Request For Inspection and Joint Measurements
Request For Inspection and Joint Measurements
Request For Inspection and Joint Measurements
IRN Revision: 0 Planned Date of Inspection Saturday, 11 june 2022 Time : 11:00AM
(iii)
6 Request Sent to Company Representatives below Email Addresses
(i) Ahemed ASIIMWE ahamed.asiimwe@external.totalenergies.com
(ii) Innocent OSUNA innocent.osuna@external.totalenergies.com
(iii) Januario AYETUNGA januario.ayetunga@external.totalenergies.com
(iv) Duncan MIIRO duncan.miiro@external.totalenergies.com
(v) TIL-Well Pad Superintendentt til-well-pad-superintendent-south@totalenergies.com
STAGE 1 : PREPARATION OF INSPECTION AND OR TESTING
The Contractor's Project Manager / Representative ensure and verifies that all the works presented for inspection and or testing are acceptable, ready, safe and accessible to inspection team.
The Contractor's Representative confirms that the inspection and or testing was conducted using an approved QCP
Contractor's Representative
present during inspection and NAME POSITION SIGNATURE DATE
or testing
QCI Saturday, 11 June 2022
The Company's Representative, on site, at the time of inspection, confirms receiving this inspection request and also confirms that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
The Contractor's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
Project Manager
The Company's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
MEECA-IS-ITP-003 REV00
Company Doc Number 000164
Work Package WP2 Inspection Request No.: IFN-007 Saturday, June 11, 2022
Item - SSSWU 2.4.3.1 (a1) Joint Inspection and Measurement of Removal of Topsoil Removal of Topsoil
Remarks / Comments
COMPANY's Rep.
Work Package 1,2,3,4 & 5 Inspection Number Earthworks / Discipline ITP No Activity No.
QC-CODE
WP2 IFN-007 EPC
Equipment Procurement-EQP / Material Procurement - MTP / Surveying Works - SVW/ Earthworks - Platform Construction – EPC /Drainage Works – DNW /Fencing Works – FNW / Pavement Layer
Work-Discipline>>> Works- PLW / Concrete Works - CNW /Bituminous Pavement Works - BPW/ Other Service Works - OSW / As-Built - ASB
REQUEST FOR INSPECTION & APPROVAL (Rev03)
IRN Revision: 0 Planned Date of Inspection Saturday, 11 june 2022 Time : 11:00AM
(iii)
6 Request Sent to Company Representatives below Email Addresses
(i) Ahemed ASIIMWE ahamed.asiimwe@external.totalenergies.com
(ii) Innocent OSUNA innocent.osuna@external.totalenergies.com
(iii) Januario AYETUNGA januario.ayetunga@external.totalenergies.com
(iv) Duncan MIIRO duncan.miiro@external.totalenergies.com
(v) TIL-Well Pad Superintendentt til-well-pad-superintendent-south@totalenergies.com
STAGE 1 : PREPARATION OF INSPECTION AND OR TESTING
The Contractor's Project Manager / Representative ensure and verifies that all the works presented for inspection and or testing are acceptable, ready, safe and accessible to inspection team.
The Contractor's Representative confirms that the inspection and or testing was conducted using an approved QCP
Contractor's Representative
present during inspection and NAME POSITION SIGNATURE DATE
or testing
QCI Saturday, 11 June 2022
The Company's Representative, on site, at the time of inspection, confirms receiving this inspection request and also confirms that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
The Contractor's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
Project Manager
The Company's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
MEECA-IS-ITP-003 REV00
Company Doc Number 000164
Work Package WP2 Inspection Request No.: IFN-006 Saturday, June 11, 2022
Item - SSSWU 2.4.3.1 (a1) Removal of Topsoil under Bill Item SSSWU 2.4.3.1 (a1) Removal of Topsoil
Remarks / Comments
COMPANY's Rep.
Work Package 1,2,3,4 & 5 Inspection Number Earthworks / Discipline ITP No Activity No.
