

10-Mar-18 1 1 0%

10-Mar-18 1 1 0%

1-May-18 1 1 0%

1-May-18 1 1 0%

11-May-18 1 1 0%

11-May-18 1 1 0%

15-May-18 1 1 0%

20-May-18 1 1 0%

20-May-18 1 1 0%

25-May-18 1 1 0%
25-May-18 1 1 0%

1-Jun-18 1 1 0%

1-Jun-18 1 1 0%

1-Jun-18 1 1 0%

28-Mar-18 1 1 0%

28-Mar-18 1 1 0%
31-Mar-18 1 1 0%

6-May-18 1 1 0%

11-May-18 1 1 0%

28-Mar-18 1 1 0%

28-Mar-18 1 1 0%

11-May-18 1 1 0%

11-May-18 1 1 0%

21-May-18 1 1 0%

21-May-18 1 1 0%

25-May-18 1 1 0%

30-May-18 1 1 0%

30-May-18 1 1 0%

4-Jun-18 1 1 0%
4-Jun-18 1 1 0%

11-Jun-18 1 1 0%

11-Jun-18 1 1 0%

11-Jun-18 1 1 0%

30-Oct-17 1 1 0%
12-Nov-17 1 1 0%
25-Nov-17 1 1 0%
26-Nov-17 1 1 0%

4-Nov-17 1 1 0%

22-Nov-17 1 1 0%
10-Dec-17 1 1 0%
28-Dec-17 1 1 0%
15-Jan-18 1 1 0%

2-Feb-18 1 1 0%
20-Feb-18 1 1 0%
8-Mar-18 1 1 0%

26-Mar-18 1 1 0%

13-Apr-18 1 1 0%

1-May-18 1 1 0%

19-May-18 1 1 0%

6-Jun-18 1 1 0%

24-Jun-18 1 1 0%

12-Jul-18 1 1 0%
30-Jul-18 1 1 0%
R, DUCT AND PIPE CONNECTION
22-Nov-17 1 1 0%

10-Dec-17 1 1 0%

28-Dec-17 1 1 0%
15-Jan-18 1 1 0%
2-Feb-18 1 1 0%
12-Feb-18 1 1 0%
2-Mar-18 1 1 0%
18-Mar-18 1 1 0%
5-Apr-18 1 1 0%
23-Apr-18 1 1 0%
11-May-18 1 1 0%
29-May-18 1 1 0%
16-Jun-18 1 1 0%
4-Jul-18 1 1 0%
22-Jul-18 1 1 0%
9-Aug-18 1 1 0%

10-Dec-17 1 1 0%
28-Dec-17 1 1 0%
15-Jan-18 1 1 0%
2-Feb-18 1 1 0%

5-Apr-18 1 1 0%

23-Apr-18 1 1 0%

11-May-18 1 1 0%

29-May-18 1 1 0%

16-Jun-18 1 1 0%

4-Jul-18 1 1 0%

22-Jul-18 1 1 0%

9-Aug-18 1 1 0%

27-Aug-18 1 1 1 0%
1-Nov-17 1 1 0%

11-Nov-17 1 1 0%
16-Nov-17 1 1 0%
18-Nov-17 1 1 0%

23-Nov-17 1 1 0%

28-Nov-17 1 1 0%
5-Dec-17 1 1 0%

7-Dec-17 1 1 0%

9-Dec-17 1 1 0%

11-Dec-17 1 1 0%

16-Dec-17 1 1 0%

23-Dec-17 1 1 0%

30-Dec-17 1 1 0%

11-Nov-17 1 1 0%

21-Nov-17 1 1 0%
26-Nov-17 1 1 0%
28-Nov-17 1 1 0%

3-Dec-17 1 1 0%

15-Dec-17 1 1 0%
17-Dec-17 1 1 0%
19-Dec-17 1 1 0%
21-Dec-17 1 1 0%
26-Dec-17 1 1 0%

2-Jan-18 1 1 0%

9-Jan-18 1 1 0%

21-Nov-17 1 1 0%

1-Dec-17 1 1 0%
6-Dec-17 1 1 0%
8-Dec-17 1 1 0%

13-Dec-17 1 1 0%

25-Dec-17 1 1 0%
27-Dec-17 1 1 0%
29-Dec-17 1 1 0%
31-Dec-17 1 1 0%

5-Jan-18 1 1 0%

12-Jan-18 1 1 0%

19-Jan-18 1 1 0%

1-Dec-17 1 1 0%

11-Dec-17 1 1 0%
16-Dec-17 1 1 0%
18-Dec-17 1 1 0%

23-Dec-17 1 1 0%

4-Jan-18 1 1 0%
6-Jan-18 1 1 0%
8-Jan-18 1 1 0%
10-Jan-18 1 1 0%

15-Jan-18 1 1 0%

22-Jan-18 1 1 0%

29-Jan-18 1 1 0%

22-Nov-17 1 1 0%

2-Dec-17 1 1 0%
7-Dec-17 1 1 0%
9-Dec-17 1 1 0%

14-Dec-17 1 1 0%

26-Dec-17 1 1 0%
28-Dec-17 1 1 0%
30-Dec-17 1 1 0%
1-Jan-18 1 1 0%

6-Jan-18 1 1 0%

13-Jan-18 1 1 0%

20-Jan-18 1 1 0%

2-Dec-17 1 1 0%

12-Dec-17 1 1 0%
17-Dec-17 1 1 0%
19-Dec-17 1 1 0%

24-Dec-17 1 1 0%
5-Jan-18 1 1 0%
7-Jan-18 1 1 0%
9-Jan-18 1 1 0%
11-Jan-18 1 1 0%

16-Jan-18 1 1 0%

23-Jan-18 1 1 0%

30-Jan-18 1 1 0%

12-Dec-17 1 1 0%

22-Dec-17 1 1 0%
27-Dec-17 1 1 0%
29-Dec-17 1 1 0%

3-Jan-18 1 1 0%

15-Jan-18 1 1 0%
17-Jan-18 1 1 0%
19-Jan-18 1 1 0%
21-Jan-18 1 1 0%

26-Jan-18 1 1 0%

2-Feb-18 1 1 0%

9-Feb-18 1 1 0%

22-Dec-17 1 1 0%

1-Jan-18 1 1 0%
6-Jan-18 1 1 0%
8-Jan-18 1 1 0%
13-Jan-18 1 1 0%

25-Jan-18 1 1 0%
27-Jan-18 1 1 0%
29-Jan-18 1 1 0%
31-Jan-18 1 1 0%

5-Feb-18 1 1 0%

12-Feb-18 1 1 0%

19-Feb-18 1 1 0%

1-Jan-18 1 1 0%

11-Jan-18 1 1 0%
16-Jan-18 1 1 0%
18-Jan-18 1 1 0%

23-Jan-18 1 1 0%

4-Feb-18 1 1 0%
6-Feb-18 1 1 0%
8-Feb-18 1 1 0%
10-Feb-18 1 1 0%

15-Feb-18 1 1 0%

22-Feb-18 1 1 0%

1-Mar-18 1 1 0%

11-Jan-18 1 1 0%
21-Jan-18 1 1 0%
26-Jan-18 1 1 0%
28-Jan-18 1 1 0%

2-Feb-18 1 1 0%

14-Feb-18 1 1 0%
16-Feb-18 1 1 0%
18-Feb-18 1 1 0%
20-Feb-18 1 1 0%

25-Feb-18 1 1 0%

4-Mar-18 1 1 0%

11-Mar-18 1 1 0%

21-Jan-18 1 1 0%

31-Jan-18 1 1 0%
5-Feb-18 1 1 0%
7-Feb-18 1 1 0%

12-Feb-18 1 1 0%

24-Feb-18 1 1 0%
26-Feb-18 1 1 0%
28-Feb-18 1 1 0%
2-Mar-18 1 1 0%

7-Mar-18 1 1 0%

14-Mar-18 1 1 0%

21-Mar-18 1 1 0%
31-Jan-18 1 1 0%

10-Feb-18 1 1 0%
15-Feb-18 1 1 0%
17-Feb-18 1 1 0%

22-Feb-18 1 1 0%

6-Mar-18 1 1 0%
8-Mar-18 1 1 0%
10-Mar-18 1 1 0%
12-Mar-18 1 1 0%

17-Mar-18 1 1 0%

24-Mar-18 1 1 0%

31-Mar-18 1 1 0%

4-May-18 1 1 0%

14-May-18 1 1 0%
19-May-18 1 1 0%
21-May-18 1 1 0%

26-May-18 1 1 0%

7-Jun-18 1 1 0%
9-Jun-18 1 1 0%
11-Jun-18 1 1 0%
13-Jun-18 1 1 0%

18-Jun-18 1 1 0%
25-Jun-18 1 1 0%

2-Jul-18 1 1 0%

14-May-18 1 1 0%

24-May-18 1 1 0%
29-May-18 1 1 0%
31-May-18 1 1 0%

5-Jun-18 1 1 0%

17-Jun-18 1 1 0%
19-Jun-18 1 1 0%
21-Jun-18 1 1 0%
23-Jun-18 1 1 0%

28-Jun-18 1 1 0%

5-Jul-18 1 1 0%

12-Jul-18 1 1 0%

24-May-18 1 1 0%

3-Jun-18 1 1 0%
8-Jun-18 1 1 0%
10-Jun-18 1 1 0%

15-Jun-18 1 1 0%

27-Jun-18 1 1 0%
29-Jun-18 1 1 0%
1-Jul-18 1 1 0%
3-Jul-18 1 1 0%
8-Jul-18 1 1 0%

15-Jul-18 1 1 0%

22-Jul-18 1 1 0%

6-Nov-17 1 1 0%

24-Nov-17 1 1 0%
12-Dec-17 1 1 0%
30-Dec-17 1 1 0%
17-Jan-18 1 1 0%
4-Feb-18 1 1 0%
22-Feb-18 1 1 0%
17-Mar-18 1 1 0%
14-Apr-18 1 1 0%
2-May-18 1 1 0%
20-May-18 1 1 0%
7-Jun-18 1 1 0%

25-Jun-18 1 1 0%

13-Jul-18 1 1 0%

26-Jul-18 1 1 0%
8-Aug-18 1 1 0%
, EARTHING SYSTEM...)
24-Nov-17 1 1 0%
12-Dec-17 1 1 0%
30-Dec-17 1 1 0%
17-Jan-18 1 1 0%
4-Feb-18 1 1 0%

22-Feb-18 1 1 0%
12-Mar-18 1 1 0%
27-Mar-18 1 1 0%
24-Apr-18 1 1 0%
12-May-18 1 1 0%
30-May-18 1 1 0%
17-Jun-18 1 1 0%
5-Jul-18 1 1 0%
18-Jul-18 1 1 0%
31-Jul-18 1 1 0%
4-Aug-18 1 1 0%

18-Dec-17 1 1 0%
30-Dec-17 1 1 0%
17-Jan-18 1 1 0%
4-Feb-18 1 1 0%
24-Apr-18 1 1 0%

12-May-18 1 1 0%

30-May-18 1 1 0%

17-Jun-18 1 1 0%

5-Jul-18 1 1 0%

23-Jul-18 1 1 0%

5-Aug-18 1 1 0%

14-Aug-18 1 1 0%

25-Aug-18 1 1 0%

30-May-18 1 1 0%

4-Jun-18 1 1 0%
9-Jun-18 1 1 0%
24-Jul-18 1 1 0%
3-Aug-18 1 1 0%
13-Aug-18 1 1 0%
23-Aug-18 1 1 0%

30-Aug-18 1 1 0%

30-Aug-18 1 1 0%
30-Aug-18 1 1 0%
Papaste dito ung sa successors

Predecessors Succcessors PREDECE

1341
FS

OPT-SUB-SUB-0001, OPT-GEN-GENREQS-
0001, OPT-GEN-GENREQS-0002
OPT-ENGG-CE-0001

OPT-HO-HNDNGOVR-0001, OPT-HO-
HNDNGOVR-0002, OPT-HO-HNDNGOVR-
0003, OPT-GEN-GENREQS-0002, OPT-
MIL-GM-0002, OPT-MIL-GM-0001, OPT-
MIL-GM-0004, OPT-MIL-GM-0003

OPT-SUB-SUB-0001

OPT-SUB-FWA7-0007
OPT-SUB-B&SGF-0003 OPT-IFIN-MASB4-0001, OPT-MECH-F&SGF-
0002
OPT-SUB-B&SGF-0003, OPT-SUPR-
B&S2F-0003 OPT-MECH-F&S2F-0004
OPT-SUPR-B&S3F-0003 OPT-MECH-F&S3F-0003, OPT-MECH-FFGF-
0005, OPT-MECH-FFGF-0005
OPT-SUPR-B&S4F-0003 OPT-MECH-SECB4-0001, OPT-MECH-EMB4F-
0003
OPT-SUPR-B&S5F-0003 OPT-MECH-EMB5F-0003
OPT-SUPR-B&S6F-0003 OPT-MECH-EMB6F-0003
OPT-SUPR-B&S7F-0003 OPT-IFIN-MAS4F-0001, OPT-MECH-EMB7F-
0003, OPT-MECH-FF4F-0008
OPT-SUPR-B&S8F-0003 OPT-MECH-EMB8F-0003, OPT-MECH-FF5F-
0009
OPT-SUPR-B&S9F-0003 OPT-MECH-EMB9F-0003, OPT-MECH-FF6F-
0010
OPT-SUPR-B&S10F-0003 OPT-MECH-EMB10F-0003, OPT-MECH-FF7F-
0011
OPT-SUPR-B&S11F-0003 OPT-MECH-EMB11F-0003, OPT-MECH-FF8F-
0012
OPT-SUPR-B&SRD-0003 OPT-MECH-FF9F-0001, OPT-MECH-SECB4-
0003, OPT-MECH-FF9F-0013

OPT-SUPR-CLN6F-0004 OPT-MIL-KD-0003
OPT-SUPR-B&SRD-0003 OPT-MIL-KD-0003
OPT-ELEC-FF8F-0012, OPT-ELEC-SF8F-
0012 OPT-MIL-KD-0003
OPT-MECH-T&P11F-0003 OPT-MIL-KD-0003

OPT-MIL-KD-0001 OPT-SUB-SUB-0001 1
OPT-MIL-KD-0001 OPT-MIL-KD-0003 1

OPT-MIL-KD-0002 OPT-ENGG-ARCHI-0001, OPT-MAT-MSACE- 1


0001

OPT-ENGG-CE-0001 OPT-ENGG-MECH-0001, OPT-MAT-


MSAARCH-0001

OPT-ENGG-ARCHI-0001 OPT-ENGG-EE-0001, OPT-MAT-MSAMECH-


0001

OPT-ENGG-MECH-0001 OPT-MAT-MSAEE-0001

OPT-ENGG-CE-0001 OPT-MAT-ORDCE-0002

OPT-ENGG-ARCHI-0001 OPT-MAT-ORDARCH-0002

OPT-ENGG-MECH-0001 OPT-MAT-ORDMECH-0001

OPT-ENGG-EE-0001 OPT-MAT-ORDEE-0001

OPT-MAT-MSACE-0001 OPT-MAT-SLIMCE-0003

OPT-MAT-MSAARCH-0001 OPT-MAT-SLIMARC-0003

OPT-MAT-MSAMECH-0001 OPT-MAT-SLIMMEC-0001, OPT-MAT-


LLIMMEC-0001, OPT-MECH-VSI-0001
OPT-MAT-MSAEE-0001 OPT-MAT-SLIMEE-0001, OPT-MAT-LLIMEE-
0001, OPT-MAT-LLIMEE-0001

OPT-MAT-ORDCE-0002 OPT-SUB-SUB-0001

OPT-MAT-ORDARCH-0002 OPT-IFIN-MASB4-0001

OPT-MAT-ORDMECH-0001 OPT-MECH-SECB4-0001, OPT-MECH-EMBB4-


0003

OPT-MAT-ORDEE-0001 OPT-ELEC-FFB4-0001

OPT-MAT-ORDMECH-0001 OPT-MECH-SECB4-0001 1

OPT-MAT-ORDEE-0001, OPT-MAT-
ORDEE-0001 1
OPT-MECH-VSI-0001, OPT-ELEC-TFB4-0001

OPT-MIL-KD-0001, OPT-GEN-GENREQS- OPT-SUB-FWA1-0001, OPT-MIL-STWRKS- 1


0001, OPT-MAT-SLIMCE-0003 0001

OPT-SUB-SUB-0001
OPT-SUB-FWA1-0002, OPT-SUB-FWA2-0001
OPT-SUB-FWA1-0001 1
OPT-SUB-FWA1-0003, OPT-SUB-FWA1-0005
OPT-SUB-FWA1-0002 OPT-SUB-FWA1-0004, OPT-SUB-UNDERB4- 1
0001
OPT-SUB-FWA1-0003 OPT-SUB-FWA1-0006
OPT-SUB-FWA1-0002 OPT-SUB-FWA1-0007 1
OPT-SUB-FWA1-0004 OPT-SUB-FWA1-0007
OPT-SUB-FWA1-0005, OPT-SUB-FWA1-
0006 2
OPT-SUB-FWA2-0007, OPT-SUB-FWA2-0001

OPT-SUB-FWA1-0001, OPT-SUB-FWA1- OPT-SUB-FWA2-0002, OPT-SUB-FWA3-0001, 2


0007 OPT-SUB-CLNB4A1-0001
OPT-SUB-FWA2-0001 1
OPT-SUB-FWA2-0003, OPT-SUB-FWA2-0006
OPT-SUB-FWA2-0002 OPT-SUB-FWA2-0004
OPT-SUB-FWA2-0003 OPT-SUB-FWA2-0005
OPT-SUB-FWA2-0004 OPT-SUB-FWA2-0007
OPT-SUB-FWA2-0002 OPT-SUB-FWA2-0007 1
OPT-SUB-FWA2-0006, OPT-SUB-FWA2- 3
0005, OPT-SUB-FWA1-0007 OPT-SUB-FWA3-0001

OPT-SUB-FWA2-0001, OPT-SUB-FWA2- 2
0007 OPT-SUB-FWA3-0002, OPT-SUB-FWA4-0001
OPT-SUB-FWA3-0001 1
OPT-SUB-FWA3-0003, OPT-SUB-FWA3-0006
OPT-SUB-FWA3-0002 OPT-SUB-FWA3-0004
OPT-SUB-FWA3-0003 OPT-SUB-FWA3-0005
OPT-SUB-FWA3-0004 OPT-SUB-FWA3-0007
OPT-SUB-FWA3-0002 OPT-SUB-FWA3-0007 1
OPT-SUB-FWA3-0006, OPT-SUB-FWA3- OPT-SUB-FWA4-0001, OPT-SUB-CLNB4A2-
0005 2
0001

OPT-SUB-FWA3-0001, OPT-SUB-FWA3-
0007 OPT-SUB-FWA4-0002, OPT-SUB-FWA5-0001
OPT-SUB-FWA4-0001 1
OPT-SUB-FWA4-0003, OPT-SUB-FWA4-0006
OPT-SUB-FWA4-0002 OPT-SUB-FWA4-0004
OPT-SUB-FWA4-0003 OPT-SUB-FWA4-0005
OPT-SUB-FWA4-0004 OPT-SUB-FWA4-0007
OPT-SUB-FWA4-0002 OPT-SUB-FWA4-0007 1
OPT-SUB-FWA4-0006, OPT-SUB-FWA4- OPT-SUB-FWA5-0001, OPT-SUB-SWESB4-
2
0005 0001, OPT-MECH-EMBB4-0002

OPT-SUB-FWA4-0001, OPT-SUB-FWA4-
2
0007 OPT-SUB-FWA5-0002, OPT-SUB-FWA6-0001
OPT-SUB-FWA5-0001 1
OPT-SUB-FWA5-0003, OPT-SUB-FWA5-0006
OPT-SUB-FWA5-0002 OPT-SUB-FWA5-0004
OPT-SUB-FWA5-0003 OPT-SUB-FWA5-0005
OPT-SUB-FWA5-0004 OPT-SUB-FWA5-0007
OPT-SUB-FWA5-0002 OPT-SUB-FWA5-0007 1
OPT-SUB-FWA5-0006, OPT-SUB-FWA5- OPT-SUB-FWA6-0001, OPT-SUB-CLNB4A3-
0005 2
0001

OPT-SUB-FWA5-0001, OPT-SUB-FWA5-
0007 OPT-SUB-FWA6-0002, OPT-SUB-FWA7-0001
OPT-SUB-FWA6-0001 1
OPT-SUB-FWA6-0003, OPT-SUB-FWA6-0006
OPT-SUB-FWA6-0002 OPT-SUB-FWA6-0004
OPT-SUB-FWA6-0003 OPT-SUB-FWA6-0005
OPT-SUB-FWA6-0004 OPT-SUB-FWA6-0007
OPT-SUB-FWA6-0002 OPT-SUB-FWA6-0007 1
OPT-SUB-FWA6-0006, OPT-SUB-FWA6- 2
0005 OPT-SUB-FWA7-0001

OPT-SUB-FWA6-0001, OPT-SUB-FWA6- 1
0007 OPT-SUB-FWA7-0002
OPT-SUB-FWA7-0001 1
OPT-SUB-FWA7-0003, OPT-SUB-FWA7-0004
OPT-SUB-FWA7-0002 OPT-SUB-FWA7-0005 1
OPT-SUB-FWA7-0002 OPT-SUB-FWA7-0007 1
OPT-SUB-FWA7-0003 OPT-SUB-FWA7-0006
OPT-SUB-FWA7-0005 OPT-SUB-FWA7-0007
OPT-SUB-FWA7-0004, OPT-SUB-FWA7- OPT-SUB-WALB4A3-0006, OPT-MIL-CONC-
0006 2
0001

OPT-SUB-FWA2-0001 OPT-SUB-CLNB4A1-0002, OPT-SUB- 1


WALB4A1-0004, OPT-SUB-CLNB4A2-0001
OPT-SUB-CLNB4A1-0001 OPT-SUB-CLNB4A1-0003
OPT-SUB-CLNB4A1-0002 OPT-SUB-CLNB4A2-0003
OPT-SUB-CLNB4A1-0001 OPT-SUB-WALB4A1-0005
OPT-SUB-WALB4A1-0004 OPT-SUB-WALB4A1-0006
OPT-SUB-WALB4A1-0005 OPT-SUB-WALB4A2-0006, OPT-SUB-
B&SB3A1-0001

OPT-SUB-CLNB4A1-0001, OPT-SUB- OPT-SUB-CLNB4A2-0002, OPT-SUB- 2


FWA3-0007 WALB4A2-0004, OPT-SUB-CLNB4A3-0001
OPT-SUB-CLNB4A2-0001 OPT-SUB-CLNB4A2-0003
OPT-SUB-CLNB4A2-0002, OPT-SUB-
1
CLNB4A1-0003 OPT-SUB-CLNB4A3-0004
OPT-SUB-CLNB4A2-0001 OPT-SUB-WALB4A2-0005
OPT-SUB-WALB4A2-0004 OPT-SUB-WALB4A2-0006
OPT-SUB-WALB4A2-0005, OPT-SUB- OPT-SUB-WALB4A3-0006, OPT-SUB- 1
WALB4A1-0006 B&SB3A2-0001

OPT-SUB-CLNB4A2-0001, OPT-SUB- OPT-SUB-CLNB4A3-0002, OPT-SUB- 2


FWA5-0007 CLNB4A3-0003
OPT-SUB-CLNB4A3-0001 OPT-SUB-CLNB4A3-0004
OPT-SUB-CLNB4A3-0001 OPT-SUB-WALB4A3-0005
OPT-SUB-CLNB4A3-0002, OPT-SUB- 1
CLNB4A2-0003 OPT-SUB-WALB4A3-0006
OPT-SUB-CLNB4A3-0003 OPT-SUB-WALB4A3-0006
OPT-SUB-WALB4A3-0005, OPT-SUB-
FWA7-0007, OPT-SUB-WALB4A2-0006, OPT-SUB-STR&RB4-0001, OPT-SUB- 3
OPT-SUB-CLNB4A3-0004 B&SB3A3-0001
OPT-SUB-WALB4A3-0006 OPT-SUB-STR&RB4-0002 1
OPT-SUB-STR&RB4-0001 OPT-SUB-STR&RB4-0003
OPT-SUB-STR&RB4-0002 OPT-SUB-STRB3-0001

OPT-SUB-FWA1-0003 OPT-MECH-SECB4-0001 1

OPT-SUB-WALB4A1-0006 OPT-SUB-B&SB3A1-0002, OPT-SUB- 1


CLNB3A1-0004
OPT-SUB-B&SB3A1-0001 OPT-SUB-B&SB3A1-0003
OPT-SUB-B&SB3A1-0002 OPT-SUB-CLNB3A1-0004 1
OPT-SUB-B&SB3A1-0001, OPT-SUB- OPT-SUB-CLNB3A1-0005, OPT-SUB- 2
B&SB3A1-0003 WALB3A1-0007
OPT-SUB-CLNB3A1-0004 OPT-SUB-CLNB3A1-0006
OPT-SUB-CLNB3A1-0005 OPT-SUB-WALB3A1-0009 1
OPT-SUB-CLNB3A1-0004 OPT-SUB-WALB3A1-0008
OPT-SUB-WALB3A1-0007 OPT-SUB-WALB3A1-0009
OPT-SUB-WALB3A1-0008, OPT-SUB-
CLNB3A1-0006 1
OPT-SUB-B&SB2A1-0001

OPT-SUB-WALB4A2-0006 OPT-SUB-B&SB3A2-0002, OPT-SUB- 1


CLNB3A2-0004
OPT-SUB-B&SB3A2-0001 OPT-SUB-B&SB3A2-0003
OPT-SUB-B&SB3A2-0002 OPT-SUB-CLNB3A2-0004 1
OPT-SUB-B&SB3A2-0001, OPT-SUB- OPT-SUB-CLNB3A2-0005, OPT-SUB- 2
B&SB3A2-0003 WALB3A2-0007, OPT-SUB-SWESB3-0001
OPT-SUB-CLNB3A2-0004 OPT-SUB-CLNB3A2-0006
OPT-SUB-CLNB3A2-0005 OPT-SUB-WALB3A2-0009 1
OPT-SUB-CLNB3A2-0004 OPT-SUB-WALB3A2-0008
OPT-SUB-WALB3A2-0007 OPT-SUB-WALB3A2-0009
OPT-SUB-WALB3A2-0008, OPT-SUB-
1
CLNB3A2-0006 OPT-SUB-B&SB2A2-0001

OPT-SUB-WALB4A3-0006 OPT-SUB-B&SB3A3-0002, OPT-SUB- 1


CLNB3A3-0004, OPT-SUB-B&SB2A3-0001
OPT-SUB-B&SB3A3-0001 OPT-SUB-B&SB3A3-0003
OPT-SUB-B&SB3A3-0002 OPT-SUB-CLNB3A3-0004, OPT-MECH- 1
EMBB3-0003
OPT-SUB-B&SB3A3-0001, OPT-SUB- OPT-SUB-CLNB3A3-0005, OPT-SUB- 2
B&SB3A3-0003 WALB3A3-0007
OPT-SUB-CLNB3A3-0004 OPT-SUB-CLNB3A3-0006
OPT-SUB-CLNB3A3-0005 OPT-SUB-WALB3A3-0009 1
OPT-SUB-CLNB3A3-0004 OPT-SUB-WALB3A3-0008
OPT-SUB-WALB3A3-0007 OPT-SUB-WALB3A3-0009
OPT-SUB-WALB3A3-0008, OPT-SUB- OPT-SUB-WALB2A3-0009, OPT-SUB- 1
CLNB3A3-0006 B&SB2A3-0001

OPT-SUB-WALB3A1-0009 OPT-SUB-B&SB2A1-0002, OPT-SUB- 1


CLNB2A1-0004
OPT-SUB-B&SB2A1-0001 OPT-SUB-B&SB2A1-0003
OPT-SUB-B&SB2A1-0002 OPT-SUB-CLNB2A1-0004 1
OPT-SUB-B&SB2A1-0001, OPT-SUB- OPT-SUB-CLNB2A1-0005, OPT-SUB- 2
B&SB2A1-0003 WALB2A1-0007
OPT-SUB-CLNB2A1-0004 OPT-SUB-CLNB2A1-0006
OPT-SUB-CLNB2A1-0005 OPT-SUB-WALB2A1-0009 1
OPT-SUB-CLNB2A1-0004 OPT-SUB-WALB2A1-0008
OPT-SUB-WALB2A1-0007 OPT-SUB-WALB2A1-0009
OPT-SUB-WALB2A1-0008, OPT-SUB- 1
CLNB2A1-0006 OPT-SUB-B&SB1A1-0001

OPT-SUB-WALB3A2-0009 OPT-SUB-B&SB2A2-0002, OPT-SUB- 1


CLNB2A2-0004
OPT-SUB-B&SB2A2-0001 OPT-SUB-B&SB2A2-0003
OPT-SUB-B&SB2A2-0002 OPT-SUB-CLNB2A2-0004 1
OPT-SUB-B&SB2A2-0001, OPT-SUB- OPT-SUB-CLNB2A2-0005, OPT-SUB- 2
B&SB2A2-0003 WALB2A2-0007, OPT-SUB-SWESB2-0001
OPT-SUB-CLNB2A2-0004 OPT-SUB-CLNB2A2-0006
OPT-SUB-CLNB2A2-0005 OPT-SUB-WALB2A2-0009 1
OPT-SUB-CLNB2A2-0004 OPT-SUB-WALB2A2-0008
OPT-SUB-WALB2A2-0007 OPT-SUB-WALB2A2-0009
OPT-SUB-WALB2A2-0008, OPT-SUB-
1
CLNB2A2-0006 OPT-SUB-B&SB1A2-0001

OPT-SUB-B&SB3A3-0001, OPT-SUB- OPT-SUB-B&SB2A3-0002, OPT-SUB- 2


WALB3A3-0009 CLNB2A3-0004
OPT-SUB-B&SB2A3-0001 OPT-SUB-B&SB2A3-0003
OPT-SUB-B&SB2A3-0002 OPT-SUB-CLNB2A3-0004 1
OPT-SUB-B&SB2A3-0001, OPT-SUB- OPT-SUB-CLNB2A3-0005, OPT-SUB- 2
B&SB2A3-0003 WALB2A3-0007
OPT-SUB-CLNB2A3-0004 OPT-SUB-CLNB2A3-0006
OPT-SUB-CLNB2A3-0005 OPT-SUB-WALB2A3-0009 1
OPT-SUB-CLNB2A3-0004 OPT-SUB-WALB2A3-0008
OPT-SUB-WALB2A3-0007 OPT-SUB-WALB2A3-0009
OPT-SUB-WALB2A3-0008, OPT-SUB-
CLNB2A3-0006, OPT-SUB-WALB3A3- OPT-SUB-B&SB1A3-0001, OPT-SUB-STRB3-
2
0009 0001

OPT-SUB-WALB2A1-0009 OPT-SUB-B&SB1A1-0002, OPT-SUB- 1


CLNB1A1-0004
OPT-SUB-B&SB1A1-0001 OPT-SUB-B&SB1A1-0003
OPT-SUB-B&SB1A1-0002 OPT-SUB-CLNB1A1-0004 1
OPT-SUB-B&SB1A1-0001, OPT-SUB- OPT-SUB-CLNB1A1-0005, OPT-SUB-
B&SB1A1-0003 2
WALB1A1-0007
OPT-SUB-CLNB1A1-0004 OPT-SUB-CLNB1A1-0006
OPT-SUB-CLNB1A1-0005 OPT-SUB-WALB1A1-0009 1
OPT-SUB-CLNB1A1-0004 OPT-SUB-WALB1A1-0008
OPT-SUB-WALB1A1-0007 OPT-SUB-WALB1A1-0009
OPT-SUB-WALB1A1-0008, OPT-SUB- OPT-SUB-WALB1A2-0009, OPT-SUB-B&SGF- 1
CLNB1A1-0006 0001

OPT-SUB-WALB2A2-0009 OPT-SUB-B&SB1A2-0002, OPT-SUB- 1


CLNB1A2-0004
OPT-SUB-B&SB1A2-0001 OPT-SUB-B&SB1A2-0003
OPT-SUB-B&SB1A2-0002 OPT-SUB-CLNB1A2-0004 1
OPT-SUB-B&SB1A2-0001, OPT-SUB- OPT-SUB-CLNB1A2-0005, OPT-SUB-
B&SB1A2-0003 2
WALB1A2-0007, OPT-SUB-SWESB1-0001
OPT-SUB-CLNB1A2-0004 OPT-SUB-CLNB1A2-0006
OPT-SUB-CLNB1A2-0005 OPT-SUB-WALB1A2-0009 1
OPT-SUB-CLNB1A2-0004 OPT-SUB-WALB1A2-0008
OPT-SUB-WALB1A2-0007 OPT-SUB-WALB1A2-0009
OPT-SUB-WALB1A2-0008, OPT-SUB-
CLNB1A2-0006, OPT-SUB-WALB1A1- 2
0009 OPT-SUB-WALB1A3-0009

OPT-SUB-WALB2A3-0009 OPT-SUB-B&SB1A3-0002, OPT-SUB- 1


CLNB1A3-0004
OPT-SUB-B&SB1A3-0001 OPT-SUB-B&SB1A3-0003
OPT-SUB-B&SB1A3-0002 OPT-SUB-CLNB1A3-0004, OPT-SUB-STRB2- 1
0001, OPT-IFIN-MASB4-0001
OPT-SUB-B&SB1A3-0001, OPT-SUB- OPT-SUB-CLNB1A3-0005, OPT-SUB-
B&SB1A3-0003 2
WALB1A3-0007
OPT-SUB-CLNB1A3-0004 OPT-SUB-CLNB1A3-0006
OPT-SUB-CLNB1A3-0005 OPT-SUB-WALB1A3-0009 1
OPT-SUB-CLNB1A3-0004 OPT-SUB-WALB1A3-0008
OPT-SUB-WALB1A3-0007 OPT-SUB-WALB1A3-0009
OPT-SUB-WALB1A3-0008, OPT-SUB-
CLNB1A3-0006, OPT-SUB-WALB1A2- 1
0009 OPT-SUPR-CLNGF-0003

OPT-SUB-WALB1A1-0009 OPT-SUB-B&SGF-0002 1
OPT-SUB-B&SGF-0001 OPT-SUB-B&SGF-0003

OPT-MIL-CONC-0003, OPT-SUPR-CLNGF-
OPT-SUB-B&SGF-0002 0001, OPT-SUPR-B&S2F-0001, OPT-SUB-
STRB1-0001, OPT-XFIN-CRTGF-0001, OPT-
MIL-CONC-0002, OPT-MECH-FFB4-0001
OPT-SUB-B&SGF-0003 OPT-SUPR-CLNGF-0002, OPT-SUPR-CLN2F-
0004
OPT-SUPR-CLNGF-0001 OPT-SUPR-CLNGF-0003
OPT-SUPR-CLNGF-0002, OPT-SUB- OPT-SUPR-CLN2F-0006, OPT-SUPR-B&S2F-
WALB1A3-0009 1
0001

OPT-SUB-B&SGF-0003, OPT-SUPR-
CLNGF-0003 OPT-SUPR-B&S2F-0002
OPT-SUPR-B&S2F-0001 OPT-SUPR-B&S2F-0003
OPT-SUPR-CLN2F-0004, OPT-SUPR-STRGF-
OPT-SUPR-B&S2F-0002 0001, OPT-MIL-CONC-0003, OPT-MECH-
F&SB1-0001
OPT-SUPR-CLNGF-0001, OPT-SUPR- OPT-SUPR-CLN2F-0005, OPT-SUPR-CLN3F-
B&S2F-0003 0004
OPT-SUPR-CLN2F-0004 OPT-SUPR-CLN2F-0006
OPT-SUPR-CLN2F-0005, OPT-SUPR-
1
CLNGF-0003 OPT-SUPR-B&S3F-0001

OPT-SUPR-CLN2F-0006 OPT-SUPR-B&S3F-0002
OPT-SUPR-B&S3F-0001 OPT-SUPR-B&S3F-0003
OPT-SUPR-B&S3F-0002 OPT-SUPR-CLN3F-0004, OPT-SUPR-STR2F-
0001, OPT-MIL-CONC-0004
OPT-SUPR-CLN2F-0004, OPT-SUPR- OPT-SUPR-CLN3F-0005, OPT-SUPR-CLN4F-
B&S3F-0003 0004
OPT-SUPR-CLN3F-0004 OPT-SUPR-CLN3F-0006
OPT-SUPR-CLN3F-0005 OPT-SUPR-B&S4F-0001

OPT-SUPR-CLN3F-0006 OPT-SUPR-B&S4F-0002
OPT-SUPR-B&S4F-0001 OPT-SUPR-B&S4F-0003
OPT-SUPR-CLN4F-0004, OPT-SUPR-STR3F-
OPT-SUPR-B&S4F-0002 0001, OPT-MECH-EMB4F-0003, OPT-MIL-
CONC-0005
OPT-SUPR-CLN3F-0004, OPT-SUPR- OPT-SUPR-CLN4F-0005, OPT-SUPR-CLN5F- 1
B&S4F-0003 0004
OPT-SUPR-CLN4F-0004 OPT-SUPR-CLN4F-0006
OPT-SUPR-CLN4F-0005 OPT-SUPR-B&S5F-0001

OPT-SUPR-CLN4F-0006 OPT-SUPR-B&S5F-0002
OPT-SUPR-B&S5F-0001 OPT-SUPR-B&S5F-0003
OPT-SUPR-B&S5F-0002 OPT-SUPR-CLN5F-0004, OPT-SUPR-STR4F-
0001, OPT-MIL-CONC-0006
OPT-SUPR-CLN4F-0004, OPT-SUPR- OPT-SUPR-CLN5F-0005, OPT-SUPR-CLN6F- 1
B&S5F-0003 0004
OPT-SUPR-CLN5F-0004 OPT-SUPR-CLN5F-0006
OPT-SUPR-CLN5F-0005 OPT-SUPR-B&S6F-0001

OPT-SUPR-CLN5F-0006 OPT-SUPR-B&S6F-0002
OPT-SUPR-B&S6F-0001 OPT-SUPR-B&S6F-0003
OPT-SUPR-B&S6F-0002 OPT-SUPR-CLN6F-0004, OPT-SUPR-STR5F-
0001, OPT-MIL-CONC-0007
OPT-SUPR-CLN5F-0004, OPT-SUPR- OPT-SUPR-CLN6F-0005, OPT-SUPR-CLN7F-
B&S6F-0003 0004, OPT-MIL-GM-0001
OPT-SUPR-CLN6F-0004 OPT-SUPR-CLN6F-0006
OPT-SUPR-CLN6F-0005 OPT-SUPR-B&S7F-0001

OPT-SUPR-CLN6F-0006 OPT-SUPR-B&S7F-0002
OPT-SUPR-B&S7F-0001 OPT-SUPR-B&S7F-0003
OPT-SUPR-B&S7F-0002 OPT-SUPR-CLN7F-0004, OPT-SUPR-STR6F-
0001, OPT-MIL-CONC-0008
OPT-SUPR-CLN6F-0004, OPT-SUPR- OPT-SUPR-CLN7F-0005, OPT-SUPR-CLN8F- 1
B&S7F-0003 0004
OPT-SUPR-CLN7F-0004 OPT-SUPR-CLN7F-0006
OPT-SUPR-CLN7F-0005 OPT-SUPR-B&S8F-0001

OPT-SUPR-CLN7F-0006 OPT-SUPR-B&S8F-0002
OPT-SUPR-B&S8F-0001 OPT-SUPR-B&S8F-0003
OPT-SUPR-B&S8F-0002 OPT-SUPR-CLN8F-0004, OPT-SUPR-STR7F-
0001, OPT-MIL-CONC-0009
OPT-SUPR-CLN7F-0004, OPT-SUPR- OPT-SUPR-CLN8F-0005, OPT-SUPR-CLN9F- 1
B&S8F-0003 0004
OPT-SUPR-CLN8F-0004 OPT-SUPR-CLN8F-0006
OPT-SUPR-CLN8F-0005 OPT-SUPR-B&S9F-0001

OPT-SUPR-CLN8F-0006 OPT-SUPR-B&S9F-0002
OPT-SUPR-B&S9F-0001 OPT-SUPR-B&S9F-0003
OPT-SUPR-B&S9F-0002 OPT-SUPR-CLN9F-0004, OPT-SUPR-STR8F-
0001, OPT-MIL-CONC-0010
OPT-SUPR-CLN8F-0004, OPT-SUPR- OPT-SUPR-CLN9F-0005, OPT-SUPR-CLN10F- 1
B&S9F-0003 0004
OPT-SUPR-CLN9F-0004 OPT-SUPR-CLN9F-0006
OPT-SUPR-CLN9F-0005 OPT-SUPR-B&S10F-0001

OPT-SUPR-CLN9F-0006 OPT-SUPR-B&S10F-0002
OPT-SUPR-B&S10F-0001 OPT-SUPR-B&S10F-0003
OPT-SUPR-B&S10F-0002 OPT-SUPR-CLN10F-0004, OPT-SUPR-STR9F-
0001, OPT-MIL-CONC-0011
OPT-SUPR-CLN9F-0004, OPT-SUPR- OPT-SUPR-CLN10F-0005, OPT-SUPR-CLN11F- 1
B&S10F-0003 0004
OPT-SUPR-CLN10F-0004 OPT-SUPR-CLN10F-0006
OPT-SUPR-CLN10F-0005 OPT-SUPR-B&S11F-0001

OPT-SUPR-CLN10F-0006 OPT-SUPR-B&S11F-0002
OPT-SUPR-B&S11F-0001 OPT-SUPR-B&S11F-0003
OPT-SUPR-B&S11F-0002 OPT-SUPR-CLN11F-0004, OPT-SUPR-STR10F-
0001, OPT-MIL-CONC-0012
OPT-SUPR-CLN10F-0004, OPT-SUPR- 1
B&S11F-0003 OPT-SUPR-CLN11F-0005
OPT-SUPR-CLN11F-0004 OPT-SUPR-CLN11F-0006
OPT-SUPR-CLN11F-0005 OPT-SUPR-B&SRD-0001

OPT-SUPR-CLN11F-0006 OPT-SUPR-B&SRD-0002
OPT-SUPR-B&SRD-0001 OPT-SUPR-B&SRD-0003
OPT-SUPR-B&SRD-0002 OPT-SUPR-STR11F-0001, OPT-MIL-GM-0002,
OPT-MIL-CONC-0013

OPT-SUB-FWA4-0007 OPT-SUB-SWESB4-0002, OPT-SUB-SWESB3- 1


0001
OPT-SUB-SWESB4-0001 OPT-SUB-SWESB4-0003
OPT-SUB-SWESB4-0002 OPT-SUB-SWESB3-0003

OPT-SUB-SWESB4-0001, OPT-SUB- OPT-SUB-SWESB3-0002, OPT-SUB-SWESB2- 1


CLNB3A2-0004 0001
OPT-SUB-SWESB3-0001 OPT-SUB-SWESB3-0003
OPT-SUB-SWESB3-0002, OPT-SUB- 1
SWESB4-0003 OPT-SUB-SWESB2-0003

OPT-SUB-SWESB3-0001, OPT-SUB- OPT-SUB-SWESB2-0002, OPT-SUB-SWESB1- 1


CLNB2A2-0004 0001
OPT-SUB-SWESB2-0001 OPT-SUB-SWESB2-0003
OPT-SUB-SWESB2-0002, OPT-SUB- 1
SWESB3-0003 OPT-SUB-SWESB1-0003

OPT-SUB-SWESB2-0001, OPT-SUB- OPT-SUB-SWESB1-0002, OPT-SUPR-WALGF- 1


CLNB1A2-0004 0001
OPT-SUB-SWESB1-0001 OPT-SUB-SWESB1-0003
OPT-SUB-SWESB1-0002, OPT-SUB-
SWESB2-0003 1
OPT-SUPR-WALGF-0003

OPT-SUB-SWESB1-0001 OPT-SUPR-WALGF-0002, OPT-SUPR-WAL2F- 1


0001
OPT-SUPR-WALGF-0001 OPT-SUPR-WALGF-0003
OPT-SUPR-WALGF-0002, OPT-SUB-
1
SWESB1-0003 OPT-SUPR-WAL2F-0003

OPT-SUPR-WALGF-0001 OPT-SUPR-WAL2F-0002, OPT-SUPR-WAL3F- 1


0001
OPT-SUPR-WAL2F-0001 OPT-SUPR-WAL2F-0003
OPT-SUPR-WAL2F-0002, OPT-SUPR- 1
WALGF-0003 OPT-SUPR-WAL3F-0003

OPT-SUPR-WAL2F-0001 OPT-SUPR-WAL3F-0002, OPT-SUPR-WAL4F- 1


0001
OPT-SUPR-WAL3F-0001 OPT-SUPR-WAL3F-0003
OPT-SUPR-WAL3F-0002, OPT-SUPR-
1
WAL2F-0003 OPT-SUPR-WAL4F-0003

OPT-SUPR-WAL3F-0001 OPT-SUPR-WAL4F-0002, OPT-SUPR-WAL5F- 1


0001
OPT-SUPR-WAL4F-0001 OPT-SUPR-WAL4F-0003
OPT-SUPR-WAL4F-0002, OPT-SUPR- 1
WAL3F-0003 OPT-SUPR-WAL5F-0003

OPT-SUPR-WAL4F-0001 OPT-SUPR-WAL5F-0002, OPT-SUPR-WAL6F- 1


0001
OPT-SUPR-WAL5F-0001 OPT-SUPR-WAL5F-0003
OPT-SUPR-WAL5F-0002, OPT-SUPR- 1
WAL4F-0003 OPT-SUPR-WAL6F-0003

OPT-SUPR-WAL5F-0001 OPT-SUPR-WAL6F-0002, OPT-SUPR-WAL7F- 1


0001
OPT-SUPR-WAL6F-0001 OPT-SUPR-WAL6F-0003
OPT-SUPR-WAL6F-0002, OPT-SUPR-
WAL5F-0003 1
OPT-SUPR-WAL7F-0003
OPT-SUPR-WAL6F-0001 OPT-SUPR-WAL7F-0002, OPT-SUPR-WAL8F- 1
0001
OPT-SUPR-WAL7F-0001 OPT-SUPR-WAL7F-0003
OPT-SUPR-WAL7F-0002, OPT-SUPR-
1
WAL6F-0003 OPT-SUPR-WAL8F-0003

OPT-SUPR-WAL7F-0001 OPT-SUPR-WAL8F-0002, OPT-SUPR-WAL9F- 1


0001
OPT-SUPR-WAL8F-0001 OPT-SUPR-WAL8F-0003
OPT-SUPR-WAL8F-0002, OPT-SUPR-
WAL7F-0003 1
OPT-SUPR-WAL9F-0003

OPT-SUPR-WAL8F-0001 OPT-SUPR-WAL9F-0002, OPT-SUPR-WAL10F- 1


0001
OPT-SUPR-WAL9F-0001 OPT-SUPR-WAL9F-0003
OPT-SUPR-WAL9F-0002, OPT-SUPR-
1
WAL8F-0003 OPT-SUPR-WAL10F-0003

OPT-SUPR-WAL9F-0001 OPT-SUPR-WAL10F-0002, OPT-SUPR- 1


WAL11F-0001
OPT-SUPR-WAL10F-0001 OPT-SUPR-WAL10F-0003
OPT-SUPR-WAL10F-0002, OPT-SUPR- 1
WAL9F-0003 OPT-SUPR-WAL11F-0003

OPT-SUPR-WAL10F-0001 OPT-SUPR-WAL11F-0002 1
OPT-SUPR-WAL11F-0001 OPT-SUPR-WAL11F-0003
OPT-SUPR-WAL11F-0002, OPT-SUPR- 1
WAL10F-0003 OPT-MECH-VSI-0001

OPT-SUB-STR&RB4-0003, OPT-SUB-
WALB2A3-0009 2
OPT-SUB-STRB3-0002
OPT-SUB-STRB3-0001 OPT-SUB-STRB3-0003
OPT-SUB-STRB3-0002 OPT-SUB-STRB2-0001

OPT-SUB-STRB3-0003, OPT-SUB-
2
B&SB1A3-0003 OPT-SUB-STRB2-0002, OPT-SUB-STRB1-0001
OPT-SUB-STRB2-0001 OPT-SUB-STRB2-0003
OPT-SUB-STRB2-0002

OPT-SUB-STRB2-0001, OPT-SUB-B&SGF-
0003 2
OPT-SUB-STRB1-0002
OPT-SUB-STRB1-0001 OPT-SUB-STRB1-0003
OPT-SUB-STRB1-0002 OPT-SUPR-STRGF-0001

OPT-SUB-STRB1-0003, OPT-SUPR-B&S2F-
2
0003 OPT-SUPR-STRGF-0002
OPT-SUPR-STRGF-0001 OPT-SUPR-STRGF-0003
OPT-SUPR-STRGF-0002 OPT-SUPR-STR2F-0001

OPT-SUPR-STRGF-0003, OPT-SUPR-
2
B&S3F-0003 OPT-SUPR-STR2F-0002
OPT-SUPR-STR2F-0001 OPT-SUPR-STR2F-0003
OPT-SUPR-STR2F-0002 OPT-SUPR-STR3F-0001

OPT-SUPR-STR2F-0003, OPT-SUPR-
B&S4F-0003 2
OPT-SUPR-STR3F-0002
OPT-SUPR-STR3F-0001 OPT-SUPR-STR3F-0003
OPT-SUPR-STR3F-0002 OPT-SUPR-STR4F-0001

OPT-SUPR-STR3F-0003, OPT-SUPR-
B&S5F-0003 2
OPT-SUPR-STR4F-0002
OPT-SUPR-STR4F-0001 OPT-SUPR-STR4F-0003
OPT-SUPR-STR4F-0002 OPT-SUPR-STR5F-0001

OPT-SUPR-STR4F-0003, OPT-SUPR- 2
B&S6F-0003 OPT-SUPR-STR5F-0002
OPT-SUPR-STR5F-0001 OPT-SUPR-STR5F-0003
OPT-SUPR-STR5F-0002 OPT-SUPR-STR6F-0001

OPT-SUPR-STR5F-0003, OPT-SUPR-
B&S7F-0003 2
OPT-SUPR-STR6F-0002
OPT-SUPR-STR6F-0001 OPT-SUPR-STR6F-0003
OPT-SUPR-STR6F-0002 OPT-SUPR-STR7F-0001

OPT-SUPR-STR6F-0003, OPT-SUPR- 2
B&S8F-0003 OPT-SUPR-STR7F-0002
OPT-SUPR-STR7F-0001 OPT-SUPR-STR7F-0003
OPT-SUPR-STR7F-0002 OPT-SUPR-STR8F-0001

OPT-SUPR-STR7F-0003, OPT-SUPR- 2
B&S9F-0003 OPT-SUPR-STR8F-0002
OPT-SUPR-STR8F-0001 OPT-SUPR-STR8F-0003
OPT-SUPR-STR8F-0002 OPT-SUPR-STR9F-0001
OPT-SUPR-STR8F-0003, OPT-SUPR- 2
B&S10F-0003 OPT-SUPR-STR9F-0002
OPT-SUPR-STR9F-0001 OPT-SUPR-STR9F-0003
OPT-SUPR-STR9F-0002 OPT-SUPR-STR10F-0001

OPT-SUPR-STR9F-0003, OPT-SUPR- 2
B&S11F-0003 OPT-SUPR-STR10F-0002
OPT-SUPR-STR10F-0001 OPT-SUPR-STR10F-0003
OPT-SUPR-STR10F-0002 OPT-SUPR-STR11F-0001

OPT-SUPR-STR10F-0003, OPT-SUPR-
2
B&SRD-0003 OPT-SUPR-STR11F-0002
OPT-SUPR-STR11F-0001 OPT-SUPR-STR11F-0003
OPT-SUPR-STR11F-0002

OPT-MIL-CONC-0002, OPT-MAT- OPT-IFIN-PSTB4-0001, OPT-IFIN-WSB4-0001,


OPT-IFIN-TMPB4-0001, OPT-IFIN-MASB3-
SLIMARC-0003, OPT-SUB-B&SB1A3-0003 0001, OPT-IFIN-CONB4-0001, OPT-MECH- 3
FIRB4-0001

OPT-IFIN-MASB4-0001 OPT-IFIN-PNTB4-0001, OPT-IFIN-DRSB4- 1


0001, OPT-IFIN-CRBB4-0001

OPT-IFIN-PNTB4-0002, OPT-IFIN-TILB4-0001,
OPT-IFIN-PSTB4-0001 OPT-IFIN-TILB4-0003, OPT-IFIN-DRSB4-0002, 1
OPT-IFIN-GYPB4-0001, OPT-IFIN-EPOB4-
0001
OPT-IFIN-PNTB4-0001, OPT-IFIN-TMPB4- OPT-IFIN-PNTB4-0003, OPT-IFIN-DRSB4-
0001 2
0003, OPT-IFIN-CMTB4-0001

OPT-IFIN-PNTB4-0002, OPT-IFIN-TILB4-
0003, OPT-IFIN-DRSB4-0003, OPT-IFIN-
DRYB4-0002, OPT-IFIN-WINB4-0002,
OPT-IFIN-TILB4-0004, OPT-IFIN-METB4- 11
0001, OPT-IFIN-WSB4-0001, OPT-IFIN-
RDB4-0001, OPT-IFIN-TILB4-0002, OPT-
IFIN-TILB4-0005
OPT-IFIN-CMTB4-0003

OPT-IFIN-MASB4-0001 OPT-IFIN-PNTB4-0002

OPT-IFIN-PNTB4-0001
OPT-IFIN-TMPB4-0002, OPT-IFIN-TILB4-0002
OPT-IFIN-TILB4-0001 OPT-IFIN-PNTB4-0003

OPT-IFIN-EPOB4-0001 OPT-IFIN-PNTB4-0003 1

OPT-IFIN-PSTB4-0001 OPT-IFIN-DRSB4-0002, OPT-IFIN-WINB4- 1


0001
OPT-IFIN-DRSB4-0001, OPT-IFIN-PNTB4-
0001 2
OPT-IFIN-DRSB4-0003
OPT-IFIN-DRSB4-0002, OPT-IFIN-PNTB4-
0002 2
OPT-IFIN-PNTB4-0003

OPT-IFIN-DRSB4-0001 OPT-IFIN-WINB4-0002
OPT-IFIN-WINB4-0001 OPT-IFIN-PNTB4-0003

OPT-IFIN-GYPB4-0001 OPT-IFIN-DRYB4-0002 1
OPT-IFIN-DRYB4-0001 OPT-IFIN-PNTB4-0003 1

OPT-IFIN-TILB4-0001 1
OPT-IFIN-TILB4-0004, OPT-IFIN-TILB4-0005

OPT-IFIN-PNTB4-0001 1
OPT-IFIN-PNTB4-0003, OPT-IFIN-TILB4-0005
OPT-IFIN-TMPB4-0002 OPT-IFIN-PNTB4-0003 1
OPT-IFIN-TMPB4-0002, OPT-IFIN-TILB4-
2
0003, OPT-IFIN-CRBB4-0001 OPT-IFIN-PNTB4-0003

OPT-IFIN-PNTB4-0001 OPT-IFIN-METB4-0001 1

OPT-IFIN-PSTB4-0001, OPT-IFIN-CONB4-
0001 2
OPT-IFIN-RDB4-0001, OPT-IFIN-TILB4-0005

OPT-IFIN-CRBB4-0001, OPT-IFIN-WSB4- 2
0001 OPT-IFIN-PNTB4-0003

OPT-IFIN-MASB4-0001 1
OPT-IFIN-PNTB4-0003, OPT-IFIN-RDB4-0001

OPT-IFIN-MASB4-0001 OPT-IFIN-CRBB4-0001

OPT-IFIN-PNTB4-0002 OPT-IFIN-CMTB4-0002 1
OPT-IFIN-CMTB4-0001 OPT-IFIN-CMTB4-0003
OPT-IFIN-CMTB4-0002, OPT-IFIN-GYPB4-
0002, OPT-MECH-FINB4-0004, OPT-
MECH-FINB4-0005, OPT-MECH-TFB4-
0001, OPT-MECH-TFB4-0003, OPT- 11
MECH-TFB4-0004, OPT-MECH-TFB4-
0005, OPT-MECH-TFB4-0006, OPT-
MECH-TFB4-0007, OPT-IFIN-PNTB4-0003
OPT-IFIN-CMTB3-0003

OPT-IFIN-PNTB4-0001 OPT-IFIN-GYPB4-0002, OPT-IFIN-DRYB4- 1


0001
OPT-IFIN-GYPB4-0001 OPT-IFIN-CMTB4-0003 1

OPT-IFIN-PSTB3-0001, OPT-IFIN-WSB3-0001,
OPT-IFIN-MASB4-0001 OPT-IFIN-TMPB3-0001, OPT-IFIN-CONCB3- 1
0001, OPT-MECH-FIRB3-0001, OPT-IFIN-
MASB2-0001

OPT-IFIN-MASB3-0001 OPT-IFIN-PNTB3-0001, OPT-IFIN-DRSB3- 1


0001, OPT-IFIN-CRBB3-0001

OPT-IFIN-PNTB3-0002, OPT-IFIN-TILB3-0001,
OPT-IFIN-PSTB3-0001 OPT-IFIN-TILB3-0003, OPT-IFIN-DRSB3-0002, 1
OPT-IFIN-GYPB3-0001, OPT-IFIN-EPOB3-
0001
OPT-IFIN-PNTB3-0001, OPT-IFIN-TMPB3- OPT-IFIN-PNTB3-0003, OPT-IFIN-DRSB3-
0001 2
0003, OPT-IFIN-CMTB3-0001

OPT-IFIN-PNTB3-0002, OPT-IFIN-TILB3-
0003, OPT-IFIN-DRSB3-0003, OPT-IFIN-
DRYB3-0002, OPT-IFIN-WINB3-0002,
OPT-IFIN-TILB3-0004, OPT-IFIN-METB3- 11
0001, OPT-IFIN-WSB3-0001, OPT-IFIN-
RDB3-0001, OPT-IFIN-TILB3-0005, OPT-
IFIN-TILB3-0002
OPT-IFIN-CMTB3-0003

OPT-IFIN-MASB3-0001 OPT-IFIN-PNTB3-0002

OPT-IFIN-PNTB3-0001
OPT-IFIN-TMPB3-0002, OPT-IFIN-TILB3-0002
OPT-IFIN-TILB3-0001 OPT-IFIN-PNTB3-0003

OPT-IFIN-EPOB3-0001 OPT-IFIN-PNTB3-0003 1
OPT-IFIN-PSTB3-0001 OPT-IFIN-DRSB3-0002, OPT-IFIN-WINB3- 1
0001
OPT-IFIN-DRSB3-0001, OPT-IFIN-PNTB3-
0001 2
OPT-IFIN-DRSB3-0003
OPT-IFIN-DRSB3-0002, OPT-IFIN-PNTB3- 2
0002 OPT-IFIN-PNTB3-0003

OPT-IFIN-DRSB3-0001 OPT-IFIN-WINB3-0002
OPT-IFIN-WINB3-0001 OPT-IFIN-PNTB3-0003 1

OPT-IFIN-GYPB3-0001 OPT-IFIN-DRYB3-0002 1
OPT-IFIN-DRYB3-0001 OPT-IFIN-PNTB3-0003 1

OPT-IFIN-TILB3-0001 1
OPT-IFIN-TILB3-0004, OPT-IFIN-TILB3-0005

OPT-IFIN-PNTB3-0001 1
OPT-IFIN-PNTB3-0003, OPT-IFIN-TILB3-0005
OPT-IFIN-TMPB3-0002 OPT-IFIN-PNTB3-0003 1
OPT-IFIN-TMPB3-0002, OPT-IFIN-TILB3-
0003, OPT-IFIN-CRBB3-0001 2
OPT-IFIN-PNTB3-0003

OPT-IFIN-PNTB3-0001 OPT-IFIN-METB3-0001 1

OPT-IFIN-PSTB3-0001, OPT-IFIN-CONCB3-
0001 2
OPT-IFIN-RDB3-0001, OPT-IFIN-TILB3-0005

OPT-IFIN-CRBB3-0001, OPT-IFIN-WSB3-
0001 2
OPT-IFIN-PNTB3-0003

OPT-IFIN-MASB3-0001 1
OPT-IFIN-PNTB3-0003, OPT-IFIN-RDB3-0001

OPT-IFIN-MASB3-0001 OPT-IFIN-CRBB3-0001

OPT-IFIN-PNTB3-0002 OPT-IFIN-CMTB3-0002 1
OPT-IFIN-CMTB3-0001 OPT-IFIN-CMTB3-0003 1
OPT-IFIN-CMTB3-0002, OPT-IFIN-GYPB3-
0002, OPT-IFIN-CMTB4-0003, OPT-IFIN- 4
PNTB3-0003 OPT-IFIN-CMTB2-0003
OPT-IFIN-PNTB3-0001 OPT-IFIN-GYPB3-0002, OPT-IFIN-DRYB3- 1
0001
OPT-IFIN-GYPB3-0001 OPT-IFIN-CMTB3-0003 1

OPT-IFIN-PSTB2-0001, OPT-IFIN-WSB2-0001,
OPT-IFIN-MASB3-0001 OPT-IFIN-TMPB2-0001, OPT-IFIN-CONB2- 1
0001, OPT-IFIN-MASB1-0001

OPT-IFIN-MASB2-0001 OPT-IFIN-PNTB2-0001, OPT-IFIN-DRSB2- 1


0001, OPT-IFIN-CRBB2-0001

OPT-IFIN-PNTB2-0002, OPT-IFIN-TILB2-0001,
OPT-IFIN-PSTB2-0001 OPT-IFIN-TILB2-0003, OPT-IFIN-DRSB2-0002, 1
OPT-IFIN-GYPB2-0001, OPT-IFIN-EPOB2-
0001
OPT-IFIN-PNTB2-0001, OPT-IFIN-TMPB2- OPT-IFIN-PNTB2-0003, OPT-IFIN-DRSB2-
0001 2
0003, OPT-IFIN-CMTB2-0001

OPT-IFIN-PNTB2-0002, OPT-IFIN-TILB2-
0003, OPT-IFIN-DRSB2-0003, OPT-IFIN-
DRYB2-0002, OPT-IFIN-WINB2-0002,
OPT-IFIN-TILB2-0004, OPT-IFIN-METB2- 11
0001, OPT-IFIN-WSB2-0001, OPT-IFIN-
RDB2-0001, OPT-IFIN-TILB2-0005, OPT-
IFIN-TILB2-0002
OPT-IFIN-CMTB2-0003

OPT-IFIN-MASB2-0001 OPT-IFIN-PNTB2-0002

OPT-IFIN-PNTB2-0001
OPT-IFIN-TMPB2-0002, OPT-IFIN-TILB2-0002
OPT-IFIN-TILB2-0001 OPT-IFIN-PNTB2-0003

OPT-IFIN-EPOB2-0001 OPT-IFIN-PNTB2-0003 1

OPT-IFIN-PSTB2-0001 OPT-IFIN-DRSB2-0002, OPT-IFIN-WINB2- 1


0001
OPT-IFIN-DRSB2-0001, OPT-IFIN-PNTB2- 2
0001 OPT-IFIN-DRSB2-0003
OPT-IFIN-DRSB2-0002, OPT-IFIN-PNTB2-
2
0002 OPT-IFIN-PNTB2-0003

OPT-IFIN-DRSB2-0001 OPT-IFIN-WINB2-0002
OPT-IFIN-WINB2-0001 OPT-IFIN-PNTB2-0003 1
OPT-IFIN-GYPB2-0001 OPT-IFIN-DRYB2-0002 1
OPT-IFIN-DRYB2-0001 OPT-IFIN-PNTB2-0003 1

OPT-IFIN-TILB2-0001 1
OPT-IFIN-TILB2-0004, OPT-IFIN-TILB2-0005

OPT-IFIN-PNTB2-0001 1
OPT-IFIN-PNTB2-0003, OPT-IFIN-TILB2-0005
OPT-IFIN-TMPB2-0002 OPT-IFIN-PNTB2-0003 1
OPT-IFIN-TMPB2-0002, OPT-IFIN-TILB2-
0003, OPT-IFIN-CRBB2-0001 2
OPT-IFIN-PNTB2-0003

OPT-IFIN-PNTB2-0001 OPT-IFIN-METB2-0001 1

OPT-IFIN-PSTB2-0001, OPT-IFIN-CONB2- 2
0001 OPT-IFIN-RDB2-0001, OPT-IFIN-TILB2-0005

OPT-IFIN-CRBB2-0001, OPT-IFIN-WSB2- 2
0001 OPT-IFIN-PNTB2-0003

OPT-IFIN-MASB2-0001 1
OPT-IFIN-PNTB2-0003, OPT-IFIN-RDB2-0001

OPT-IFIN-MASB2-0001 OPT-IFIN-CRBB2-0001

OPT-IFIN-PNTB2-0002 OPT-IFIN-CMTB2-0002 1
OPT-IFIN-CMTB2-0001 OPT-IFIN-CMTB2-0003 1
OPT-IFIN-CMTB2-0002, OPT-IFIN-GYPB2-
0002, OPT-IFIN-PNTB2-0003, OPT-IFIN- 4
CMTB3-0003 OPT-IFIN-CMTB1-0003

OPT-IFIN-PNTB2-0001 OPT-IFIN-GYPB2-0002, OPT-IFIN-DRYB2- 1


0001
OPT-IFIN-GYPB2-0001 OPT-IFIN-CMTB2-0003 1

OPT-IFIN-PSTB1-0001, OPT-IFIN-WSB1-0001,
OPT-IFIN-MASB2-0001 OPT-IFIN-TMPB1-0001, OPT-IFIN-CONB1-
0001, OPT-IFIN-MASGF-0001
OPT-IFIN-MASB1-0001 OPT-IFIN-PNTB1-0001, OPT-IFIN-DRSB1- 1
0001, OPT-IFIN-CRBB1-0001

OPT-IFIN-PNTB1-0002, OPT-IFIN-TILB1-0001,
OPT-IFIN-PSTB1-0001 OPT-IFIN-TILB1-0003, OPT-IFIN-DRSB1-0002, 1
OPT-IFIN-GYPB1-0001, OPT-IFIN-EPOB1-
0001
OPT-IFIN-PNTB1-0001, OPT-IFIN-TMPB1- OPT-IFIN-PNTB1-0003, OPT-IFIN-DRSB1-
0001 2
0003, OPT-IFIN-CMTB1-0001

OPT-IFIN-PNTB1-0002, OPT-IFIN-TILB1-
0003, OPT-IFIN-DRSB1-0003, OPT-IFIN-
DRYB1-0002, OPT-IFIN-WINB1-0002,
OPT-IFIN-TILB1-0004, OPT-IFIN-METB1- 11
0001, OPT-IFIN-WSB1-0001, OPT-IFIN-
RDMB1-0001, OPT-IFIN-TILB1-0005, OPT-
IFIN-TILB1-0002
OPT-IFIN-CMTB1-0003

OPT-IFIN-MASB1-0001 OPT-IFIN-PNTB1-0002

OPT-IFIN-PNTB1-0001
OPT-IFIN-TMPB1-0002, OPT-IFIN-TILB1-0002
OPT-IFIN-TILB1-0001 OPT-IFIN-PNTB1-0003

OPT-IFIN-EPOB1-0001 OPT-IFIN-PNTB1-0003 1

OPT-IFIN-PSTB1-0001 OPT-IFIN-DRSB1-0002, OPT-IFIN-WINB1- 1


0001
OPT-IFIN-DRSB1-0001, OPT-IFIN-PNTB1- 2
0001 OPT-IFIN-DRSB1-0003
OPT-IFIN-DRSB1-0002, OPT-IFIN-PNTB1-
2
0002 OPT-IFIN-PNTB1-0003

OPT-IFIN-DRSB1-0001 OPT-IFIN-WINB1-0002
OPT-IFIN-WINB1-0001 OPT-IFIN-PNTB1-0003 1

OPT-IFIN-GYPB1-0001 OPT-IFIN-DRYB1-0002 1
OPT-IFIN-DRYB1-0001 OPT-IFIN-PNTB1-0003 1

OPT-IFIN-TILB1-0001 1
OPT-IFIN-TILB1-0004, OPT-IFIN-TILB1-0005

OPT-IFIN-PNTB1-0001 1
OPT-IFIN-PNTB1-0003, OPT-IFIN-TILB1-0005
OPT-IFIN-TMPB1-0002 OPT-IFIN-PNTB1-0003 1
OPT-IFIN-TMPB1-0002, OPT-IFIN-TILB1-
0003, OPT-IFIN-CRBB1-0001 3
OPT-IFIN-PNTB1-0003

OPT-IFIN-PNTB1-0001 OPT-IFIN-METB1-0001 1

OPT-IFIN-PSTB1-0001, OPT-IFIN-CONB1-
0001 2
OPT-IFIN-RDMB1-0001, OPT-IFIN-TILB1-0005

OPT-IFIN-CRBB1-0001, OPT-IFIN-WSB1-
0001 2
OPT-IFIN-PNTB1-0003

OPT-IFIN-MASB1-0001 OPT-IFIN-PNTB1-0003, OPT-IFIN-RDMB1- 1


0001

OPT-IFIN-MASB1-0001 OPT-IFIN-CRBB1-0001

OPT-IFIN-PNTB1-0002 OPT-IFIN-CMTB1-0002 1
OPT-IFIN-CMTB1-0001 OPT-IFIN-CMTB1-0003 1
OPT-IFIN-CMTB1-0002, OPT-IFIN-GYPB1-
0002, OPT-IFIN-PNTB1-0003, OPT-IFIN- 4
CMTB2-0003 OPT-IFIN-CMT2F-0003

OPT-IFIN-PNTB1-0001 OPT-IFIN-GYPB1-0002, OPT-IFIN-DRYB1- 1


0001
OPT-IFIN-GYPB1-0001 OPT-IFIN-CMTB1-0003 1

OPT-IFIN-MASB1-0001 OPT-IFIN-PSTGF-0001, OPT-IFIN-MAS2F-


0001

OPT-IFIN-MASGF-0001 OPT-IFIN-PNTGF-0001, OPT-IFIN-DRSGF- 1


0001

OPT-IFIN-PNTGF-0002, OPT-IFIN-TMPGF-
OPT-IFIN-PSTGF-0001 0001, OPT-IFIN-TILGF-0001, OPT-IFIN- 1
DRSGF-0002, OPT-IFIN-CRBGF-0001
OPT-IFIN-PNTGF-0001, OPT-IFIN-TMPGF- OPT-IFIN-PNTGF-0003, OPT-IFIN-DRSGF-
2
0001 0003, OPT-IFIN-CMTGF-0001
OPT-IFIN-PNTGF-0002, OPT-IFIN-TILGF-
0001, OPT-IFIN-DRSGF-0003, OPT-IFIN-
WINGF-0002, OPT-IFIN-METGF-0001, 7
OPT-IFIN-SPCGF-0001, OPT-IFIN-METGF-
0002
OPT-IFIN-CMTGF-0003

OPT-IFIN-PNTGF-0001 OPT-IFIN-PNTGF-0002

OPT-IFIN-CRBGF-0001 OPT-IFIN-PNTGF-0003, OPT-IFIN-METGF- 1


0002
OPT-IFIN-METGF-0001 OPT-IFIN-PNTGF-0003

OPT-IFIN-PSTGF-0001 OPT-IFIN-DRSGF-0002, OPT-IFIN-WINGF- 1


0001
OPT-IFIN-DRSGF-0001, OPT-IFIN-PNTGF-
2
0001 OPT-IFIN-DRSGF-0003
OPT-IFIN-DRSGF-0002, OPT-IFIN-PNTGF-
0002 2
OPT-IFIN-PNTGF-0003

OPT-IFIN-DRSGF-0001 OPT-IFIN-WINGF-0002
OPT-IFIN-WINGF-0001 OPT-IFIN-PNTGF-0003 1

OPT-IFIN-PNTGF-0001 OPT-IFIN-PNTGF-0003, OPT-IFIN-SPCGF- 1


0001

OPT-IFIN-PNTGF-0001 OPT-IFIN-METGF-0001 1

OPT-IFIN-TILGF-0001 OPT-IFIN-PNTGF-0003

OPT-IFIN-PNTGF-0002 OPT-IFIN-CMTGF-0002 1
OPT-IFIN-CMTGF-0001 OPT-IFIN-CMTGF-0003 1
OPT-IFIN-CMTGF-0002, OPT-IFIN-PNTGF-
2
0003 OPT-IFIN-CMT2F-0003

OPT-IFIN-MASGF-0001
OPT-IFIN-PST2F-0001, OPT-IFIN-MAS3F-0001

OPT-IFIN-MAS2F-0001 1
OPT-IFIN-PNT2F-0001, OPT-IFIN-DRS2F-0001
OPT-IFIN-PST2F-0001 OPT-IFIN-PNT2F-0002, OPT-IFIN-TIL2F-0001, 1
OPT-IFIN-TIL2F-0003, OPT-IFIN-DRS2F-0002,
OPT-IFIN-GYP2F-0001, OPT-IFIN-EPO2F-0001
OPT-IFIN-PNT2F-0001 OPT-IFIN-PNT2F-0003, OPT-IFIN-DRS2F- 1
0003, OPT-IFIN-CMT2F-0001

OPT-IFIN-PNT2F-0002, OPT-IFIN-TIL2F-
0003, OPT-IFIN-DRS2F-0003, OPT-IFIN-
DRY2F-0002, OPT-IFIN-WIN2F-0002,
10
OPT-IFIN-TIL2F-0004, OPT-IFIN-MET2F-
0001, OPT-IFIN-SPC2F-0001, OPT-IFIN-
MET2F-0002, OPT-MECH-SF2F-0006
OPT-IFIN-CMT2F-0003

OPT-IFIN-PNT2F-0001 OPT-IFIN-CRB2F-0001

OPT-IFIN-EPO2F-0001 OPT-IFIN-PNT2F-0003, OPT-IFIN-MET2F- 1


0002
OPT-IFIN-MET2F-0001 OPT-IFIN-PNT2F-0003

OPT-IFIN-PST2F-0001 OPT-IFIN-DRS2F-0002, OPT-IFIN-WIN2F- 1


0001
OPT-IFIN-DRS2F-0001, OPT-IFIN-PNT2F- 2
0001 OPT-IFIN-DRS2F-0003
OPT-IFIN-DRS2F-0002, OPT-IFIN-PNT2F-
2
0002 OPT-IFIN-PNT2F-0003

OPT-IFIN-DRS2F-0001 OPT-IFIN-WIN2F-0002
OPT-IFIN-WIN2F-0001 OPT-IFIN-PNT2F-0003 1

OPT-IFIN-GYP2F-0001 OPT-IFIN-DRY2F-0002 1
OPT-IFIN-DRY2F-0001 OPT-IFIN-PNT2F-0003 1

OPT-IFIN-TIL2F-0001 OPT-IFIN-TIL2F-0004 1

OPT-IFIN-PNT2F-0001 1
OPT-IFIN-PNT2F-0003, OPT-IFIN-SPC2F-0001
OPT-IFIN-CRB2F-0001 OPT-IFIN-PNT2F-0003 1

OPT-IFIN-PNT2F-0001 OPT-IFIN-MET2F-0001 1

OPT-IFIN-TIL2F-0003 OPT-IFIN-PNT2F-0003
OPT-IFIN-PNT2F-0002 OPT-IFIN-CMT2F-0002 1
OPT-IFIN-CMT2F-0001 OPT-IFIN-CMT2F-0003 1
OPT-IFIN-CMT2F-0002, OPT-IFIN-GYP2F-
0002, OPT-IFIN-ACO2F-0002, OPT-IFIN-
PNT2F-0003, OPT-IFIN-CMTGF-0003, 7
OPT-MECH-F&S2F-0004, OPT-IFIN-
CMTB1-0003
OPT-IFIN-CMT3F-0003

OPT-IFIN-PNT2F-0001 OPT-IFIN-GYP2F-0002, OPT-IFIN-ACO2F- 1


0001, OPT-IFIN-DRY2F-0001
OPT-IFIN-GYP2F-0001 OPT-IFIN-CMT2F-0003 1

OPT-IFIN-GYP2F-0001 OPT-IFIN-ACO2F-0002
OPT-IFIN-ACO2F-0001 OPT-IFIN-CMT2F-0003 1

OPT-IFIN-MAS2F-0001
OPT-IFIN-PST3F-0001, OPT-IFIN-MAS4F-0001

OPT-IFIN-MAS3F-0001 1
OPT-IFIN-PNT3F-0001, OPT-IFIN-DRS3F-0001

OPT-IFIN-PST3F-0001 OPT-IFIN-PNT3F-0002, OPT-IFIN-TIL3F-0001, 1


OPT-IFIN-DRS3F-0002, OPT-IFIN-EPO3F-0001
OPT-IFIN-PNT3F-0001 OPT-IFIN-PNT3F-0003, OPT-IFIN-DRS3F- 1
0003, OPT-IFIN-CMT3F-0001
OPT-IFIN-PNT3F-0002, OPT-IFIN-TIL3F-
0001, OPT-IFIN-DRS3F-0003, OPT-IFIN- 5
WIN3F-0002, OPT-IFIN-MET3F-0001 OPT-IFIN-CMT3F-0003

OPT-IFIN-EPO3F-0001 OPT-IFIN-PNT3F-0003 1

OPT-IFIN-PST3F-0001 OPT-IFIN-DRS3F-0002, OPT-IFIN-WIN3F- 1


0001
OPT-IFIN-DRS3F-0001, OPT-IFIN-PNT3F-
0001 2
OPT-IFIN-DRS3F-0003
OPT-IFIN-DRS3F-0002, OPT-IFIN-PNT3F- 2
0002 OPT-IFIN-PNT3F-0003

OPT-IFIN-DRS3F-0001 OPT-IFIN-WIN3F-0002
OPT-IFIN-WIN3F-0001 OPT-IFIN-PNT3F-0003 1
OPT-IFIN-PNT3F-0001 OPT-IFIN-PNT3F-0003 1

OPT-IFIN-PNT3F-0001 OPT-IFIN-MET3F-0001 1

OPT-IFIN-PNT3F-0002 OPT-IFIN-CMT3F-0002 1
OPT-IFIN-CMT3F-0001 OPT-IFIN-CMT3F-0003 1
OPT-IFIN-CMT3F-0002, OPT-IFIN-PNT3F-
0003, OPT-IFIN-CMT2F-0003, OPT-
MECH-F&S3F-0003, OPT-MECH-SF3F- 6
0007, OPT-ELEC-SF3F-0007
OPT-IFIN-CMT4F-0003

OPT-MIL-CONC-0008, OPT-IFIN-MAS3F- OPT-IFIN-PST4F-0001, OPT-IFIN-MAS5F-


0001 1
0001, OPT-MECH-FIR4F-0001

OPT-IFIN-MAS4F-0001 1
OPT-IFIN-PNT4F-0001, OPT-IFIN-DRS4F-0001

OPT-IFIN-PST4F-0001 OPT-IFIN-PNT4F-0002, OPT-IFIN-TIL4F-0001, 1


OPT-IFIN-TIL4F-0002, OPT-IFIN-DRS4F-0002,
OPT-IFIN-GYP4F-0001, OPT-IFIN-EPO4F-0001
OPT-IFIN-PNT4F-0001 OPT-IFIN-PNT4F-0003, OPT-IFIN-DRS4F- 1
0003, OPT-IFIN-CMT4F-0001
OPT-IFIN-PNT4F-0002, OPT-IFIN-TIL4F-
0002, OPT-IFIN-DRS4F-0003, OPT-IFIN-
DRY4F-0002, OPT-IFIN-WIN4F-0002, 8
OPT-IFIN-TIL4F-0003, OPT-IFIN-MET4F-
0001, OPT-IFIN-SPC4F-0001
OPT-IFIN-CMT4F-0003

OPT-IFIN-PNT4F-0001 OPT-IFIN-TMP4F-0001

OPT-IFIN-EPO4F-0001 OPT-IFIN-PNT4F-0003 1

OPT-IFIN-PST4F-0001 OPT-IFIN-DRS4F-0002, OPT-IFIN-WIN4F- 1


0001
OPT-IFIN-DRS4F-0001, OPT-IFIN-PNT4F-
0001 2
OPT-IFIN-DRS4F-0003
OPT-IFIN-DRS4F-0002, OPT-IFIN-PNT4F-
2
0002 OPT-IFIN-PNT4F-0003
OPT-IFIN-DRS4F-0001 OPT-IFIN-WIN4F-0002
OPT-IFIN-WIN4F-0001 OPT-IFIN-PNT4F-0003 1

OPT-IFIN-GYP4F-0001 OPT-IFIN-DRY4F-0002 1
OPT-IFIN-DRY4F-0001 OPT-IFIN-PNT4F-0003 1

OPT-IFIN-TIL4F-0001 OPT-IFIN-TIL4F-0003 1

OPT-IFIN-PNT4F-0001 1
OPT-IFIN-PNT4F-0003, OPT-IFIN-SPC4F-0001
OPT-IFIN-TMP4F-0001 OPT-IFIN-PNT4F-0003 1

OPT-IFIN-PNT4F-0001 OPT-IFIN-MET4F-0001 1

OPT-IFIN-TIL4F-0002 OPT-IFIN-PNT4F-0003

OPT-IFIN-PNT4F-0002 OPT-IFIN-CMT4F-0002 1
OPT-IFIN-CMT4F-0001 OPT-IFIN-CMT4F-0003 1

OPT-IFIN-CMT4F-0002, OPT-IFIN-GYP4F-
0002, OPT-IFIN-ACO4F-0002, OPT-IFIN- 5
PNT4F-0003, OPT-IFIN-CMT3F-0003
OPT-IFIN-CMT5F-0003

OPT-IFIN-PNT4F-0001 OPT-IFIN-GYP4F-0002, OPT-IFIN-ACO4F- 1


0001, OPT-IFIN-DRY4F-0001
OPT-IFIN-GYP4F-0001 OPT-IFIN-CMT4F-0003 1

OPT-IFIN-GYP4F-0001 OPT-IFIN-ACO4F-0002
OPT-IFIN-ACO4F-0001 OPT-IFIN-CMT4F-0003 1

OPT-IFIN-MAS4F-0001 OPT-IFIN-PST5F-0001, OPT-IFIN-MAS6F-


0001, OPT-MECH-FIR5F-0001

OPT-IFIN-MAS5F-0001 1
OPT-IFIN-PNT5F-0001, OPT-IFIN-DRS5F-0001

OPT-IFIN-PST5F-0001 OPT-IFIN-PNT5F-0002, OPT-IFIN-TIL5F-0001, 1


OPT-IFIN-TIL5F-0002, OPT-IFIN-DRS5F-0002,
OPT-IFIN-GYP5F-0001, OPT-IFIN-EPO5F-0001
OPT-IFIN-PNT5F-0001 OPT-IFIN-PNT5F-0003, OPT-IFIN-DRS5F- 1
0003, OPT-IFIN-CMT5F-0001
OPT-IFIN-PNT5F-0002, OPT-IFIN-TIL5F-
0002, OPT-IFIN-DRS5F-0003, OPT-IFIN-
DRY5F-0002, OPT-IFIN-WIN5F-0002, 8
OPT-IFIN-TIL5F-0003, OPT-IFIN-MET5F-
0001, OPT-IFIN-SPC5F-0001
OPT-IFIN-CMT5F-0003

OPT-IFIN-PNT5F-0001 OPT-IFIN-TMP5F-0001

OPT-IFIN-EPO5F-0001 OPT-IFIN-PNT5F-0003 1

OPT-IFIN-PST5F-0001 OPT-IFIN-DRS5F-0002, OPT-IFIN-WIN5F- 1


0001
OPT-IFIN-DRS5F-0001, OPT-IFIN-PNT5F-
2
0001 OPT-IFIN-DRS5F-0003
OPT-IFIN-DRS5F-0002, OPT-IFIN-PNT5F-
0002 2
OPT-IFIN-PNT5F-0003

OPT-IFIN-DRS5F-0001 OPT-IFIN-WIN5F-0002
OPT-IFIN-WIN5F-0001 OPT-IFIN-PNT5F-0003 1

OPT-IFIN-GYP5F-0001 OPT-IFIN-DRY5F-0002 1
OPT-IFIN-DRY5F-0001 OPT-IFIN-PNT5F-0003 1

OPT-IFIN-TIL5F-0001 OPT-IFIN-TIL5F-0003 1

OPT-IFIN-PNT5F-0001 1
OPT-IFIN-PNT5F-0003, OPT-IFIN-SPC5F-0001
OPT-IFIN-TMP5F-0001 OPT-IFIN-PNT5F-0003 1

OPT-IFIN-PNT5F-0001 OPT-IFIN-MET5F-0001 1

OPT-IFIN-TIL5F-0002 OPT-IFIN-PNT5F-0003

OPT-IFIN-PNT5F-0002 OPT-IFIN-CMT5F-0002 1
OPT-IFIN-CMT5F-0001 OPT-IFIN-CMT5F-0003 1
OPT-IFIN-CMT5F-0002, OPT-IFIN-GYP5F-
0002, OPT-IFIN-ACO5F-0002, OPT-IFIN-
CMT4F-0003, OPT-IFIN-PNT5F-0003, 5
OPT-IFIN-GYP5F-0002, OPT-IFIN-ACO5F-
0002
OPT-IFIN-CMT6F-0003
OPT-IFIN-PNT5F-0001 OPT-IFIN-GYP5F-0002, OPT-IFIN-ACO5F- 1
0001, OPT-IFIN-DRY5F-0001
OPT-IFIN-GYP5F-0001 OPT-IFIN-CMT5F-0003, OPT-IFIN-CMT5F- 1
0003

OPT-IFIN-GYP5F-0001 OPT-IFIN-ACO5F-0002
OPT-IFIN-ACO5F-0001 OPT-IFIN-CMT5F-0003, OPT-IFIN-CMT5F- 1
0003

OPT-IFIN-MAS5F-0001 OPT-IFIN-PST6F-0001, OPT-IFIN-MAS7F-


0001, OPT-MECH-FIR6F-0001

OPT-IFIN-MAS6F-0001 1
OPT-IFIN-PNT6F-0001, OPT-IFIN-DRS6F-0001

OPT-IFIN-PST6F-0001 OPT-IFIN-PNT6F-0002, OPT-IFIN-TIL6F-0001, 1


OPT-IFIN-TIL6F-0002, OPT-IFIN-DRS6F-0002,
OPT-IFIN-GYP6F-0001, OPT-IFIN-EPO6F-0001
OPT-IFIN-PNT6F-0001 OPT-IFIN-PNT6F-0003, OPT-IFIN-DRS6F- 1
0003, OPT-IFIN-CMT6F-0001
OPT-IFIN-PNT6F-0002, OPT-IFIN-TIL6F-
0002, OPT-IFIN-DRS6F-0003, OPT-IFIN-
DRY6F-0002, OPT-IFIN-WIN6F-0002, 8
OPT-IFIN-TIL6F-0003, OPT-IFIN-MET6F-
0001, OPT-IFIN-SPC6F-0001
OPT-IFIN-CMT6F-0003

OPT-IFIN-PNT6F-0001 OPT-IFIN-TMP6F-0001

OPT-IFIN-EPO6F-0001 OPT-IFIN-PNT6F-0003 1

OPT-IFIN-PST6F-0001 OPT-IFIN-DRS6F-0002, OPT-IFIN-WIN6F- 1


0001
OPT-IFIN-DRS6F-0001, OPT-IFIN-PNT6F-
0001 2
OPT-IFIN-DRS6F-0003
OPT-IFIN-DRS6F-0002, OPT-IFIN-PNT6F-
0002 2
OPT-IFIN-PNT6F-0003

OPT-IFIN-DRS6F-0001 OPT-IFIN-WIN6F-0002
OPT-IFIN-WIN6F-0001 OPT-IFIN-PNT6F-0003 1

OPT-IFIN-GYP6F-0001 OPT-IFIN-DRY6F-0002 1
OPT-IFIN-DRY6F-0001 OPT-IFIN-PNT6F-0003 1

OPT-IFIN-TIL6F-0001 OPT-IFIN-TIL6F-0003 1

OPT-IFIN-PNT6F-0001 1
OPT-IFIN-PNT6F-0003, OPT-IFIN-SPC6F-0001
OPT-IFIN-TMP6F-0001 OPT-IFIN-PNT6F-0003 1

OPT-IFIN-PNT6F-0001 OPT-IFIN-MET6F-0001 1

OPT-IFIN-TIL6F-0002 OPT-IFIN-PNT6F-0003

OPT-IFIN-PNT6F-0002 OPT-IFIN-CMT6F-0002 1
OPT-IFIN-CMT6F-0001 OPT-IFIN-CMT6F-0003 1

OPT-IFIN-CMT6F-0002, OPT-IFIN-GYP6F-
0002, OPT-IFIN-ACO6F-0002, OPT-IFIN- 5
PNT6F-0003, OPT-IFIN-CMT5F-0003
OPT-IFIN-CMT7F-0003

OPT-IFIN-PNT6F-0001 OPT-IFIN-GYP6F-0002, OPT-IFIN-ACO6F- 1


0001, OPT-IFIN-DRY6F-0001
OPT-IFIN-GYP6F-0001 OPT-IFIN-CMT6F-0003 1

OPT-IFIN-GYP6F-0001 OPT-IFIN-ACO6F-0002
OPT-IFIN-ACO6F-0001 OPT-IFIN-CMT6F-0003

OPT-IFIN-MAS6F-0001 OPT-IFIN-PST7F-0001, OPT-IFIN-MAS8F-


0001, OPT-MECH-FIR7F-0001

OPT-IFIN-MAS7F-0001 1
OPT-IFIN-PNT7F-0001, OPT-IFIN-DRS7F-0001

OPT-IFIN-PST7F-0001 OPT-IFIN-PNT7F-0002, OPT-IFIN-TIL7F-0001, 1


OPT-IFIN-TIL7F-0002, OPT-IFIN-DRS7F-0002,
OPT-IFIN-GYP7F-0001, OPT-IFIN-EPO7F-0001
OPT-IFIN-PNT7F-0001 OPT-IFIN-PNT7F-0003, OPT-IFIN-DRS7F- 1
0003, OPT-IFIN-CMT7F-0001
OPT-IFIN-PNT7F-0002, OPT-IFIN-TIL7F-
0002, OPT-IFIN-DRS7F-0003, OPT-IFIN-
DRY7F-0002, OPT-IFIN-WIN7F-0002, 8
OPT-IFIN-TIL7F-0003, OPT-IFIN-MET7F-
0001, OPT-IFIN-SPC7F-0001
OPT-IFIN-CMT7F-0003

OPT-IFIN-PNT7F-0001 OPT-IFIN-TMP7F-0001

OPT-IFIN-EPO7F-0001 OPT-IFIN-PNT7F-0003 1

OPT-IFIN-PST7F-0001 OPT-IFIN-DRS7F-0002, OPT-IFIN-WIN7F- 1


0001
OPT-IFIN-DRS7F-0001, OPT-IFIN-PNT7F-
2
0001 OPT-IFIN-DRS7F-0003
OPT-IFIN-DRS7F-0002, OPT-IFIN-PNT7F-
0002 2
OPT-IFIN-PNT7F-0003

OPT-IFIN-DRS7F-0001 OPT-IFIN-WIN7F-0002
OPT-IFIN-WIN7F-0001 OPT-IFIN-PNT7F-0003 1

OPT-IFIN-GYP7F-0001 OPT-IFIN-DRY7F-0002 1
OPT-IFIN-DRY7F-0001 OPT-IFIN-PNT7F-0003 1

OPT-IFIN-TIL7F-0001 OPT-IFIN-TIL7F-0003 1

OPT-IFIN-PNT7F-0001 1
OPT-IFIN-PNT7F-0003, OPT-IFIN-SPC7F-0001
OPT-IFIN-TMP7F-0001 OPT-IFIN-PNT7F-0003 1

OPT-IFIN-PNT7F-0001 OPT-IFIN-MET7F-0001 1

OPT-IFIN-TIL7F-0002 OPT-IFIN-PNT7F-0003

OPT-IFIN-PNT7F-0002 OPT-IFIN-CMT7F-0002 1
OPT-IFIN-CMT7F-0001 OPT-IFIN-CMT7F-0003 1

OPT-IFIN-CMT7F-0002, OPT-IFIN-GYP7F-
0002, OPT-IFIN-ACO7F-0002, OPT-IFIN- 5
CMT6F-0003, OPT-IFIN-PNT7F-0003
OPT-IFIN-CMT8F-0003

OPT-IFIN-PNT7F-0001 OPT-IFIN-GYP7F-0002, OPT-IFIN-ACO7F- 1


0001, OPT-IFIN-DRY7F-0001
OPT-IFIN-GYP7F-0001 OPT-IFIN-CMT7F-0003 1

OPT-IFIN-GYP7F-0001 OPT-IFIN-ACO7F-0002
OPT-IFIN-ACO7F-0001 OPT-IFIN-CMT7F-0003 1

OPT-IFIN-MAS7F-0001 OPT-IFIN-PST8F-0001, OPT-IFIN-MAS9F-


0001, OPT-MECH-FIR8F-0001

OPT-IFIN-MAS8F-0001 1
OPT-IFIN-PNT8F-0001, OPT-IFIN-DRS8F-0001

OPT-IFIN-PST8F-0001 OPT-IFIN-PNT8F-0002, OPT-IFIN-TIL8F-0001, 1


OPT-IFIN-TIL8F-0002, OPT-IFIN-DRS8F-0002,
OPT-IFIN-GYP8F-0001, OPT-IFIN-EPO8F-0001
OPT-IFIN-PNT8F-0001 OPT-IFIN-PNT8F-0003, OPT-IFIN-DRS8F- 1
0003, OPT-IFIN-CMT8F-0001
OPT-IFIN-PNT8F-0002, OPT-IFIN-TIL8F-
0002, OPT-IFIN-DRS8F-0003, OPT-IFIN-
DRY8F-0002, OPT-IFIN-WIN8F-0002, 8
OPT-IFIN-TIL8F-0003, OPT-IFIN-MET8F-
0001, OPT-IFIN-SPC8F-0001
OPT-IFIN-CMT9F-0003

OPT-IFIN-PNT8F-0001 OPT-IFIN-TMP8F-0001

OPT-IFIN-EPO8F-0001 OPT-IFIN-PNT8F-0003 1

OPT-IFIN-PST8F-0001 OPT-IFIN-DRS8F-0002, OPT-IFIN-WIN8F- 1


0001
OPT-IFIN-DRS8F-0001, OPT-IFIN-PNT8F- 2
0001 OPT-IFIN-DRS8F-0003
OPT-IFIN-DRS8F-0002, OPT-IFIN-PNT8F-
2
0002 OPT-IFIN-PNT8F-0003

OPT-IFIN-DRS8F-0001 OPT-IFIN-WIN8F-0002
OPT-IFIN-WIN8F-0001 OPT-IFIN-PNT8F-0003 1

OPT-IFIN-GYP8F-0001 OPT-IFIN-DRY8F-0002 1
OPT-IFIN-DRY8F-0001 OPT-IFIN-PNT8F-0003 1

OPT-IFIN-TIL8F-0001 OPT-IFIN-TIL8F-0003 1
OPT-IFIN-PNT8F-0001 1
OPT-IFIN-PNT8F-0003, OPT-IFIN-SPC8F-0001
OPT-IFIN-TMP8F-0001 OPT-IFIN-PNT8F-0003 1

OPT-IFIN-PNT8F-0001 OPT-IFIN-MET8F-0001 1

OPT-IFIN-TIL8F-0002 OPT-IFIN-PNT8F-0003

OPT-IFIN-PNT8F-0002 OPT-IFIN-CMT8F-0002 1
OPT-IFIN-CMT8F-0001 OPT-IFIN-CMT8F-0003 1
OPT-IFIN-CMT8F-0002, OPT-IFIN-GYP8F-
0002, OPT-IFIN-ACO8F-0002, OPT-IFIN- 4
CMT7F-0003 OPT-IFIN-CMT9F-0003

OPT-IFIN-PNT8F-0001 OPT-IFIN-GYP8F-0002, OPT-IFIN-ACO8F- 1


0001, OPT-IFIN-DRY8F-0001
OPT-IFIN-GYP8F-0001 OPT-IFIN-CMT8F-0003 1

OPT-IFIN-GYP8F-0001 OPT-IFIN-ACO8F-0002
OPT-IFIN-ACO8F-0001 OPT-IFIN-CMT8F-0003 1

OPT-IFIN-MAS8F-0001 OPT-IFIN-PST9F-0001, OPT-IFIN-MAS10F- 1


0001, OPT-MECH-FIR9F-0001

OPT-IFIN-MAS9F-0001 1
OPT-IFIN-PNT9F-0001, OPT-IFIN-DRS9F-0001

OPT-IFIN-PST9F-0001 OPT-IFIN-PNT9F-0002, OPT-IFIN-TIL9F-0001, 1


OPT-IFIN-TIL9F-0002, OPT-IFIN-DRS9F-0002,
OPT-IFIN-GYP9F-0001, OPT-IFIN-EPO9F-0001
OPT-IFIN-PNT9F-0001 OPT-IFIN-PNT9F-0003, OPT-IFIN-DRS9F- 1
0003, OPT-IFIN-CMT9F-0001
OPT-IFIN-PNT9F-0002, OPT-IFIN-TIL9F-
0002, OPT-IFIN-DRS9F-0003, OPT-IFIN-
DRY9F-0002, OPT-IFIN-WIN9F-0002, 8
OPT-IFIN-TIL9F-0003, OPT-IFIN-MET9F-
0001, OPT-IFIN-SPC9F-0001
OPT-IFIN-CMT9F-0003

OPT-IFIN-PNT9F-0001 OPT-IFIN-TMP9F-0001
OPT-IFIN-EPO9F-0001 OPT-IFIN-PNT9F-0003 1

OPT-IFIN-PST9F-0001 OPT-IFIN-DRS9F-0002, OPT-IFIN-WIN9F- 1


0001
OPT-IFIN-DRS9F-0001, OPT-IFIN-PNT9F- 2
0001 OPT-IFIN-DRS9F-0003
OPT-IFIN-DRS9F-0002, OPT-IFIN-PNT9F- 2
0002 OPT-IFIN-PNT9F-0003

