Plant 6 3: Risk Assessment For Lifting Operations
Plant 6 3: Risk Assessment For Lifting Operations
Plant 6 3: Risk Assessment For Lifting Operations
Plant
1 Only trained and authorized persons are permitted to operate the plant
Personal risk of injury and / or ill health Supervisor – Prior to setting up the operator and the designated banks man will assess
Operator –Labor- the ground conditions for stability to prevent subsidence.
Risk of Injury to the public The crane will be set up as close to the lift area as possible to avoid
Overturning, Public Supervisor
Risk of damage to property and
equipment
2 3
6 overreaching.
The crane operator will not attempt to lift outside the specified crane
–
Operators
3 1
3
capacity
The load should always be Kept close to the ground
The crane operator should maintain a steady speed during the operation
Lack of
3 communication Personal risk of injury and / or ill health Supervisor –
Operator -Labor Supervisor
Risk of Injury to the public
Physical
1
Revision: 00
Risk Assessment for Lifting Operations
Lifting
Ensure the correct type of lifting equipment is selected for the lift.
Ensure the load does not exceed the SWL of the equipment.
Failure of lifting equipment Do not lift outside of the cranes safe working radius
1 Lifting
Labor, Staff,
Public, Operators
3 3
9 Ensure that all equipment certification is in date.
Inspect equipment before use to ensure it is free from damage. Rigger
Do not use makeshift or untested equipment.
Report any damage to your supervisor and take it out of use.
Charge-
hand 1 3 3
Only allow competent operatives to carry out lifting activities.
9
2 Lifting Labor, Operators 3 3 Ensure all equipment is stored correctly when not in use.
Only use lifting equipment for what it is designed.
Do not leave nylon sling exposed to heat or sunlight. Rigger
3
Damage to lifting equipment 3 1
Do not tie nylon or wire lifting equipment together to extend it. Charge-
2
Revision: 00
Risk Assessment for Lifting Operations
hand
Ensure only competent persons are permitted to carry out the lifting operations.
3 Lifting
Loss of load
Public, Operators,
Labor
3 3
9 Ensure tag lines are used to control the load.
Place packing around sharp edges or corners to prevent damage.
Do not use hooks that are stretched or damaged.
Rigger
Charge- 3 1
3
hand
Traffic Management
Ensure that an adequate barriers or hoardings are erected around the site to
CM,
prevent access.
Supervisor
1
Traffic
Public Access
Public, Staff,
Labor
2 3
6 Ensure that appropriate warning signs are on display (multi language if required)
warning of the dangers.
Restrict the access to construction traffic only.
and
Operatives
2 1
2
Provide security to prevent unauthorized access.
CM,
Where appropriate implement a one way system to control vehicle movement, Supervisor
2
Traffic
Plant & Vehicle Movement
Public, Staff,
Labor
2 3
6 where possible segregate walkways form vehicle movement.
Install designated parking areas.
and
Operatives
2 1
2
Ensure that only trained and authorized persons are permitted to operate plant
CM,
and equipment.
Supervisor
3
Traffic
Trapping / Crushing
Public, Staff,
Labor
2 3
6 Ensure that reversing vehicles are fitted with audible warning systems, where this
is not possible provide a banksman to direct the operator.
Provide High Viz Vests to the workforce so they are more visible to the operators
and
Operatives
2 1
2
of plant.
4 3 3
Ensure all reversing vehicles are controlled by a trained and competent banks
man.
Logistics
Traffic
Collision while reversing
Public, Staff,
Labor 9 Ensure routes are checked before reversing.
All mobile plant should be fitted with an audible reverse alarm.
Where practicable safety cones and plastic chain should be erected around the
Manager
Banksman
3
Driver 3 1
reversing area.
5 3 3
Ensure adequate access lighting is installed and maintained on main roadways. Logistics
Traffic
Collision at night
Public, Staff,
Labor 9 Ensure all vehicle and plant lights are in good working order and used at night.
Restrict vehicle movement at night
Unloading should be carried out in well lit and restricted areas.
Manager /
Supervisor
Banksman 3
3 1
Ensure vehicles stay on the designated access roads and do not take shortcuts
6
Traffic
Overturning
Public, Staff,
Labor
2 2
4 over the sandy areas.
If unloading materials using a forklift ensure the ground is level.
Ensure roads are maintained and free from potholes.
Supervisor
Banksman 2
1
2
9
7 Traffic Public, Staff, 3 3 Ensure adequate pedestrian accesses are installed that give pedestrian right of Logistics
Labor way. Where possible post a flagman to control vehicle and pedestrian movement. Manager /
3
Contact with people or pedestrians 3
Construct speed humps in areas where pedestrians need to cross. Supervisor 1
Implement designated pedestrian routes with barriers to segregate the Banksman
3
Revision: 00
Risk Assessment for Lifting Operations
Severity (S) Frequency (F) Risk Rating (RR) Very High High Medium Low
R=SxF 15-25 8-12 4-6 1-3
1 Minor Injury 1 Improbable
Assessment Date: