Progress Report - 01.04.2021-31.03.2022

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 145

Progress Report

Division: Paramakudi(H), Nabard & Rural Roads Month: November -2020 Rs. In Lakhs
Sanction details Contract details Expenditure details (in lakhs) Work status

Proble date of completion/


Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ROADS AND BRIDGES/ ROB/RUB/ BYPASSES/ PUR
G.O.Ms.No.11/Highways & Minor Ports(HW-1) department /dated.01.02.2018 (56 Bridges)

14158392 35045658
Construction of bridgeat km 4/2of 400.00 Thiru.P.
Sivagangai/ 10.10.18/ 09.10.202
1 Perambalur - manamadurai road to 365.00 CE.No.27 / Arumuga 290.14 41.87 0.35 332.36 85% Work completed.
Manamadurai 2017-18 m
09.12.19 0
Velur

Construction of High level Bridge at 190.00 M/s. S.K.


Sivagangai/ 28.06.18/ Work completed. PCR
2 km 1/4 of Madurai – Thondi road to 190.00 CR.No. Constructi 27.03.19 138.82 138.82 87%
Karaikudi /2018-19 on
27.03.19 submitted.
Meet Uruvatti- Melavaikottai road

25088022
287.00 M/s. S.K.
Sivagangai/ Construction of high level Bridge at 10.10.18/ 30.09.202
3 270.00 CE.No.26 / Constructi 215.96 43.70 259.66 90% Work completed.
Karaikudi km. 5/6 of Kappalur - Embal road 2018-19 on
09.12.19 0

M/s.

21165600
Construction of High level bridga at 244.00
Sivagangai/ Headways 15.01.18/
4 km 5/6 of Satharasankottai - 244.00 CE.No. 14.09.19 217.55 2.12 219.67 95% Work completed.
Sivagangai /2018-19
constructio 14.09.19
Sooranam road n, Madurai

G.O.Ms.No.33/Highways & Minor Ports(HW-1) department /dated.12.03.2018 (70 Bridges)

B.S. All Deck slabs


65882758

Constrcution of High level bridge at 762.00 Engineer's


Sivagangai/ 13.12.18/ 12.12.202 completed. Approach
5 km 9/6-8 of Thiruppathur - Alangudi 750.00 CE.No. and 320.08 192.82 57.99 570.89 70%

1972.00
Karaikudi /2018-19 Contractor
12.12.20 0 road work is in
road progress.
s
18096674

Ramanatha 198.00 Thiru.A.


Construction of Bridge at km 5/2 of 03.08.18/
6 puram / 198.00 Cr.No.16/20 Gnana 02.04.19 120.35 68.75 189.10 100% Work completed.
Puthenthal - Erwadi Road 18-19 prakasam
02.04.19
Ramanathapuram
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto

1972.00
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16

M/s.

15937596
Ramanatha Reconstruction of Bridge at km 11/8 192.00
Headways 15.10.18/ Work completed.
7 puram / of Mudukuklathur - Uthirakosai 192.00 CR.No.23 14.06.19 183.33 183.33 100%
/2018-19
constructio 14.06.19 PCR submitted.
Mudukulathur Mangai Road n, Madurai
1972.00
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
G.O.Ms.No184/Highways & Minor Ports(HW-1) department /dated.14.11.2018 (79 Bridges)
Construction of High Level Bridge at

41215112.00
Km 2/2 of Natham - Nediyamanickam M/
Ramanathapuram Road. s.Vasanth 10.09.19/ 09.09.202 Work completed. Final
8 ODR 500.00 500.00 169.67 157.95 71.87 399.49 80%
/ Mudukulathur aConstruct 09.09.20 0 Payment to be made.
ion Pvt.Ltd

Reconstruction of Bridge at Km 6/6 of

21825965.00
Ramanathapuram - Emaneswaram MR.Hitech
Ramanathapuram 02.08.19/ 01.06.202
9 Road To P.Kodikulam Road. ODR 310.00 297.50 Engineers 267.24 35.75 302.99 100% Work completed.
/ Paramakudi LTd
01.06.20 0

Construction of Minor Bridge at Km

8761114.00
0/4 of Andichi Oorani - Ottanam 95.00 M/s. S.K. Work completed.
Sivagangai 18.01.19/
10 Road. ODR 205.00 Cr.No.31/ Constructi 17.06.19 62.53 24.96 87.49 100% PCR to be
/Sivagangai 18-19 on
17.06.19
submitted.

Construction of minor bridge @Km

7939687.00
5/2 of Karaikudi O.Siruvayal Road 82.50 Work completed.
Sivagangai / R.Venkate 01.02.19/
11 ODR 75.00 Cr.No.32/ 31.07.19 79.51 0.79 80.30 100% PCR to be
Karaikudi 18-19
sh 31.07.19
submitted.

Construction of minor bridge @Km

25222435.00
1/4 of Mathur to Mulaikulam Road M/s. S.K.
Sivagangai / 21.08.19/ 30.09.202 Approach road work
12 ODR 231.30 254.43 Constructi 3.18 120.50 41.23 164.91 71%
Sivagangai on
20.06.20 0 is in progress.

Construction of Minor bridge at km


16227599.00 23031997.00

Work completed.
3/2 of Malakottai Nainapatti road
Sivagangai / A.Vijayaku 09.08.19/ Final payment
13 ODR 219.00 219.00 08.06.20 174.30 56.26 230.56 105%
Thirupathur mar 08.06.20 made.PCR to be
submitted.
Construction of Minor Bridge at Km
2/6 of Watrap - Maharajapuram Road 180.00 M/s.Ram 13.06.201
Virudhunagar/ Panchay 31.01.202 Initial pile load test is
14 to Taniparai Road. at Union
175.00 Cr.No.114/ constructio 9/12.20.20 1.35 1.35 1%
Srivilliputhur 18-19 ns 20
1 in progress.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Construction of Minor Bridge at Km

12045031 16849047.00 13104104.00


3/10 of Chithurajapuram- Work completed.
150.00 M/s.Ram
Virudhunagar / E.T.Reddiyapatti Road 24.01.19/ Final payment
15 ODR 150.00 Cr.No.33/ constructio 31.12.19 126.43 5.84 1.31 133.58 89%
Sivakasi 18-19 ns
23.09.19 made.PCR to be
submitted.

Construction of Minor Bridge at Km Work completed.


Virudhunagar/ 1/6 of Amathur to meet Alagapuri - 176.00 M/s.Ram
Final payment
24.01.19/
16 Virudhunagar Road (Via) Moolipatti ODR 175.00 Cr.No.34/ constructio 23.09.19 167.84 1.68 169.52 96%
Virudhunagar 18-19 ns
23.09.19 made.PCR to be
Road. submitted.
Construction of Minor Bridge at Km Work completed.
10/4 of Aruppukottai - 144.00 M/s.Ram
Virudhunagar/ 24.01.19/ Final payment
17 Kurunthanmadam Road. ODR 140.00 Cr.No.35/ constructio 23.09.19 121.64 1.76 2.40 125.80 87%
Aruppukottai 18-19 ns
23.09.19 made.PCR to be
submitted.
Construction of Minor Bridge at Km

9004035.00
7/8 of Meenachipuram - A.Mukkulam Work completed.
99.00 M/s.Ram
Virudhunagar / Road. 24.01.19/ Final payment
18 ODR 90.00 Cr.No.36/ constructio 23.06.19 92.17 0.90 93.07 94%
Thiruchuli 18-19 ns
23.06.19 made.PCR to be
submitted.

Construction of Minor Bridge at Km

18231818.00
4/8 of Rajapalayam - Ayyanarkovil M/ Work completed.
199.75 04.06.201
Virudhunagar/ Road to Shenbagathoppu Road. s.Lakshmi 03.02.202 Final payment
19 ODR 200.00 Cr.No.113/ 9/03.02.20 177.14 17.21 1.83 196.18 98%
Rajapalayam 18-19
constructio
20
0 made.PCR to be
ns submitted.

G.O.Ms.No57/Highways & Minor Ports(HW-1) department /dated.20.03.2020 (40 Bridges)


Reconstruction of High level bridge at B.S.
07.09.202
km 153/4-6 of Thanjavur-Sayalkudi Engineer's Diversion work
Sivagangai/ 0/ 06.11.202
1 road 1034.38 1035.00 and 0.38 0.38 0% completed. Initial Pile
Karaikudi Contractor
06.11.202 1
load test is in progress.
1
s
Construction of minor bridge at km
02.07.202 Work completed.
Sivagangai/ 0/2 -NH 210 to Vattanam road Thriu.B.Su 0/ 01.11.202
2 70.97 78.00 53.09 24.35 77.44 99% PCR to be
Karaikudi bramanian 01.11.202 0
0 submitted.

2929.23 726.58 247.99 3879.07


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ROB/RUB
Construction of limited use subway
(LUS)at Virudhunagar – Aruppukottai
road as deposit work in lieu of Work Completed.
temporary level crossing constructed 1053.00 M/s. 30.08.201 Final payment

59552855
Virudhunagar during the construction of ROB at LC CE's Lakshmi 6 13.09.201 made.Balance
1 325.00 1053.00 1053.00 100%
Virudhunagar 406 No.7, /2016- Constructi 29.10.201 7 Amount to be
17 on 7 adjusted in Finace
Year 2020-21

Construction of ROB at Railway


Km. 538/600-700 in lieu of existing
LC No.403 between Virudhunagar 2053.00

1278572550
and Thulukkapatti Railway Stations M/s. 04.03.201 Work Completed.
CR.No.20/2
Virudhunagar (Virudhunagar Town) Myans 6 22.02.201 Final payment
2 2053.00 015-16 2216.61 2216.61 100%
Virudhunagar RAS.
Constructi 03.03.201 9 made. Sub Estimate
n 8 work to be done.
2675.20
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bye Pass
1) 15 (2) notification
published on 30.3.2012.
Since interim stay order
granted by Hon'ble high
court, Madurai. 15(2)
Notification not published.
The stay was dismissed on
27.3.2015 and CAVEAT filed
on 1.4.2015 vide No.
659/2015.

2)15(2) Notification
Forming Bye-Pass Road in published on 15.06.2015.
Mudukulathur Town km 0/0-4/090 15(1) notification has been
Paramakudi

approved by Government
(Branching at Km. 225/885 and ending for publication as per G.O.
1 at Km.229/265 of SH29) 710.36 527.96 527.96 (D)No.118/Highways and
Minor ports(HQ-1)
Department dated.
( GO.Ms.No.8/2012/ Highways 09.06.2016. Work in
Department/ Dated. 20.01.2012.) Progress for Revised land
valuation Revenue
Department.
3)As per G.O. the
15(1) Notification published
on29.06.2016 in Tamil Nadu
Government Gazette No.26,
Volume -II, Section-2 Page
368.

4)15(1)
notification has been
approved for wet lands by
Government for publication
as per
G.O.(D)No.53/Highways and
Minor ports(HQ-1)
Department dated.
22.03.2017.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

5)As the publication of 19(2)


Private Negotiation land
owner was conducted on
26.09.2017 by DRO,
Ramanathapuram. DPR
1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 estimate has16been
submitted on 06.07.2018 to
Superintending Engineer(H),
N&RR, Tirunelveli.

6).Under section 19(6) of


Tamil Nadu highways act
2001 final proposal sent for
approval to CLA on
12.07.2018.

7)Letter from CLA


clarification needed for
variation in the guildeline
value on 14.09.2018

8)Letter from CLA


clarification needed for
variation in the guildeline
value on 14.09.2018

9) Letter sent to DIG


Registration department,
Madurai by District collector
Ramanathapuram on
09.11.2018 regarding
justificatin for variation in
guildline value.

10) The Inspector General of


Registration, Chennai in the
Lr.No.5688/L2/2019/Dated.
02.03.2019 , stated that
valuation committee under
the chairmanship of
Inspector General does not
fix value for any survey
No /Streets.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

It formulates only policy,


methodology, and
administration of market
1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 value of guideline
16 in the
state. Valuation sub-
committee under the
chairmanship of concerned
District collector fixes rates.
Any clarification or
rectification regarding
fixation of guideline value in
respect of Land may be sent
to CLA directly.

11) In guideline value


fixation sub-committee
formed under the chairman
of District Collector,
Ramanathapuram and
District Register
Ramanathapuram, Sub-
Register Mudukulathur,
Thasildhar Mudukulathur,
Town Panchayat Officer
Mudukulathur on 21.11.2019
at 4.00pm. 12) In Revised
land value proposal sent to
Commissioner of Land
Acquisition, Elilagam,
Chennai-5 from the District
Collector, Ramanathapuram
vide Lr.No.B1
/10357/2012/dated.
21.11.2019 . 13) In
rectification and revised land
value proposal sent to
Commissioner of Land
Acquisition, Elilagam,
Chennai-5 from the District
Collector, Ramanathapuram
vide
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Lr.No.B1 /10357/2012/dated.
21.11.2019 . 13) In
rectification and revised land
value proposal sent to
Commissioner of Land
Acquisition, Elilagam,
Chennai-5 from the District
Collector, Ramanathapuram
vide Lr.No.B1
/10357/2012/dated.
14.02.2020.14) The forming
of Mudukulathur Byepass
work (Phase-I)
administration sanction
accorded from the
Government vide G.O.
(Ms)no.20/Highways & minor
ports(HQ1) department,
dated. 23.01.2020 for
Rs.18.30 Crore . After
the completion of the land
acquiction process then the
work will be started..

Estimate Under preparation.


Forming Bye-Pass Road in Mudukulathur
Town km 0/0-4/090 (Branching at Km.
225/885 and ending at Km.229/265 of
1830.00
SH29) (work)(G.O.(Ms)no.20/Highways &
minor ports(HQ1) department, dated.
23.01.2020 )
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PUR 2018-19
Package 6 (2018-19)
Ramanathapuram District
Upgradation of Keelakkarai Erwadi 26.02.201
Ramanathapuram/ 9/ 25.10.201
1 Ramanathapuram
road to melamadai (via) Velanoor 391.00 430.00
25.10.201 9
371.34 371.34 90% Work Completed.
km:0/0-7/100 9

M/S.Krishna & co
Rs.98726234
26.02.201
Ramanathapuram Upgradation of Erwadi Dharga to 9/ 25.10.201
2 496.00 545.00 477.78 477.78 90% Work Completed.
/ Mudukulathur Serandai road Km. 0/0 -12/300. 25.10.201 9
9

Upgradation of Peraiyur - 26.02.201


Ramanathapuram 9/ 25.10.201
3 Senkottaipatti road to Keelavalasai 130.00 136.00 103.37 103.37 90% Work Completed.
/ Mudukulathur 25.10.201 9
road Km.0/0-2/400 9
Package 6 Total 1017.00 1111.00 952.49 952.49
Package 7
01.03.201
Ramanathapuram Upgradation of Mudukulathur - Sikkal 9/ 31.12.201
1 255.00 280.50 253.51 253.51 90% Work Completed.
/ Mudukulathur Road to Keelaselvanur road Km.0/0- 31.12.201 9

16674.58
7/2 9

01.03.201
Ramanathapuram Upgradation of Km. 6/2 Mudukulathur 9/ 31.12.201
2 320.00 327.00 279.45 279.45 90% Work Completed.

M/S.Velumanickam & co
/ Mudukulathur -Uthiragosa mangai road to 31.12.201 9
9
Ramalinga puram road Km. 0/0 - 5/0.
Rs.101622748/-

01.03.201
Ramanathapuram Upgradation of Kathanendal - 9/ 31.12.201
3 110.00 113.00 101.16 101.16 90% Work Completed.
/ Mudukulathur Paraiyankulam road Km.0/0-1/800 31.12.201 9
9

01.03.201
Ramanathapuram Upgradation of A.Punavasal - 9/ 31.12.201
4 70.00 75.00 67.61 67.61 90% Work Completed.
/ Mudukulathur Keelaselvanur road to Maranthai - 31.12.201 9
9
Saveriyarpattinam road Km.0/0-0/9
01.03.201
Ramanathapuram 9/ 31.12.201
5 280.00 308.00 282.16 282.16 90% Work Completed.
/ Mudukulathur Upgradation of Melakidaram to M. 31.12.201 9
Krishnapuram road Km.0/0 - 8/0. 9
Package 7 Total 1035.00 1103.50 983.89 983.89
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 8
08.03.201
Ramanathapuram Upgradation of Keelaparuthiyur - 9/ 07.01.202
1 215.00 236.50 214.81 6.55 221.36 90% Work Completed.
/ Paramakudi Veeracholam road km. 0/0-3/900 07.01.202 0
0
08.03.201
Ramanathapuram Upgradation of NH49 to Lakshmi 9/ 07.01.202
2 110.00 121.00 111.83 111.83 90% Work Completed.
/ Paramakudi puram road km. 0/0-2/0 07.01.202 0
0

Upgradation of NH 49 to 08.03.201
Ramanathapuram 9/ 07.01.202

Rs.108604089/-

R.Tamilselvam
3 Muthuchellapuram road km. 0/0- 162.00 177.00 151.88 151.88 90% Work Completed.
/ Paramakudi 07.01.202 0

16674.58
2/940 0

Upgradation of S.Kodikulam-V.P. 08.03.201


Ramanathapuram 9/ 07.01.202
4 Kovil road to K. P. Madam road 177.00 194.00 173.35 173.35 90% Work Completed.
/ Paramakudi 07.01.202 0
km.0/0-3/217 0
08.03.201
Ramanathapuram Upgradation of Ramnad-Melur road 9/ 07.01.202
5 132.00 145.00 132.94 132.94 90% Work Completed.
/ Paramakudi to Kulathur road km.0/0-2/400 07.01.202 0
0
08.03.201
Ramanathapuram Upgradation of Sikkal to 9/ 07.01.202
6 265.00 291.50 275.42 275.42 90% Work Completed.
/ Mudukulathur Andichikulam road Km. 0/0 - 4/8 07.01.202 0
0
Package 8 Total 1061.00 1165.00 1060.23 6.55 0.00 1066.78
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 9
Upgradation of Anandur - Valanai link 08.03.201
Ramanathapuram 9/ 07.01.202
1 road (via) Rakinarkottai road km. 0/0- 178.00 195.80 182.45 182.45 90% Work Completed.
/ Thiruvadanai 07.01.202 0
3/225 0
08.03.201
Ramanathapuram Upgradation of Kallikudi -Kottakudi 9/ 07.01.202
2 190.00 167.00 153.61 153.61 90% Work Completed.
/ Thiruvadanai (via) Soorampuli km.0/0-3/435 07.01.202 0
0
Upgradation of R.S.Mangalam - 08.03.201
Ramanathapuram Uppoor-Avarenthal road to 9/ 07.01.202
3 121.00 132.50 121.59 121.59 90% Work Completed.
/ Thiruvadanai Vettukulam (via) Kalangapuli road 07.01.202 0

P.Ramu, Devakottai
0

Rs.10,32,28,197/-
km. 0/0-2/2

16674.78
Upgradation of Anjukottai - 08.03.201
Ramanathapuram 9/ 07.01.202
4 Neerkunram road to Kannangudi road 115.50 127.05 115.8 115.80 90% Work Completed.
/ Thiruvadanai 07.01.202 0
Km.0/0-2/100 0
08.03.201
Ramanathapuram Upgradation of NH230 to 9/ 07.01.202
5 165.00 179.50 166.13 166.13 90% Work Completed.
/ Thiruvadanai Thalirmarungoor road km. 0/0-3/0 07.01.202 0
0
08.03.201
Ramanathapuram Upgradation of ECR-Karankadu road 9/ 07.01.202
6 121.00 121.00 109.43 109.43 90% Work Completed.
/ Thiruvadanai km. 0/0-2/200 07.01.202 0
0
08.03.201
Ramanathapuram Upgradation of Ramnad Nainarkoil 9/ 07.01.202
7 198.00 199.00 185.82 185.82 90% Work Completed.
/ Thiruvadanai road to Sakkankudi Road km.0/0-3/6 07.01.202 0
0
Package 9 Total 1088.50 1121.85 1034.83 1034.83
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Virudhunagar District
Package -10
01.03.201
Virudhunagar/ Upgradation of Manthopu road to 9/ 31.10.201
1 143.00 149.00 130.88 130.88 90% Work Completed.
Thiruchuli Karisalkulam road 0/0 - 2/588 31.10.201 9
9
01.03.201
Virudhunagar/ Upgradation of Trichy-Tuticorin Road 9/ 31.10.201
2 61.00 67.00 62.04 62.04 90% Work Completed.
Thiruchuli to Uplikundu 3/4 - 4/5 31.10.201 9

M/S.Krishnan & Co
Rs.5,91,65,460/-
9
01.03.201
Virudhunagar/ Upgradation of Kariyapatti-Thiruchuli 9/ 31.10.201
3 137.00 150.60 135.02 135.02 90% Work Completed.
Thiruchuli Road to K.Pudur 0/0 - 2/5 31.10.201 9
9
01.03.201
Virudhunagar/ Upgradation of Mithilaikulam - 9/ 31.10.201
4 120.00 122.00 105.42 105.42 90% Work Completed.
Thiruchuli Iluppaikulam (via) Mayilee 0/0 - 2/2 31.10.201 9
9
01.03.201
Virudhunagar/ Upgradation of K.Mettupatty - 9/ 31.10.201

16674.78
5 165.00 167.00 145.57 145.57 90% Work Completed.
Sattur Sirukulam Road Km 0/0 - 3/0 31.10.201 9
9
Package 10 Total 626.00 655.60 578.93 578.93
Package -11
08.03.201
Virudhunagar/ Upgradation of MCC road to 9/ 07.11.201
1 90.00 92.00 76.16 0.76 76.92 90% Work Completed.
Virudhunagar Inamreddiyapatti Km 0/0 - 1/6 07.11.201 9
9
08.03.201
Rs.5,35,63,958/-

Virudhunagar/ Upgradation of NH7 to Pavali (Via) 9/ 07.11.201


2
Virudhunagar Sangu Odai Km 0/0 - 3/3
180.00 180.00 S.Murugesan 07.11.201 9
151.98 1.52 153.50 90% Work Completed.
9
08.03.201
Virudhunagar/ Upgradation of Koundampatti to 9/ 07.11.201
3 190.00 199.60 178.69 1.78 180.47 90% Work Completed.
Virudhunagar kothaneri km 0/0 - 3/430 07.11.201 9
9
08.03.201
Virudhunagar/ Upgradation of Kalaiyarkurchi to 9/ 07.11.201
4 125.00 133.00 115.16 1.26 116.42 90% Work Completed.
Sivakasi sanarpatti km 0/0-2/250 07.11.201 9
9
Package 11 Total 585.00 604.60 521.99 5.32 0 527.31
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -12
08.03.201
Virudhunagar/ Upgradation of Sithurajapuram to 9/ 07.11.201
1 300.00 300.00 261.47 3.77 265.24 90% Work Completed.
Sivakasi E.T.Rediyapatti road km 0/0-4/2 07.11.201 9
9

Upgradation of Sivakasi - 08.03.201


Virudhunagar/ 9/ 07.11.201
2 Erichanatham road to M.Pudupatti 25.00 25.00 17.36 0.18 17.54 90% Work Completed.
Sivakasi 07.11.201 9
road km 0/0-0/450 9

M/s.Balaji Constructions.
08.03.201
Virudhunagar/ Upgradation of Nathikudi to 9/ 07.11.201

Rs.5,94,08,035/-
3 90.00 92.00 78.34 0.81 79.15 90% Work Completed.
Sattur Thiruvenkatapuram Road 0/0 - 1/155 07.11.201 9
9

16674.78
08.03.201
Virudhunagar/ Upgradation of Kothankulam to 9/ 07.11.201
4 85.00 85.00 12.84 0.15 12.99 90% Work Completed.
Sattur Chatrapatti Road KM 5/200 - 6/728 07.11.201 9
9

Upgradation of Krishnapuram to meet 08.03.201


Virudhunagar/ 9/ 07.11.201
5 Tenkasi -Thirumangalam road (via) 55.00 55.00 47.4 0.49 47.89 90% Work Completed.
Virudhunagar 07.11.201 9
Chokkampatti km 0/0-1/0 9

08.03.201
Virudhunagar/ Upgradation of O.Mettupatti - 9/ 07.11.201
6 115.00 122.00 104.82 2.30 107.12 90% Work Completed.
Sattur Pethureddipatty road km 3/0-5/010 07.11.201 9
9
Package 12 Total 670.00 679.00 522.23 7.70 0.00 529.93
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -13
22.08.201
Virudhunagar/ Upgradation of Vadakarai to District 9/ 21.02.202
1 210.66 32.33 242.99 90% Work Completed.
Sattur border road 0/0 to 5/6 21.02.202 0
300.00 300.00 0
Upgradation of Seithur Zaminkalam 22.08.201
Virudhunagar/ 9/ 21.02.202
2 road to Athiputhira ayyanar koil road 156.58 39.71 196.29 90% Work Completed.
Rajapalayam 21.02.202 0

Rs.89506176/-
0/0 - 4/438 245.00 245.00

Tmt.K.Selvi
0
22.08.201
Virudhunagar/ Upgradation of Khansapuram to 9/ 21.02.202
3 247.23 18.12 265.35 90% Work Completed.
Srivillputhur Athikoil road km 0/0-6/0 21.02.202 0
330.00 330.00 0
22.08.201
Virudhunagar/ Upgradation of Keelagopalapuram to 9/ 21.02.202
4 73.46 5.40 78.86 90% Work Completed.
Srivillputhur kalyanipuram road 0/0-1/756 21.02.202 0
95.00 95.00 0
22.08.201
Virudhunagar/ Upgradation of Kunnur to 9/ 21.02.202
5 59.71 4.03 63.74 90% Work Completed.
Srivillputhur keelagopalapuram road 0/0-1/400 21.02.202 0
80.00 80.00 0
Package 13 Total 1050.00 1050.00 747.64 99.59 0.00 847.23

16674.78
Sivagangai District
Package -18
Upgradation of Nalukottai to
Sivagangai/ Keelapoonkudi (via) 08.03.19/ 07.11.201
1 Thirunarayanpuram Paranipatti road 284.35 284.35 246.38 246.38 80% Work Completed.
Sivagangai 07.11.19 9
km 0/0-5/170
Upgradation of Melur - Sivagangai

Thiru.M.Ramachandran
Sivagangai/ road to Koovanipatti road km 0/0- 08.03.19/ 07.11.201
2 1/800 99.00 99.00 87.75 87.75 80% Work Completed.
Rs.5,68,8,209/-

Sivagangai 07.11.19 9

Upgradation of Idaya Melur -


Sivagangai/ Koovanipatti road km 0/0-1/750 08.03.19/ 07.11.201
3 96.25 98.00 86.74 86.74 80% Work Completed.
Sivagangai 07.11.19 9

Upgradation of Thamarakki -
Sivagangai/ Kothankulam road0/0-3/060 R32 08.03.19/ 07.11.201
4 168.30 164.00 145.75 145.75 60% Work Completed.
Sivagangai 07.11.19 9

Package 18 Total 647.90 645.35 566.62 566.62


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -19
Upgradation of Ramnad - Sivagangai
Sivagangai/ - Melur road to Kottakudi toad upto 01.03.19/ 31.10.201
1 block limit km 0/0-1/010 55.55 55.55 47.95 47.95 90% Work Completed.
Sivagangai 31.10.19 9

Upgradation of Kalmekki road 0/0-


Sivagangai/ 2/200 01.03.19/ 31.10.201
2 121.00 121.00 106.68 106.68 90% Work Completed.
Sivagangai 31.10.19 9

M/s.S.A.L. Company
Rs.5,81,59,084/-
Sivagangai/ Upgradation of Pasankarai - 01.03.19/ 31.10.201
3 60.50 60.50 53.45 53.45 90% Work Completed.
Sivagangai Kalameikki km 0/0-1/100 31.10.19 9

Sivagangai/ Upgradation of Pillur - Kovanoor road 01.03.19/ 31.10.201


4 36.30 36.30 33.92 33.92 90% Work Completed.
Sivagangai 0/0-0/660 31.10.19 9

Upgradation of Oyyavandhan to

16674.78
Sivagangai/ kanjipatti road via orupokki, kalkulam, 01.03.19/ 31.10.201
5 368.50 372.00 326.86 326.86 90% Work Completed.
Sivagangai ponnakal km 0/0-6/700. 31.10.19 9

Package 19 Total 641.85 645.35 568.86 568.86


Package -20
Upgradation of Kovanoor -
Sivagangai/ Vairavanpatti road 29.05.19/
1 28.01.20 155.22 155.22 90% Work Completed.
Sivagangai km 0/0-3/145
28.01.20
172.98 172.98
Upgradation of Andichioorani -
Sivagangai/ Mudukkoorani road km 0/0-4/200 29.05.19/
2 28.01.20 201.07 201.07 90% Work Completed.
M/s.KOP & Co
Rs.55245592

Sivagangai 28.01.20
231.00 231.00

Sivagangai/ Upgradation of Regunathamadai - 29.05.19/


3 28.01.20 50.49 50.49 90% Work Completed.
Sivagangai Krishnapuram road km 0/0-1/0 28.01.20
55.00 55.50

Sivagangai/ Upgradation of Idaikattur - 29.05.19/


4 28.01.20 145.48 145.48 90% Work Completed.
Sivagangai Arulananthapuram road km 0/0-2/900 28.01.20
159.50 160.00
Package 20 Total 618.48 619.48 552.26 552.26
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -21
Sivagangai/ Upgradation of SIPCOT Konnakulam 08.03.19/ 07.11.201
1 33.89 33.89 90% Work Completed.
Manamadurai link road km 0/0-0/630 07.11.19 9
37.80 37.50

Sivagangai/ Upgradation of Velur- 08.03.19/ 07.11.201

Rs.5,76,90,581/-
2 105.26 4.94 110.20 90% Work Completed.

Thiru.T.Ramar
Manamadurai Sriranganatham road km 0/0-2/400 07.11.19 9
132.00 133.00

Upgradation of Melachorikulam road


Sivagangai/ 08.03.19/ 07.11.201
3 to meet Thanjakoor road km 0/0- 88.73 88.73 90% Work Completed.
Manamadurai 07.11.19 9
1/854
101.97 101.97

16674.78
Upgradation of Salaigramam -
Sivagangai/ 08.03.19/ 07.11.201
4 Sarugani raod to Ochanthittu 0/0- 174.57 174.57 90% Work Completed.
Sivagangai 07.11.19 9
3/600 198.00 198.00

Sivagangai/ Upgradation of Krishnapuram - 08.03.19/ 07.11.201


5 43.5 43.50 90% Work Completed.
Sivagangai Mulliarenthal road km 0/0-0/800 07.11.19 9
44.00 44.00

Rs.5,76,90,581/-

Thiru.T.Ramar
Sivagangai/ Upgradation of Mulliarenthal - 08.03.19/ 07.11.201
6 79.17 79.17 90% Work Completed.
Sivagangai Munaivendri road km 0/0-1/600 07.11.19 9
88.00 89.00

Sivagangai/ Upgradation of Nedunkulam road - 08.03.19/ 07.11.201


7 40.85 40.85 90% Work Completed.
Sivagangai Mulliarenthal raod km 0/0-0/800 07.11.19 9
44.00 44.00
Package 21 Total 645.77 647.47 565.97 0 570.91
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -22
Sivagangai/ Upgradation of Valaiyapatty - 08.03.19/ 07.11.201
1 127.1 0.39 127.49 90% Work Completed.
Manamadurai Pokaraipatty road km 0/0-2/393 131.62 131.62 07.11.19 9
Upgradation of Madurai - Devakottai
Sivagangai/ 08.03.19/ 07.11.201

Thiru.M.Ravichandran
2 road to Siravayalpudur road KM 0/0- 125.89 0.39 126.28 90% Work Completed.
Sivagangai 07.11.19 9

Rs.5,60,45,882/-
2/400 132.00 132.00
Upgradation of Devakottai
Sivagangai/ Municipality limit to Sarugani - 08.03.19/ 07.11.201
3 Devakottai road (via) Marichanpatti 106.43 0.21 106.64 90% Work Completed.
Karaikudi 07.11.19 9
km 0/0-1/900 105.00 105.00
Upgradation of Madurai- Thondi road
Sivagangai/ to Thoonukudi (via) Pavasi road km 08.03.19/ 07.11.201
4 216.92 0.77 217.69 90% Work Completed.
Karaikudi 0/0-4/700 07.11.19 9
260.00 260.00
Package 22 Total 628.62 628.62 576.34 1.76 0 578.10
Package -23
Sivagangai/ Upgradation of Unjani - 08.03.19/ 07.11.201

16674.78
1 175.02 175.02 90% Work Completed.
Karaikudi Narasimmapuram road km 0/0-3/600 07.11.19 9

Rs.5,83,01,667/-

Thiru.V.Meenal
198.00 198.00
Upgradation of Kallal- Devakottai to
Sivagangai/ Kallangudi Pudur road km 0/0-2/210 08.03.19/ 07.11.201
2 112.62 112.62 90% Work Completed.
Karaikudi 07.11.19 9
122.00 122.00

Sivagangai/ Upgradation of NH210 Chettiyendal 08.03.19/ 07.11.201


3 305.64 305.64 90% Work Completed.
Karaikudi road km 0/0-6/0 07.11.19 9
330.00 330.00
Package 23 Total 650.00 650.00 593.28 593.28
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


16674.78
Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -24
Sivagangai/ Upgradation of Porivayal - Eagarai 08.03.19/ 07.11.201
1 1.200 57.51 3.76 61.27 90% Work Completed.
Karaikudi road km 0/0-1/200 66.00 66.00 07.11.19 9

Rs.4,93,62,127/-

M/s.A.M. & Co
Sivagangai/ Upgradation of Vetriyur 08.03.19/ 07.11.201
2 4.200 221.76 6.72 228.48 90% Work Completed.
Sivagangai A.Karunkulam road at 0/0-4/200 07.11.19 9
231.00 231.00
Upgradation of Pudukottai Ambel
Sivagangai/ 08.03.19/ 07.11.201
3 Road to Kakkakottai Road (Via) 4.800 212.89 6.97 219.86 90% Work Completed.
Karaikudi 07.11.19 9
Appalai Molumbur at km0/0- 4/800 264.00 264.00
Package 24 Total 561.00 561.00 492.16 17.45 0 509.61
Package -25
08.03.201
Sivagangai/ Upgradation of Kalapoor - Soorakudi 9/ 07.11.201
1 227.47 4.20 231.67 90% Work Completed.
Thiruppathur raod km 0/0-4/840 07.11.201 9
266.00 266.00 9

Rs.5,30,78,452/-

M/s.A.M. & Co
Upgradation of Kalapoor - 08.03.201
Sivagangai/ 9/ 07.11.201
2 Kumarathakudipatti road km 0/0- 147.36 2.00 149.36 90% Work Completed.
Thiruppathur 07.11.201 9
2/900 159.50 162.00 9
08.03.201
Sivagangai/ Upgradation of Kalapoor - 9/ 07.11.201
3 150.45 2.83 153.28 90% Work Completed.
Thiruppathur Manavathan road km 0/0-2/600 07.11.201 9
143.00 157.00 9
Package 25 Total 568.50 585.00 525.28 9.03 0 534.31

16674.78
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -26
Upgradation of Sevaipettai - 08.03.201
Sivagangai/ 9/ 07.11.201
1 Govindamangalam road to 98.00 98.00 90% Work Completed.
Karaikudi 07.11.201 9
Pudukurichi km 0/0-2/0

Thiru.R.Saravanan
9

Rs.5,72,37,575/-
110.00 110.00
Upgradation of Sirugavayal - 08.03.201
Sivagangai/ 9/ 07.11.201
2 Thalaiyur road to Kalathur km 0/0- 158.86 158.86 90% Work Completed.

16674.78
Karaikudi 07.11.201 9
3/200 176.00 176.00 9
Upgradation of Thenkarai - 08.03.201
Sivagangai/ 9/ 07.11.201
3 Konkarathi (Via) valayapatti Km0/0- 317.07 317.07 90% Work Completed.
Sivagangai 07.11.201 9
6/400 352.00 352.00 9
Package 26 Total 638.00 638.00 573.93 573.93
Package -27
Upgradation of Kattanipatti - 01.03.201
Sivagangai/ 9/ 31.10.201
1 Saruguvalayapatti road to Odaipatti 165.37 165.37 90% Work Completed.
Thiruppathur 31.10.201 9
km 0/0-3/100 170.50 182.50 9

M/S.Velumanickam & co
01.03.201
Sivagangai/ Upgradation of Jeyankondanilai to

Rs.5,79,21,532/-
9/ 31.10.201
2 94.34 94.34 90% Work Completed.
Thiruppathur Kattanipatti road km 0/0-1/900 31.10.201 9
104.50 105.00 9
01.03.201
Sivagangai/ Upgradation of Madurai - Devakottai 9/ 31.10.201
3 216.82 216.82 90% Work Completed.
Thiruppathur road to Sevalpatti km 0/0-4/400 31.10.201 9
242.00 242.00 9

Upgradation of Madurai - Devakottai 01.03.201


Sivagangai/ 9/ 31.10.201
4 road -Sevalpatty road to Oppilanpatti 100.00 100.00 90% Work Completed.
Thiruppathur 31.10.201 9
km 0/0-2/0 110.00 110.00 9
Package 27 Total 627.00 639.50 576.53 576.53
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
13359.62 13750.31

Rs.36542816/

13.03.2020/
12.09.2020
Tmt.K.Selvi

12.12.2020
Upgradation of Ramachandrapuram - Earth Work and CD
1 Virudhunagar 400.00 400.00 4.10 2.82 6.92
Sankaranatham Road 0/0 - 2/8 work is in progress

-
(G.O.(2D)No.45 & 46/ Highways and Minor Ports(HF-1) Department dated 15.10.2019 2.82 0.00 2.82
2019-20 PUR ROAD WORKS Sivagangai District 3336.28 150.22 0.00 12148.62
Package -1

Sivagangai/
Arasanoor - Samathuvapuram Road 2.715 152.24 167.00 0.10 147.22 147.32 88% Work Completed.
Sivagangai
1

23.08.2020
Thiru.B.Subramanian
Sivagangai/

Rs.60527283/-
Idayamelur B Colony to A Colony 2.700 151.43 164.00 0.10 143.11 143.21 87% Work Completed.
Sivagangai

23.08.2020
2

/
Sivagangai/
Arasanoor - A.R.Usilampatti Road 3.070 172.07 182.00 0.10 157.84 157.94 87% Work Completed.

24.2.2020
Sivagangai
3
Sundaranadappu - Patcheri Vilakku
Sivagangai/
Road to Mutharasan Link Road (Via) 2.600 146.26 159.00 0.07 140.89 140.96 89% Work Completed.
Sivagangai
4 Vanakaruppu
Total 11.085 622.000 672.000 0.37 589.06 0.00 589.43
Package -2
Sivagangai/ Vannikudi-Maruchukkatti Road Km
4.700 265.70 266.00 0.08 230.97 231.05 87% Work Completed.
1 Sivagangai 0/0-4/7

23.08.2020
Thiru.B.Subramanian
Kayaodai valanai road to Meet
Rs.57688724/-

Sivagangai/
satharasakottai-sooranam road (via) 3.000 167.91 181.00 0.08 158.1 158.18 87% Work Completed.
Sivagangai

23.08.2020
2 Allivayal

Kayaoodai valanai road to vannikudi


/

Sivagangai/ maruchikatti road via kalaikulam, o


24.2.2020

3.600 201.94 198.00 0.08 179.22 0.40 179.70 91% Work Completed.
Sivagangai maruthangudi, katiyakara srimam
Kalaikulam road 0/0 - 3/6
3
Total 11.300 635.550 645.000 0.24 568.29 0.4 568.93
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -3
Thanjavore - Sayalkudi road to vani
Sivagangai 0.06 203.13 0.25 203.44 87% Work Completed.

11.08.2020
4.000 223.84 233.00

M/s Velumanickam.& Co
road
1

Rs.57921812/-
Kadamuthanpatti to Namanoor

11.08.2020
Sivagangai 1.400 78.27 81.00 0.06 69.44 0.25 69.75 86% Work Completed.
Periyakottai Patti Road
2

/
 Ilayangudi road Mangalam road to

12.02.2020
Sivagangai 2.400 137.13 148.00 0.06 123.7 0.25 124.01 84% Work Completed.
Kongampatty
3

Sivagangai Anandur road to kalladithidal 3.000 167.91 183.00 0.06 162.22 0.25 162.53 89% Work Completed.
4
Total 10.800 607.150 645.00 0.24 558.49 1.00 559.73
Package -4

12.08.2020
Sivagangai Keeladi to parani chamber 2.050 115.13 126.00 0.06 114.11 114.17 91% Work Completed.

M/s Subash Builders


1

Rs. 51317054/-
Sivagangai Parani chamber to sayanapuram 1.800 101.84 107.00 0.06 93.5 93.56 87% Work Completed.

12.08.2020
2

/
Sivagangai Madapuram - Theli road 4.000 225.88 244.00 0.06 211.46 211.52 87% Work Completed.

13.02.2020
3

Sivagangai Palayanoor to Vallarendal 1.450 81.43 89.57 0.06 83.15 83.21 93% Work Completed.
4
Total 9.300 524.280 566.57 0.24 502.22 0 502.46
Package -5
Rs.62666847/-

Thiru.T.Ramar
NH49 TO Chinnakannanur (via)
Sivagangai 0.12 452.13 452.25 87% Work Completed.

28.02.2020 /
8.200 481.33 520.00

27.08.2020

27.08.2020
Somathur road upto block limit
1
Thirupachetti Narikudi road to Vilathur
Sivagangai 2.800 158.08 171.00 0.12 157.28 157.40 92% Work Completed.
road
2
Total 11.000 639.410 691.00 0.24 609.41 0 609.65
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -6
Shanmuganathapattinam - Kaikudi
Sivagangai 2.505 140.08 140.00 0.06 116.5 0.44 117.00 84% Work Completed.
Road
1

28.02.2020 / 27.08.2020
Thiru.B.Uthayakumar
Rs.54115401/-
Sivagangai Pudukurichi - Kongumuthi Road 4.400 247.27 255.00 0.06 223.04 0.73 223.83 88% Work Completed.

27.08.2020
2
Kudikadu pappakudi road to
Sivagangai 2.240 126.28 136.00 0.06 114.04 0.44 114.54 84% Work Completed.
Umayandavayal road
3
KM 9/4 Of Sundaranadappu pacheri
Sivagangai 1.200 62.62 66.00 0.06 55.02 0.73 55.81 85% Work Completed.
road to V.Pudukulam road
4
Total 10.345 576.250 597.00 0.24 508.6 2.34 511.18
Package -7

Sivagangai Kottaiyur Bye Pass Road NH210 3.200 180.87 184.00 0.05 127.89 33.35 161.29 88% Work Completed.
1

05.03.2020 / 04.09.2020
Sivagangai NH210 to Avudai pogai 0.900 41.60 41.60 0.05 39.88 1.39 41.32 99% Work Completed.
2

Rs.60767349/-

M/s A.M. & Co

04.09.2020
Kararikudi - Mathur Road to
Sivagangai Kandanoor Mathur Road Via 3.000 168.48 168.50 0.05 2.3 131.92 134.27 80% Work Completed.
Karaikaran kudieruppu (Vaigai Nagar)
3

Sivagangai Alangudi to Ilangudi road 3.650 205.41 216.00 0.05 164.44 16.2 180.69 84% Work Completed.
4

Sivagangai Kannankudi Kadamboor Road 1.000 55.79 56.00 0.04 1.51 42.55 44.10 79% Work Completed.
5
Total 11.750 652.150 666.10 0.24 336.02 225.41 561.67
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -8
Kallal kalaiyarkoil road to
Sivagangai 2.000 112.35 108.00 28.28 80.00 0.30 108.58 101% Work Completed.
1 malaikandan raod

24.02.2020 / 23.08.2020
Thiru.R.Saravanan
Rs.55962332/-
Kandanoor -Mathur road to Alagappa
Sivagangai 3.600 201.48 198.00 24.43 157.45 0.31 182.19 92% Work Completed.

23.08.2020
Engineering collage road
2

Sivagangai Malaikandan to Vetriyur road 2.000 111.93 113.00 4.79 93.14 0.30 98.23 87% Work Completed.
3

Nagavayal rastha Road to Devakottai


Sivagangai 3.500 196.31 197.00 133.05 26.43 0.30 159.78 81% Work Completed.
Sr.pattinam (link road)road
4
Total 11.100 622.070 616.00 190.55 357.02 1.21 548.78
Package -9

M/s B.S. Engineers and Contreactors


Piranmalai -Thenammalpatti Road to
Sivagangai 2.000 111.97 115.00 0.05 95.92 4.58 100.55 87% Work Completed.
Mettupatti Road to Sirumaruthur road
1

07.02.2020 / 06.08.2020
Madurai - Devakottai Road
Sivagangai 18.38 32.76 2.75 53.89 80% Work Completed.

Rs.60675058/-
1.400 61.37 67.00
2 Vettangudipatti Road

06.08.2020
Vettangudipatti Road to Sevalatti
Sivagangai 3.270 150.83 164.00 61.05 88.54 6.88 156.47 95% Work Completed.
3 Road

Sivagangai K.Pudupatti to Athikaram road 3.100 173.43 186.00 0.05 160.26 7.67 167.98 90% Work Completed.
4
 R.S.Mangalam- Iiayangudi road to
Sivagangai 2.200 122.92 133.00 0.05 105.97 5.21 111.23 84% Work Completed.
5 Valakkani road (via)S.Kottaiyur
Total 11.970 620.520 665.00 79.58 483.45 27.09 590.12
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -10

 Sivagangai Ilayangudi road to


Sivagangai 5.200 291.91 307.00 0.10 270.76 270.86 88% Work Completed.
Kuruathankuban (via) maruthangudi
1

24.02.2020 / 23.08.2020
Rs.67945469/-
Kudikadu pappakudi road to

Tmt.V.Meenal
Sivagangai 1.270 67.07 72.00 0.04 63.02 63.06 88% Work Completed.

23.08.2020
poothakudi road
2

Sivagangai Siruganoor road to Poothakudi Road 3.411 186.12 183.00 0.06 162.56 162.62 89% Work Completed.
3

Sivagangai Pappankulam to V.Pudukulam road 3.000 170.21 187.00 0.04 162.97 163.01 87% Work Completed.
4
Total 12.881 715.310 749.00 0.24 659.31 0.00 659.55
Package -11

Upgradation of Madurai- Thondi road


Sivagangai 1.400 77.00 83.00 30.48 45.79 0.17 76.44 92% Work Completed.
to Mudikandam

13.08.2020
1

Thiru.A.Rajmohan
Upgradation of Madurai- Thondi road

Rs. 55968526/-
Sivagangai 1.600 88.00 95.50 0.02 83.82 0.17 84.01 88% Work Completed.
to Nattakudi

13.08.2020
2

/
Upgradation of M.T.Road -
Sivagangai Padamathur- Thiruppachehi road to 3.625 200.00 192.00 0.10 173.84 0.17 174.11 91% Work Completed.

14.02.2020
Nattakudi (via) Ilanthangudi road
3
Upgradation of Kumarapatii-
Sivagangai 4.200 231.00 242.00 84.05 133.22 0.18 217.45 90% Work Completed.
Mudikandam
4
Total 10.825 596.000 612.50 114.65 436.67 0.69 552.01
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -12

Upgradation of Thanjavur- Sayalkudi


Sivagangai 1.200 66.00 77.60 0.05 61.12 2.99 64.16 83% Work Completed.
road to Velarandal road km 3/4-4/6
1

09.08.2020
Upgradation of Madurai- Thondi road

Rs. 56575420/-

Thiru.M. Alagar
Sivagangai 4.500 247.50 268.00 0.05 228.69 11.27 240.01 90% Work Completed.
to Mudukkoorani
2

09.08.2020
10.02.2020 /
Sivagangai Upgradation of Ammachipatti road 1.500 82.50 90.00 0.04 76.17 3.71 79.92 89% Work Completed.
3
Upgradation of Sarugani- Devakottai
Sivagangai 1.000 55.00 60.00 0.05 50.1 2.47 52.62 88% Work Completed.
4 road to Chokkanathapuram
Upgradation of Thirukostiyur-
Sivagangai Pattamangalam road to 2.200 121.00 133.10 0.05 115.19 5.57 120.81 91% Work Completed.
5 Karuvelkurichi - Anna nagar road
Total 10.400 572.000 628.70 0.24 531.27 26.01 557.52
Package -13
Upgradation of Kalaiyar koil-
Sivagangai Mudikkarai road to Sathani Vilakku 2.800 154.00 169.00 0.06 149.53 0.34 149.93 89% Work Completed.

24.02.2020 / 23.08.2020
1 via Kiluvachi 0/0-2/800

Thiru.P.Ramu
Upgradation of Kallankudi Pudur road

23.08.2020
Sivagangai 4.000 220.00 233.00 0.06 232.29 0.45 232.80 100% Work Completed.
to Uvarkulam
2
Upgradation of Kappaloor - Embal
Sivagangai 1.000 55.00 56.00 0.06 43.45 0.08 43.59 78% Work Completed.
road km 6/8-7/8
3
Upgradation of Thiruppakottai-
Sivagangai 2.800 154.00 169.40 0.06 122.94 0.34 123.34 73% Work Completed.
Athankudi road km 3/2-6/0
4
Total 10.600 583.000 627.40 0.24 548.21 1.21 549.66
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Virudhunagar District
Package -14
Virudhunagar / Oruchirangampatti To Dharmam
2.000 113.79 125.00 0.13 105.09 7.93 113.15 91% Work Completed
Thiruchuzhi Road
1

14.02.2020 / 13.08.2020
M/s Lucky Associates
Virudhunagar / Dharmam Theli Road to Poovakani
2.385 134.70 148.00 0.13 120.03 8.85 129.01 87% Work Completed
Thiruchuzhi Road

Rs. 59955644/-
2

13.08.2020
Virudhunagar / Poovakani To Kottakatchiyenthal
2.250 130.91 133.00 0.13 100.28 13.56 113.97 86% Work Completed
Thiruchuzhi Road
3
Virudhunagar /
SH-42 to Udaiyanampatti 2.430 141.39 155.00 0.13 111.75 10.72 122.60 79% Work Completed
Thiruchuzhi
4
Virudhunagar /
Veerasolan road to Nayanenthal 1.600 92.67 98.00 0.13 89.85 5.73 95.71 98% Work Completed
Thiruchuzhi
5
Total 10.665 613.46 659.00 0.65 527 46.79 574.44
Package -15

12.02.2020 / 11.08.2020
Virudhunagar/ Upgradation of S.Maraikulam -
252.06 21.35 2.22 275.63 88% Work Completed

M/s Krishna & Co


5.400 304.03 315.00
Thiruchuli Thulukkankulam Road km 0/0 - 5/4

Rs. 58466216/-
1

11.08.2020
Upgradation of Kariyapatti - Narikudi
Virudhunagar/
Thiruchuli
Road to T.Veppankulam Road km 0/0 - 3.010 167.03 180.00 7.71 153.92 1.27 162.90 91% Work Completed
2 3/010
Virudhunagar/ Upgradation of P.Thottiyankulam to
2.690 155.14 155.14 0.14 132.81 1.15 134.10 86% Work Completed
Thiruchuli Krishnapuram km 0/0 - 2/690
3
Total 11.100 626.20 650.14 259.91 308.08 4.64 572.63
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -16
Virudhunagar/ Upgradation of Pandalkudi to
5.000 276.82 300.00 0.13 228.17 9.50 237.8 79% Work Completed.
Aruppukottai Udyanthapuram road km 0/0 - 5/0
1
Virudhunagar/ Upgradation of Suthamadam to
4.280 234.54 234.54 0.13 174.94 1.44 176.51 75% Work Completed.
Thiruchuli Krishnapuram road km 0/0 - 4/280
2

13.03.2020 / 12.09.2020
Rs. 63660603/-
Virudhunagar/ Upgradation of Madurai Kanniyakumari
0.13 35.52 35.65 78% Work Completed.

Tmt.K.Selvi
0.800 43.67 45.50

12.09.2020
Aruppukottai Road to Meenakshipuram km 0/0 - 0/8
3
Virudhunagar/ Upgradation of Shanmugapuram Road
0.670 37.92 37.92 0.13 30.13 30.26 80% Work Completed.
Aruppukottai km 0/0 - 0/670
4
Virudhunagar/ Upgradation of Sivananainthapuram to
0.800 43.67 48.00 0.13 36.99 37.12 77% Work Completed.
Aruppukottai Meenakshipuram km 0/0 - 0/8
5
Upgradation of Melamadai to
Virudhunagar/
Palavanatham Road to 0.800 45.39 49.00 0.13 38.89 39.02 80% Work Completed.
Aruppukottai
6 Gnanapathiyapuram km 0/0 - 0/8
Total 12.350 682.010 714.96 0.78 152.47 556.36
Package -17
Virudhunagar/ Upgradation of ESI Colony road to
1.230 65.75 72.30 0.13 65.15 65.28 90% Work Completed.
1 Rajapalayam Kalangaperi road km 0/0 - 1/500

M/s Sri Balaji Construction

13.03.2020 / 12.09.2020
Virudhunagar/ Upgradation of Ramasamiyapuram to
2.970 169.56 185.00 0.13 161.76 161.89 88% Work Completed.
Rs. 79259887/-

Srivillputhur Pooriparaikulam road km 1/0 - 3/966


2

12.09.2020
Upgradation of Sattur –
Virudhunagar/ Thiruvenkatapuram road to
3.400 184.16 195.00 0.14 164.45 164.59 84% Work Completed.
Sattur E.T.Reddiapatti upto union limit km 0/0 -
3 3/2

Upgradation of Vembakottai -
Virudhunagar/
Guganparai road via Keelanmarainadu 8.200 373.00 410.00 0.14 367.76 367.90 90% Work Completed.
Sattur
km 5/2-13/4 (PUR-34)
4
Total 15.800 792.470 862.30 0.54 759.12 0 759.66
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -18
Virudhunagar/ Upgradation of Vadakkunatham to
Thiruchuli Therkunatham road km 0/0 - 2/040
2.040 141.01 123.00 0.13 119.75 0.98 120.86 98% Work Completed
1
Virudhunagar/ Upgradation of Poolankal to Dharka
1.600 84.17 92.00 0.13 91.28 0.73 92.14 100% Work Completed

M/s Lakshmi Construction


Thiruchuli road km 0/0 - 1/600

07.02.2020/ 06.08.2020
2

Rs. 50031359/-
Virudhunagar/ Upgradation of Madurai Kanniyakumari

06.08.2020
1.000 53.13 53.13 0.13 48.93 0.48 49.54 93% Work Completed.
Aruppukottai Road to Pulvaipatty km 0/0 - 1/0
3
Virudhunagar/ Upgradation of Nalli road to
1.340 72.72 79.95 0.13 48.58 0.65 49.36 62% Work Completed.
Aruppukottai Singamudaiyar koil km 0/0 - 1/340
4
Virudhunagar/ Upgradation of A.Ramalingapuram -
2.200 120.10 120.10 0.13 116.1 1.15 117.38 98% Work Completed.
Aruppukottai Kulasekharapuram road km 0/0 - 2/2
5
Upgradation of Madurai -
Virudhunagar/
Kanniyakumari road to Thottilovanpatti 1.600 87.35 87.35 0.13 54.89 0.74 55.76 64% Work Completed.
Aruppukottai
6 km 0/0 - 1/600
Total 9.780 558.48 555.53 0.78 479.53 4.73 485.04
Ramanathapuram District
Package -19
Ramanathapura

28.02.2020/ 27.08.2020
Kalayanoor to Poothondi 2.300 136.47 142.00 0.10 120.99 121.09 85% Work Completed.
m

Thiru. V. Kathiresan
1 Rs. 57647830/-

27.08.2020
Ramanathapura
Vaigai Road to Poothondi 1.350 80.94 89.20 0.10 81.02 81.12 91% Work Completed.
m
2

Ramanathapura Aanandhur road - Kavuur vilakku (via)


6.150 347.30 407.00 0.06 358.06 358.12 88% Work Completed.
m Kavanakottai 00 - 6150
3
Total 9.800 564.71 638.20 0.26 560.07 0.00 560.33
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -20

11.08.2020
Ramanathapura

K.O.Periyakaruppan @
NH210- Oodaikkal road Km 00-2330 2.330 131.75 147.00 119.06 11.68 130.74 89% work completed.
m

Rs. 61119302/-
1

11.08.2020
Thiru.
Ramanathapura Odaikaal road to Aliyathanmozhli

Balu
4.450 251.31 260.00 209.52 20.25 229.77 88% work completed.
m road (via) Kulamanikam 00 - 4450

/
2

12.02.2020
Ramanathapura Vellaiyapuram Main Road to
4.500 254.12 270.00 185.82 51.49 237.31 88% work completed.
m Maruthavayal Road
3
Total 11.280 637.18 677.00 514.40 83.42 0.00 597.82
Package -21

24.02.2020/ 23.08.2020
Ramanathapura NH49To Achankudi (via)
2.840 183.53 194.00 0.06 155.52 155.58 80% Work Completed.
m L.Karunkulam

Rs. 67512462/-
1

Thiru.P.Ramu

23.08.2020
Ramanathapura Andavoorani Kannankudi road to
4.120 233.45 272.00 0.05 227.43 227.48 84% Work Completed.
m Paganoor road
2
Ramanathapura Devakottai Vattanam road to
4.100 231.52 272.00 0.05 233.22 233.27 86% Work Completed.
m Kadambur
3
Total 11.060 648.50 738.00 0.16 616.17 0.00 616.33
Package -22

Ramanathapura Ramnad - Keelakarai road to Palkarai


Rs. 62898940/-

3.200 187.30 200.00 153.72 9.48 0.23 163.43 82% Work Completed.
Venkateswara
Construction
road

03.02.2020/
m

02.08.2020

02.08.2020
1
M/s Sri

work completed.Final
Ramanathapura
Mariyarayapuram to Melamadai 5.493 442.36 497.01 230.44 123.19 60.61 414.24 83% Payment to be
m
made.
2
Total 8.693 629.66 697.01 384.16 132.67 60.84 577.67
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -23
Ramanathapura Devipattinam - Thirupalaikudi roaa to
2.450 146.82 161.81 0.06 141.08 0.18 141.32 87% Work Completed.