OPT-IFIN-DRS9F-0001 OPT-IFIN-WIN9F-0002
OPT-IFIN-WIN9F-0001 OPT-IFIN-PNT9F-0003 1

OPT-IFIN-GYP9F-0001 OPT-IFIN-DRY9F-0002 1
OPT-IFIN-DRY9F-0001 OPT-IFIN-PNT9F-0003 1

OPT-IFIN-TIL9F-0001 OPT-IFIN-TIL9F-0003 1

OPT-IFIN-PNT9F-0001 1
OPT-IFIN-PNT9F-0003, OPT-IFIN-SPC9F-0001
OPT-IFIN-TMP9F-0001 OPT-IFIN-PNT9F-0003 1

OPT-IFIN-PNT9F-0001 OPT-IFIN-MET9F-0001 1

OPT-IFIN-TIL9F-0002 OPT-IFIN-PNT9F-0003

OPT-IFIN-PNT9F-0002 OPT-IFIN-CMT9F-0002 1
OPT-IFIN-CMT9F-0001 OPT-IFIN-CMT9F-0003 1
OPT-IFIN-CMT9F-0002, OPT-IFIN-GYP9F-
0002, OPT-IFIN-ACO9F-0002, OPT-IFIN-
CMT8F-0003, OPT-IFIN-PNT9F-0003, 6
OPT-IFIN-PNT8F-0003
OPT-IFIN-CMT10F-0003

OPT-IFIN-PNT9F-0001 OPT-IFIN-GYP9F-0002, OPT-IFIN-ACO9F- 1


0001, OPT-IFIN-DRY9F-0001
OPT-IFIN-GYP9F-0001 OPT-IFIN-CMT9F-0003 1

OPT-IFIN-GYP9F-0001 OPT-IFIN-ACO9F-0002
OPT-IFIN-ACO9F-0001 OPT-IFIN-CMT9F-0003 1
OPT-IFIN-MAS9F-0001 OPT-IFIN-PST10F-0001, OPT-IFIN-MAS11F- 1
0001, OPT-MECH-FIR10F-0001

OPT-IFIN-MAS10F-0001 OPT-IFIN-PNT10F-0001, OPT-IFIN-DRS10F- 1


0001

OPT-IFIN-PNT10F-0002, OPT-IFIN-TIL10F-
OPT-IFIN-PST10F-0001 0001, OPT-IFIN-TIL10F-0002, OPT-IFIN- 1
DRS10F-0002, OPT-IFIN-GYP10F-0001, OPT-
IFIN-EPO10F-0001
OPT-IFIN-PNT10F-0001 OPT-IFIN-PNT10F-0003, OPT-IFIN-DRS10F- 1
0003, OPT-IFIN-CMT10F-0001

OPT-IFIN-PNT10F-0002, OPT-IFIN-TIL10F-
0002, OPT-IFIN-DRS10F-0003, OPT-IFIN-
DRY10F-0002, OPT-IFIN-WIN10F-0002, 8
OPT-IFIN-TIL10F-0003, OPT-IFIN-
MET10F-0001, OPT-IFIN-SPC10F-0001
OPT-IFIN-CMT10F-0003

OPT-IFIN-PNT10F-0001 OPT-IFIN-TMP10F-0001

OPT-IFIN-EPO10F-0001 OPT-IFIN-PNT10F-0003 1

OPT-IFIN-PST10F-0001 OPT-IFIN-DRS10F-0002, OPT-IFIN-WIN10F- 1


0001
OPT-IFIN-DRS10F-0001, OPT-IFIN-
2
PNT10F-0001 OPT-IFIN-DRS10F-0003
OPT-IFIN-DRS10F-0002, OPT-IFIN-
PNT10F-0002 2
OPT-IFIN-PNT10F-0003

OPT-IFIN-DRS10F-0001 OPT-IFIN-WIN10F-0002
OPT-IFIN-WIN10F-0001 OPT-IFIN-PNT10F-0003 1

OPT-IFIN-GYP10F-0001 OPT-IFIN-DRY10F-0002 1
OPT-IFIN-DRY10F-0001 OPT-IFIN-PNT10F-0003 1

OPT-IFIN-TIL10F-0001 OPT-IFIN-TIL10F-0003 1

OPT-IFIN-PNT10F-0001 OPT-IFIN-PNT10F-0003, OPT-IFIN-SPC10F- 1


0001
OPT-IFIN-TMP10F-0001 OPT-IFIN-PNT10F-0003 1

OPT-IFIN-PNT10F-0001 OPT-IFIN-MET10F-0001 1
OPT-IFIN-TIL10F-0002 OPT-IFIN-PNT10F-0003

OPT-IFIN-PNT10F-0002 OPT-IFIN-CMT10F-0002 1
OPT-IFIN-CMT10F-0001 OPT-IFIN-CMT10F-0003 1
OPT-IFIN-CMT10F-0002, OPT-IFIN-
GYP10F-0002, OPT-IFIN-ACO10F-0002,
5
OPT-IFIN-CMT9F-0003, OPT-IFIN-
PNT10F-0003
OPT-IFIN-CMT11F-0003

OPT-IFIN-PNT10F-0001 OPT-IFIN-GYP10F-0002, OPT-IFIN-ACO10F- 1


0001, OPT-IFIN-DRY10F-0001
OPT-IFIN-GYP10F-0001 OPT-IFIN-CMT10F-0003 1

OPT-IFIN-GYP10F-0001 OPT-IFIN-ACO10F-0002
OPT-IFIN-ACO10F-0001 OPT-IFIN-CMT10F-0003 1

OPT-IFIN-MAS10F-0001 OPT-IFIN-PST11F-0001, OPT-IFIN-MASRD-


0001, OPT-MECH-FIR11F-0001

OPT-IFIN-MAS11F-0001 OPT-IFIN-PNT11F-0001, OPT-IFIN-DRS11F- 1


0001

OPT-IFIN-PNT11F-0002, OPT-IFIN-TIL11F-
OPT-IFIN-PST11F-0001 0001, OPT-IFIN-TIL11F-0002, OPT-IFIN- 1
DRS11F-0002, OPT-IFIN-GYP11F-0001, OPT-
IFIN-EPO11F-0001
OPT-IFIN-PNT11F-0001 OPT-IFIN-PNT11F-0003, OPT-IFIN-DRS11F- 1
0003, OPT-IFIN-CMT11F-0001

OPT-IFIN-PNT11F-0002, OPT-IFIN-TIL11F-
0002, OPT-IFIN-DRS11F-0003, OPT-IFIN-
DRY11F-0002, OPT-IFIN-WIN11F-0002, 8
OPT-IFIN-TIL11F-0003, OPT-IFIN-
MET11F-0001, OPT-IFIN-SPC11F-0001
OPT-IFIN-CMT11F-0003

OPT-IFIN-PNT11F-0001 OPT-IFIN-TMP11F-0001

OPT-IFIN-EPO11F-0001 OPT-IFIN-PNT11F-0003 1
OPT-IFIN-PST11F-0001 OPT-IFIN-DRS11F-0002, OPT-IFIN-WIN11F- 1
0001
OPT-IFIN-DRS11F-0001, OPT-IFIN- 2
PNT11F-0001 OPT-IFIN-DRS11F-0003
OPT-IFIN-DRS11F-0002, OPT-IFIN-
2
PNT11F-0002 OPT-IFIN-PNT11F-0003

OPT-IFIN-DRS11F-0001 OPT-IFIN-WIN11F-0002
OPT-IFIN-WIN11F-0001 OPT-IFIN-PNT11F-0003 1

OPT-IFIN-GYP11F-0001 OPT-IFIN-DRY11F-0002 1
OPT-IFIN-DRY11F-0001 OPT-IFIN-PNT11F-0003 1

OPT-IFIN-TIL11F-0001 OPT-IFIN-TIL11F-0003 1

OPT-IFIN-PNT11F-0001 OPT-IFIN-PNT11F-0003, OPT-IFIN-SPC11F- 1


0001
OPT-IFIN-TMP11F-0001 OPT-IFIN-PNT11F-0003 1

OPT-IFIN-PNT11F-0001 OPT-IFIN-MET11F-0001 1

OPT-IFIN-TIL11F-0002 OPT-IFIN-PNT11F-0003

OPT-IFIN-PNT11F-0002 OPT-IFIN-CMT11F-0002 1
OPT-IFIN-CMT11F-0001 OPT-IFIN-CMT11F-0003 1
OPT-IFIN-CMT11F-0002, OPT-IFIN-
GYP11F-0002, OPT-IFIN-ACO11F-0002,
5
OPT-IFIN-CMT10F-0003, OPT-IFIN-
PNT11F-0003
OPT-IFIN-CMTRD-0003

OPT-IFIN-PNT11F-0001 OPT-IFIN-GYP11F-0002, OPT-IFIN-ACO11F- 1


0001, OPT-IFIN-DRY11F-0001
OPT-IFIN-GYP11F-0001 OPT-IFIN-CMT11F-0003 1

OPT-IFIN-GYP11F-0001 OPT-IFIN-ACO11F-0002
OPT-IFIN-ACO11F-0001 OPT-IFIN-CMT11F-0003 1

OPT-IFIN-MAS11F-0001 OPT-IFIN-PSTRD-0001 1
OPT-IFIN-MASRD-0001 OPT-IFIN-PNTRD-0001, OPT-IFIN-DRSRD- 1
0001

OPT-IFIN-PNTRD-0002, OPT-IFIN-DRSRD-
OPT-IFIN-PSTRD-0001 0002, OPT-IFIN-METRD-0001, OPT-IFIN- 1
TMPRD-0001
OPT-IFIN-PNTRD-0001 OPT-IFIN-PNTRD-0003, OPT-IFIN-DRSRD- 1
0003, OPT-IFIN-CMTRD-0001
OPT-IFIN-PNTRD-0002, OPT-IFIN-DRSRD-
0003, OPT-IFIN-WINRD-0002, OPT-IFIN-
5
RDFRD-0001, OPT-IFIN-METRD-0001,
OPT-IFIN-METRD-0001
OPT-IFIN-CMTRD-0003

OPT-IFIN-PNTRD-0001 OPT-IFIN-PNTRD-0003, OPT-IFIN-PNTRD- 1


0003

OPT-IFIN-PSTRD-0001 OPT-IFIN-DRSRD-0002, OPT-IFIN-WINRD- 1


0001
OPT-IFIN-DRSRD-0001, OPT-IFIN-PNTRD-
0001 2
OPT-IFIN-DRSRD-0003
OPT-IFIN-DRSRD-0002, OPT-IFIN-PNTRD-
0002, OPT-IFIN-TMPRD-0001 3
OPT-IFIN-PNTRD-0003

OPT-IFIN-DRSRD-0001 OPT-IFIN-WINRD-0002
OPT-IFIN-WINRD-0001 OPT-IFIN-PNTRD-0003 1

OPT-IFIN-PNTRD-0001 OPT-IFIN-RDFRD-0001, OPT-IFIN-RDFRD- 1


0001, OPT-IFIN-DRSRD-0003

OPT-IFIN-TMPRD-0001, OPT-IFIN- OPT-IFIN-PNTRD-0003, OPT-IFIN-CMTRD- 1


TMPRD-0001 0003

OPT-IFIN-PNTRD-0002 OPT-IFIN-CMTRD-0002 1
OPT-IFIN-CMTRD-0001 OPT-IFIN-CMTRD-0003 1
OPT-IFIN-CMTRD-0002, OPT-IFIN-RDFRD-
0001, OPT-IFIN-CMT11F-0003, OPT-IFIN- 4
PNTRD-0003 OPT-HO-HNDNGOVR-0003

OPT-SUB-B&SGF-0003 OPT-XFIN-CRT2F-0002, OPT-XFIN-ALUGF- 1


0001
OPT-XFIN-CRTGF-0001 OPT-XFIN-CRT3F-0003
OPT-XFIN-CRT2F-0002 OPT-XFIN-CRT4F-0004
OPT-XFIN-CRT3F-0003 OPT-XFIN-CRT5F-0005
OPT-XFIN-CRT4F-0004 OPT-XFIN-CRT6F-0006
OPT-XFIN-CRT5F-0005 OPT-XFIN-CRT7F-0007
OPT-XFIN-CRT6F-0006 OPT-XFIN-CRT8F-0008
OPT-XFIN-CRT7F-0007 OPT-XFIN-CRT9F-0009
OPT-XFIN-CRT8F-0008 OPT-XFIN-CRT10F-0010
OPT-XFIN-CRT9F-0009 OPT-XFIN-CRT11F-0011
OPT-XFIN-CRT10F-0010 1

OPT-XFIN-CRTGF-0001 OPT-XFIN-ALU2F-0002
OPT-XFIN-ALUGF-0001 OPT-XFIN-ALU3F-0003
OPT-XFIN-ALU2F-0002 OPT-XFIN-ALU4F-0004
OPT-XFIN-ALU3F-0003 OPT-XFIN-ALU5F-0005
OPT-XFIN-ALU4F-0004 OPT-XFIN-ALU6F-0006
OPT-XFIN-ALU5F-0005 OPT-XFIN-ALU7F-0007
OPT-XFIN-ALU6F-0006 OPT-XFIN-ALU8F-0008
OPT-XFIN-ALU7F-0007 OPT-XFIN-ALU9F-0009
OPT-XFIN-ALU8F-0008 OPT-XFIN-ALU10F-0010
OPT-XFIN-ALU9F-0009 OPT-XFIN-ALU11F-0011
OPT-XFIN-ALU10F-0010 OPT-XFIN-ALURD-0012
OPT-XFIN-ALU11F-0011

OPT-MIL-CONC-0005, OPT-SUB-
UNDERB4-0001, OPT-MAT-SLIMMEC- 4
0001, OPT-MAT-LLIMMEC-0001 OPT-MECH-SECB4-0002
OPT-MECH-SECB4-0001 OPT-MECH-T&PB4-0001, OPT-MECH-FINB4-
0001
OPT-MIL-CONC-0013 OPT-MECH-T&PB4-0002 1

OPT-MECH-SECB4-0002 OPT-MECH-T&PB4-0001 1

OPT-MECH-SECB4-0002, OPT-MECH- 2
FINB4-0001 OPT-MECH-C&HB4-0001
OPT-MECH-SECB4-0003 OPT-MECH-C&HB4-0001 1

OPT-MECH-T&PB4-0002, OPT-MECH-
T&PB4-0001 2
OPT-HO-HNDNGOVR-0001

OPT-MECH-EMBB4-0002 OPT-MECH-FIRB4-0001, OPT-MECH-SECB4-


0004
OPT-SUB-FWA4-0007 OPT-MECH-FIRB4-0001, OPT-MECH-EMBB4-
0003, OPT-MECH-EMBB4-0001
OPT-MECH-EMBB4-0002, OPT-MAT- OPT-MECH-FIRB4-0001, OPT-MECH-SECB4-
SLIMMEC-0001 0005

OPT-MECH-EMBB4-0002, OPT-MECH-
EMBB4-0003, OPT-MECH-EMBB4-0001, 3
OPT-IFIN-MASB4-0001 OPT-MECH-FIRB4-0002
OPT-MECH-FIRB4-0001 OPT-MECH-SECB4-0006, OPT-MECH-SECB4-
0007

OPT-MECH-EMBB4-0001 OPT-MECH-SECB4-0010, OPT-MECH-SECB4-


0008
OPT-MECH-EMBB4-0003 OPT-MECH-SECB4-0010, OPT-MECH-SECB4-
0009
OPT-MECH-FIRB4-0002 OPT-MECH-SECB4-0010, OPT-MECH-SECB4-
0008
OPT-MECH-FIRB4-0002 OPT-MECH-SECB4-0010, OPT-MECH-SECB4-
0009
OPT-MECH-SECB4-0004, OPT-MECH-
SECB4-0006 2
OPT-MECH-SECB4-0010
OPT-MECH-SECB4-0005, OPT-MECH- OPT-MECH-SECB4-0011, OPT-MECH-SECB4-
SECB4-0007 2
0012
OPT-MECH-SECB4-0004, OPT-MECH-
SECB4-0005, OPT-MECH-SECB4-0008,
OPT-MECH-SECB4-0006, OPT-MECH- 5
SECB4-0007 OPT-MECH-T&PB4-0004, OPT-MECH-T&PB4-
0005
OPT-MECH-SECB4-0009 OPT-MECH-T&PB4-0003, OPT-MECH-FINB4- 1
0004
OPT-MECH-SECB4-0009 OPT-MECH-T&PB4-0003, OPT-MECH-FINB4- 1
0005

OPT-MECH-T&PB4-0003, OPT-MECH-T&PB4-
OPT-MECH-SECB4-0011 0004, OPT-MECH-T&PB4-0005, OPT-IFIN- 1
CMTB4-0003
OPT-MECH-SECB4-0012 OPT-MECH-T&PB4-0003, OPT-IFIN-CMTB4- 1
0003

OPT-MECH-SECB4-0012, OPT-MECH-
SECB4-0011, OPT-MECH-FINB4-0004, 4
OPT-MECH-FINB4-0005 OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB4-0010, OPT-MECH- 2
FINB4-0004 OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB4-0010, OPT-MECH-
2
FINB4-0004 OPT-HO-HNDNGOVR-0001
OPT-MECH-EMBB3-0003 OPT-MECH-FIRB3-0001, OPT-MECH-SECB3-
0002
OPT-MECH-EMBB3-0003 OPT-MECH-FIRB3-0001, OPT-MECH-SECB3-
0001
OPT-MECH-FIRB3-0001, OPT-MECH-EMBB3-
OPT-SUB-B&SB3A3-0003 0001, OPT-MECH-EMBB3-0002, OPT-MECH- 1
EMBB2-0003

OPT-MECH-EMBB3-0003, OPT-MECH-
EMBB3-0001, OPT-MECH-EMBB3-0002, 3
OPT-IFIN-MASB3-0001 OPT-MECH-FIRB3-0002
OPT-MECH-FIRB3-0001 OPT-MECH-SECB3-0003, OPT-MECH-SECB3-
0004

OPT-MECH-EMBB3-0002 OPT-MECH-SECB3-0007, OPT-MECH-SECB3-


0005
OPT-MECH-EMBB3-0001 OPT-MECH-SECB3-0007, OPT-MECH-SECB3-
0006
OPT-MECH-FIRB3-0002 OPT-MECH-SECB3-0007, OPT-MECH-SECB3-
0005
OPT-MECH-FIRB3-0002 OPT-MECH-SECB3-0007, OPT-MECH-SECB3-
0006
OPT-MECH-SECB3-0001, OPT-MECH-
SECB3-0003 2
OPT-MECH-SECB3-0007
OPT-MECH-SECB3-0002, OPT-MECH- OPT-MECH-SECB3-0008, OPT-MECH-SECB3-
SECB3-0004 2
0009
OPT-MECH-SECB3-0001, OPT-MECH-
SECB3-0002, OPT-MECH-SECB3-0005,
OPT-MECH-SECB3-0003, OPT-MECH- 5
SECB3-0004 OPT-MECH-T&PB3-0002, OPT-MECH-T&PB3-
0003
OPT-MECH-SECB3-0006 OPT-MECH-T&PB3-0001, OPT-MECH-T&PB3- 1
0001, OPT-MECH-FINB3-0001
OPT-MECH-SECB3-0006 OPT-MECH-T&PB3-0001, OPT-MECH-FINB3- 1
0002

OPT-MECH-SECB3-0008 OPT-MECH-T&PB3-0001, OPT-MECH-T&PB3- 1


0002, OPT-MECH-T&PB3-0003
OPT-MECH-SECB3-0009 OPT-MECH-T&PB3-0001 1

OPT-MECH-SECB3-0009, OPT-MECH-
SECB3-0008, OPT-MECH-SECB3-0008,
4
OPT-MECH-FINB3-0001, OPT-MECH-
FINB3-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB3-0007, OPT-MECH- 2
FINB3-0001 OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB3-0007, OPT-MECH-
2
FINB3-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMBB2-0003 OPT-MECH-FIRB2-0001, OPT-MECH-SECB2-


0002
OPT-MECH-EMBB2-0003 OPT-MECH-FIRB2-0001, OPT-MECH-SECB2-
0001
OPT-MECH-FIRB2-0001, OPT-MECH-EMBB2-
OPT-MECH-EMBB3-0003 0001, OPT-MECH-EMBB2-0002, OPT-MECH- 1
EMBB1-0003

OPT-MECH-EMBB2-0003, OPT-MECH-
3
EMBB2-0001, OPT-MECH-EMBB2-0002 OPT-MECH-FIRB2-0002
OPT-MECH-FIRB2-0001 OPT-MECH-SECB2-0003, OPT-MECH-SECB2-
0004

OPT-MECH-EMBB2-0002 OPT-MECH-SECB2-0007, OPT-MECH-SECB2-


0005
OPT-MECH-EMBB2-0001 OPT-MECH-SECB2-0007, OPT-MECH-SECB2-
0006
OPT-MECH-FIRB2-0002 OPT-MECH-SECB2-0007, OPT-MECH-SECB2-
0005
OPT-MECH-FIRB2-0002 OPT-MECH-SECB2-0007, OPT-MECH-SECB2-
0006
OPT-MECH-SECB2-0001, OPT-MECH-
2
SECB2-0003 OPT-MECH-SECB2-0007
OPT-MECH-SECB2-0002, OPT-MECH- OPT-MECH-SECB2-0008, OPT-MECH-SECB2-
SECB2-0004 2
0009
OPT-MECH-SECB2-0001, OPT-MECH-
SECB2-0002, OPT-MECH-SECB2-0005,
OPT-MECH-SECB2-0003, OPT-MECH- 5
SECB2-0004 OPT-MECH-T&PB2-0002, OPT-MECH-T&PB2-
0003
OPT-MECH-SECB2-0006 OPT-MECH-T&PB2-0001, OPT-MECH-T&PB2- 1
0001, OPT-MECH-FINB2-0001
OPT-MECH-SECB2-0006 OPT-MECH-T&PB2-0001, OPT-MECH-FINB2- 1
0002

OPT-MECH-SECB2-0008 OPT-MECH-T&PB2-0001, OPT-MECH-T&PB2- 1


0002, OPT-MECH-T&PB2-0003
OPT-MECH-SECB2-0009 OPT-MECH-T&PB2-0001 1
OPT-MECH-SECB2-0009, OPT-MECH-
SECB2-0008, OPT-MECH-SECB2-0008,
OPT-MECH-FINB2-0001, OPT-MECH- 4
FINB2-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB2-0007, OPT-MECH-
FINB2-0001 2
OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB2-0007, OPT-MECH- 2
FINB2-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMBB1-0003 OPT-MECH-FIRB1-0001, OPT-MECH-SECB1-


0002
OPT-MECH-EMBB1-0003 OPT-MECH-FIRB1-0001, OPT-MECH-SECB1-
0001
OPT-MECH-EMBB2-0003 OPT-MECH-FIRB1-0001, OPT-MECH-EMBB1- 1
0001, OPT-MECH-EMBB1-0002

OPT-MECH-EMBB1-0003, OPT-MECH- 3
EMBB1-0001, OPT-MECH-EMBB1-0002 OPT-MECH-FIRB1-0002

OPT-MECH-FIRB1-0001 OPT-MECH-SECB1-0003, OPT-MECH-SECB1-


0004

OPT-MECH-EMBB1-0002 OPT-MECH-SECB1-0007, OPT-MECH-SECB1-


0005
OPT-MECH-EMBB1-0001 OPT-MECH-SECB1-0007, OPT-MECH-SECB1-
0006
OPT-MECH-FIRB1-0002 OPT-MECH-SECB1-0007, OPT-MECH-SECB1-
0005
OPT-MECH-FIRB1-0002 OPT-MECH-SECB1-0007, OPT-MECH-SECB1-
0006
OPT-MECH-SECB1-0001, OPT-MECH-
SECB1-0003 OPT-MECH-SECB1-0007
OPT-MECH-SECB1-0002, OPT-MECH- OPT-MECH-SECB1-0008, OPT-MECH-SECB1-
SECB1-0004 0009
OPT-MECH-SECB1-0001, OPT-MECH-
SECB1-0002, OPT-MECH-SECB1-0005,
OPT-MECH-SECB1-0003, OPT-MECH-
SECB1-0004 OPT-MECH-T&PB1-0002, OPT-MECH-T&PB1-
0003
OPT-MECH-SECB1-0006 OPT-MECH-T&PB1-0001, OPT-MECH-T&PB1- 1
0001, OPT-MECH-FINB1-0001
OPT-MECH-SECB1-0006 OPT-MECH-T&PB1-0001, OPT-MECH-FINB1- 1
0002

