Navios Start Up
Navios Start Up
Navios Start Up
▼
Open the Power Supply door and check
▼
Record the startup checks on the Maintenance Log
SYSTEM CLEANING
▼
1. Put ONE test tube containing about 2 mL of cleanse solution into carousel
“Position 1”and
2. THREE freshly prepared tubes, each containing about 2 mL of distilled
water into positions 2, 3, and 4 of the carousel.
1. 2.
▼
Select Cleanse.PNL from the list of panels.
▼
Enter the Carousel No. in the Worklist.
The tube Location numbers will automatically appear.
▼
Click the Play “►” Button to start.
▼
At the end of the cleanse panel check for <100 events. If more events then repeat the
Cleanse panel with fresh tubes.
▼
After that run Prime and Cleanse cycle.
▼
The message Cleanse cycle in progress appears during the cleaning cycle.
When the cleaning cycle is done, the message changes back to Press Idle
Mode button to Initialize.
Flow Check
(Quality Control)
Vortex the Flow Check Pro Reagent bottle.
▼
Dispense 15-20 drops (0.5ml) of Flow- Check reagent into a 12 x 17mm. test tube.
▼
From the tool bar menu, click Tools, Autoset-up Scheduler.
▼
Select: QC_Flow Check_br8c OR directly select the same from the resource explorer-
protocol
▼
Enter Carousel #
▼
Place the tube containing Flow-Check beads in the carousel and close the MCL
cover.
▼
Press Start/RUN button on the tool bar menu.
Note: At the dialog box, “Do you want to save the current protocol?” Click NO.
▼
If the HPCV of Lin, FL1 Lin, FL2 Lin, Fl3 Lin, FL4 is < 2 and respective chanel,
Click Finish and Click Approve.
If the HPCV of any of the Parameter is > 2, then repeat Step 2. If possible, press
cleanse button or expel bubbles in the system before repeating the run.