19.03.2020/18.09.2020
1m Papanenthal road

M/s Krishna & Co


Rs. 52647659/-
Ramanathapura

18.09.2020
 Koravalli Karan Road 1.430 85.66 95.50 0.04 80.96 0.18 81.18 85% Work Completed.
2m
Ramanathapura Vannankundu - Pudukovil road (via)
2.860 172.23 189.80 0.08 162.55 0.16 162.79 86% Work Completed.
3m Nehrupuram

Ramanathapura  NH 49 Therkkukattur Road (via)


2.400 144.01 145.00 0.08 117.69 0.15 117.92 81% Work Completed.
4m Muslim KudyIruppu
Total 9.140 548.72 592.11 0.26 502.28 0.67 503.21
Package -24
Ramanathapura
Vengaloor to Kowl Road 2.020 122.37 130.00 101.89 26.81 0.13 128.83 99% Work Completed.
1m

10.02.2020 /09.08.2020
Thiru.R.Tamilselvam
Rs. 61521942/-
Ramanathapura PMK- Mukuladhur road to
2.509 155.30 155.30 120.03 30.04 0.15 150.22 97% Work Completed.

09.08.2020
m Pulithikulam (Via) Thenpothuvakudi
2

Ramanathapura Melaykudi -Thirusanmuganathapuram


2.648 187.30 187.30 93.60 55.91 0.15 149.66 80% Work Completed.
m to Kulavipatti Junction
3
Ramanathapura
Puthukudi Lakshmipuram Road 3.160 195.98 195.98 0.08 172.17 0.13 172.38 88% Work Completed.
4m
Total 10.337 660.95 668.58 315.60 284.93 0.56 601.09
Package -25

05.03.2020/ 04.09.2020
Km7/6 Mudukulathur - Ukmangai
Thiru. G.Ramamoorthi

Ramanathapura
road to Ramalingapuram road in Km 3.200 183.53 181.24 0.08 176.24 0.25 176.57 97% Work Completed.
m
Rs. 60269637/-

1 0/0 -3/200 (via) Kumarakurichi

04.09.2020
Ramanathapura Mudukulathur - U.K.Mangai road to
2.840 187.30 200.00 0.08 178.44 0.35 178.87 89% Work Completed.
2m Kakkoor road (via) South Kakkoor
Kadukusanthai-Mariyur Road to
Ramanathapura
Oppilan Road (Via) Seeninathapuram 3.500 244.71 263.00 0.10 228.20 0.08 228.38 87% Work Completed.
m
3 Road
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Total 9.540 615.54 644.24 0.26 582.88 0.68 583.82
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -26

Ramanathapura Maruthanganallur to Kadambankulam


2.400 160.00 177.00 0.06 148.6 1.19 149.85 85% Work Completed.
m road 0/0 -2/4

19.02.2020/ 18.08.2020
1

Thiru.R.Tamilselvam
Ramanathapura Pasumpon to Kadambangulam road

Rs.55990300/-
1.800 122.36 133.00 0.06 114.82 1.19 116.07 87% Work Completed.

18.08.2020
m 0/0 -1/8
2

Ramanathapura Thanjavur- Sayalkudi Road to


1.730 105.53 108.00 0.06 91.77 1.15 92.98 86% Work Completed.
m Koorankottai Road (Via) Malataru
3

Ramanathapura
Vallanthai to Pothanathi road 0/0 -3/2 3.200 187.29 200.00 0.08 177.03 1.19 178.30 89% Work Completed.
m
4
Total 9.130 575.18 618.00 0.26 532.22 4.72 537.2

Package -27

M/s Krishna & Co


Rs. 56568753/-
Ramanathapura Muthukulathur Sikkal Road to

06.03.2020/
3.433 216.41 241.00 0.13 203.58 16.25 219.96 91% Work Completed.

05.09.2020
05.09.2020
m Sokkanai (Via) T.Alangulam Road
1

Ramanathapura Sikkal to Thanichiyam (Via) Ithurani


5.000 329.42 637.00 0.13 294.81 38.02 332.96 52% Work Completed.
m Sirakulam Road
2
Total 8.433 545.83 878.00 0.26 498.39 54.27 552.92
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -28

Ramanathapura Upgradation of Ettivayal - Idambadal


1.700 85.86 100.00 0.06 71.29 71.35 71% Work Completed.
m road to Nallirukkai km 0/0-1/7
1
Upgradation of P.Kodikulam road to
Ramanathapura
Pandappanendal road km 0/0-1/550 1.550 78.28 94.00 0.06 71.5 71.56 76% Work Completed.

04.05.2020/ 03.11.2020
m
(R36)
2

Rs. 50477740/-

Thiru.T.Raju

03.11.2020
Upgradation of Rameswaram -
Ramanathapura
Ramarpatham to Vadakadu road km 1.000 50.51 60.50 0.06 45.01 45.07 74% Work Completed.
m
2/0-3/0(R543)
3

Ramanathapura Upgradation of N.Pethanendal road


0.600 32.14 36.30 0.02 29.34 29.36 81% Work Completed.
m km 0/0-0/6 ( R263)
4

Ramanathapura Upgradation of Parthibanoor- Narikudi


4.600 238.75 277.00 0.06 219.01 219.07 79% Work Completed.
m road to Thaduthalankottai km 0/0-4/6
5
Total 9.450 485.54 567.80 0.26 436.15 0 436.41
Package -29

Ramanathapura Upgradation of Perumalthevanpatti to

13.02.2020 / 12.08.2020
3.300 183.66 200.00 0.10 181.46 181.56 91% Work Completed.

Tmt.G. Saravanapriya
m Muthupatti road km 0/0-3/3

12.08.2020
Rs. 57790678/-

1
Upgradation of T.M.Kottai to Perunali
Ramanathapura Uchinatham road (via)
5.000 298.44 302.50 255.72 1.75 257.47 85% Work Completed.
m Annapoovanayackkanpatti road km
0/0-5/0
2
Ramanathapura
 NH 49 to Therkkuvadi street 1.500 90.36 100.00 0.06 78.45 78.51 79% BT completed.
3m
Total 9.800 572.46 602.50 255.88 183.21 78.45 517.54
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -30
Upgradation of Devakottai-
Ramanathapura

12.02.2020 / 11.08.2020
Devipatinam road to Vennathur km 2.700 136.36 151.00 0.06 122.01 122.07 81% Work completed.

Thiru. M.Ravichandran
m
1 0/0-2/7

Rs. 54162250/-

11.08.2020
Ramanathapura Kottamangalam - Andichiyendal (via)
2.050 103.54 124.30 0.06 109.47 109.53 88% Work completed.
2m Pandamangalam km 0/0-2/05

Ramanathapura Upgradation of ECR -


1.200 60.60 72.00 0.04 61.1 61.14 85% Work completed.
m Keelachithoorwadi km 0/0-1/2 (R249)
3
Ramanathapura Upgradation of Thalimarungoor to
4.300 217.17 260.00 0.10 230.14 230.24 89% Work completed.
4m Thelur road km 0/0-4/3 ( R115)
Total 10.250 517.67 607.30 0.26 522.72 0.00 522.98
Grand Total 319.964 18240.250 19751.940 5458.27 13847.08 694.18 29064.76
(G.O.(2D)No.12/ Highways and Minor Ports(HF-1) Department dated 04.06.2020
Virudhunagar Distrcit
Package-1

Virudhunagar/ Upgradation of Mellakallankulam-


1.78 107.00 103.00 0.05 0.05 WMM completed.
Thriuchuli Nazerpuliyankulam

21.09.2020 / 20.03.2021
1

Rs. 53114221/-
Virudhunagar/ Upgradation of Seeganenthal-

Thiru.P.Raja
2.43 146.00 137.00 0.05 0.05 WMM completed.

20.03.2021
Thriuchuli Kanjamanayaganpatti Road
2
Upgradation of Trichy-Tuticorin Road
Virudhunagar/
To Panikanenthal Via Kariapatti - 2.40 258.00 283.80 0.05 0.05 CD work completed.
Thriuchuli
3 Narikudi Joining Road
Upgradation of Thiruppuvanam -
Virudhunagar/
Narikudi Road To Kalvimadai Km 0/0 2.46 148.00 147.00 0.05 0.05 CD work completed.
Thriuchuli
4 -2/460
Total 9.070 659.00 670.80 0.20 0.20
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-2 0.00
Upgradation of Kalkurichi -
Virudhunagar/ Earth work is in
Virudhunagar Road To Villipathiri Road 0.60 36.00 35.00 0.05 0.05
Thriuchuli progress.
1 Km 0/0-0/6

23.09.2020 / 22.03.2021
Thiru.S.K.Subbureddiyar
Virudhunagar/ Upgradation of Keppilingampatti- Earth work is in
2.00 120.00 117.00 0.05 0.05
Thriuchuli Kanthasamy Thottam To Periya Perali progress.

Rs. 50239840/-
2

22.03.2021
Virudhunagar/ Upgradation of Thiruchuli - Kariapatti Earth work is in
1.60 112.00 98.00 0.05 0.05
3 Thriuchuli road to Pulikurichi Km 0/0-1/6 progress.
Virudhunagar/ Upgradation of Nochikulam to K.Pudur Earth work is in
1.32 92.00 84.00 0.05 0.05
4 Thriuchuli road Km 0/0-1/320 progress.
Virudhunagar/ Upgradation of Poolangal to Dharkka Earth work is in
2.00 120.00 123.00 0.05 0.05
5 Thriuchuli road Km 1/6-3/6 progress.
Virudhunagar/ Earth work is in
Upgradation of Ayyampatti link Road 1.59 111.00 112.50 0.05 0.05
6 Aruppukottai progress.
9.110 591.000 569.500 0.30 0.30
Package-3 0.00

Virudhunagar/ Upgradation of Madurai- kanniyakumari


2.00 120.00 121.00 0.05 0.05 WMM completed.
Aruppukottai road toChinnaodai patty
1

23.09.2020 / 22.03.2021
Thiru.S.K.Subbureddiyar
Virudhunagar/ Upgradation of Perumalpatti to
1.70 119.00 123.00 0.05 0.05 CD work completed.
2 Aruppukottai Kappureddipatty Rs. 51313173/-

22.03.2021
Virudhunagar/ Upgradation of Madurai-Kanniyakumari Earth work is in
1.40 84.00 91.00 0.05 23.85 23.90
Aruppukottai road to Sivanainthapuram progress.
3
Upgradation of Sevaloor BG Road To
Virudhunagar/
Meet Koundampatti - Kothaneri Road 2.22 155.00 157.00 0.05 110.34 110.39 BM completed.
Virudhunagar
4 Km 0/0-2/220
Virudhunagar/ Upgradation of Meesalur To
1.50 90.00 84.50 0.05 37.66 37.71 WMM completed.
Virudhunagar Thathampatti Road
5
8.820 568.00 576.50 0.25 171.85 172.10
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-4 0.00
Upgradation of Palayampatti

Rs.57484141
Virudhunagar/ Retaining wall work

01.10.2020/
M/s.Krishna
Mutharaiyar Nagar Road To Meet Bye- 1.30 600.00 660.00 0.05 83.96 84.01

31.03.2021

31.03.2021
Aruppukottai is in progress.
1 Pass Road Km 0/0-1/300

/-
Virudhunagar/ Upgradation of Valvangi To Chettikurichi

& Co
1.40 84.00 80.00 0.05 0.05 WMM completed.
2 Thriuchuli Road
Total 2.700 684.000 740.000 0.10 83.96 84.06 0.000
Package-5 0.00
Upgradation of Sengundrapuram To
Virudhunagar/
Virudhunagar
T.Kallupatti -Virudhunagar Road Upto 2.60 156.00 142.00 0.05 115.71 115.76 BT completed.
1 Union Limit Road

01.10.2020/ 31.03.2021
Virudhunagar/ Upgradation of Appaiyanaickenpatti - Earth work is in

M/s.Krishna & Co
1.90 114.00 116.50 0.05 0.05

Rs.52835745/-
2 Virudhunagar Pudupatty Road progress.

31.03.2021
Virudhunagar/ Upgradation of Rajivgandhinagar To Earth work is in
1.57 140.00 133.00 0.05 0.05
3 Virudhunagar Shanmugasundarapuram progress.
Virudhunagar/ Upgradation of NH-208 - K.Thottiyapatti Earth work is in
2.02 121.00 114.00 0.05 0.05
Rajapalayam Road Km 0/125-2/145 progress.
4
Virudhunagar/ Upgradation of Valavanthalpuram - Earth work is in
1.56 94.00 95.00 0.05 0.05
5 Virudhunagar Kuppampatty Road progress.
Total 9.650 1225.50 600.50 0.25 115.71 115.96
Package-6 0.00
Virudhunagar/ Upgradation of Boovanathapuram To CD work is in
1.60 96.00 101.25 0.05 0.05
1 Sivakasi Injar Road Km 0/0-1/6 progress.
Virudhunagar/ Upgradation of Ramalingapuram- Earth work is in
1.81 126.00 126.00 0.05 0.05
Sattur Sundararajapuram Road Km 0/0-1/810 progress.
2
Upgradation of Rajapalayam -
Virudhunagar/ Earth work is in
Srivilliputtur Limit To Inam Chettikulam 0.48 30.00 26.00 0.05 0.05
Tmt.K.Selvi

Rajapalayam progress.
3 Km 0/0-0/480
Upgradation of Kottaipatti -
Virudhunagar/ Earth work is in
O .Mettupatti To Panayadipatty Road 1.48 89.00 75.00 0.05 0.05
Sattur progress.
4 Km 0/0-1/480
Upgradation of Rajapalayam -
Virudhunagar/ Earth work is in
Vembakottai Road To Ethirkottai Via 2.61 157.00 142.00 0.05 0.05
Sattur progress.
5 Kudayirruppu Road Km 0/0-2/610
Virudhunagar/ Upgradation of Valayapatty To Earth work is in
1.92 134.00 130.00 0.05 0.05
6 Sattur Arunachalapuram Road progress.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Total 9.900 632.00 600.25 0.30 0.30
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-7 0.00
Upgradation of Mathagupatty -
Sivagangai/ Alagumanagari road to
1.20 80.00 80.00 0.05 0.05 CD work completed.
Sivagangai Kadamutrhanpatti up to Block Limit
1 road km 0/0-1/2
Sivagangai/ Upgradation of Periya Olagudipatti Earth work is in
2.40 168.00 164.00 0.05 0.05

01.10.2020/ 31.03.2021
Sivagangai Road Km 0/0-2/4 progress.
2

Rs. 57199625/-

Thriu.P.Ramu

31.03.2021
Sivagangai/ Upgradation of Chinna Olagudipatti to Earth work is in
2.20 154.00 154.00 0.05 0.05
Sivagangai Kathalampattu Road Km 0/0-2/2 progress.
3
Sivagangai/ Upgradation of Mulliyarendal road to Earth work is in
1.00 66.00 66.50 0.05 0.05
4 Manamadurai Pethanenthal road Km 0/0-1/0 progress.
Sivagangai/ Upgradation of Thoothai Road Km Earth work is in
1.60 112.00 123.20 0.05 0.05
5 Manamadurai 0/0-1/6 progress.
Sivagangai/ Upgradation of Patcheri- Earth work is in
0.80 49.50 54.45 0.05 0.05
6 Manamadurai Michelpattinam road Km 0/0-0/8 progress.
Total 9.200 629.50 642.15 0.30 0.30
Package-8 0.00

Sivagangai/ Upgradation of Athankudi road to


1.10 73.50 77.00 0.05 0.05 CD work completed.
Karaikudi Thergu Seyyanenthal Km 0/0-1/100
1
Upgradation of NH 210 Road to
Sivagangai/ CD work is in
Block limit via Kadagampatti Km 0/0- 1.60 105.50 113.00 0.05 0.05

09.10.2020/ 08.04.2021
Karaikudi progress.

Thriu.B.Karunakaran
2 1/6
Rs. 50592554/-

08.04.2021
Sivagangai/ Upgradation of Chokkanathapuram Earth work is in
2.10 135.00 135.00 0.05 0.05
Karaikudi to Uvarkulam Km 0/0-2/100 progress.
3
Upgradation of Sarugani Devakottai
Sivagangai/ Earth work is in
to Karugudi road via Thergu porgudi 2.20 145.00 159.50 0.05 0.05
Karaikudi progress.
4 Km 0/0-2/2

Sivagangai/ Upgradation of Chettiyendhal road to


1.20 84.00 83.00 0.05 0.05 CD work completed.
Karaikudi Block limit via Puligulam Km 0/0-1/2
5
Total 8.200 543.00 567.50 0.25 0.25
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-9 0.00
Upgradation of Vattanam Road To
Sivagangai/ Earth work is in
Alangudi road via Vadugani Km 0/0- 1.40 95.00 104.50 0.05 0.05
1 Karaikudi 1/4
progress.

Sivagangai/ Upgradation of Koviloor to Earth work is in


1.60 112.00 123.20 0.05 0.05
2 Karaikudi Sanganthidal Road Km 0/0-1/6 progress.

05.10.2020/ 04.04.2021
Thriu.R.Saravanan
Rs. 51121296/-
Sivagangai/ Upgradation of Kudikkadu Road to Earth work is in

04.04.2021
1.20 75.40 82.94 0.05 0.05
3 Karaikudi Sathamangalam Road Km 0/0-1/2 progress.

Sivagangai/ Upgradation of Oorivayal Road Km Earth work is in


1.20 84.00 92.40 0.05 0.05
4 Karaikudi 0/0-1/2 progress.

Sivagangai/ Upgradation of Monnani Road Km Earth work is in


1.80 125.00 137.50 0.05 0.05
5 Karaikudi 0/0-1/8 progress.