OPT-MECH-SECB1-0008 OPT-MECH-T&PB1-0001, OPT-MECH-T&PB1- 1


0002, OPT-MECH-T&PB1-0003
OPT-MECH-SECB1-0009 OPT-MECH-T&PB1-0001 1

OPT-MECH-SECB1-0009, OPT-MECH-
SECB1-0008, OPT-MECH-SECB1-0008, 4
OPT-MECH-FINB1-0001, OPT-MECH-
FINB1-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB1-0007, OPT-MECH- 2
FINB1-0001 OPT-HO-HNDNGOVR-0001
OPT-MECH-SECB1-0007, OPT-MECH- 2
FINB1-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB4F-0003 OPT-MECH-FIR4F-0001, OPT-MECH-SEC4F-


0002
OPT-MECH-EMB4F-0003 OPT-MECH-FIR4F-0001, OPT-MECH-SEC4F-
0001

OPT-MIL-CONC-0005, OPT-SUPR-B&S4F- OPT-MECH-FIR4F-0001, OPT-MECH-EMB4F-


0003 0001, OPT-MECH-EMB4F-0002, OPT-MECH-
EMB5F-0003

OPT-MECH-EMB4F-0003, OPT-MECH-
EMB4F-0001, OPT-MECH-EMB4F-0002, 3
OPT-IFIN-MAS4F-0001 OPT-MECH-FIR4F-0002
OPT-MECH-FIR4F-0001 OPT-MECH-SEC4F-0003, OPT-MECH-SEC4F-
0004, OPT-MECH-FF4F-0008

OPT-MECH-EMB4F-0002 OPT-MECH-SEC4F-0007, OPT-MECH-SEC4F-


0005
OPT-MECH-EMB4F-0001 OPT-MECH-SEC4F-0007, OPT-MECH-SEC4F-
0006
OPT-MECH-FIR4F-0002 OPT-MECH-SEC4F-0007, OPT-MECH-SEC4F-
0005
OPT-MECH-FIR4F-0002 OPT-MECH-SEC4F-0007, OPT-MECH-SEC4F-
0006
OPT-MECH-SEC4F-0001, OPT-MECH- 2
SEC4F-0003 OPT-MECH-SEC4F-0007
OPT-MECH-SEC4F-0002, OPT-MECH- OPT-MECH-SEC4F-0008, OPT-MECH-SEC4F- 2
SEC4F-0004 0009
OPT-MECH-SEC4F-0001, OPT-MECH-
SEC4F-0002, OPT-MECH-SEC4F-0005, 5
OPT-MECH-SEC4F-0003, OPT-MECH-
SEC4F-0004 OPT-MECH-T&P4F-0002, OPT-MECH-T&P4F-
0003
OPT-MECH-SEC4F-0006 OPT-MECH-T&P4F-0001, OPT-MECH-T&P4F- 1
0001, OPT-MECH-FIN4F-0001
OPT-MECH-SEC4F-0006 OPT-MECH-T&P4F-0001, OPT-MECH-FIN4F- 1
0002

OPT-MECH-SEC4F-0008 OPT-MECH-T&P4F-0001, OPT-MECH-T&P4F- 1


0002, OPT-MECH-T&P4F-0003
OPT-MECH-SEC4F-0009 OPT-MECH-T&P4F-0001 1

OPT-MECH-SEC4F-0009, OPT-MECH-
SEC4F-0008, OPT-MECH-SEC4F-0008,
OPT-MECH-FIN4F-0001, OPT-MECH- 4
FIN4F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC4F-0007, OPT-MECH-
FIN4F-0001 2
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC4F-0007, OPT-MECH-
FIN4F-0001 2
OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB5F-0003 OPT-MECH-FIR5F-0001, OPT-MECH-SEC5F-


0002
OPT-MECH-EMB5F-0003 OPT-MECH-FIR5F-0001, OPT-MECH-SEC5F-
0001

OPT-MECH-EMB4F-0003, OPT-MIL- OPT-MECH-FIR5F-0001, OPT-MECH-EMB5F-


CONC-0006 0001, OPT-MECH-EMB5F-0002, OPT-MECH- 1
EMB6F-0003

OPT-MECH-EMB5F-0003, OPT-MECH-
EMB5F-0001, OPT-MECH-EMB5F-0002, 3
OPT-IFIN-MAS5F-0001 OPT-MECH-FIR5F-0002
OPT-MECH-FIR5F-0001 OPT-MECH-SEC5F-0003, OPT-MECH-SEC5F-
0004

OPT-MECH-EMB5F-0002 OPT-MECH-SEC5F-0007, OPT-MECH-SEC5F-


0005
OPT-MECH-EMB5F-0001 OPT-MECH-SEC5F-0007, OPT-MECH-SEC5F-
0006
OPT-MECH-FIR5F-0002 OPT-MECH-SEC5F-0007, OPT-MECH-SEC5F-
0005
OPT-MECH-FIR5F-0002 OPT-MECH-SEC5F-0007, OPT-MECH-SEC5F-
0006
OPT-MECH-SEC5F-0001, OPT-MECH-
SEC5F-0003 2
OPT-MECH-SEC5F-0007
OPT-MECH-SEC5F-0002, OPT-MECH- OPT-MECH-SEC5F-0008, OPT-MECH-SEC5F- 2
SEC5F-0004 0009
OPT-MECH-SEC5F-0001, OPT-MECH-
SEC5F-0002, OPT-MECH-SEC5F-0005,
OPT-MECH-SEC5F-0003, OPT-MECH- 5
SEC5F-0004 OPT-MECH-T&P5F-0002, OPT-MECH-T&P5F-
0003
OPT-MECH-SEC5F-0006 OPT-MECH-T&P5F-0001, OPT-MECH-T&P5F- 1
0001, OPT-MECH-FIN5F-0001
OPT-MECH-SEC5F-0006 OPT-MECH-T&P5F-0001, OPT-MECH-FIN5F- 1
0002

OPT-MECH-SEC5F-0008 OPT-MECH-T&P5F-0001, OPT-MECH-T&P5F- 1


0002, OPT-MECH-T&P5F-0003
OPT-MECH-SEC5F-0009 OPT-MECH-T&P5F-0001 1

OPT-MECH-SEC5F-0009, OPT-MECH-
SEC5F-0008, OPT-MECH-SEC5F-0008, 4
OPT-MECH-FIN5F-0001, OPT-MECH-
FIN5F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC5F-0007, OPT-MECH- 2
FIN5F-0001 OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC5F-0007, OPT-MECH-
2
FIN5F-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB6F-0003 OPT-MECH-FIR6F-0001, OPT-MECH-SEC6F-


0002, OPT-MECH-EMB7F-0003
OPT-MECH-EMB6F-0003 OPT-MECH-FIR6F-0001, OPT-MECH-SEC6F-
0001
OPT-MECH-EMB5F-0003, OPT-MIL- OPT-MECH-FIR6F-0001, OPT-MECH-EMB6F- 1
CONC-0007 0001, OPT-MECH-EMB6F-0002

OPT-MECH-EMB6F-0003, OPT-MECH-
EMB6F-0001, OPT-MECH-EMB6F-0002, 3
OPT-IFIN-MAS6F-0001 OPT-MECH-FIR6F-0002
OPT-MECH-FIR6F-0001 OPT-MECH-SEC6F-0003, OPT-MECH-SEC6F-
0004

OPT-MECH-EMB6F-0002 OPT-MECH-SEC6F-0007, OPT-MECH-SEC6F-


0005
OPT-MECH-EMB6F-0001 OPT-MECH-SEC6F-0007, OPT-MECH-SEC6F-
0006
OPT-MECH-FIR6F-0002 OPT-MECH-SEC6F-0007, OPT-MECH-SEC6F-
0005
OPT-MECH-FIR6F-0002 OPT-MECH-SEC6F-0007, OPT-MECH-SEC6F-
0006
OPT-MECH-SEC6F-0001, OPT-MECH- 2
SEC6F-0003 OPT-MECH-SEC6F-0007
OPT-MECH-SEC6F-0002, OPT-MECH- OPT-MECH-SEC6F-0008, OPT-MECH-SEC6F- 2
SEC6F-0004 0009
OPT-MECH-SEC6F-0001, OPT-MECH-
SEC6F-0002, OPT-MECH-SEC6F-0005, 5
OPT-MECH-SEC6F-0003, OPT-MECH-
SEC6F-0004 OPT-MECH-T&P6F-0002, OPT-MECH-T&P6F-
0003
OPT-MECH-SEC6F-0006 OPT-MECH-T&P6F-0001, OPT-MECH-T&P6F- 1
0001, OPT-MECH-FIN6F-0001
OPT-MECH-SEC6F-0006 OPT-MECH-T&P6F-0001, OPT-MECH-FIN6F- 1
0002

OPT-MECH-SEC6F-0008 OPT-MECH-T&P6F-0001, OPT-MECH-T&P6F- 1


0002, OPT-MECH-T&P6F-0003
OPT-MECH-SEC6F-0009 OPT-MECH-T&P6F-0001 1

OPT-MECH-SEC6F-0009, OPT-MECH-
SEC6F-0008, OPT-MECH-SEC6F-0008,
OPT-MECH-FIN6F-0001, OPT-MECH- 4
FIN6F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC6F-0007, OPT-MECH-
FIN6F-0001 2
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC6F-0007, OPT-MECH- 2
FIN6F-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB7F-0003 OPT-MECH-FIR7F-0001, OPT-MECH-SEC7F-


0002
OPT-MECH-EMB7F-0003 OPT-MECH-FIR7F-0001, OPT-MECH-SEC7F-
0001
OPT-MIL-CONC-0008, OPT-MECH- OPT-MECH-FIR7F-0001, OPT-MECH-EMB7F-
EMB6F-0001 1
0001, OPT-MECH-EMB7F-0002

OPT-MECH-EMB7F-0003, OPT-MECH-
EMB7F-0001, OPT-MECH-EMB7F-0002, 3
OPT-IFIN-MAS7F-0001 OPT-MECH-FIR7F-0002
OPT-MECH-FIR7F-0001 OPT-MECH-SEC7F-0003, OPT-MECH-SEC7F-
0004

OPT-MECH-EMB7F-0002 OPT-MECH-SEC7F-0007, OPT-MECH-SEC7F-


0005
OPT-MECH-EMB7F-0001 OPT-MECH-SEC7F-0007, OPT-MECH-SEC7F-
0006
OPT-MECH-FIR7F-0002 OPT-MECH-SEC7F-0007, OPT-MECH-SEC7F-
0005
OPT-MECH-FIR7F-0002 OPT-MECH-SEC7F-0007, OPT-MECH-SEC7F-
0006
OPT-MECH-SEC7F-0001, OPT-MECH- 2
SEC7F-0003 OPT-MECH-SEC7F-0007
OPT-MECH-SEC7F-0002, OPT-MECH- OPT-MECH-SEC7F-0008, OPT-MECH-SEC7F- 2
SEC7F-0004 0009
OPT-MECH-SEC7F-0001, OPT-MECH-
SEC7F-0002, OPT-MECH-SEC7F-0005, 5
OPT-MECH-SEC7F-0003, OPT-MECH-
SEC7F-0004 OPT-MECH-T&P7F-0002, OPT-MECH-T&P7F-
0003
OPT-MECH-SEC7F-0006 OPT-MECH-T&P7F-0001, OPT-MECH-T&P7F- 1
0001, OPT-MECH-FIN7F-0001
OPT-MECH-SEC7F-0006 OPT-MECH-T&P7F-0001, OPT-MECH-FIN7F- 1
0002

OPT-MECH-SEC7F-0008 OPT-MECH-T&P7F-0001, OPT-MECH-T&P7F- 1


0002, OPT-MECH-T&P7F-0003
OPT-MECH-SEC7F-0009 OPT-MECH-T&P7F-0001 1

OPT-MECH-SEC7F-0009, OPT-MECH-
SEC7F-0008, OPT-MECH-SEC7F-0008,
OPT-MECH-FIN7F-0001, OPT-MECH- 4
FIN7F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC7F-0007, OPT-MECH-
FIN7F-0001 2
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC7F-0007, OPT-MECH- 2
FIN7F-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB8F-0003 OPT-MECH-FIR8F-0001, OPT-MECH-SEC8F-


0002
OPT-MECH-EMB8F-0003 OPT-MECH-FIR8F-0001, OPT-MECH-SEC8F-
0001
OPT-MIL-CONC-0009 OPT-MECH-FIR8F-0001, OPT-MECH-EMB8F-
0001, OPT-MECH-EMB8F-0002

OPT-MECH-EMB8F-0003, OPT-MECH-
EMB8F-0001, OPT-MECH-EMB8F-0002, 3
OPT-IFIN-MAS8F-0001 OPT-MECH-FIR8F-0002
OPT-MECH-FIR8F-0001 OPT-MECH-SEC8F-0003, OPT-MECH-SEC8F-
0004
OPT-MECH-EMB8F-0002 OPT-MECH-SEC8F-0007, OPT-MECH-SEC8F-
0005
OPT-MECH-EMB8F-0001 OPT-MECH-SEC8F-0007, OPT-MECH-SEC8F-
0006
OPT-MECH-FIR8F-0002 OPT-MECH-SEC8F-0007, OPT-MECH-SEC8F-
0005
OPT-MECH-FIR8F-0002 OPT-MECH-SEC8F-0007, OPT-MECH-SEC8F-
0006
OPT-MECH-SEC8F-0001, OPT-MECH- 2
SEC8F-0003 OPT-MECH-SEC8F-0007
OPT-MECH-SEC8F-0002, OPT-MECH- OPT-MECH-SEC8F-0008, OPT-MECH-SEC8F- 2
SEC8F-0004 0009
OPT-MECH-SEC8F-0001, OPT-MECH-
SEC8F-0002, OPT-MECH-SEC8F-0005, 5
OPT-MECH-SEC8F-0003, OPT-MECH-
SEC8F-0004 OPT-MECH-T&P8F-0002, OPT-MECH-T&P8F-
0003
OPT-MECH-SEC8F-0006 OPT-MECH-T&P8F-0001, OPT-MECH-T&P8F- 1
0001, OPT-MECH-FIN8F-0001
OPT-MECH-SEC8F-0006 OPT-MECH-T&P8F-0001, OPT-MECH-FIN8F- 1
0002

OPT-MECH-SEC8F-0008 OPT-MECH-T&P8F-0001, OPT-MECH-T&P8F- 1


0002, OPT-MECH-T&P8F-0003
OPT-MECH-SEC8F-0009 OPT-MECH-T&P8F-0001 1

OPT-MECH-SEC8F-0009, OPT-MECH-
SEC8F-0008, OPT-MECH-SEC8F-0008,
OPT-MECH-FIN8F-0001, OPT-MECH- 4
FIN8F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC8F-0007, OPT-MECH-
FIN8F-0001 2
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC8F-0007, OPT-MECH- 2
FIN8F-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB9F-0003 OPT-MECH-FIR9F-0001, OPT-MECH-SEC9F-


0002
OPT-MECH-EMB9F-0003 OPT-MECH-FIR9F-0001, OPT-MECH-SEC9F-
0001
OPT-MIL-CONC-0010 OPT-MECH-FIR9F-0001, OPT-MECH-EMB9F-
0001, OPT-MECH-EMB9F-0002

OPT-MECH-EMB9F-0003, OPT-MECH-
EMB9F-0001, OPT-MECH-EMB9F-0002, 3
OPT-IFIN-MAS9F-0001 OPT-MECH-FIR9F-0002
OPT-MECH-FIR9F-0001 OPT-MECH-SEC9F-0003, OPT-MECH-SEC9F-
0004

OPT-MECH-EMB9F-0002 OPT-MECH-SEC9F-0007, OPT-MECH-SEC9F-


0005
OPT-MECH-EMB9F-0001 OPT-MECH-SEC9F-0007, OPT-MECH-SEC9F-
0006
OPT-MECH-FIR9F-0002 OPT-MECH-SEC9F-0007, OPT-MECH-SEC9F-
0005
OPT-MECH-FIR9F-0002 OPT-MECH-SEC9F-0007, OPT-MECH-SEC9F-
0006
OPT-MECH-SEC9F-0001, OPT-MECH-
SEC9F-0003 2
OPT-MECH-SEC9F-0007
OPT-MECH-SEC9F-0002, OPT-MECH- OPT-MECH-SEC9F-0008, OPT-MECH-SEC9F- 2
SEC9F-0004 0009
OPT-MECH-SEC9F-0001, OPT-MECH-
SEC9F-0002, OPT-MECH-SEC9F-0005,
OPT-MECH-SEC9F-0003, OPT-MECH- 5
SEC9F-0004 OPT-MECH-T&P9F-0002, OPT-MECH-T&P9F-
0003
OPT-MECH-SEC9F-0006 OPT-MECH-T&P9F-0001, OPT-MECH-T&P9F- 1
0001, OPT-MECH-FIN9F-0001
OPT-MECH-SEC9F-0006 OPT-MECH-T&P9F-0001, OPT-MECH-FIN9F- 1
0002

OPT-MECH-SEC9F-0008 OPT-MECH-T&P9F-0001, OPT-MECH-T&P9F- 1


0002, OPT-MECH-T&P9F-0003
OPT-MECH-SEC9F-0009 OPT-MECH-T&P9F-0001 1

OPT-MECH-SEC9F-0009, OPT-MECH-
SEC9F-0008, OPT-MECH-SEC9F-0008,
4
OPT-MECH-FIN9F-0001, OPT-MECH-
FIN9F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC9F-0007, OPT-MECH-
2
FIN9F-0001 OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC9F-0007, OPT-MECH-
FIN9F-0001 2
OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB10F-0003 OPT-MECH-FIR10F-0001, OPT-MECH-


SEC10F-0002
OPT-MECH-EMB10F-0003 OPT-MECH-FIR10F-0001, OPT-MECH-
SEC10F-0001
OPT-MIL-CONC-0011 OPT-MECH-FIR10F-0001, OPT-MECH-
EMB10F-0001, OPT-MECH-EMB10F-0002
OPT-MECH-EMB10F-0003, OPT-MECH-
EMB10F-0001, OPT-MECH-EMB10F- 3
0002, OPT-IFIN-MAS10F-0001 OPT-MECH-FIR10F-0002
OPT-MECH-FIR10F-0001 OPT-MECH-SEC10F-0003, OPT-MECH-
SEC10F-0004

OPT-MECH-EMB10F-0002 OPT-MECH-SEC10F-0007, OPT-MECH-


SEC10F-0005
OPT-MECH-EMB10F-0001 OPT-MECH-SEC10F-0007, OPT-MECH-
SEC10F-0006
OPT-MECH-FIR10F-0002 OPT-MECH-SEC10F-0007, OPT-MECH-
SEC10F-0005
OPT-MECH-FIR10F-0002 OPT-MECH-SEC10F-0007, OPT-MECH-
SEC10F-0006
OPT-MECH-SEC10F-0001, OPT-MECH-
SEC10F-0003 2
OPT-MECH-SEC10F-0007
OPT-MECH-SEC10F-0002, OPT-MECH- OPT-MECH-SEC10F-0008, OPT-MECH- 2
SEC10F-0004 SEC10F-0009
OPT-MECH-SEC10F-0001, OPT-MECH-
SEC10F-0002, OPT-MECH-SEC10F-0005,
OPT-MECH-SEC10F-0003, OPT-MECH- 5
SEC10F-0004 OPT-MECH-T&P10F-0002, OPT-MECH-
T&P10F-0003
OPT-MECH-SEC10F-0006 OPT-MECH-T&P10F-0001, OPT-MECH- 1
T&P10F-0001, OPT-MECH-FIN10F-0001
OPT-MECH-SEC10F-0006 OPT-MECH-T&P10F-0001, OPT-MECH- 1
FIN10F-0002

OPT-MECH-SEC10F-0008 OPT-MECH-T&P10F-0001, OPT-MECH- 1


T&P10F-0002, OPT-MECH-T&P10F-0003
OPT-MECH-SEC10F-0009 OPT-MECH-T&P10F-0001 1

OPT-MECH-SEC10F-0009, OPT-MECH-
SEC10F-0008, OPT-MECH-SEC10F-0008,
4
OPT-MECH-FIN10F-0001, OPT-MECH-
FIN10F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC10F-0007, OPT-MECH-
2
FIN10F-0001 OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC10F-0007, OPT-MECH-
FIN10F-0001 2
OPT-HO-HNDNGOVR-0001

OPT-MECH-EMB11F-0003 OPT-MECH-FIR11F-0001, OPT-MECH-


SEC11F-0002
OPT-MECH-EMB11F-0003 OPT-MECH-FIR11F-0001, OPT-MECH-
SEC11F-0001
OPT-MIL-CONC-0012 OPT-MECH-FIR11F-0001, OPT-MECH-
EMB11F-0001, OPT-MECH-EMB11F-0002

OPT-MECH-EMB11F-0003, OPT-MECH-
EMB11F-0001, OPT-MECH-EMB11F- 3
0002, OPT-IFIN-MAS11F-0001 OPT-MECH-FIR11F-0002
OPT-MECH-FIR11F-0001 OPT-MECH-SEC11F-0003, OPT-MECH-
SEC11F-0004

OPT-MECH-EMB11F-0002 OPT-MECH-SEC11F-0007, OPT-MECH-


SEC11F-0005
OPT-MECH-EMB11F-0001 OPT-MECH-SEC11F-0007, OPT-MECH-
SEC11F-0006
OPT-MECH-FIR11F-0002 OPT-MECH-SEC11F-0007, OPT-MECH-
SEC11F-0005
OPT-MECH-FIR11F-0002 OPT-MECH-SEC11F-0007, OPT-MECH-
SEC11F-0006
OPT-MECH-SEC11F-0001, OPT-MECH-
2
SEC11F-0003 OPT-MECH-SEC11F-0007
OPT-MECH-SEC11F-0002, OPT-MECH- OPT-MECH-SEC11F-0008, OPT-MECH-
SEC11F-0004 2
SEC11F-0009
OPT-MECH-SEC11F-0001, OPT-MECH-
SEC11F-0002, OPT-MECH-SEC11F-0005,
5
OPT-MECH-SEC11F-0003, OPT-MECH-
SEC11F-0004 OPT-MECH-T&P11F-0002, OPT-MECH-
T&P11F-0003
OPT-MECH-SEC11F-0006 OPT-MECH-T&P11F-0001, OPT-MECH- 1
T&P11F-0001, OPT-MECH-FIN11F-0001
OPT-MECH-SEC11F-0006 OPT-MECH-T&P11F-0001, OPT-MECH- 1
FIN11F-0002

OPT-MECH-SEC11F-0008 OPT-MECH-T&P11F-0001, OPT-MECH- 1


T&P11F-0002, OPT-MECH-T&P11F-0003
OPT-MECH-SEC11F-0009 OPT-MECH-T&P11F-0001 1

OPT-MECH-SEC11F-0009, OPT-MECH-
SEC11F-0008, OPT-MECH-SEC11F-0008, 4
OPT-MECH-FIN11F-0001, OPT-MECH-
FIN11F-0002
OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC11F-0007, OPT-MECH- 2
FIN11F-0001 OPT-HO-HNDNGOVR-0001
OPT-MECH-SEC11F-0007, OPT-MECH-
2
FIN11F-0001 OPT-MIL-GM-0004

OPT-SUPR-B&S2F-0003 OPT-MECH-F&SGF-0002
OPT-MIL-CONC-0002, OPT-MECH-F&SB1- OPT-MECH-F&S2F-0004, OPT-MECH-FFGF- 1
0001 0001
OPT-MIL-CONC-0004 OPT-IFIN-CMT3F-0003
OPT-MIL-CONC-0003, OPT-MECH-F&SGF- 1
0002 OPT-IFIN-CMT2F-0003

OPT-MECH-FFB3-0002, OPT-MECH-SFB4-
OPT-SUB-B&SGF-0003 0001, OPT-MECH-TFB4-0001, OPT-ELEC- 1
FFB4-0001, OPT-MECH-FFB4-0002
OPT-MECH-FFB4-0001 OPT-MECH-SFB3-0002, OPT-MECH-FFB2- 1
0003
OPT-MECH-FFB3-0002 OPT-MECH-FFB1-0004 1
OPT-MECH-FFB2-0003 OPT-MECH-FFGF-0005 1
OPT-MECH-FFB1-0004, OPT-MIL-CONC- OPT-MECH-SFGF-0005, OPT-MECH-FF2F-
0004, OPT-MIL-CONC-0004 2
0006
OPT-MECH-FFGF-0005 OPT-MECH-SF2F-0006, OPT-MECH-FF3F- 1
0007
OPT-MECH-FF2F-0006 OPT-MECH-SF3F-0007 1
OPT-MECH-FIR4F-0002, OPT-MIL-CONC- OPT-MECH-SF4F-0008, OPT-MECH-FF5F-
0008 2
0009
OPT-MECH-FF4F-0008, OPT-MIL-CONC- OPT-MECH-SF5F-0009, OPT-MECH-FF6F- 2
0009 0010
OPT-MECH-FF5F-0009, OPT-MIL-CONC- OPT-MECH-SF6F-0010, OPT-MECH-FF7F- 2
0010 0011
OPT-MECH-FF6F-0010, OPT-MIL-CONC- OPT-MECH-SF7F-0011, OPT-MECH-FF8F-
2
0011 0012
OPT-MECH-FF7F-0011, OPT-MIL-CONC- OPT-MECH-SF8F-0012, OPT-MECH-FF9F-
0012 2
0013
OPT-MECH-FF8F-0012, OPT-MIL-CONC- OPT-MECH-SF9F-0013, OPT-MECH-FF10F- 2
0013 0014
OPT-MECH-FF9F-0013 OPT-MECH-SF10F-0014, OPT-MECH-FF11F- 1
0015
OPT-MECH-FF10F-0014 OPT-MECH-SF11F-0015, OPT-MECH-FFRD- 1
0016
OPT-MECH-FF11F-0015 OPT-MECH-SFRD-0016 1

OPT-MECH-FFB4-0001 OPT-MECH-SFB3-0002, OPT-MECH-TFB4- 1


0001
OPT-MECH-FFB3-0002, OPT-MECH-SFB4- OPT-MECH-TFB3-0002, OPT-MECH-SFB2- 1
0001 0003
OPT-MECH-SFB3-0002 OPT-MECH-SFB1-0004, OPT-MECH-TFB2- 1
0003, OPT-MECH-TFB2-0003
OPT-MECH-SFB2-0003 OPT-MECH-SFGF-0005 1
OPT-MECH-FFGF-0005, OPT-MECH-SFB1- 1
0004 OPT-MECH-SF3F-0007
OPT-MECH-FF2F-0006 OPT-IFIN-PNT2F-0003
OPT-MECH-FF3F-0007, OPT-MECH-SFGF- 1
0005 OPT-IFIN-CMT3F-0003
OPT-MECH-FF4F-0008 OPT-MECH-TF4F-0005
OPT-MECH-FF5F-0009 OPT-MECH-TF5F-0006
OPT-MECH-FF6F-0010 OPT-MECH-TF6F-0007
OPT-MECH-FF7F-0011 OPT-MECH-TF7F-0008
OPT-MECH-FF8F-0012 OPT-MECH-TF8F-0009
OPT-MECH-FF9F-0013 OPT-MECH-TF9F-0010
OPT-MECH-FF10F-0014 OPT-MECH-TF10F-0011
OPT-MECH-FF11F-0015 OPT-MECH-TF11F-0012
OPT-MECH-FFRD-0016 OPT-MECH-TFRD-0013

OPT-MECH-SFB4-0001, OPT-MECH-FFB4- OPT-MECH-TF4F-0005, OPT-IFIN-CMTB4-


0001 2
0003
OPT-MECH-SFB3-0002 OPT-MECH-TFB2-0003 1
OPT-MECH-SFB2-0003, OPT-MECH-SFB2- OPT-MECH-TF4F-0005, OPT-MECH-TFB1-
2
0003, OPT-MECH-TFB3-0002 0004
OPT-MECH-TFB2-0003 OPT-MECH-TF4F-0005 1
OPT-MECH-SF4F-0008, OPT-MECH-TFB4-
0001, OPT-MECH-TFB2-0003, OPT- 4
MECH-TFB1-0004 OPT-MECH-TF5F-0006
OPT-MECH-SF5F-0009, OPT-MECH-TF4F-
2
0005 OPT-MECH-TF6F-0007
OPT-MECH-SF6F-0010, OPT-MECH-TF5F-
0006 2
OPT-MECH-TF7F-0008
OPT-MECH-SF7F-0011, OPT-MECH-TF6F-
2
0007 OPT-MECH-TF8F-0009
OPT-MECH-SF8F-0012, OPT-MECH-TF7F-
0008 2
OPT-MECH-TF9F-0010
OPT-MECH-SF9F-0013, OPT-MECH-TF8F- 2
0009 OPT-MECH-TF10F-0011
OPT-MECH-SF10F-0014, OPT-MECH-
2
TF9F-0010 OPT-MECH-TF11F-0012
OPT-MECH-SF11F-0015, OPT-MECH-
TF10F-0011 2
OPT-MECH-TFRD-0013
OPT-MECH-SFRD-0016, OPT-MECH- 2
TF11F-0012
OPT-MECH-FFB4-0001 OPT-MECH-SFB4-0002, OPT-MECH-FFB3-
0001

OPT-MECH-FFB4-0002 OPT-MECH-SFB4-0003 1
OPT-MECH-SFB4-0002 OPT-MECH-SFB4-0004
OPT-MECH-SFB4-0003 OPT-MECH-SFB4-0005
OPT-MECH-TFB4-0003, OPT-MECH-TFB4-
OPT-MECH-SFB4-0004 0004, OPT-MECH-TFB4-0005, OPT-MECH- 1
TFB4-0006, OPT-MECH-TFB4-0002

OPT-MECH-SFB4-0005 OPT-MECH-T&PB4-0006 1
OPT-MECH-SFB4-0005 OPT-MECH-TFB4-0007, OPT-IFIN-CMTB4- 1
0003
OPT-MECH-SFB4-0005 OPT-MECH-TFB4-0007, OPT-IFIN-CMTB4- 1
0003
OPT-MECH-SFB4-0005 OPT-MECH-TFB4-0007, OPT-IFIN-CMTB4- 1
0003
OPT-MECH-SFB4-0005 OPT-MECH-TFB4-0007, OPT-IFIN-CMTB4- 1
0003
OPT-MECH-TFB4-0003, OPT-MECH-TFB4-
0004, OPT-MECH-TFB4-0005, OPT- OPT-MECH-T&PB4-0006, OPT-IFIN-CMTB4-
MECH-TFB4-0006 0003

OPT-MECH-TFB4-0007, OPT-MECH-TFB4-
2
0002 OPT-MECH-C&HB4-0002

OPT-MECH-T&PB4-0006 OPT-MECH-C&HB3-0001 1

OPT-MECH-FFB4-0002 OPT-MECH-SFB3-0001, OPT-MECH-FFB2- 1


0001

OPT-MECH-FFB3-0001 OPT-MECH-SFB3-0003 1
OPT-MECH-SFB3-0001 OPT-MECH-SFB3-0004
OPT-MECH-SFB3-0003 OPT-MECH-SFB3-0005
OPT-MECH-TFB3-0001, OPT-MECH-TFB3-
OPT-MECH-SFB3-0004 0003, OPT-MECH-TFB3-0004, OPT-MECH- 1
TFB3-0005

OPT-MECH-SFB3-0005 OPT-MECH-TFB3-0006 1
OPT-MECH-SFB3-0005 OPT-MECH-TFB3-0006 1
OPT-MECH-SFB3-0005 OPT-MECH-TFB3-0006 1
OPT-MECH-SFB3-0005 OPT-MECH-TFB3-0006 1
OPT-MECH-TFB3-0001, OPT-MECH-TFB3-
0003, OPT-MECH-TFB3-0004, OPT-
MECH-TFB3-0005 OPT-MECH-T&PB3-0004

OPT-MECH-TFB3-0006 OPT-MECH-C&HB3-0001 1

OPT-MECH-T&PB3-0004, OPT-MECH- 2
C&HB4-0002 OPT-HO-HNDNGOVR-0001

OPT-MECH-FFB3-0001 OPT-MECH-SFB2-0001, OPT-MECH-FFB1- 1


0001

OPT-MECH-FFB2-0001 OPT-MECH-SFB2-0002 1
OPT-MECH-SFB2-0001 OPT-MECH-SFB2-0004
OPT-MECH-SFB2-0002 OPT-MECH-SFB2-0005
OPT-MECH-TFB2-0001, OPT-MECH-TFB2-
OPT-MECH-SFB2-0004 0002, OPT-MECH-TFB2-0004, OPT-MECH- 1
TFB2-0005

OPT-MECH-SFB2-0005 OPT-MECH-TFB2-0006 1
OPT-MECH-SFB2-0005 OPT-MECH-TFB2-0006 1
OPT-MECH-SFB2-0005 OPT-MECH-TFB2-0006 1
OPT-MECH-SFB2-0005 OPT-MECH-TFB2-0006 1
OPT-MECH-TFB2-0001, OPT-MECH-TFB2-
0002, OPT-MECH-TFB2-0004, OPT-
MECH-TFB2-0005 OPT-MECH-T&PB2-0004

OPT-MECH-TFB2-0006 OPT-MECH-C&HB2-0001 1

OPT-MECH-T&PB2-0004 OPT-HO-HNDNGOVR-0001 1

OPT-MECH-FFB2-0001 OPT-MECH-SFB1-0001 1

OPT-MECH-FFB1-0001 OPT-MECH-SFB1-0002 1
OPT-MECH-SFB1-0001 OPT-MECH-SFB1-0003
OPT-MECH-SFB1-0002 OPT-MECH-SFB1-0005
OPT-MECH-TFB1-0001, OPT-MECH-TFB1-
OPT-MECH-SFB1-0003 0002, OPT-MECH-TFB1-0003, OPT-MECH- 1
TFB1-0005

OPT-MECH-SFB1-0005 OPT-MECH-TFB1-0006 1
OPT-MECH-SFB1-0005 OPT-MECH-TFB1-0006 1
OPT-MECH-SFB1-0005 OPT-MECH-TFB1-0006 1
OPT-MECH-SFB1-0005 OPT-MECH-TFB1-0006 1
OPT-MECH-TFB1-0001, OPT-MECH-TFB1-
0002, OPT-MECH-TFB1-0003, OPT-
MECH-TFB1-0005 OPT-MECH-T&PB1-0004

OPT-MECH-TFB1-0006 OPT-MECH-C&HB1-0001 1

OPT-MECH-T&PB1-0004 OPT-HO-HNDNGOVR-0001 1

OPT-MECH-F&SGF-0002 OPT-MECH-SFGF-0001, OPT-MECH-FF2F- 1


0001

OPT-MECH-FFGF-0001 OPT-MECH-SFGF-0002 1
OPT-MECH-SFGF-0001 OPT-MECH-SFGF-0003
OPT-MECH-SFGF-0002 OPT-MECH-SFGF-0004
OPT-MECH-TFGF-0001, OPT-MECH-TFGF-
OPT-MECH-SFGF-0003 0002, OPT-MECH-TFGF-0003, OPT-MECH- 1
TFGF-0004

OPT-MECH-SFGF-0004 OPT-MECH-TFGF-0005 1
OPT-MECH-SFGF-0004 OPT-MECH-TFGF-0005 1
OPT-MECH-SFGF-0004 OPT-MECH-TFGF-0005 1
OPT-MECH-SFGF-0004 OPT-MECH-TFGF-0005 1
OPT-MECH-TFGF-0001, OPT-MECH-TFGF-
0002, OPT-MECH-TFGF-0003, OPT-
MECH-TFGF-0004 OPT-MECH-T&PGF-0001

OPT-MECH-TFGF-0005 OPT-MECH-C&HGF-0001 1

OPT-MECH-T&PGF-0001 OPT-MECH-C&H2F-0001 1

OPT-MECH-FFGF-0001 OPT-MECH-SF2F-0001, OPT-MECH-FF3F- 1


0001

OPT-MECH-FF2F-0001 OPT-MECH-SF2F-0002 1
OPT-MECH-SF2F-0001 OPT-MECH-SF2F-0003
OPT-MECH-SF2F-0002 OPT-MECH-SF2F-0004
OPT-MECH-TF2F-0001, OPT-MECH-TF2F-
OPT-MECH-SF2F-0003 0002, OPT-MECH-TF2F-0003, OPT-MECH- 1
TF2F-0004
OPT-MECH-SF2F-0004 OPT-MECH-TF2F-0005 1
OPT-MECH-SF2F-0004 OPT-MECH-TF2F-0005 1
OPT-MECH-SF2F-0004 OPT-MECH-TF2F-0005 1
OPT-MECH-SF2F-0004 OPT-MECH-TF2F-0005 1
OPT-MECH-TF2F-0001, OPT-MECH-TF2F-
0002, OPT-MECH-TF2F-0003, OPT-MECH-
TF2F-0004 OPT-MECH-T&P2F-0001

OPT-MECH-TF2F-0005 OPT-MECH-C&H2F-0001 1

OPT-MECH-T&P2F-0001, OPT-MECH-
2
C&HGF-0001 OPT-MECH-C&H3F-0001

OPT-MECH-FF2F-0001 OPT-MECH-SF3F-0001, OPT-MECH-FF4F- 1


0001

OPT-MECH-FF3F-0001 OPT-MECH-SF3F-0002 1
OPT-MECH-SF3F-0001 OPT-MECH-SF3F-0003
OPT-MECH-SF3F-0002 OPT-MECH-SF3F-0004
OPT-MECH-TF3F-0001, OPT-MECH-TF3F-
OPT-MECH-SF3F-0003 0002, OPT-MECH-TF3F-0003, OPT-MECH- 1
TF3F-0004

OPT-MECH-SF3F-0004 OPT-MECH-TF3F-0005 1
OPT-MECH-SF3F-0004 OPT-MECH-TF3F-0005 1
OPT-MECH-SF3F-0004 OPT-MECH-TF3F-0005 1
OPT-MECH-SF3F-0004 OPT-MECH-TF3F-0005 1
OPT-MECH-TF3F-0001, OPT-MECH-TF3F-
0002, OPT-MECH-TF3F-0003, OPT-MECH-
TF3F-0004 OPT-MECH-T&P3F-0001

OPT-MECH-TF3F-0005 OPT-MECH-C&H3F-0001 1

OPT-MECH-T&P3F-0001, OPT-MECH-
C&H2F-0001 2
OPT-MECH-C&H4F-0001

OPT-MECH-FF3F-0001 OPT-MECH-SF4F-0001, OPT-MECH-FF5F- 1


0001

OPT-MECH-FF4F-0001 OPT-MECH-SF4F-0002 1
OPT-MECH-SF4F-0001 OPT-MECH-SF4F-0003
OPT-MECH-SF4F-0002 OPT-MECH-SF4F-0004
OPT-MECH-TF4F-0001, OPT-MECH-TF4F-
OPT-MECH-SF4F-0003 0002, OPT-MECH-TF4F-0003, OPT-MECH- 1
TF4F-0004

OPT-MECH-SF4F-0004 OPT-MECH-TF4F-0006 1
OPT-MECH-SF4F-0004 OPT-MECH-TF4F-0006 1
OPT-MECH-SF4F-0004 OPT-MECH-TF4F-0006 1
OPT-MECH-SF4F-0004 OPT-MECH-TF4F-0006 1
OPT-MECH-TF4F-0001, OPT-MECH-TF4F-
0002, OPT-MECH-TF4F-0003, OPT-MECH-
TF4F-0004 OPT-MECH-T&P4F-0004

OPT-MECH-TF4F-0006 OPT-MECH-C&H4F-0001 1

OPT-MECH-T&P4F-0004, OPT-MECH-
C&H3F-0001 OPT-MECH-C&H5F-0001

OPT-MECH-FF4F-0001 OPT-MECH-SF5F-0001, OPT-MECH-FF6F- 1


0001

OPT-MECH-FF5F-0001 OPT-MECH-SF5F-0002 1
OPT-MECH-SF5F-0001 OPT-MECH-SF5F-0003
OPT-MECH-SF5F-0002 OPT-MECH-SF5F-0004
OPT-MECH-TF5F-0001, OPT-MECH-TF5F-
OPT-MECH-SF5F-0003 0002, OPT-MECH-TF5F-0003, OPT-MECH- 1
TF5F-0004

OPT-MECH-SF5F-0004 OPT-MECH-TF5F-0005 1
OPT-MECH-SF5F-0004 OPT-MECH-TF5F-0005 1
OPT-MECH-SF5F-0004 OPT-MECH-TF5F-0005 1
OPT-MECH-SF5F-0004 OPT-MECH-TF5F-0005 1
OPT-MECH-TF5F-0001, OPT-MECH-TF5F-
0002, OPT-MECH-TF5F-0003, OPT-MECH-
TF5F-0004 OPT-MECH-T&P5F-0004

OPT-MECH-TF5F-0005 OPT-MECH-C&H5F-0001 1

OPT-MECH-T&P5F-0004, OPT-MECH-
2
C&H4F-0001 OPT-MECH-C&H6F-0001

OPT-MECH-FF5F-0001 OPT-MECH-SF6F-0001, OPT-MECH-FF7F- 1


0001
OPT-MECH-FF6F-0001 OPT-MECH-SF6F-0002 1
OPT-MECH-SF6F-0001 OPT-MECH-SF6F-0003
OPT-MECH-SF6F-0002 OPT-MECH-SF6F-0004
OPT-MECH-TF6F-0001, OPT-MECH-TF6F-
OPT-MECH-SF6F-0003 0002, OPT-MECH-TF6F-0003, OPT-MECH- 1
TF6F-0004

OPT-MECH-SF6F-0004 OPT-MECH-TF6F-0005 1
OPT-MECH-SF6F-0004 OPT-MECH-TF6F-0005 1
OPT-MECH-SF6F-0004 OPT-MECH-TF6F-0005 1
OPT-MECH-SF6F-0004 OPT-MECH-TF6F-0005 1
OPT-MECH-TF6F-0001, OPT-MECH-TF6F-
0002, OPT-MECH-TF6F-0003, OPT-MECH-
TF6F-0004 OPT-MECH-T&P6F-0004

OPT-MECH-TF6F-0005 OPT-MECH-C&H6F-0001 1

OPT-MECH-T&P6F-0004, OPT-MECH-
C&H5F-0001 2
OPT-MECH-C&H7F-0001

OPT-MECH-FF6F-0001 OPT-MECH-SF7F-0001, OPT-MECH-FF8F- 1


0001

OPT-MECH-FF7F-0001 OPT-MECH-SF7F-0002 1
OPT-MECH-SF7F-0001 OPT-MECH-SF7F-0003
OPT-MECH-SF7F-0002 OPT-MECH-SF7F-0004
OPT-MECH-TF7F-0001, OPT-MECH-TF7F-
OPT-MECH-SF7F-0003 0002, OPT-MECH-TF7F-0003, OPT-MECH- 1
TF7F-0004

OPT-MECH-SF7F-0004 OPT-MECH-TF7F-0005 1
OPT-MECH-SF7F-0004 OPT-MECH-TF7F-0005 1
OPT-MECH-SF7F-0004 OPT-MECH-TF7F-0005 1
OPT-MECH-SF7F-0004 OPT-MECH-TF7F-0005 1
OPT-MECH-TF7F-0001, OPT-MECH-TF7F-
0002, OPT-MECH-TF7F-0003, OPT-MECH-
TF7F-0004 OPT-MECH-T&P7F-0004

OPT-MECH-TF7F-0005 OPT-MECH-C&H7F-0001 1

OPT-MECH-T&P7F-0004, OPT-MECH-
2
C&H6F-0001 OPT-MECH-C&H8F-0001
OPT-MECH-FF7F-0001 OPT-MECH-SF8F-0001, OPT-MECH-FF9F- 1
0001

OPT-MECH-FF8F-0001 OPT-MECH-SF8F-0002 1
OPT-MECH-SF8F-0001 OPT-MECH-SF8F-0003
OPT-MECH-SF8F-0002 OPT-MECH-SF8F-0004
OPT-MECH-TF8F-0001, OPT-MECH-TF8F-
OPT-MECH-SF8F-0003 0002, OPT-MECH-TF8F-0003, OPT-MECH- 1
TF8F-0004

OPT-MECH-SF8F-0004 OPT-MECH-TF8F-0005 1
OPT-MECH-SF8F-0004 OPT-MECH-TF8F-0005 1
OPT-MECH-SF8F-0004 OPT-MECH-TF8F-0005 1
OPT-MECH-SF8F-0004 OPT-MECH-TF8F-0005 1
OPT-MECH-TF8F-0001, OPT-MECH-TF8F-
0002, OPT-MECH-TF8F-0003, OPT-MECH-
TF8F-0004 OPT-MECH-T&P8F-0004

OPT-MECH-TF8F-0005 OPT-MECH-C&H8F-0001 1

OPT-MECH-T&P8F-0004, OPT-MECH- 2
C&H7F-0001 OPT-MECH-C&H9F-0001

OPT-MECH-FF8F-0001, OPT-MIL-CONC- OPT-MECH-SF9F-0001, OPT-MECH-FF10F-


2
0013 0001

OPT-MECH-FF9F-0001 OPT-MECH-SF9F-0002 1
OPT-MECH-SF9F-0001 OPT-MECH-SF9F-0003
OPT-MECH-SF9F-0002 OPT-MECH-SF9F-0004
OPT-MECH-TF9F-0001, OPT-MECH-TF9F-
OPT-MECH-SF9F-0003 0002, OPT-MECH-TF9F-0003, OPT-MECH- 1
TF9F-0004

OPT-MECH-SF9F-0004 OPT-MECH-TF9F-0005 1
OPT-MECH-SF9F-0004 OPT-MECH-TF9F-0005 1
OPT-MECH-SF9F-0004 OPT-MECH-TF9F-0005 1
OPT-MECH-SF9F-0004 OPT-MECH-TF9F-0005 1
OPT-MECH-TF9F-0001, OPT-MECH-TF9F-
0002, OPT-MECH-TF9F-0003, OPT-MECH-
TF9F-0004 OPT-MECH-T&P9F-0004
OPT-MECH-TF9F-0005 OPT-MECH-C&H9F-0001 1

OPT-MECH-T&P9F-0004, OPT-MECH-
2
C&H8F-0001 OPT-MECH-C&H10F-0001

OPT-MECH-FF9F-0001 OPT-MECH-SF10F-0001, OPT-MECH-FF11F- 1


0001

OPT-MECH-FF10F-0001 OPT-MECH-SF10F-0002 1
OPT-MECH-SF10F-0001 OPT-MECH-SF10F-0003
OPT-MECH-SF10F-0002 OPT-MECH-SF10F-0004
OPT-MECH-TF10F-0001, OPT-MECH-TF10F-
OPT-MECH-SF10F-0003 0002, OPT-MECH-TF10F-0003, OPT-MECH- 1
TF10F-0004

OPT-MECH-SF10F-0004 OPT-MECH-TF10F-0005 1
OPT-MECH-SF10F-0004 OPT-MECH-TF10F-0005 1
OPT-MECH-SF10F-0004 OPT-MECH-TF10F-0005 1
OPT-MECH-SF10F-0004 OPT-MECH-TF10F-0005 1
OPT-MECH-TF10F-0001, OPT-MECH-
TF10F-0002, OPT-MECH-TF10F-0003,
OPT-MECH-TF10F-0004 OPT-MECH-T&P10F-0004

OPT-MECH-TF10F-0005 OPT-MECH-C&H10F-0001 1

OPT-MECH-T&P10F-0004, OPT-MECH-
2
C&H9F-0001 OPT-MECH-C&H11F-0001

OPT-MECH-FF10F-0001 OPT-MECH-SF11F-0001 1

OPT-MECH-FF11F-0001 OPT-MECH-SF11F-0002 1
OPT-MECH-SF11F-0001 OPT-MECH-SF11F-0003
OPT-MECH-SF11F-0002 OPT-MECH-SF11F-0004
OPT-MECH-TF11F-0001, OPT-MECH-TF11F-
OPT-MECH-SF11F-0003 0002, OPT-MECH-TF11F-0003, OPT-MECH- 1
TF11F-0004

OPT-MECH-SF11F-0004 OPT-MECH-TF11F-0005 1
OPT-MECH-SF11F-0004 OPT-MECH-TF11F-0005 1
OPT-MECH-SF11F-0004 OPT-MECH-TF11F-0005 1
OPT-MECH-SF11F-0004 OPT-MECH-TF11F-0005 1
OPT-MECH-TF11F-0001, OPT-MECH-
TF11F-0002, OPT-MECH-TF11F-0003,
OPT-MECH-TF11F-0004 OPT-MECH-T&P11F-0004

