CONNECTION DIAGRAM
The communication terminals (RS485) are located at the bottom of the inverter. And there are two connection terminals on the
configuration circuit board: RS485 A/B terminal blocks.
MIN 2500TL-X
MIN 3000 TL-X
MIN 3600 TL-X
MIN 4200 TL-X
MIN 4600 TL-X
MIN 5000 TL-X
MIN 6000 TL-X
MID 6KTL3-X
MID 10KTL3-X
MID 12KTL3-X
MID 17KTL3-X
MID 22KTL3-X
MAX 50000TL3-L
MAX 60000TL3-L
MAX 70000TL3-L
MAX 80000TL3-L
MAC 30KTL3-X
MAC 40KTL3-X
MAC 50KTL3-X
MAC 60KTL3-X
MAC 70KTL3-X
Growatt 7000UE
Growatt 8000UE
Growatt 9000UE
Growatt 10000UE
Growatt 12000UE
Growatt 18000UE
Growatt 20000UE
Growatt 8000TL3-S
Growatt 9000TL3-S
Growatt 10000TL
Growatt 11000TL3-S
Growatt 17000TL3-S
Growatt 20000TL3-S
Growatt 25000TL3-S
Growatt 30000TL3-S
Growatt 33000TL3-S
Growatt 40000TL3-NS
Growatt 50000TL3-S
Growatt 30000TL3-SE
Growatt 33000TL3-SE
Growatt 40000TL3-SE
The inverter can support three kinds of knock: single knock, double knock and thrice knock. Each kind of knock has different
function. Refer to specified definition in Table below:
NOTE: The below details are mentioned in the Installation & Operation Manual for Growatt Inverter.
The admin password for entering the Install Settings is 1234.
• Set a different inverter ID for each inverter in the PV plant. Otherwise, the inverters cannot be correctly identified.
• On the last inverter in the RS485 connection, switch on the RS485 termination resistor.
Setting COM address: Input password->Setting language->Set COM addr-> is the current address of inverter.”
Before entering the ‘COM Address: xxx’ setting interface, you need to enter a password as below:
According to the LCD display, you need to input three numbers: 123.You should finish several steps as below:
1. when the LCD stays bright, single knock to ‘Setting…’,and then double knock to enter ‘INPUT 123:xxx’interface.
2. Double knock to make the first number flash, single knock to change the number, and the first number you need to input is
‘1’. Double knock to enter the second number while the first number was ‘1’.
3. When the second number is flashing ,single knock to change the number, and the second number you need to input is ‘2’.
Double knock to enter the last number while the first number was ‘2’.
4. When LCD displays ‘INPUT 123:123’, triple knock to enter the setting interface.
5. Single knock to ‘COM Address: xxx’, and then double knock to enter the setting status, single knock to change the COM
Address. When setting finishes, wait for 30s or triple knock to save your setting.
SET DATE & TIME OF INVERTER
For a precise calculation of the statistics in the inverter itself and in a monitoring system, date and time have to be correct.
• If you want to set inverter time, repeat the steps as described in above section to set Com Address.
• When LCD displays ‘INPUT 123:123’, triple knock to enter the setting interface.
• Single knock until LCD displaying ‘xxxx/xx/xx xx:xx’, and then double knock to enter the setting status, the numbers begin to
flash. Single knock to change the number, each knock makes the flashing number add ‘1’, and double knock to shift to next
number setting. When setting finishes, wait for 30s or triple knock to save your setting.
Set the Correct Date & Time
Example Flow
Communication Card Settings
Multiple Inverters
In RS485 communication circuit, when the T/R+ and T/R- lines reach a certain
length (>100m), the line itself has impedance, in order to balance the
impedance of the RS485 bus line, you'd better get the jumper to the state
“ON” in RS485 BUS balance jumper of the remote inverter that the last one
connects to the RS485 bus line while others keep “OFF” state.