QC-CODE
WP2 IFN-006 EPC
Equipment Procurement-EQP / Material Procurement - MTP / Surveying Works - SVW/ Earthworks - Platform Construction – EPC /Drainage Works – DNW /Fencing Works – FNW / Pavement Layer
Work-Discipline>>> Works- PLW / Concrete Works - CNW /Bituminous Pavement Works - BPW/ Other Service Works - OSW / As-Built - ASB
REQUEST FOR INSPECTION & APPROVAL (Rev03)
IRN Revision: 0 Planned Date of Inspection Saturday, 07 june 2022 Time : 10:00AM
(iii)
6 Request Sent to Company Representatives below Email Addresses
(i) Ahemed ASIIMWE ahamed.asiimwe@external.totalenergies.com
(ii) Innocent OSUNA innocent.osuna@external.totalenergies.com
(iii) Januario AYETUNGA januario.ayetunga@external.totalenergies.com
(iv) Duncan MIIRO duncan.miiro@external.totalenergies.com
(v) TIL-Well Pad Superintendentt til-well-pad-superintendent-south@totalenergies.com
STAGE 1 : PREPARATION OF INSPECTION AND OR TESTING
The Contractor's Project Manager / Representative ensure and verifies that all the works presented for inspection and or testing are acceptable, ready, safe and accessible to inspection team.
The Contractor's Representative confirms that the inspection and or testing was conducted using an approved QCP
Contractor's Representative
present during inspection and NAME POSITION SIGNATURE DATE
or testing
Quantity Surveyor Thursday, 06 June 2022
The Company's Representative, on site, at the time of inspection, confirms receiving this inspection request and also confirms that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
The Contractor's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
Project Manager
The Company's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
MEECA-IS-ITP-003 REV00
REQUEST FOR INSPECTION & APPROVAL (Rev03)
IRN Revision: 0 Planned Date of Inspection Saturday, 07 june 2022 Time : 10:00AM
(iii)
6 Request Sent to Company Representatives below Email Addresses
(i) Ahemed ASIIMWE ahamed.asiimwe@external.totalenergies.com
(ii) Innocent OSUNA innocent.osuna@external.totalenergies.com
(iii) Januario AYETUNGA januario.ayetunga@external.totalenergies.com
(iv) Duncan MIIRO duncan.miiro@external.totalenergies.com
(v) TIL-Well Pad Superintendentt til-well-pad-superintendent-south@totalenergies.com
STAGE 1 : PREPARATION OF INSPECTION AND OR TESTING
The Contractor's Project Manager / Representative ensure and verifies that all the works presented for inspection and or testing are acceptable, ready, safe and accessible to inspection team.
The Contractor's Representative confirms that the inspection and or testing was conducted using an approved QCP
Contractor's Representative
present during inspection and NAME POSITION SIGNATURE DATE
or testing
Quantity Surveyor Thursday, 06 June 2022
The Company's Representative, on site, at the time of inspection, confirms receiving this inspection request and also confirms that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
The Contractor's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
Project Manager
The Company's Project Manager / Representative receives, accepts and approves the inspection and test records, confirming that the inspection and or testing conducted, meets the requirements set out in Project Specifications.
MEECA-IS-ITP-003 REV00
Send
WP2 WP3 Names Email Addresses
GNA01 GNA03
Januario AYETUNGA januario.ayetunga@external.totalenergies.com
to
GNA02 KGG05
Ahemed ASIIMWE ahamed.asiimwe@external.totalenergies.com
GNA04 NGR01
Andrew SSEMAMBO andrew.ssemambo@external.totalenergies.com
cc
GNA05 NGR02
Duncan MIIRO duncan.miiro@external.totalenergies.com
KGG01 NGR03A
Innocent OSUNA innocent.osuna@external.totalenergies.com
cc
South KGG03 NGR06
innocent.osuna@external.totalenergies.com
KGG04 NSO01 cc
TIL-Well Pad Superintendenttil-well-pad-superintendent-south@totalenergies.com
KW02A NSO03 cc
Miguel Mtias miguel.matias@mota-engil.ug
KW02B NSO05 cc
Bruno Dias bruno.dias@mota-engil.ug
NGR05A NSO06 cc
Samuel Sousa samuel.sousa@mota-engil.ug
NSO04 cc
Sergio P Correia sergio.p.correia@mota-engil.ug
cc
Hezron Kombe hezron.kombe@mota-engil.ug
cc Ntayiro Kiziyo kizito.ntayiro@mota-engil.ug
WP1 Send
Names Email Addresses
JBR01
Alex Male NSEREKO til-wp-north-superintendent@totalenergies.com
to
JBR02
Graham Hay til-wp-north-superintendent@totalenergies.com
JBR03
Andrew SSEMAMBO andrew.ssemambo@external.totalenergies.com
cc
JBR04
Duncan MIIRO duncan.miiro@external.totalenergies.com
JBR05 cc
Jesca Nampala til-wp-supervisor-north@totalenergies.com
JBR06 cc
North Ismail Kenyi Biko til-wp-supervisor-north@totalenergies.com