OPT-MECH-TF11F-0005 OPT-MECH-C&H11F-0001 1

OPT-MECH-T&P11F-0004, OPT-MECH- 2
C&H10F-0001 OPT-HO-HNDNGOVR-0001

OPT-MECH-FFB4-0001, OPT-MAT-
SLIMEE-0001 OPT-ELEC-FFB3-0002, OPT-ELEC-SFB4-0001
OPT-ELEC-FFB4-0001 OPT-ELEC-SFB3-0002, OPT-ELEC-FFB2-0003, 1
OPT-ELEC-SFB3-0002
OPT-ELEC-FFB3-0002 OPT-ELEC-FFB1-0004 1
OPT-ELEC-FFB2-0003 OPT-ELEC-FFGF-0005 1
OPT-ELEC-FFB1-0004 1
OPT-ELEC-SFGF-0005, OPT-ELEC-FF2F-0006
OPT-ELEC-FFGF-0005 OPT-ELEC-SF2F-0006, OPT-ELEC-FF3F-0007 1
OPT-ELEC-FF2F-0006 OPT-ELEC-SF3F-0007, OPT-ELEC-FF4F-0008 1
OPT-ELEC-FF3F-0007 OPT-ELEC-SF4F-0008, OPT-ELEC-FF5F-0009 1
OPT-ELEC-FF4F-0008 OPT-ELEC-SF5F-0009, OPT-ELEC-FF6F-0010 1
OPT-ELEC-FF5F-0009 OPT-ELEC-SF6F-0010, OPT-ELEC-FF7F-0011 1
OPT-ELEC-FF6F-0010 OPT-ELEC-SF7F-0011, OPT-ELEC-FF8F-0012 1
OPT-ELEC-FF7F-0011 OPT-ELEC-SF8F-0012, OPT-ELEC-FF9F-0013, 1
OPT-MIL-GM-0003
OPT-ELEC-FF8F-0012 1
OPT-ELEC-SF9F-0013, OPT-ELEC-FF10F-0014
OPT-ELEC-FF9F-0013 OPT-ELEC-SF10F-0014, OPT-ELEC-FF11F- 1
0015
OPT-ELEC-FF10F-0014 1
OPT-ELEC-SF11F-0015, OPT-ELEC-FFRD-0016
OPT-ELEC-FF11F-0015 OPT-ELEC-SFRD-0016 1

OPT-ELEC-FFB4-0001 OPT-ELEC-TFB4-0001 1
OPT-ELEC-FFB3-0002, OPT-ELEC-FFB3-
0002 1
OPT-ELEC-TFB3-0002, OPT-ELEC-SFB2-0003
OPT-ELEC-SFB3-0002 OPT-ELEC-SFB1-0004 1
OPT-ELEC-SFB2-0003 OPT-ELEC-SFGF-0005 1
OPT-ELEC-FFGF-0005, OPT-ELEC-SFB1-
1
0004 OPT-ELEC-SF2F-0006
OPT-ELEC-FF2F-0006, OPT-ELEC-SFGF- 1
0005 OPT-ELEC-SF3F-0007
OPT-ELEC-FF3F-0007, OPT-ELEC-SF2F- 1
0006 OPT-IFIN-CMT3F-0003
OPT-ELEC-FF4F-0008 OPT-ELEC-TF4F-0005
OPT-ELEC-FF5F-0009 OPT-ELEC-TF5F-0006
OPT-ELEC-FF6F-0010 OPT-ELEC-TF6F-0007
OPT-ELEC-FF7F-0011 OPT-ELEC-TF7F-0008
OPT-ELEC-FF8F-0012 OPT-ELEC-TF8F-0009, OPT-MIL-GM-0003
OPT-ELEC-FF9F-0013 OPT-ELEC-TF9F-0010
OPT-ELEC-FF10F-0014 OPT-ELEC-TF10F-0011
OPT-ELEC-FF11F-0015 OPT-ELEC-TF11F-0012
OPT-ELEC-FFRD-0016 OPT-ELEC-TFRD-0013

OPT-ELEC-SFB4-0001, OPT-MAT-LLIMEE-
0001 2
OPT-ELEC-TF4F-0005
OPT-ELEC-SFB3-0002 OPT-ELEC-TFB2-0003 1
OPT-ELEC-TFB3-0002 OPT-ELEC-TFB1-0004 1
OPT-ELEC-TFB2-0003 OPT-ELEC-TF4F-0005 1
OPT-ELEC-SF4F-0008, OPT-ELEC-TFB4-
0001, OPT-ELEC-TFB1-0004 3
OPT-ELEC-TF5F-0006
OPT-ELEC-SF5F-0009, OPT-ELEC-TF4F- 2
0005 OPT-ELEC-TF6F-0007
OPT-ELEC-SF6F-0010, OPT-ELEC-TF5F-
2
0006 OPT-ELEC-TF7F-0008
OPT-ELEC-SF7F-0011, OPT-ELEC-TF6F-
0007 2
OPT-ELEC-TF8F-0009
OPT-ELEC-SF8F-0012, OPT-ELEC-TF7F-
2
0008 OPT-ELEC-TF9F-0010
OPT-ELEC-SF9F-0013, OPT-ELEC-TF8F-
0009 2
OPT-ELEC-TF10F-0011
OPT-ELEC-SF10F-0014, OPT-ELEC-TF9F- 2
0010 OPT-ELEC-TF11F-0012
OPT-ELEC-SF11F-0015, OPT-ELEC-TF10F-
2
0011 OPT-ELEC-TFRD-0013
OPT-ELEC-SFRD-0016, OPT-ELEC-TF11F-
0012 2
OPT-HO-HNDNGOVR-0001

OPT-SUPR-WAL11F-0003, OPT-MAT-
LLIMEE-0001, OPT-MAT-ORDMECH-0001 3
OPT-MECH-VSI-0002
OPT-MECH-VSI-0001 OPT-MECH-VSI-0003
OPT-MECH-VSI-0002 OPT-MECH-VSI-0004
OPT-MECH-VSI-0003 OPT-MECH-VSI-0005 1
OPT-MECH-VSI-0004 OPT-MECH-VSI-0006
OPT-MECH-VSI-0005 OPT-MECH-VSI-0007
OPT-MECH-VSI-0006 OPT-HO-HNDNGOVR-0001

OPT-MECH-VSI-0007, OPT-ELEC-TFRD-
0013, OPT-MECH-C&H11F-0001, OPT-
MECH-C&HB4-0001, OPT-MECH-C&HB1-
0001, OPT-MECH-C&HB2-0001, OPT-
MECH-C&HB3-0001, OPT-MECH-T&PB4-
0005, OPT-MECH-T&PB3-0003, OPT-
MECH-T&PB2-0003, OPT-MECH-T&PB1-
0003, OPT-MECH-T&P4F-0003, OPT-
MECH-T&P5F-0003, OPT-MECH-T&P6F-
0003, OPT-MECH-T&P7F-0003, OPT-
MECH-T&P8F-0003, OPT-MECH-T&P9F-
0003, OPT-MECH-T&P10F-0003, OPT-
MECH-T&PB4-0003, OPT-MECH-T&PB4-
0004, OPT-MECH-T&PB3-0001, OPT-
MECH-T&PB3-0002, OPT-MECH-T&PB2- 40
0001, OPT-MECH-T&PB2-0002, OPT-
MECH-T&PB1-0001, OPT-MECH-T&PB1-
0002, OPT-MECH-T&P4F-0001, OPT-
MECH-T&P4F-0002, OPT-MECH-T&P5F-
0001, OPT-MECH-T&P5F-0002, OPT-
MECH-T&P6F-0001, OPT-MECH-T&P6F-
0002, OPT-MECH-T&P7F-0001, OPT-
MECH-T&P7F-0002, OPT-MECH-T&P8F-
0001, OPT-MECH-T&P8F-0002, OPT-
MECH-T&P9F-0001, OPT-MECH-T&P9F-
0002, OPT-MECH-T&P10F-0001, OPT-
MECH-T&P10F-0002, OPT-MECH-
T&P11F-0001, OPT-MECH-T&P11F-0002

OPT-MIL-KD-0003, OPT-HO-HNDNGOVR-
0002, OPT-HO-HNDNGOVR-0003
OPT-HO-HNDNGOVR-0001 OPT-MIL-KD-0003
OPT-HO-HNDNGOVR-0001, OPT-IFIN-
CMTRD-0003 OPT-MIL-KD-0003
TOTAL No. of
RELATIONSHIP negative
PREDECESSORS PREDECES

296 310 0 1947 10


FF SS SF TOTAL FS
1
1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1
1 1

1 1

1 1

1 1

1 1

1 2

2 3

1 1

1
1 1
1
1 1
2

1
1 1
1 1
1 1
1
3

1
1 1
1 1
1 1
1
2

2 2

1
1 1
1 1
1 1
1
2

1
1 1
1 1
1 1
1
2

2 2

1
1 1
1 1
1 1
1
2

1 2

1
1
1
1 1
1 1
2

1
1 1
1 1
1 1
1 1
1 1

2
1 1
1 2
1 1
1 1
1 2

2
1 1
1 1
1 2
1 1

1 4
1
1 1
1 1

1
1 1
1
2
1 1
1
1 1
1 1
1 2

1
1 1
1
2
1 1
1
1 1
1 1
1 2

1
1 1
1

2
1 1
1
1 1
1 1
1 2

1
1 1
1
2
1 1
1
1 1
1 1
1 2

1
1 1
1
2
1 1
1
1 1
1 1
1 2

2
1 1
1
2
1 1
1
1 1
1 1
1 3

1
1 1
1
2
1 1
1
1 1
1 1
1 2

1
1 1
1
2
1 1
1
1 1
1 1

1 3 1

1
1 1
1

2
1 1
1
1 1
1 1
1 1 3

1
1 1

1 1

1 1
1 1
1 2

2 2
1 1

1 1

2 2
1 1
1 2

1 1
1 1
1 1

2 2
1 1
1 1

1 1
1 1

1 1

1 2
1 1
1 1

1 1
1 1
1 1

1 2
1 1
1 1

1 1
1 1
1 1

2 2
1 1
1 1

1 1
1 1
1 1

1 2
1 1
1 1

1 1
1 1
1 1

1 2
1 1
1 1

1 1
1 1
1 1
1 2
1 1
1 1

1 1
1 1
1 1

1 2
1 1
1 1

1 1
1 1
1 1

1 2
1 1
1 1

1 1
1 1
1 1

1
1 1
1 1

1 2
1 1
1 2

1 2
1 1
1 2

1 2
1 1
1 2

1
1 1
1 2

1
1 1
1 2

1
1 1
1 2

1
1 1
1 2

1
1 1
1 2

1
1 1
1 2
1
1 1
1 2

1
1 1
1 2

1
1 1
1 2

1
1 1
1 2

1
1 1
1 2

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

2
1 1
1 1
2
1 1
1 1

2
1 1
1 1

2
1 1
1 1

11

1 1

1 1
1 1

1 1
1 1

1
1

1
1
1 3

1 1

1
1 1
11

1
1

11

1 1

1 1
1 1

1
1

1 1
1

1
1

1
1
1 3

1 1

1
1

4
1
1

11

1 1

1 1
1 1

1 1
1
1
1

1
1
1 3

1 1

1
1

1
1

1 1
1

11

1 1

1 1
1 1

1 1
1

1
1

1
1
3

1 1

1
1

1
1

1 1

2
7

1 1

1
1 1

1 1
1

1 1

1
1
2

1 1

1
1

10

1 1

1
1 1

1 1
1

1
1

1
1

1 1
1
1

1
1

1 1
1

1 1

1 1
1
1

1
1

1 2

1 1

2
1 1
1

1
1

1
1

1 1

1
1

1
1

1 1
1

1 1

1
1

1 1

1 1
1

1
1

1
1

1 1

1
1

2 7
1

1 1
1

1 1

1 1

1 1
1

1
1

1
1

1 1

1
1

1
1

1 1
1 1

1 1

1
8

1 1

1 1
1

1
1

1
1

1 1

1
1

1
1

1 1
1

1 1

1 1

1 1
1

1
1

1
1
1

1 1

1
1

1
1

1 1
1

1 1
1

1 1
1

1
1

1
1

1 1

1
1

1
1

1 1
1
1

1 1

1 1
1

1
1

1
1

1
1 1

1
1

1
1

1 1
1

1 1

1 1

1
1

1 1
1

1
1

1
1

1 1

1
1

1
1

1 1
1

1
1

1 6

1 1
1

1 2

1
1

1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1

1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1

1 1
1

2
1

1 1
1 1

1 1 2

1 4

1 1

1 1

1 1

1 1

1 1

2
1 1

1 1

1 4

1 1

1 1

1 1

1 1

1 1

1
1

1 5
2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1
1
1 5

1 1

1 1

1 1

1 1

1 1

1 1

1 1

2 2

2 2

5 5

1
1

1 5

1 1

1 1

2 2

1 4

1 1

1 1

1 1

1 1

1 1

1
1

1
1

1 5

1 1

1 1

1 2

1 4

1 1

1 1

1 1

1 1

1 1

2
5

1
1

1 5

1 1

1 1

1 2

1 4

1 1

1 1

1 1

1 1

1 1
2

1
1

1 5

1 1

1 1

1 2

1 4

1 1

1 1

1 1
1 1

1 1

1
1

1 5

1 1

1 1

1 1

1 4

1 1
1 1

1 1

1 1

1 1

1
1

1 5

1 1

1 1

1 1

1 4
1 1

1 1

1 1

1 1

1 1

1
1

1 5

1 1

1 1

1 1
1 4

1 1

1 1

1 1

1 1

1 1

1
1

1 5

1 1

1 1
1 1

1 4

1 1

1 1

1 1

1 1

1 1

1
1

1 5

1 1
1 2
1 1
1 2

1
1
1
1 3

1
1
2

1
1

1 2

1
1
1 2
1 1
1 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1

2
1
1 3
1

2
1 1

1
1 1
1 1

1
1

4 4

1
1 1
1 1

1
1
1
1
4 4

1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1

1
1
1
1
1

4 4

1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1
1

1
1
1
1

4 4

2 2

1
1 1
1 1

1
1
1
1

4 4

1
1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1

1
1
1
1

4 4

2
1

1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1

1
1
1
1

4 4
1

1
1 1
1 1

1
1
1
1

4 4

1
1 1
1 1

1
1
1
1
4 4

1 1 2

1
1
1
1
1
1
1
1
1
1
1

1 1
1 1

1
1 2
1
1
1 2

1 2
1 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1

2 1
1
1
1
3

2 2

2 2

2 2

1 1
1 1
1
1 1
1 1
1 1

1 1 42

1 1
2 2
2

negative Lags
LEAD Positive Lags
PREDECESSORS PREDECESSORS

35 2 0 47 110 177
TOTAL
FF SS SF (- lag) FS FF
0
0

0 1

0 1
0 1

0 1

0 1

0 1

1 1

0
0
0
0 1
0

0
0
0
0 1
0
0

0
0
0
0 1
0
0

0
0
0
0 1
0
0

0
0
0
0 1
0
0

0
0
0
0 1
0
0

0
0
0
0 1
0
0

0
0 1
0 1
0
0 1
0 1

0
0 1
0 1
0
0 1
0 1

0
0 1
0 1
0
0 1

0 1
0
0
0 1

0 1

0
0 1
0
0
0
0
0
0
0 1

0
0 1
0
0
0
0
0
0
0 1

0
0 1
0

0
0
0
0
0
0 1

0
0 1
0
0
0
0
0
0
0 1

0
0 1
0
0
0
0
0
0
0 1

0
0 1
0
0
0
0
0
0
0 1

0
0 1
0
0
0
0
0
0
0 1

0
0 1
0
0
0
0
0
0

1 1

0
0 1
0

0
0
0
0
0
0 1

0
0 1

0
0
0

0
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1

0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1
0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0 1
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0 1
0 1
0 1

0
0 1
0 1

0
0 1
0 1
0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0 1
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1

0
0
0 1
0
0
0 1

0
0
0 1

0
0
0 1

0
0

0
0

0
0

0 1
0
0

0 1

0
0
0

0
0

0
0

0
0

0
0

0
0

0 1
0
0

0 1

0
0

0
0
0

0
0

0
0
0
0

0 1
0
0

0 1

0
0

0
0

0
0

0
0

0
0

0
0

0 1
0
0

0 1

0
0

0
0

0
0

0
0

0
0

0 1

0 1

0
0
0

0 1

0
0

0
0

0
0

0
0

0 1
0

0 1

0
0
0

0
0

0
0

0
0
0 1

0 1

0
0

0
0
0

0
0

0 1
0

0 1

0
0

0
0

0
0

0
0

0
0

0
0

0 1
0

0 1

0
0

0
0

0
0

0
0

0
0

0 1
0

0 1

0
0

0
0

0
0

0
0

0
0

0
0

0 1
0

0 1

0
0

0
0

0
0

0
0

0
0

0
0 1
0

0 1

0
0

0
0

0
0

0
0

0
0

0
0

0 1
0

0 1

0
0

0
0

0
0
0

0
0

0
0

0 1
0

0 1
0

0
0

0 1

0
0

0
0

0
0

0
0

0
0

0 1
0

0 1

0
0

0 1

0
0

0
0

0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0 1

0
0

1 1
0 1

1 1

0 1

0 1

0 1

0
1 1

1 1

0 1

0 1

0 1

0
0

0
0

1 1

1 1

0 1

0 1

0
0
0

1 1

1 1

0 1

0 1

0
0

1 1

1 1

2 2

0 1

0 1
0 1

0
0

1 1

1 1

1 1

0 1

0
0

0 1

0 1

0
0

1 1

1 1

1 1

0 1

0
0

0 1

0 1

0
0

1 1

1 1

1 1

0 1

0
0

0 1

0 1

0
0

1 1

1 1

1 1

0 1

0
0

0 1

0 1

0
0

1 1

1 1

1 1

0 1
0

0 1

0 1

0
0

1 1

1 1

1 1
0 1

0 1

0 1

0
0

1 1

1 1
1 1

0 1

0 1

0 1

0
0

1 1
0 1
0 1
0 1

0
0
0
0

0
0
0

0
0

0 1

0
0
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1

0
0
0
0

0
0

0
0
0

0
0

0 1

0 1

0 1

0
0
0

0
0 1
0 1
0 1
0

0
0
0

0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1

0
0
0

0
0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1

0
0
0
0

0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1

0
0
0
0

0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1

0
0

0
0
0

0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1

0
0

0
0
0

0
0 1
0 1
0 1

0
0
0

0
0 1
0 1
0 1
0

0
0
0
0
0
0
0 1
0 1
0
0
0

1
1

0
0 1
0
0
0 1

0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
0 1
1 1

1
0
0
0
0 1

0 1

0 1
0 1
0
0 1
0 1
0 1

1 1 1 1

0
0 1
3

Positive Lags
LAG
PREDECESSORS

291 0 578
TOTAL
SS SF + lag > 0 days
0
0

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1
1

1 1

0
1 1
0
1
0

0
0
1 1
1
0
0

0
0
1 1
1
0
0

0
0
1 1
1
0
0

0
0
1 1
1
0
0

0
0
1 1
1
0
0

0
0
1 1
1
0
0

0
1
1
1 1
1
1

0
1
1
1 1
1
1

0
1
1
1 1
1

1
0
1 1
1

0
1
0
0
1 1
0
1 1
1 1
1

0
1
0
0
1 1
0
1 1
1 1
1

0
1
0

0
1 1
0
1 1
1 1
1

0
1
0
0
1 1
0
1 1
1 1
1

0
1
0
0
1 1
0
1 1
1 1
1

0
1
0
0
1 1
0
1 1
1 1
1

0
1
0
0
1 1
0
1 1
1 1
1

0
1
0
0
1 1
0
1 1
1 1

0
1
0

0
1 1
0
1 1
1 1
1

0
1

1 1

0
0
0

2 2
1

1 1

2 2
1
1

1 1
1
1

2 2
1
1

1 1
1

1 1
1
1

1 1
1
1

1 1
1
1

1 1
1
1

2 2
1
1

1 1
1
1

1 1
1
1

1 1
1
1

1 1
1
1

1 1
1
1
1 1
1
1

1 1
1
1

1 1
1
1

1 1
1
1

1 2
1
1

1 1
1
1

0
1
1

0
1
1

0
1
1

0
1
1

0
1
1

0
1
1

0
1
1

1
1
1

0
1
1

0
1
1
0
1
1

0
1
1

0
1
1

0
1
1

0
1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1

0
1 1
1
0
1 1
1

0
1 1
1

0
1 1
1

1 1

1 1
1 1

1 1
0

0
0

1
0
1 1

1 1

0
0
0

0
0

1 1

1 1
1 1

0
0

1 1
0

0
0

1
0
1 1

1 1

0
0

0
0
0

1 1

1 1
1 1

1 1
0
0
0

1
0
1 1

1 1

0
0

0
0

1 1
0

1 1

1 1
1 1

1 1
0

0
0

1
0
1 1

1 1

0
0

0
0

1 1

0
0

1 1

0
1 1

1 1
0

1 1

0
0
0

0
0

1 1

0
1 1

1 1
0

0
0

1
0

1 1
0
0

1 1
0

1 1
0

1 1

1 1
0
1

0
0

1 1

1 1

0
1 1
0

0
0

1
0

1 1

0
0

0
0

1 1
0

1 1

0
0

1 1

1 1
0

0
0

1
0

1 1

0
0

0
0

1 1
0

1 1

1 1

1 1
0

0
0

1
0

1 1

0
0

0
0

1 1
0

1 1

0
0

1 1

1 1
0

0
0

1
0

1 1

0
0

0
0

1 1
0

1 1

1 1

1 1
0

0
0

0
1
0

1 1

0
0

0
0

1 1
0

1 1
0

1 1
0

0
0

1
0

1 1

0
0

0
0

1 1
0
0

1 1

1 1
0

0
0

1
0

1
1 1

0
0

0
0

1 1
0

1 1

1 1

0
0

1 1
0

0
0

1
0

1 1

0
0

0
0

1 1
0

0
0

1 1
0

0
0

0
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
0

1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1

1 1
1

0
0

0
1

1 1

0
0

1 1

0
0

0
0

1 1

0
0
0

1 1

0
0

1 1

1
1

0
0

1 1

0
0

0
0

1 1

0
0

0
0

1 1

0
0

0
0

1 1
0

0
0

1
1 1

0
0

0
1

1 1

0
0

0
0

1 1

0
0

0
1
1
1

0
0
0
0

0
0
0

0
0

0
0
1
1
1
1
1
1
1
1
1
1
1
1

0
0
0
0

0
1 1

0
1 1
1 1

0
0

4 4

0
1 1
1 1

0
1
1
1
4 4

0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1

0
0
1
1
1

4 4

0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1
0

0
1
1
1

4 4

0
1 1
1 1

0
1
1
1

4 4

0
0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1

0
1
1
1

4 4

0
0

0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1

0
1
1
1

4 4
0

0
1 1
1 1

0
1
1
1

4 4

0
1 1
1 1

0
1
1
1
4 4

1 1

0
0
0
0
0
0
1
1
0
0
0

0
0

0
1
0
0
1

1
1
1
1
1
1
1
1
1
1
0

0
0
0
0
1

1
1
0
1
1
1

0
1
LOGIC
No. of incomplete task with missing logic 5
No of incomplete Task 1278
% Logic 0.39%
Remarks complied
Required not exceed 5%
Negative Lag 47
total Relation ship 1947
% leads 2.41%
Remarks not complied
Requirements must be 0%
LAGS

Positive Lag 578


total Relation 1947
% leads 29.69%
Remarks Not complied
Requirements x<5%, should not be more than 5%
DMCA 14 Points
S/N Assessment
Metrics

1 Logic

2 Leads

3 Lags
DMCA 14 Points Assessment Met

Definition

Each activity should have at least one predecessor (connected to its start)
and one successor (connected to its finish) associated with it.

Leads or negative lags are often used to advance the successor start or end
date relative to the logic link applied. Doing so can result in the successor
starting before the start of the predecessor. This check applies to all normal
activities, milestones, summaries, and level of effort (hammocks) that are
planned, or in-progress.

Lags are positive durations or delays associated with logic links to delay the
start of the successor activity. Lags tend to hide detail in schedules and
cannot be statused like normal activities. Lags should typically be replaced
with activities. This check applies to all normal activities, milestones,
summaries, and level of effort (hammocks) that are planned, in-progress, or
complete.
oints Assessment Metrics Checklists

Criteria Requirement Count Percent

Missing Logic
The number of tasks without predecessors and/or successors should
not exceed 5% of the total number of tasks.
Dangling Activities 75 5.869%
The number of activities with only SS-relationships or only FF-
relationships. This is poor practice because delays in the network are
not calculated correctly. However, the test doesn’t foresee a fail / pass
criterion for specifically this case.

No leads are to be used in the schedule: the number of tasks with a


4 0.313%
lead (= negative lag) as a predecessor should be 0.

The total number of tasks with a lag as a predecessor should not


25 1.990%
exceed 5%.
Tick if Passed and Failed in
correlation to the criteria Recommendation
Passed Failed

the total number of


dangling activies /
P missing logic must
exceed 64 counts

the total number of


negative lag must be
P not exceed zero
count

P complied