Sivagangai/ Upgradation of Kunakarai Road Km CD work is in


1.20 75.00 82.50 0.05 0.05
6 Karaikudi 0/0-1/2 progress.
Total 8.400 566.40 623.04 0.25 0.25
Package-10 0.00
Upgradation of Aralikottai -
Sivagangai/ Earth work is in
Keelavalayampatti to Valayapatti road 3.70 226.00 226.00 0.05 0.05
Thiruppathur progress.
1 Km 0/0-3/700
Sivagangai/ Upgradation of E-Valayapatti to Earth work is in

05.10.2020/ 04.04.2021
0.60 45.00 46.50 0.05 0.05
Thiruppathur Kaliammankoil road Km 0/0-0/6 progress.
2
Rs. 57101230/-

Tmt.V.Meenal

04.04.2021
Sivagangai/ Upgradation of S. Sevalpatti to CD work is in
2.20 125.00 129.50 0.05 0.05
Thiruppathur Klungapatti road Km 0/0-2/2 progress.
3
Upgradation of Devakottai-
Sivagangai/ Pudukkottai District Border Road to CD work is in
2.10 133.00 126.00 0.05 0.05
Karaikudi Sadayamangalam Via Velar progress.
4
Kudiruppu Road Km 0/0-2/100
Sivagangai/ Upgradation of NH210 CD work is in
2.00 131.50 121.00 0.05 0.05
Karaikudi Amaravathipudur Km 0/0-2/0 progress.
5
Total 10.600 660.50 649.00 0.25 0.25
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-11 0.00

Sivagangai/ Upgradation of Kesampatti to


1.70 140.00 145.00 0.03 74.36 74.39 WMM completed

Thiru.B.Balasubramanian

23.09.2020 / 22.03.2021
Thiruppathur Minnamalaipatti road km 0/0 - 1/700
1

Rs. 50630147/-
Sivagangai/ Upgradation of Ganapathypatty - Earth work is in

22.03.2021
3.00 210.00 210.00 0.03 37.07 37.10
Thiruppathur Nagamangalam Road km 0/0 - 3/0 progress.
2
Sivagangai/ Upgradation of Piranmalai Earth work is in
0.55 70.00 76.00 0.03 7.67 7.70
Thiruppathur Therodum Veedhi road Km 0/0-0/550 progress.
3
Sivagangai/ Upgradation of Thiruvalandur to WMM work is in
1.60 135.00 140.00 0.03 40.91 40.94
Thiruppathur Kallakalanpatti road km 0/0 - 1/6 progress.
4
Total 6.850 555.00 571.00 0.12 160.01 160.13
Package-12 0.00

01.10.2020/31.03.2021
Ramanathapuram Upgradation of Koolipatti to Earth & CD work is
2.20 145.00 135.00 0.03 0.03
1 / Mudukulathur Singampatti Km 0/0-2/2 in progress.

Rs.64090681/-

S.P.K. & Co

31.03.2021
Ramanathapuram Upgradation of Komboothi to kadaladi Earth & CD work is
6.80 430.00 445.00 0.03 0.03
/ Mudukulathur Road Km 0/0-6/8 in progress.
2

Ramanathapuram Upgradation of Komboothi to Earth & CD work is


2.40 150.00 153.00 0.03 0.03
/ Mudukulathur Ochathevankottai Road Km 0/0-2/4 in progress.
3
Total 11.400 725.00 733.00 0.09 0.09
Package-13 0.00
Upgradation of Anandhur to
Ramanathapuram Earth & CD work is
Govindamangalam Road km 0/0 - 4.50 284.00 284.00 0.03 0.03
Thiru.V.Kathiresan

/ Tiruvadanai in progress.
Rs.50645836/-

1 4/500
23.09.2020 /

22.03.2021
Ramanathapuram Upgradation of Anandhur Road to
2.10 142.00 154.00 22.03.2021 0.03 123.33 123.36 BM & BC completed.
/ Tiruvadanai Kappakudi road km 0/0 - 2/100
2
Ramanathapuram Upgradation of Thiruvarangam Road
2.00 145.00 145.00 0.03 112.95 112.98 BM & BC completed.
/ Mudukulathur to Vathiyenenthal Road Km 0/0-2/0
3
Total 8.600 1154.00 583.00 0.09 236.28 236.37
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
BE

agreement

completed
A.S. T.S. Expndr. Expndr. Cumulative
Sl.N Name of District / 2018 - Expndr.
Name of Work Amount Amount During During Epr. Upto
o. Constituency 19 (In Upto Present stage of work
Rs. In Rs. In 1.04.20 to 1.11.20 to 30.11.20 (Rs.
Lakhs) 31.03.20
lakhs Lakhs 31.10.20 30.11.20 In lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-14 0.00

21.09.2020 / 20.03.2021
Ramanathapuram
Upgradation of Ettivayal Ithambadal

Thiru.G.Ramamoorthy
/ 2.57 179.90 172.00 0.03 129.74 129.77 BM & BC completed.
road to Koneriyendal Km 0/0-2/570
1 Ramanathapuram

Rs.50830084/-

20.03.2021
Ramanathapuram
Upgradation of Alangulam to
/ 3.00 210.00 200.00 0.03 139.11 139.14 BM & BC completed.
Thaliyerenthal road Km 0/0-3/0
2 Ramanathapuram
Ramanathapuram Upgradation of T.U Mangai
/ Thiruppullani Road to 1.47 170.00 187.00 0.03 164.64 164.67 BM & BC completed.
3 Ramanathapuram Deivachilainallur road Km 0/0-1/465
Total 7.035 559.90 559.00 0.09 433.49 433.58
Package-15 0.00

Ramanathapuram Upgradation of Manjakollai to WMM work


3.20 210.00 200.00 0.03 74.70 74.73
/ Paramakudi Karumbukoottam Road Km 0/0-3/2 Completed.
1

01.10.2020/31.03.2021
Thiru.R.Tamilselvam
Ramanathapuram Upgradation of Peerkankurichy to Earth & CD work is

Rs.55626714
3.60 250.00 230.00 0.03 0.03

31.03.2021
/ Paramakudi Keelaparuthiyur Road Km 0/0-3/6 in progress.
2
Upgradation of NH 87 Poduvakudi
Ramanathapuram
Road to S.Andakudy Road (opposite 1.75 125.00 125.00 0.03 82.94 82.97 BM & BC completed.
/ Paramakudi
3 Attai company) Km 0/0-1/750
Upgradation of Paramakudi -
Ramanathapuram WMM work
Muthukulathur road to Thalaikal 1.50 105.00 100.00 0.02 71.12 71.14
/ Paramakudi Completed.
4 Ammankoil road Km 0/0-1/500
Total 10.050 1345.00 655.00 0.11 228.76 228.87
Grand Total 129.585 11097.800 9340.240 0.000 0.000 0.000 0.000 0.000 0.000 2.953 1430.060 1433.013
Grand Total 449.549 30365.050 30131.680 #VALUE! #VALUE! #VALUE! #VALUE! 0.000 6038.900 14268.270 2124.24 22431.41

Divisional Engineer(H),
Nabard & Rural Roads
Paramakudi.
Spill over works as on 01.04.2021

Division: Paramakudi(H), Nabard & Rural Roads Month: April-2021 Rs. In Lakhs
Sanction details Contract details Expenditure details (in lakhs)

Proble date of completion/


Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
ROADS AND BRIDGES/ ROB/RUB/ BYPASSES/ PUR
G.O.Ms.No184/Highways & Minor Ports(HW-1) department /dated.14.11.2018 (79 Bridges)
Construction of Minor Bridge at Km 2/6

16227599.00
of Watrap - Maharajapuram Road to
180.00
Virudhunagar/ Taniparai Road. Panchay M/s.Ram 13.06.2019/12.0 Pile Work is in
1 at Union
175.00 Cr.No.114/
constructions 2.2020
30.04.2021 1.35
Srivilliputhur 18-19 Progress

G.O.Ms.No57/Highways & Minor Ports(HW-1) department /dated.20.03.2020 (40 Bridges)


Reconstruction of High level bridge at

84632576.00
km 153/4-6 of Thanjavur-Sayalkudi road B.S. Engineer's
07.09.2020/ Capping Beam work is in
1 Sivagangai 1034.38 1035.00 and 06.11.2021 233.56
Contractors
06.11.2021 progress.

G.O.(Ms)No.132/ Highways and Minor Ports(EAP.II(2)) Department dated 24.10.2020 ( 50 Bridges)


Construction of High level bridge at km Awaiting for TAC
Sivagangai / 1/6-8 of Veppankulam-Vishalayankottai approval and Bridge
1 road 987.93
Karaikudi Design from Design
wing.
Construction of High level bridge across Awaiting for TAC
Sivagangai / vaigai river at km 22/4 of NH49 approval and Bridge
2 madurai- Dhanushkodi road to meet 1778.27
Manamadurai Design from Design
Pedhanenthal wing.
Construction of Minor Bridge at km 0/2 s.R.Tamilselv
6354002.00

03.05.2021
03.05.2021
04.01.2021/
am & CO Above sill level work
Ramanathapuram of Paramakudi - Mudukulathur road to
3 59.27 65.00 13.02 and Retaining wall
M/

/ Paramakudi Pulithikulam road (via) Thenpoduvakudi.


work is in progress.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Construction of Bridge at km 2/2 of

28.07.2021
Constructions, Constructions, Constructions,
13786873.00

Rajapalayam Rajapalayam Rajapalayam


M/s.Lakshmi

28.07.2021
Puthulupatti- Thiyagarapuram road

29.01.2021/
Virudhunagar/ Above Sill work
4 148.18 160.00 35.50
Virudhunagar Completed

Construction of Bridge at km 0/8 of

12.07.2021
M/s.Lakshmi M/s.Lakshmi
8253968.00

12.07.2021
Puthulupatti- Thiyagarapuram road

13.01.2021/
Diversion Road Work
Virudhunagar/
5 296.37 101.00 7.90 Completed. Earth
Virudhunagar
Work in progress

Construction of Bridge at km 1/0 of of

12.07.2021
9402303.00

12.07.2021
13.01.2021/
K.Pudur- Thiyagarajapuram road Diversion Road Work
Virudhunagar/
6 148.18 108.00 7.76 Completed. Earth
Virudhunagar
Work in progress

G.O.(Ms)No.136/ Highways and Minor Ports(EAP.II(2)) Department dated 05.11.2020 ( 26 Bridges)


Construction of High level bridge across
vaigai river in the road branching from
Awaiting for TAC
Madurai - Dhanushkodi road (NH-49) to
Ramanathapuram Meet Ramnad- Melur road (SH-34) (via) approval and Bridge
1 1554.62
/ Paramakudi Pottithatti, Mandivalasai, Kalladiyendal, Design from Design
Vallam, Pagaivendri. wing.

G.O.(Ms)No.21/ Highways and Minor Ports(EAP.II(2)) Department dated 04.02.2021 ( 21 Bridges)


Constructiono of Minor Bridge at km 3/0
of Amathur to meet Alagapuri -
Virudhunagar/ Tender Completed.
1 Virudhunagar road (via) Moolipatti road. 200.00
Virudhunagar Awaiting for opening.

Construction of High level bridge at km


Sivagangai/ 10/6 of Kayaodai- Valanai road.
2 450.00 Estimate submitted.
Manamadhurai
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11

G.O.(Ms)No.29/ Highways and Minor Ports(EAP.II(2)) Department dated 10.02.2021 ( 5 Bridges)

Construction of bed level causeway at


km 46/8 of Krishnarajapuram 1) Estimate under
connection Manamadurai - Paramakudi preparation.
road (via) T.Pudukottai at km 0/6 of 2)
Sivagangai/
1 900.00 Permission request
Manamadhurai Kannar street and Madurai submitted to EE, PWD,
Dhanushkodi road across Vaigai river
Paramakudi. 3) Awaiting
NOC from PWD.

(G.O.(2D)No.12/ Highways and Minor Ports(HF-1) Department dated 04.06.2020


Virudhunagar Distrcit
Package-8 0.00

Sivagangai/ Upgradation of Athankudi road to BM & BC work


1.10 73.50 77.00 62.98
Karaikudi Thergu Seyyanenthal Km 0/0-1/100 completed.
1

Sivagangai/ Upgradation of NH 210 Road to Block BM & BC work

09.10.2020/ 08.04.2021
1.60 105.50 113.00 94.14

Thriu.B.Karunakaran
Karaikudi limit via Kadagampatti Km 0/0-1/6 completed.
2

Rs. 50592554/-

08.04.2021
Sivagangai/ Upgradation of Chokkanathapuram to BM & BC work
2.10 135.00 135.00 0.56
3 Karaikudi Uvarkulam Km 0/0-2/100 completed.
Upgradation of Sarugani Devakottai to
Sivagangai/ BM & BC work
Karugudi road via Thergu porgudi Km 2.20 145.00 159.50 136.44
Karaikudi completed.
4 0/0-2/2

Sivagangai/ Upgradation of Chettiyendhal road to BM & BC work


1.20 84.00 83.00 66.71
Karaikudi Block limit via Puligulam Km 0/0-1/2 completed.
5
Total 8.200 543.00 567.50 360.83
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package-9 0.00
Sivagangai/ Upgradation of Vattanam Road To
1.40 95.00 104.50 3.72 CD work completed.
1 Karaikudi Alangudi road via Vadugani Km 0/0-1/4

Sivagangai/ Upgradation of Koviloor to


1.60 112.00 123.20 86.52 BM & BC completed.
2 Karaikudi Sanganthidal Road Km 0/0-1/6

05.10.2020/ 04.04.2021
Thriu.R.Saravanan
Rs. 51121296/-
Sivagangai/ Upgradation of Kudikkadu Road to

04.04.2021
1.20 75.40 82.94 71.11 BM & BC completed.
3 Karaikudi Sathamangalam Road Km 0/0-1/2

Sivagangai/ Upgradation of Oorivayal Road Km 0/0-


1.20 84.00 92.40 76.19 BM & BC completed.
4 Karaikudi 1/2

Sivagangai/ Upgradation of Monnani Road Km 0/0-


1.80 125.00 137.50 51.59 WMM work completed.
5 Karaikudi 1/8

Sivagangai/ Upgradation of Kunakarai Road Km


1.20 75.00 82.50 73.48 BM & BC completed.
6 Karaikudi 0/0-1/2
Total 8.400 566.40 623.04 358.89
Package-10 0.00

Sivagangai/ Upgradation of Aralikottai - Keelavalavu WMM work is in


3.70 226.00 226.00 0.13
Thiruppathur road to Valayapatti road Km 0/0-3/700 progress.
1
Sivagangai/ Upgradation of E-Valayapatti to WMM work is in

05.10.2020/ 04.04.2021
0.60 45.00 46.50 0.12
2 Thiruppathur Kaliammankoil road Km 0/0-0/6 Rs. 57101230/- progress.

Tmt.V.Meenal

04.04.2021
Sivagangai/ Upgradation of S. Sevalpatti to WMM work
2.20 125.00 129.50 0.12
Thiruppathur Klungapatti road Km 0/0-2/2 completed. .
3
Upgradation of Devakottai-Pudukkottai
Sivagangai/ District Border Road to
2.10 133.00 126.00 100.96 BM & BC completed
Karaikudi Sadayamangalam Via Velar Kudiruppu
4
Road Km 0/0-2/100
Sivagangai/ Upgradation of NH210
2.00 131.50 121.00 95.53 BM & BC completed
Karaikudi Amaravathipudur Km 0/0-2/0
5
1
o.

2
Constituency
Sl.N Name of District /

3
Total
Name of Work

Length in km
10.600
A.S.

lakhs
Rs. In

4
Amount

660.50
T.S.

Rs. In
Lakhs

5
Amount

649.00
6

Contract value
Rs. 57101230/-
7

Contractor's Name
Tmt.V.Meenal

Date of Commencement /
8

Date of Completion
05.10.2020/ asper
04.04.2021
agreement

Proble date of completion/


9

04.04.2021
Actual completed date
10
lakhs)
(Rs. In

196.86
Epr. Upto
30.04.2021
Cumulative

11
Present stage of work
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
(G.O.(2D)No.53/ Highways and Minor Ports(HF-1) Department dated 30.12.2020
Package 24

Virudhunagar/ Upgradation of Palayampatti aranmanai road CD Work is in


2.60 150.09 153.00

54720677.000

Thiru.R.Raju

21.08.2021
Aruppukottai to kattangudi Km 0/0-2/6 Progress

21.08.2021
22.02.2021/
1
Virudhunagar/ Upgradation of Pappanam to V.Nagoor Km Earth Work is in
Thiruchuli 0/0-4/100
4.10 294.80 324.00
2 progress
Virudhunagar/ Upgradation of Maniyampatti Road - Earth Work is in
Aruppukottai Kulasekarapuram Road Km 0/0 - 1/770
1.77 112.00 123.00
3 progress
8.47 556.89 600.00 0.00
Package 25
Virudhunagar/ Upgradation of Sengamalaipatti to Municipal WMM Work is in
Sivakasi Limit Km 0/0 - 4/100
4.10 222.00 222.00
progress

51737424.000

Constructions.
1

24.08.2021

24.08.2021
25.02.2021/
M/s.Balaji
Upgradation of Sivakasi Municipal Limit to
Virudhunagar/
Sivakasi
Sithurajapuram via Uthandamadasamy Kovil 2.40 123.00 127.00 98.59 BT Completed.
2 Km 0/0 - 2/4
Virudhunagar/ Upgradation of Vilampatti to Periyapottalpatti Earth Work is in
Sivakasi Road Km 0/0 - 1/650
1.65 234.00 235.00
3 progress
8.150 579.000 584.000 98.590
Package 26

Virudhunagar/ Upgradation of NH7 Thatampatti Earth Work is in

S.K.Subba Reddiyar
3.51 251.00 272.000
Virudhunagar Inamreediapatti Road Km 0/0 - 3/510 progress
56836007.000
1

23.08.2021
23.08.2021
24.02.2021/
Virudhunagar/ Upgradation of Avudaiyapuram - Earth Work is in
Virudhunagar Subbaiahpuram Road Km 0/0 - 1/5
1.50 151.50 166.00
2
progress

Virudhunagar/ Upgradation of Sivakasi - Erichanatham road CD Work is in


Sivakasi to Kallipatti road Km 0/0 - 3/6
3.60 197.00 200.00
Progress
3
8.610 599.500 638.000 0.000
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 27
Sivagangai/ Upgradation of Koduvoor to Melakarai Road Earth Work is in
Karaikudi km 0/0 - 2/930
2.93 199.50 183.12
1 progress

21.08.2021
Sivagangai/ Upgradation Ariyakudi - Unjanai road km 0/0 -

Thiru.A.Rajmohan
Karaikudi 1/0
1.00 60.50 48.58 BM &BC completed.

57250184.000
2

21.08.2021
Sivagangai/ Upgradation of Aralikottai BT Road km 0/0 -
Thiruppathur 1/250
1.25 95.00 104.50 BM &BC completed.

22.02.2021/
3
Sivagangai/ Upgradation of Jeyankondanilai - Malampatti
Thiruppathur Road km 0/0 - 0/8
0.80 62.00 68.20 BM &BC completed.
4
Sivagangai/ Upgradation of Kattayampatti to District Limit WMM Work is in
Thiruppathur Road km 0/0 - 3/2
3.20 185.00 197.00
5 progress
Total 9.180 602.00 601.40 0.00
Package 28

M/s.RGR & Co
58360858.000
Paramakudi / Upgradation of Muthukulathur-Kamuthi road Earth & CD Work is in

25.08.2021
26.02.2021/
25.08.2021
2.50 355.26 358.000
Mudukulathur (via)Chithirankudi Km 0/0-2/500 progress
1
Upgradation of Chithirankudi to
Paramakudi / BM Completed BC
E.Veppankulam AD colony(via) Erachikulam 3.80 296.52 297.000
Mudukulathur
Road km 0/0-3/800 work is in progress.
2
Total 6.300 651.780 655.000 0.000
Package 29
WMM Work is

M/s.Venkateshwara
Paramakudi / Upgradation of (Via) Preiyur, Aliyathanmozli
4.54 276.65 303.000
Completed
61331019.000
Thiruvadanai km 2/0-6/540

Constructions
1

23.08.2021

23.08.2021
24.02.2021/
Paramakudi / Upgradation of - Peruvayal to BM & BC work is
1.30 198.76 162.500 100.81
2
Thiruvadanai Therkuperuvayal Km 0/0-1/300 Completed
Paramakudi / Upgradation of Kadamboor to Manikkamkottai WMM Work is
2.70 240.67 240.700
3 Thiruvadanai Km 0/0-2/700 Completed
Total 8.540 716.08 706.20 100.81
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 30
Paramakudi / Upgradation of Devakottai- Vattanam Road to
Thiruvadanai keelakurichi Road Km 0/0-2/2
2.20 125.25 137.500 116.34 BM & BC completed.
1

23.08.2021
Paramakudi / Upgradation of Neerkundram Road to

Thiru.B.Subramanian
Thiruvadanai Aranootrivayal road Km 0/0-2/370
2.37 139.07 152.500 127.94 BM & BC completed.
2

72693887.000

23.08.2021
Paramakudi / Upgradation of Sirugambaiyur to Oriyur road
Thiruvadanai Km 0/0-2/200
2.20 125.27 137.000 114.83 BM & BC completed.
3

24.02.2021/
Upgradation of Anjukottai Neerkundram Road
Paramakudi /
Thiruvadanai
to Thinnakathanvayal road link Road km 0/0- 2.15 130.65 135.000 113.28 BM & BC completed.
2/150
4

Paramakudi / Upgradation of NH210 to kumulendal Road


Thiruvadanai Km 0/0-3/400
3.40 211.00 232.000 22.91 BM & BC completed.
5
Total 12.320 731.240 794.000 495.300
Package 31
Paramakudi / Upgradation of NH-49 to Kummukottai via
Paramakudi Poovilathur Road Km 0/0-3/500
3.50 248.01 264.000 BT work is Completed
1

M/s.R.Tamilselvam & Co

25.02.2021/ 24.08.2021
Paramakudi / Upgradation of Poovilathur to Karuthanendal
1.95 126.08 138.50 BT work is Completed

72156319.000
Paramakudi Road Km 0/0-1/950
2

24.08.2021
Paramakudi / Upgradation of Seyyalur to Veeravanur Road
Paramakudi 0/0-1/860
1.86 141.41 144.00 BT work is Completed
3
Paramakudi / Upgradation of NH-49 Manjakollai road to
Paramakudi Karuthanendal road Km 0/0-1/350
1.35 69.64 75.00 BT work is Completed
4
Paramakudi / Upgradation of Melathooval to Keeranur road WMM Work is
3.10 200.00 200.000
Mudukulathur Km 0/0-3/100 Completed
5
Total 11.760 785.14 821.50 0.00
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 32

Paramakudi / Upgradation of Melathooval to K.R Patnam WMM Work is


2.80 213.13 220.000

Thiru.V.Kathiresan
Mudukulathur Road Km 0/0-2/800 Completed

52937151.000
1

25.08.2021
25.08.2021
26.02.2021/
Upgradation of Udaikulam Natham Road to
Paramakudi / Earth & CD Work is in
meet Muthaneri-Nallikuruchi road via 3.90 273.58 273.600
Mudukulathur progress
2 M.Kottakudi Km 0/0-3/900

Paramakudi / Upgradation of Kottaiyendhal Road Km 0/0-


Mudukulathur 1/400
1.40 103.93 105.000 Work yet to be Started
3
Total 8.100 590.640 598.600 0.000
81.430 5812.270 5998.700 694.700
Progress Report

Division: Paramakudi(H), Nabard & Rural Roads Month: April-2021 Rs. In Lakhs
Sanction details Contract details Expenditure details (in lakhs)

Proble date of completion/


Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
ROADS AND BRIDGES/ ROB/RUB/ BYPASSES/ PUR
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
G.O.Ms.No184/Highways & Minor Ports(HW-1) department /dated.14.11.2018 (79 Bridges)
Construction of Minor Bridge at Km 2/6

16227599.00
of Watrap - Maharajapuram Road to
180.00
Virudhunagar/ Taniparai Road. Panchay M/s.Ram 13.06.2019/12.0 Pile Work is in
14 at Union
175.00 Cr.No.114/ 30.04.2021 1.35
Srivilliputhur 18-19
constructions 2.2020 Progress

G.O.Ms.No57/Highways & Minor Ports(HW-1) department /dated.20.03.2020 (40 Bridges)


Reconstruction of High level bridge at
km 153/4-6 of Thanjavur-Sayalkudi road B.S. Engineer's
07.09.2020/ Capping Beam work is in
1 Sivagangai 1034.38 1035.00 and
06.11.2021
06.11.2021 233.56
progress.
Contractors
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
G.O.(Ms)No.132/ Highways and Minor Ports(EAP.II(2)) Department dated 24.10.2020 ( 50 Bridges)
Construction of Minor Bridge at km 0/2

Constructions, Constructions, s.R.Tamilselv


6354002.00

03.05.2021

03.05.2021
04.01.2021/
am & CO
Above sill level work
Ramanathapuram of Paramakudi - Mudukulathur road to
3 59.27 65.00 13.02 and Retaining wall

M/
/ Paramakudi Pulithikulam road (via) Thenpoduvakudi.
work is in progress.

Construction of Bridge at km 2/2 of

28.07.2021
Rajapalayam Rajapalayam
13786873.00

M/s.Lakshmi

28.07.2021
Puthulupatti- Thiyagarapuram road

29.01.2021/
Virudhunagar/ Above Sill work
4 148.18 160.00 35.50
Virudhunagar Completed

Construction of Bridge at km 0/8 of

12.07.2021
M/s.Lakshmi
8253968.00

12.07.2021 12.07.2021
Puthulupatti- Thiyagarapuram road

13.01.2021/ 13.01.2021/
Diversion Road Work
Virudhunagar/
5 296.37 101.00 7.90 Completed. Earth
Virudhunagar
Work in progress

Construction of Bridge at km 1/0 of of

Rajapalayam
M/s.Lakshmi
Construction
9402303.00

12.07.2021
K.Pudur- Thiyagarajapuram road Diversion Road Work
Virudhunagar/
6 148.18 108.00 7.76 Completed. Earth

s,
Virudhunagar
Work in progress
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Bye Pass
1) 15 (2) notification published
on 30.3.2012. Since interim
stay order granted by Hon'ble
high court, Madurai. 15(2)
Notification not published. The
stay was dismissed on
27.3.2015 and CAVEAT filed on
1.4.2015 vide No. 659/2015.

2)15(2) Notification
published on 15.06.2015. 15(1)
notification has been approved
by Government for publication
Forming Bye-Pass Road in Mudukulathur as per
Paramakudi

Town km 0/0-4/090 (Branching at Km. G.O.(D)No.118/Highways and


Minor ports(HQ-1) Department
225/885 and ending at Km.229/265 of
1 710.36 527.96 dated. 09.06.2016. Work in
SH29) Progress for Revised land
( GO.Ms.No.8/2012/ Highways valuation Revenue Department.
3)As per
Department/ Dated. 20.01.2012.) G.O. the 15(1) Notification
published on29.06.2016 in
Tamil Nadu Government
Gazette No.26, Volume -II,
Section-2 Page 368.

4)15(1) notification has been


approved for wet lands by
Government for publication as
per G.O.(D)No.53/Highways
and Minor ports(HQ-1)
Department dated. 22.03.2017.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

5)As the publication of 19(2)


Private Negotiation land owner
1 2 3 3 4 5 6 7 8 9 10 was conducted11 on 26.09.2017
by DRO, Ramanathapuram.
DPR estimate has been
submitted on 06.07.2018 to
Superintending Engineer(H),
N&RR, Tirunelveli.

6).Under
section 19(6) of Tamil Nadu
highways act 2001 final
proposal sent for approval to
CLA on 12.07.2018.

7)Letter from CLA


clarification needed for variation
in the guildeline value on
14.09.2018
8)Letter from CLA
clarification needed for variation
in the guildeline value on
14.09.2018
9) Letter
sent to DIG Registration
department, Madurai by District
collector Ramanathapuram on
09.11.2018 regarding
justificatin for variation in
guildline value.

10) The
Inspector General of
Registration, Chennai in the
Lr.No.5688/L2/2019/Dated.
02.03.2019 , stated that
valuation committee under the
chairmanship of Inspector
General does not fix value for
any survey No /Streets.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11 policy,
It formulates only
methodology, and
administration of market value
of guideline in the state.
Valuation sub-committee under
the chairmanship of concerned
District collector fixes rates. Any
clarification or rectification
regarding fixation of guideline
value in respect of Land may be
sent to CLA directly.

11)
In guideline value fixation sub-
committee formed under the
chairman of District Collector,
Ramanathapuram and District
Register Ramanathapuram,
Sub-Register Mudukulathur,
Thasildhar Mudukulathur, Town
Panchayat Officer
Mudukulathur on 21.11.2019 at
4.00pm. 12) In Revised land
value proposal sent to
Commissioner of Land
Acquisition, Elilagam, Chennai-
5 from the District Collector,
Ramanathapuram vide
Lr.No.B1 /10357/2012/dated.
21.11.2019 . 13) In rectification
and revised land value proposal
sent to Commissioner of Land
Acquisition, Elilagam, Chennai-
5 from the District Collector,
Ramanathapuram
Lr.No.B1 vide
/10357/2012/dated.
21.11.2019 . 13) In rectification
and revised land value proposal
sent to Commissioner of Land
Acquisition, Elilagam, Chennai-
5 from the District Collector,
Ramanathapuram vide
Lr.No.B1 /10357/2012/dated.
14.02.2020.14) The forming of
Mudukulathur Byepass work
(Phase-I) administration
sanction accorded from the
Government vide G.O.
(Ms)no.20/Highways & minor
ports(HQ1) department, dated.
23.01.2020 for Rs.18.30 Crore .
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
16) The revised Land value
proposal as per revised
guideline value sent to
Inspector General of
Registration, Chennai-28 from
the District Collector,
Ramanathapuram Vide
Lr.No.B1/10357/2012 /dated.
05.06.2020. 17)
Inspector General of
Registration, Chennai-28
Lr.No.16556/L1/2020/
dated.14.08.2020 to District
Collector, Ramanathapuram,
the revision and rectification of
anomalies in the marketvalue
guidelinefor sub committee to
approve the market value
guideline consists of the
following members i) District
Collector-Chairman, ii) District
Revenue Officer, iii) Deputy
Inspector General of
Registration iv) District
Registrars of the concerned
Registration District, v) District
Register of the Head Quarters
of the concerned- revenue
district- Secretary vi) Assistant
Director of Town Panchayats
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
vii) Assistant Director of
Panchayats viii) Regional
Director of Municipalities and ix)
Representatives of local bodies.
18) District Collector,
Ramanathapuram.
Lr.No.B1/10357/2012/dated.
27.10.2020 to Inspector
General of Registration
Chennai-28. After fixing the
guideline value by forming sub
committee as per Tamil Nadu
Stamp rule 2010. The Field
Inspection carried out by
RDO,DR and Sub Registrar
Vide Lr.No.32906/L2/2020,
dated. 20.11.2020 from
Inspector General of
Registration, Chennai-28 to the
District Collector,
Ramanathapuram. The field
inspection work under process
and the report to submit IG
Office with in the week.
Allotment fund requision based
on the Revised LA demand.
DRO, Ramanathapuram,
Lr.No.10357/2012/dated.
03.03.2021. Estimate Prepared
to an amount of Rs.18.22
Crore and submitted to
Superintending Engineer (H),
Nabard & Rural Roads,
Tirunevelli for Technical
Sanction. After the completion
of the land acquiction process
then the work will be started..

Estimate submitted.

Forming Bye-Pass Road in Mudukulathur


Town km 0/0-4/090 (Branching at Km.
225/885 and ending at Km.229/265 of SH29) 1830.00
(work)(G.O.(Ms)no.20/Highways & minor
ports(HQ1) department, dated. 23.01.2020 )
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
PUR 2018-19
Package 6 (2018-19)
Ramanathapuram District
Upgradation of Keelakkarai Erwadi road
Ramanathapuram/ 26.02.2019/
1 Ramanathapuram
to melamadai (via) Velanoor km:0/0- 391.00 430.00
25.10.2019
25.10.2019 371.34 Work Completed.
7/100

M/S.Krishna & co
Rs.98726234
Ramanathapuram Upgradation of Erwadi Dharga to 26.02.2019/
2 496.00 545.00
25.10.2019
25.10.2019 477.78 Work Completed.
/ Mudukulathur Serandai road Km. 0/0 -12/300.

Ramanathapuram Upgradation of Peraiyur - Senkottaipatti 26.02.2019/


3 130.00 136.00
25.10.2019
25.10.2019 103.37 Work Completed.
/ Mudukulathur road to Keelavalasai road Km.0/0-2/400

Package 6 Total 1017.00 1111.00 952.49


Package 7

Ramanathapuram 01.03.2019/
1 255.00 280.50
31.12.2019
31.12.2019 253.51 Work Completed.
/ Mudukulathur Upgradation of Mudukulathur - Sikkal
Road to Keelaselvanur road Km.0/0-7/2

Ramanathapuram Upgradation of Km. 6/2 Mudukulathur - 01.03.2019/


2 320.00 327.00 31.12.2019 279.45 Work Completed.

M/S.Velumanickam & co
/ Mudukulathur Uthiragosa mangai road to Ramalinga 31.12.2019
puram road Km. 0/0 - 5/0. Rs.101622748/-

Ramanathapuram Upgradation of Kathanendal - 01.03.2019/


3 110.00 113.00 31.12.2019 101.16 Work Completed.
/ Mudukulathur Paraiyankulam road Km.0/0-1/800 31.12.2019

Ramanathapuram Upgradation of A.Punavasal - 01.03.2019/


4 70.00 75.00
31.12.2019
31.12.2019 67.61 Work Completed.
/ Mudukulathur Keelaselvanur road to Maranthai -
Saveriyarpattinam road Km.0/0-0/9

Ramanathapuram 01.03.2019/
5 280.00 308.00 31.12.2019 282.16 Work Completed.
/ Mudukulathur Upgradation of Melakidaram to M. 31.12.2019
Krishnapuram road Km.0/0 - 8/0.
Package 7 Total 1035.00 1103.50 983.89
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 8
Ramanathapuram Upgradation of Keelaparuthiyur - 08.03.2019/
1 215.00 236.50 07.01.2020 221.36 Work Completed.
/ Paramakudi Veeracholam road km. 0/0-3/900 07.01.2020
Ramanathapuram Upgradation of NH49 to Lakshmi puram 08.03.2019/
2 110.00 121.00
07.01.2020
07.01.2020 111.83 Work Completed.
/ Paramakudi road km. 0/0-2/0

Rs.108604089/-
Ramanathapuram Upgradation of NH 49 to 08.03.2019/

R.Tamilselvam
3 162.00 177.00 07.01.2020 151.88 Work Completed.
/ Paramakudi Muthuchellapuram road km. 0/0-2/940 07.01.2020

Ramanathapuram Upgradation of S.Kodikulam-V.P. Kovil 08.03.2019/


4 177.00 194.00 07.01.2020 173.35 Work Completed.
/ Paramakudi road to K. P. Madam road km.0/0-3/217 07.01.2020

Ramanathapuram Upgradation of Ramnad-Melur road to 08.03.2019/


5 132.00 145.00
07.01.2020
07.01.2020 132.94 Work Completed.
/ Paramakudi Kulathur road km.0/0-2/400
Ramanathapuram Upgradation of Sikkal to Andichikulam 08.03.2019/
6 265.00 291.50 07.01.2020 275.42 Work Completed.
/ Mudukulathur road Km. 0/0 - 4/8 07.01.2020
Package 8 Total 1061.00 1165.00 1066.78
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 9
Upgradation of Anandur - Valanai link
Ramanathapuram 08.03.2019/
1 road (via) Rakinarkottai road km. 0/0- 178.00 195.80 07.01.2020 182.45 Work Completed.
/ Thiruvadanai 07.01.2020
3/225
Ramanathapuram Upgradation of Kallikudi -Kottakudi (via) 08.03.2019/
2 190.00 167.00 07.01.2020 153.61 Work Completed.
/ Thiruvadanai Soorampuli km.0/0-3/435 07.01.2020

Upgradation of R.S.Mangalam -

P.Ramu, Devakottai
Ramanathapuram 08.03.2019/

Rs.10,32,28,197/-
3 Uppoor-Avarenthal road to Vettukulam 121.00 132.50 07.01.2020 121.59 Work Completed.
/ Thiruvadanai 07.01.2020
(via) Kalangapuli road km. 0/0-2/2

Ramanathapuram Upgradation of Anjukottai - Neerkunram 08.03.2019/


4 115.50 127.05 07.01.2020 115.80 Work Completed.
/ Thiruvadanai road to Kannangudi road Km.0/0-2/100 07.01.2020

Ramanathapuram Upgradation of NH230 to 08.03.2019/


5 165.00 179.50
07.01.2020
07.01.2020 166.13 Work Completed.
/ Thiruvadanai Thalirmarungoor road km. 0/0-3/0
Ramanathapuram Upgradation of ECR-Karankadu road 08.03.2019/
6 121.00 121.00 07.01.2020 109.43 Work Completed.
/ Thiruvadanai km. 0/0-2/200 07.01.2020
Ramanathapuram Upgradation of Ramnad Nainarkoil road 08.03.2019/
7 198.00 199.00
07.01.2020
07.01.2020 185.82 Work Completed.
/ Thiruvadanai to Sakkankudi Road km.0/0-3/6
Package 9 Total 1088.50 1121.85 1034.83
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Virudhunagar District
Package -10
Virudhunagar/ Upgradation of Manthopu road to 01.03.2019/
1 143.00 149.00
31.10.2019
31.10.2019 130.88 Work Completed.
Thiruchuli Karisalkulam road 0/0 - 2/588
Virudhunagar/ Upgradation of Trichy-Tuticorin Road to 01.03.2019/
2 61.00 67.00 31.10.2019 62.04 Work Completed.
Thiruchuli Uplikundu 3/4 - 4/5 31.10.2019

M/S.Krishnan & Co
Rs.5,91,65,460/-
Virudhunagar/ Upgradation of Kariyapatti-Thiruchuli 01.03.2019/
3 137.00 150.60
31.10.2019
31.10.2019 135.02 Work Completed.
Thiruchuli Road to K.Pudur 0/0 - 2/5

Virudhunagar/ Upgradation of Mithilaikulam - 01.03.2019/


4 120.00 122.00
31.10.2019
31.10.2019 105.42 Work Completed.
Thiruchuli Iluppaikulam (via) Mayilee 0/0 - 2/2

Virudhunagar/ Upgradation of K.Mettupatty - Sirukulam 01.03.2019/


5 165.00 167.00
31.10.2019
31.10.2019 145.57 Work Completed.
Sattur Road Km 0/0 - 3/0
Package 10 Total 626.00 655.60 578.93
Package -11

Virudhunagar/ Upgradation of MCC road to 08.03.2019/


1 90.00 92.00
07.11.2019
07.11.2019 76.92 Work Completed.
Virudhunagar Inamreddiyapatti Km 0/0 - 1/6

Rs.5,35,63,958/-
Virudhunagar/ Upgradation of NH7 to Pavali (Via) 08.03.2019/

S.Murugesan
2 180.00 180.00 07.11.2019 153.50 Work Completed.
Virudhunagar Sangu Odai Km 0/0 - 3/3 07.11.2019

Virudhunagar/ Upgradation of Koundampatti to 08.03.2019/


3 190.00 199.60 07.11.2019 180.47 Work Completed.
Virudhunagar kothaneri km 0/0 - 3/430 07.11.2019

Virudhunagar/ Upgradation of Kalaiyarkurchi to 08.03.2019/


4 125.00 133.00 07.11.2019 116.42 Work Completed.
Sivakasi sanarpatti km 0/0-2/250 07.11.2019

Package 11 Total 585.00 604.60 527.31


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -12
Virudhunagar/ Upgradation of Sithurajapuram to 08.03.2019/
1 300.00 300.00 07.11.2019 265.24 Work Completed.
Sivakasi E.T.Rediyapatti road km 0/0-4/2 07.11.2019

Virudhunagar/ Upgradation of Sivakasi - Erichanatham 08.03.2019/


2 25.00 25.00 07.11.2019 17.54 Work Completed.

M/s.Balaji Constructions.
Sivakasi road to M.Pudupatti road km 0/0-0/450 07.11.2019

Rs.5,94,08,035/-
Virudhunagar/ Upgradation of Nathikudi to 08.03.2019/
3 90.00 92.00
07.11.2019
07.11.2019 79.15 Work Completed.
Sattur Thiruvenkatapuram Road 0/0 - 1/155
Virudhunagar/ Upgradation of Kothankulam to 08.03.2019/
4 85.00 85.00
07.11.2019
07.11.2019 12.99 Work Completed.
Sattur Chatrapatti Road KM 5/200 - 6/728
Upgradation of Krishnapuram to meet
Virudhunagar/ 08.03.2019/
5 Tenkasi -Thirumangalam road (via) 55.00 55.00
07.11.2019
07.11.2019 47.89 Work Completed.
Virudhunagar
Chokkampatti km 0/0-1/0
Virudhunagar/ Upgradation of O.Mettupatti - 08.03.2019/
6 115.00 122.00 07.11.2019 107.12 Work Completed.
Sattur Pethureddipatty road km 3/0-5/010 07.11.2019
Package 12 Total 670.00 679.00 529.93
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -13
Virudhunagar/ Upgradation of Vadakarai to District 22.08.2019/
1 21.04.2020 245.49 Work Completed.
Sattur border road 0/0 to 5/6 300.00 300.00 21.04.2020
Upgradation of Seithur Zaminkalam
Virudhunagar/ 22.08.2019/
2 road to Athiputhira ayyanar koil road 0/0 21.04.2020
21.04.2020 198.33 Work Completed.
Rajapalayam
- 4/438 245.00 245.00

Rs.89506176/-

Tmt.K.Selvi
Virudhunagar/ Upgradation of Khansapuram to Athikoil 22.08.2019/
3 21.04.2020
21.04.2020 268.26 Work Completed.
Srivillputhur road km 0/0-6/0
330.00 330.00
Virudhunagar/ Upgradation of Keelagopalapuram to 22.08.2019/
4 21.04.2020
21.04.2020 79.68 Work Completed.
Srivillputhur kalyanipuram road 0/0-1/756
95.00 95.00

Virudhunagar/ Upgradation of Kunnur to 22.08.2019/


5 21.04.2020 64.39 Work Completed.
Srivillputhur keelagopalapuram road 0/0-1/400 21.04.2020
80.00 80.00
Package 13 Total 1050.00 1050.00 856.15
Sivagangai District
Package -18
Upgradation of Nalukottai to
Sivagangai/ Keelapoonkudi (via) Thirunarayanpuram 08.03.19/
1 Paranipatti road km 0/0-5/170 284.35 284.35
07.11.19
07.11.2019 246.38 Work Completed.
Sivagangai

Upgradation of Melur - Sivagangai road

Thiru.M.Ramachandran
Sivagangai/ to Koovanipatti road km 0/0-1/800 08.03.19/
2 99.00 99.00 Rs.5,68,8,209/- 07.11.2019 87.75 Work Completed.
Sivagangai 07.11.19

Upgradation of Idaya Melur -


Sivagangai/ Koovanipatti road km 0/0-1/750 08.03.19/
3 96.25 98.00
07.11.19
07.11.2019 86.74 Work Completed.
Sivagangai

Upgradation of Thamarakki -
Sivagangai/ Kothankulam road0/0-3/060 R32 08.03.19/
4 168.30 164.00 07.11.2019 145.75 Work Completed.
Sivagangai 07.11.19

Package 18 Total 647.90 645.35 566.62


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -19
Upgradation of Ramnad - Sivagangai -
Sivagangai/ Melur road to Kottakudi toad upto block 01.03.19/
1 limit km 0/0-1/010 55.55 55.55
31.10.19
31.10.2019 47.95 Work Completed.
Sivagangai

Upgradation of Kalmekki road 0/0-2/200


Sivagangai/ 01.03.19/
2 121.00 121.00 31.10.2019 106.68 Work Completed.
Sivagangai 31.10.19

M/s.S.A.L. Company
Rs.5,81,59,084/-
Sivagangai/ Upgradation of Pasankarai - Kalameikki 01.03.19/
3 60.50 60.50
31.10.19
31.10.2019 53.45 Work Completed.
Sivagangai km 0/0-1/100

Sivagangai/ Upgradation of Pillur - Kovanoor road 01.03.19/


4 36.30 36.30
31.10.19
31.10.2019 33.92 Work Completed.
Sivagangai 0/0-0/660

Upgradation of Oyyavandhan to
Sivagangai/ kanjipatti road via orupokki, kalkulam, 01.03.19/
5 368.50 372.00 31.10.2019 326.86 Work Completed.
Sivagangai ponnakal km 0/0-6/700. 31.10.19

Package 19 Total 641.85 645.35 568.86


Package -20
Upgradation of Kovanoor - Vairavanpatti
Sivagangai/ road 29.05.19/
1 28.01.20
28.01.20 155.22 Work Completed.
Sivagangai km 0/0-3/145 172.98 172.98
Upgradation of Andichioorani -
Sivagangai/ Mudukkoorani road km 0/0-4/200 29.05.19/
2 28.01.20 201.07 Work Completed.
M/s.KOP & Co
Rs.55245592

Sivagangai 28.01.20
231.00 231.00

Sivagangai/ Upgradation of Regunathamadai - 29.05.19/


3 28.01.20
28.01.20 50.49 Work Completed.
Sivagangai Krishnapuram road km 0/0-1/0
55.00 55.50

Sivagangai/ Upgradation of Idaikattur - 29.05.19/


4 28.01.20 145.48 Work Completed.
Sivagangai Arulananthapuram road km 0/0-2/900 28.01.20
159.50 160.00
Package 20 Total 618.48 619.48 552.26
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -21
Sivagangai/ Upgradation of SIPCOT Konnakulam 08.03.19/
1 07.11.2019 33.89 Work Completed.
Manamadurai link road km 0/0-0/630 07.11.19
37.80 37.50

Sivagangai/ Upgradation of Velur- Sriranganatham 08.03.19/

Rs.5,76,90,581/-
2 110.20 Work Completed.

Thiru.T.Ramar
07.11.2019
Manamadurai road km 0/0-2/400 07.11.19
132.00 133.00

Sivagangai/ Upgradation of Melachorikulam road to 08.03.19/


3 07.11.2019 88.73 Work Completed.
Manamadurai meet Thanjakoor road km 0/0-1/854 07.11.19
101.97 101.97

Sivagangai/ Upgradation of Salaigramam - Sarugani 08.03.19/


4 07.11.19
07.11.2019 174.57 Work Completed.
Sivagangai raod to Ochanthittu 0/0-3/600
198.00 198.00

Sivagangai/ Upgradation of Krishnapuram - 08.03.19/


5 07.11.19
07.11.2019 43.50 Work Completed.
Sivagangai Mulliarenthal road km 0/0-0/800
44.00 44.00

Rs.5,76,90,581/-

Thiru.T.Ramar
Sivagangai/ Upgradation of Mulliarenthal - 08.03.19/
6 07.11.19
07.11.2019 79.17 Work Completed.
Sivagangai Munaivendri road km 0/0-1/600
88.00 89.00

Sivagangai/ Upgradation of Nedunkulam road - 08.03.19/


7 07.11.2019 40.85 Work Completed.
Sivagangai Mulliarenthal raod km 0/0-0/800 07.11.19
44.00 44.00
Package 21 Total 645.77 647.47 570.91
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -22
Sivagangai/ Upgradation of Valaiyapatty - 08.03.19/
1 07.11.2019 127.49 Work Completed.
Manamadurai Pokaraipatty road km 0/0-2/393 131.62 131.62 07.11.19
Upgradation of Madurai - Devakottai
Sivagangai/ 08.03.19/

Thiru.M.Ravichandran
2 road to Siravayalpudur road KM 0/0- 07.11.19
07.11.2019 126.28 Work Completed.
Sivagangai

Rs.5,60,45,882/-
2/400 132.00 132.00
Upgradation of Devakottai Municipality
Sivagangai/ limit to Sarugani - Devakottai road (via) 08.03.19/
3 Marichanpatti km 0/0-1/900 07.11.2019 106.64 Work Completed.
Karaikudi 07.11.19
105.00 105.00
Upgradation of Madurai- Thondi road to
Sivagangai/ Thoonukudi (via) Pavasi road km 0/0- 08.03.19/
4 07.11.2019 217.69 Work Completed.
Karaikudi 4/700 07.11.19
260.00 260.00
Package 22 Total 628.62 628.62 578.10
Package -23
Sivagangai/ Upgradation of Unjani - 08.03.19/
1 07.11.2019 175.02 Work Completed.

Rs.5,83,01,667/-
Karaikudi Narasimmapuram road km 0/0-3/600 07.11.19

Thiru.V.Meenal
198.00 198.00
Sivagangai/ Upgradation of Kallal- Devakottai to 08.03.19/
2 07.11.2019 112.62 Work Completed.
Karaikudi Kallangudi Pudur road km 0/0-2/210 122.00 122.00 07.11.19

Sivagangai/ Upgradation of NH210 Chettiyendal 08.03.19/


3 07.11.19
07.11.2019 305.64 Work Completed.
Karaikudi road km 0/0-6/0
330.00 330.00
Package 23 Total 650.00 650.00 593.28
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -24
Sivagangai/ Upgradation of Porivayal - Eagarai road 08.03.19/
1 1.200 07.11.2019 61.27 Work Completed.
Karaikudi km 0/0-1/200 66.00 66.00 07.11.19

Rs.4,93,62,127/-

M/s.A.M. & Co
Sivagangai/ Upgradation of Vetriyur A.Karunkulam 08.03.19/
2 4.200
07.11.19
07.11.2019 228.48 Work Completed.
Sivagangai road at 0/0-4/200
231.00 231.00
Upgradation of Pudukottai Ambel Road
Sivagangai/ 08.03.19/
3 to Kakkakottai Road (Via) Appalai 4.800
07.11.19
07.11.2019 219.86 Work Completed.
Karaikudi
Molumbur at km0/0- 4/800 264.00 264.00
Package 24 Total 561.00 561.00 509.61
Package -25
Sivagangai/ Upgradation of Kalapoor - Soorakudi 08.03.2019/
1 07.11.2019 231.67 Work Completed.

Rs.5,30,78,452/-
Thiruppathur raod km 0/0-4/840 266.00 266.00 07.11.2019

M/s.A.M. & Co
Sivagangai/ Upgradation of Kalapoor - 08.03.2019/
2 07.11.2019
07.11.2019 149.36 Work Completed.
Thiruppathur Kumarathakudipatti road km 0/0-2/900
159.50 162.00
Sivagangai/ Upgradation of Kalapoor -Manavathan 08.03.2019/
3 07.11.2019 153.28 Work Completed.
Thiruppathur road km 0/0-2/600 143.00 157.00 07.11.2019
Package 25 Total 568.50 585.00 534.31
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -26
Upgradation of Sevaipettai -
Sivagangai/ 08.03.2019/
1 Govindamangalam road to Pudukurichi 07.11.2019 98.00 Work Completed.
Karaikudi 07.11.2019

Thiru.R.Saravanan
km 0/0-2/0

Rs.5,72,37,575/-
110.00 110.00

Sivagangai/ Upgradation of Sirugavayal - Thalaiyur 08.03.2019/


2 07.11.2019 158.86 Work Completed.
Karaikudi road to Kalathur km 0/0-3/200 07.11.2019
176.00 176.00

Sivagangai/ Upgradation of Thenkarai - Konkarathi 08.03.2019/


3 07.11.2019
07.11.2019 317.07 Work Completed.
Sivagangai (Via) valayapatti Km0/0- 6/400
352.00 352.00
Package 26 Total 638.00 638.00 573.93
Package -27
Upgradation of Kattanipatti -
Sivagangai/ 01.03.2019/
1 Saruguvalayapatti road to Odaipatti km 31.10.2019
31.10.2019 165.37 Work Completed.
Thiruppathur
0/0-3/100 170.50 182.50

M/S.Velumanickam & co
Sivagangai/ Upgradation of Jeyankondanilai to

Rs.5,79,21,532/-
01.03.2019/
2 31.10.2019
31.10.2019 94.34 Work Completed.
Thiruppathur Kattanipatti road km 0/0-1/900
104.50 105.00

Sivagangai/ Upgradation of Madurai - Devakottai 01.03.2019/


3 31.10.2019
31.10.2019 216.82 Work Completed.
Thiruppathur road to Sevalpatti km 0/0-4/400
242.00 242.00
Upgradation of Madurai - Devakottai
Sivagangai/ 01.03.2019/
4 road -Sevalpatty road to Oppilanpatti 31.10.2019
31.10.2019 100.00 Work Completed.
Thiruppathur
km 0/0-2/0 110.00 110.00
Package 27 Total 627.00 639.50 576.53
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
13359.62 13750.31

Rs.36542816/

13.03.2020/
12.09.2020
Tmt.K.Selvi

12.09.2020
Upgradation of Ramachandrapuram - Retaining wall Work is
1 Virudhunagar 400.00 400.00 6.92
Sankaranatham Road 0/0 - 2/8 in progress

-
(G.O.(2D)No.45 & 46/ Highways and Minor Ports(HF-1) Department dated 15.10.2019 0.00
2019-20 PUR ROAD WORKS Sivagangai District 12154.72
Package -1

Sivagangai/
Arasanoor - Samathuvapuram Road 2.715 152.24 167.00 148.92 Work Completed.
Sivagangai
1

23.08.2020
Thiru.B.Subramanian
Sivagangai/

Rs.60527283/-
Idayamelur B Colony to A Colony 2.700 151.43 164.00 144.68 Work Completed.
Sivagangai

23.08.2020
2

/
Sivagangai/
Arasanoor - A.R.Usilampatti Road 3.070 172.07 182.00 159.56 Work Completed.

24.2.2020
Sivagangai
3
Sundaranadappu - Patcheri Vilakku
Sivagangai/
Road to Mutharasan Link Road (Via) 2.600 146.26 159.00 142.41 Work Completed.
Sivagangai
4 Vanakaruppu
Total 11.085 622.000 672.000 595.57
Package -2
Sivagangai/ Vannikudi-Maruchukkatti Road Km 0/0-
4.700 265.70 266.00 233.51 Work Completed.

23.08.2020
Thiru.B.Subramanian
1 Sivagangai 4/7
Rs.57688724/-

Kayaodai valanai road to Meet


Sivagangai/
satharasakottai-sooranam road (via) 3.000 167.91 181.00 159.88 Work Completed.

23.08.2020
Sivagangai
2 Allivayal
Kayaoodai valanai road to vannikudi

/
Sivagangai/ maruchikatti road via kalaikulam, o
24.2.2020
3.600 201.94 198.00 181.47 Work Completed.
Sivagangai maruthangudi, katiyakara srimam
3 Kalaikulam road 0/0 - 3/6
Total 11.300 635.550 645.000 574.86
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -3
Thanjavore - Sayalkudi road to vani
Sivagangai 205.53 Work Completed.

11.08.2020
4.000 223.84 233.00

M/s Velumanickam.& Co
road
1

Rs.57921812/-
Kadamuthanpatti to Namanoor

11.08.2020
Sivagangai 1.400 78.27 81.00 70.47 Work Completed.
Periyakottai Patti Road
2

/
 Ilayangudi road Mangalam road to

12.02.2020
Sivagangai 2.400 137.13 148.00 125.28 Work Completed.
Kongampatty
3

Sivagangai Anandur road to kalladithidal 3.000 167.91 183.00 171.79 Work Completed.
4
Total 10.800 607.150 645.00 573.07
Package -4

12.08.2020
Sivagangai Keeladi to parani chamber 2.050 115.13 126.00 115.30 Work Completed.

M/s Subash Builders


1

Rs. 51317054/-
Sivagangai Parani chamber to sayanapuram 1.800 101.84 107.00 94.82 Work Completed.

12.08.2020
2

/
Sivagangai Madapuram - Theli road 4.000 225.88 244.00 213.47 Work Completed.

13.02.2020
3

Sivagangai Palayanoor to Vallarendal 1.450 81.43 89.57 84.00 Work Completed.


4
Total 9.300 524.280 566.57 507.59
Package -5
Rs.62666847/-

Sivagangai
NH49 TO Chinnakannanur (via) Thiru.T.Ramar 456.90 Work Completed.

28.02.2020 /
8.200 481.33 520.00

27.08.2020

27.08.2020
Somathur road upto block limit
1
Thirupachetti Narikudi road to Vilathur
Sivagangai 2.800 158.08 171.00 159.01 Work Completed.
road
2
Total 11.000 639.410 691.00 615.91
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -6
Shanmuganathapattinam - Kaikudi
Sivagangai 2.505 140.08 140.00 123.90 Work Completed.
Road
1

28.02.2020 / 27.08.2020
Thiru.B.Uthayakumar
Rs.54115401/-
Sivagangai Pudukurichi - Kongumuthi Road 4.400 247.27 255.00 236.27 Work Completed.

27.08.2020
2
Kudikadu pappakudi road to
Sivagangai 2.240 126.28 136.00 121.26 Work Completed.
Umayandavayal road
3
KM 9/4 Of Sundaranadappu pacheri
Sivagangai 1.200 62.62 66.00 59.09 Work Completed.
road to V.Pudukulam road
4
Total 10.345 576.250 597.00 540.52
Package -7

Sivagangai Kottaiyur Bye Pass Road NH210 3.200 180.87 184.00 169.98 Work Completed.
1

05.03.2020 / 04.09.2020
Sivagangai NH210 to Avudai pogai 0.900 41.60 41.60 48.80 Work Completed.
2

Rs.60767349/-

M/s A.M. & Co

04.09.2020
Kararikudi - Mathur Road to Kandanoor
Sivagangai Mathur Road Via Karaikaran kudieruppu 3.000 168.48 168.50 142.70 Work Completed.
(Vaigai Nagar)
3

Sivagangai Alangudi to Ilangudi road 3.650 205.41 216.00 191.15 Work Completed.
4

Sivagangai Kannankudi Kadamboor Road 1.000 55.79 56.00 46.66 Work Completed.
5
Total 11.750 652.150 666.10 599.29
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -8
Kallal kalaiyarkoil road to malaikandan
Sivagangai 2.000 112.35 108.00 113.72 Work Completed.

24.02.2020 / 23.08.2020
1 raod

Thiru.R.Saravanan
Rs.55962332/-
Kandanoor -Mathur road to Alagappa
Sivagangai 3.600 201.48 198.00 183.99 Work Completed.

23.08.2020
2 Engineering collage road

Sivagangai Malaikandan to Vetriyur road 2.000 111.93 113.00 103.39 Work Completed.
3

Nagavayal rastha Road to Devakottai


Sivagangai 3.500 196.31 197.00 165.96 Work Completed.
Sr.pattinam (link road)road
4
Total 11.100 622.070 616.00 567.06
Package -9

M/s B.S. Engineers and Contreactors


Piranmalai -Thenammalpatti Road to
Sivagangai 2.000 111.97 115.00 101.57 Work Completed.
Mettupatti Road to Sirumaruthur road
1

07.02.2020 / 06.08.2020
Madurai - Devakottai Road
Sivagangai

Rs.60675058/-
1.400 61.37 67.00 54.51 Work Completed.
2 Vettangudipatti Road

06.08.2020
Sivagangai Vettangudipatti Road to Sevalatti Road 3.270 150.83 164.00 158.01 Work Completed.
3

Sivagangai K.Pudupatti to Athikaram road 3.100 173.43 186.00 169.70 Work Completed.
4
 R.S.Mangalam- Iiayangudi road to
Sivagangai 2.200 122.92 133.00 112.40 Work Completed.
5 Valakkani road (via)S.Kottaiyur
Total 11.970 620.520 665.00 596.19
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -10

 Sivagangai Ilayangudi road to


Sivagangai 5.200 291.91 307.00 284.51 Work Completed.
Kuruathankuban (via) maruthangudi
1

24.02.2020 / 23.08.2020
Rs.67945469/-
Kudikadu pappakudi road to poothakudi

Tmt.V.Meenal
Sivagangai 1.270 67.07 72.00 67.49 Work Completed.

23.08.2020
road
2

Sivagangai Siruganoor road to Poothakudi Road 3.411 186.12 183.00 168.38 Work Completed.
3

Sivagangai Pappankulam to V.Pudukulam road 3.000 170.21 187.00 164.60 Work Completed.
4
Total 12.881 715.310 749.00 684.98
Package -11

Upgradation of Madurai- Thondi road to


Sivagangai 1.400 77.00 83.00 80.65 Work Completed.
Mudikandam

13.08.2020
1

Thiru.A.Rajmohan
Upgradation of Madurai- Thondi road to

Rs. 55968526/-
Sivagangai 1.600 88.00 95.50 89.32 Work Completed.
Nattakudi

13.08.2020
2

/
Upgradation of M.T.Road - Padamathur-
Sivagangai Thiruppachehi road to Nattakudi (via) 3.625 200.00 192.00 175.89 Work Completed.

14.02.2020
Ilanthangudi road
3
Upgradation of Kumarapatii-
Sivagangai 4.200 231.00 242.00 219.64 Work Completed.
Mudikandam
4
Total 10.825 596.000 612.50 565.5
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -12

Upgradation of Thanjavur- Sayalkudi


Sivagangai 1.200 66.00 77.60 64.82 Work Completed.
road to Velarandal road km 3/4-4/6
1

09.08.2020
Upgradation of Madurai- Thondi road to

Rs. 56575420/-

Thiru.M. Alagar
Sivagangai 4.500 247.50 268.00 242.42 Work Completed.
Mudukkoorani
2

09.08.2020
10.02.2020 /
Sivagangai Upgradation of Ammachipatti road 1.500 82.50 90.00 80.74 Work Completed.
3
Upgradation of Sarugani- Devakottai
Sivagangai 1.000 55.00 60.00 53.16 Work Completed.
4 road to Chokkanathapuram
Upgradation of Thirukostiyur-
Sivagangai Pattamangalam road to Karuvelkurichi - 2.200 121.00 133.10 124.02 Work Completed.
5 Anna nagar road
Total 10.400 572.000 628.70 565.16
Package -13
Upgradation of Kalaiyar koil-
Sivagangai Mudikkarai road to Sathani Vilakku via 2.800 154.00 169.00 151.46 Work Completed.

24.02.2020 / 23.08.2020
1 Kiluvachi 0/0-2/800

Thiru.P.Ramu
Upgradation of Kallankudi Pudur road to

23.08.2020
Sivagangai 4.000 220.00 233.00 234.87 Work Completed.
Uvarkulam
2
Upgradation of Kappaloor - Embal road
Sivagangai 1.000 55.00 56.00 44.08 Work Completed.
km 6/8-7/8
3
Upgradation of Thiruppakottai-
Sivagangai 2.800 154.00 169.40 124.95 Work Completed.
Athankudi road km 3/2-6/0
4
Total 10.600 583.000 627.40 555.36
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Virudhunagar District
Package -14
Virudhunagar /
Oruchirangampatti To Dharmam Road 2.000 113.79 125.00 115.64 Work Completed
Thiruchuzhi
1

14.02.2020 / 13.08.2020
M/s Lucky Associates
Virudhunagar / Dharmam Theli Road to Poovakani
2.385 134.70 148.00 131.69 Work Completed
Thiruchuzhi Road

Rs. 59955644/-
2

13.08.2020
Virudhunagar /
Poovakani To Kottakatchiyenthal Road 2.250 130.91 133.00 116.36 Work Completed
Thiruchuzhi
3
Virudhunagar /
SH-42 to Udaiyanampatti 2.430 141.39 155.00 125.40 Work Completed
Thiruchuzhi
4
Virudhunagar /
Veerasolan road to Nayanenthal 1.600 92.67 98.00 97.47 Work Completed
Thiruchuzhi
5
Total 10.665 613.46 659.00 586.56
Package -15

12.02.2020 / 11.08.2020
Virudhunagar/ Upgradation of S.Maraikulam -
Work Completed

M/s Krishna & Co


5.400 304.03 315.00 291.21

Rs. 58466216/-
Thiruchuli Thulukkankulam Road km 0/0 - 5/4
1

11.08.2020
Virudhunagar/ Upgradation of Kariyapatti - Narikudi Road
3.010 167.03 180.00 170.97 Work Completed
Thiruchuli to T.Veppankulam Road km 0/0 - 3/010
2
Virudhunagar/ Upgradation of P.Thottiyankulam to
Thiruchuli Krishnapuram km 0/0 - 2/690
2.690 155.14 155.14 136.88 Work Completed
3
Total 11.100 626.20 650.14 599.06
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -16
Virudhunagar/ Upgradation of Pandalkudi to
5.000 276.82 300.00 267.64 Work Completed.
Aruppukottai Udyanthapuram road km 0/0 - 5/0
1
Virudhunagar/ Upgradation of Suthamadam to
4.280 234.54 234.54 200.74 Work Completed.
Thiruchuli Krishnapuram road km 0/0 - 4/280
2

13.03.2020 / 12.09.2020
Rs. 63660603/-
Virudhunagar/ Upgradation of Madurai Kanniyakumari

Tmt.K.Selvi
0.800 43.67 45.50 39.09 Work Completed.

12.09.2020
Aruppukottai Road to Meenakshipuram km 0/0 - 0/8
3
Virudhunagar/ Upgradation of Shanmugapuram Road km
0.670 37.92 37.92 33.48 Work Completed.
Aruppukottai 0/0 - 0/670
4
Virudhunagar/ Upgradation of Sivananainthapuram to
0.800 43.67 48.00 40.44 Work Completed.
Aruppukottai Meenakshipuram km 0/0 - 0/8
5
Upgradation of Melamadai to
Virudhunagar/
Palavanatham Road to 0.800 45.39 49.00 42.56 Work Completed.
Aruppukottai
6 Gnanapathiyapuram km 0/0 - 0/8
Total 12.350 682.010 714.96 623.95
Package -17
Virudhunagar/ Upgradation of ESI Colony road to
1.230 65.75 72.30 66.62 Work Completed.

M/s Sri Balaji Construction


1 Rajapalayam Kalangaperi road km 0/0 - 1/500

13.03.2020 / 12.09.2020
Virudhunagar/ Upgradation of Ramasamiyapuram to
Rs. 79259887/-
2.970 169.56 185.00 172.36 Work Completed.
Srivillputhur Pooriparaikulam road km 1/0 - 3/966

12.09.2020
2
Upgradation of Sattur –
Virudhunagar/ Thiruvenkatapuram road to
3.400 184.16 195.00 173.05 Work Completed.
Sattur E.T.Reddiapatti upto union limit km 0/0 -
3 3/2
Upgradation of Vembakottai - Guganparai
Virudhunagar/
road via Keelanmarainadu km 5/2-13/4 8.200 373.00 410.00 379.94 Work Completed.
Sattur
4 (PUR-34)
Total 15.800 792.470 862.30 791.97
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -18
Virudhunagar/ Upgradation of Vadakkunatham to
Thiruchuli Therkunatham road km 0/0 - 2/040
2.040 141.01 123.00 124.41 Work Completed
1
Virudhunagar/ Upgradation of Poolankal to Dharka road
1.600 84.17 92.00 93.81 Work Completed

M/s Lakshmi Construction


Thiruchuli km 0/0 - 1/600

07.02.2020/ 06.08.2020
2

Rs. 50031359/-
Virudhunagar/ Upgradation of Madurai Kanniyakumari

06.08.2020
1.000 53.13 53.13 55.18 Work Completed.
Aruppukottai Road to Pulvaipatty km 0/0 - 1/0
3
Virudhunagar/ Upgradation of Nalli road to
1.340 72.72 79.95 50.75 Work Completed.
Aruppukottai Singamudaiyar koil km 0/0 - 1/340
4
Virudhunagar/ Upgradation of A.Ramalingapuram -
2.200 120.10 120.10 124.32 Work Completed.
Aruppukottai Kulasekharapuram road km 0/0 - 2/2
5

Virudhunagar/ Upgradation of Madurai - Kanniyakumari


1.600 87.35 87.35 57.31 Work Completed.
Aruppukottai road to Thottilovanpatti km 0/0 - 1/600
6
Total 9.780 558.48 555.53 505.78
Ramanathapuram District
Package -19
Ramanathapura

28.02.2020/ 27.08.2020
Kalayanoor to Poothondi 2.300 136.47 142.00 122.33 Work Completed.
m

Thiru. V. Kathiresan
1
Rs. 57647830/-

27.08.2020
Ramanathapura
Vaigai Road to Poothondi 1.350 80.94 89.20 82.39 Work Completed.
m
2

Ramanathapura Aanandhur road - Kavuur vilakku (via)


6.150 347.30 407.00 361.38 Work Completed.
m Kavanakottai 00 - 6150
3
Total 9.800 564.71 638.20 566.10
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -20

11.08.2020
Ramanathapura

K.O.Periyakaruppan @
NH210- Oodaikkal road Km 00-2330 2.330 131.75 147.00 132.06 work completed.
m

Rs. 61119302/-
1

11.08.2020
Thiru.
Ramanathapura Odaikaal road to Aliyathanmozhli road

Balu
4.450 251.31 260.00 232.73 work completed.
m (via) Kulamanikam 00 - 4450

/
2

12.02.2020
Ramanathapura Vellaiyapuram Main Road to
4.500 254.12 270.00 209.11 work completed.
m Maruthavayal Road
3
Total 11.280 637.18 677.00 573.90
Package -21

24.02.2020/ 23.08.2020
Ramanathapura
NH49To Achankudi (via) L.Karunkulam 2.840 183.53 194.00 168.46 Work Completed.
m

Rs. 67512462/-
1

Thiru.P.Ramu

23.08.2020
Ramanathapura Andavoorani Kannankudi road to
4.120 233.45 272.00 240.93 Work Completed.
m Paganoor road
2
Ramanathapura
Devakottai Vattanam road to Kadambur 4.100 231.52 272.00 246.83 Work Completed.
m
3
Total 11.060 648.50 738.00 656.22
Package -22

Ramanathapura Ramnad - Keelakarai road to Palkarai


Rs. 62898940/-

3.200 187.30 200.00 172.98 Work Completed.

Venkateswara
Construction
road

03.02.2020/
m

02.08.2020

02.08.2020
1 M/s Sri

Ramanathapura
Mariyarayapuram to Melamadai 5.493 442.36 497.01 447.46 Work Completed.
m
2
Total 8.693 629.66 697.01 620.44
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -23
Ramanathapura Devipattinam - Thirupalaikudi roaa to
2.450 146.82 161.81 142.76 Work Completed.

19.03.2020/18.09.2020
1m Papanenthal road

M/s Krishna & Co


Rs. 52647659/-
Ramanathapura

18.09.2020
 Koravalli Karan Road 1.430 85.66 95.50 82.04 Work Completed.
2m
Ramanathapura Vannankundu - Pudukovil road (via)
2.860 172.23 189.80 164.51 Work Completed.
3m Nehrupuram

Ramanathapura  NH 49 Therkkukattur Road (via) Muslim


2.400 144.01 145.00 119.14 Work Completed.
4m KudyIruppu
Total 9.140 548.72 592.11 508.45
Package -24
Ramanathapura
Vengaloor to Kowl Road 2.020 122.37 130.00 129.94 Work Completed.
1m

10.02.2020 /09.08.2020
Thiru.R.Tamilselvam
Rs. 61521942/-
Ramanathapura PMK- Mukuladhur road to Pulithikulam
2.509 155.30 155.30 151.66 Work Completed.

09.08.2020
m (Via) Thenpothuvakudi
2

Ramanathapura Melaykudi -Thirusanmuganathapuram


2.648 187.30 187.30 151.44 Work Completed.
m to Kulavipatti Junction
3
Ramanathapura
Puthukudi Lakshmipuram Road 3.160 195.98 195.98 174.09 Work Completed.
4m
Total 10.337 660.95 668.58 607.13
Package -25

05.03.2020/ 04.09.2020
Km7/6 Mudukulathur - Ukmangai road
Thiru. G.Ramamoorthi

Ramanathapura
to Ramalingapuram road in Km 0/0 - 3.200 183.53 181.24 178.38 Work Completed.
m
Rs. 60269637/-

1 3/200 (via) Kumarakurichi

04.09.2020
Ramanathapura Mudukulathur - U.K.Mangai road to
2.840 187.30 200.00 180.70 Work Completed.
2m Kakkoor road (via) South Kakkoor

Ramanathapura Kadukusanthai-Mariyur Road to Oppilan


3.500 244.71 263.00 230.72 Work Completed.
m Road (Via) Seeninathapuram Road
3
Total 9.540 615.54 644.24 589.8
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -26

Ramanathapura Maruthanganallur to Kadambankulam


2.400 160.00 177.00 151.13 Work Completed.
m road 0/0 -2/4

19.02.2020/ 18.08.2020
1

Thiru.R.Tamilselvam
Ramanathapura Pasumpon to Kadambangulam road 0/0

Rs.55990300/-
1.800 122.36 133.00 117.26 Work Completed.

18.08.2020
m -1/8
2

Ramanathapura Thanjavur- Sayalkudi Road to


1.730 105.53 108.00 94.21 Work Completed.
m Koorankottai Road (Via) Malataru
3

Ramanathapura
Vallanthai to Pothanathi road 0/0 -3/2 3.200 187.29 200.00 180.12 Work Completed.
m
4
Total 9.130 575.18 618.00 542.72

Package -27

M/s Krishna & Co


Rs. 56568753/-
Ramanathapura Muthukulathur Sikkal Road to Sokkanai

06.03.2020/
3.433 216.41 241.00 222.30 Work Completed.

05.09.2020
05.09.2020
m (Via) T.Alangulam Road
1

Ramanathapura Sikkal to Thanichiyam (Via) Ithurani


5.000 329.42 637.00 347.64 Work Completed.
m Sirakulam Road
2
Total 8.433 545.83 878.00 569.94
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -28

Ramanathapura Upgradation of Ettivayal - Idambadal


1.700 85.86 100.00 79.74 Work Completed.
m road to Nallirukkai km 0/0-1/7
1
Upgradation of P.Kodikulam road to
Ramanathapura
Pandappanendal road km 0/0-1/550 1.550 78.28 94.00 78.62 Work Completed.

04.05.2020/ 03.11.2020
m
(R36)
2

Rs. 50477740/-

Thiru.T.Raju

03.11.2020
Upgradation of Rameswaram -
Ramanathapura
Ramarpatham to Vadakadu road km 1.000 50.51 60.50 51.29 Work Completed.
m
2/0-3/0(R543)
3

Ramanathapura Upgradation of N.Pethanendal road km


0.600 32.14 36.30 32.46 Work Completed.
m 0/0-0/6 ( R263)
4

Ramanathapura Upgradation of Parthibanoor- Narikudi


4.600 238.75 277.00 245.18 Work Completed.
m road to Thaduthalankottai km 0/0-4/6
5
Total 9.450 485.54 567.80 487.29
Package -29

Ramanathapura Upgradation of Perumalthevanpatti to

13.02.2020 / 12.08.2020
3.300 183.66 200.00 197.06 Work Completed.

Tmt.G. Saravanapriya
m Muthupatti road km 0/0-3/3

12.08.2020
Rs. 57790678/-

1
Upgradation of T.M.Kottai to Perunali
Ramanathapura Uchinatham road (via)
5.000 298.44 302.50 275.50 Work Completed.
m Annapoovanayackkanpatti road km 0/0-
5/0
2
Ramanathapura
 NH 49 to Therkkuvadi street 1.500 90.36 100.00 84.79 BT completed.
3m
Total 9.800 572.46 602.50 557.35
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package -30

12.02.2020 / 11.08.2020
Ramanathapura Upgradation of Devakottai- Devipatinam
2.700 136.36 151.00 123.34 Work completed.

Thiru. M.Ravichandran
m road to Vennathur km 0/0-2/7
1

Rs. 54162250/-

11.08.2020
Ramanathapura Kottamangalam - Andichiyendal (via)
2.050 103.54 124.30 110.66 Work completed.
2m Pandamangalam km 0/0-2/05

Ramanathapura Upgradation of ECR -


1.200 60.60 72.00 61.77 Work completed.
m Keelachithoorwadi km 0/0-1/2 (R249)
3
Ramanathapura Upgradation of Thalimarungoor to
4.300 217.17 260.00 232.60 Work completed.
4m Thelur road km 0/0-4/3 ( R115)
Total 10.250 517.67 607.30 528.37
Grand Total 319.964 18240.250 19751.940 29610.81
(G.O.(2D)No.12/ Highways and Minor Ports(HF-1) Department dated 04.06.2020
Virudhunagar Distrcit
Package-1

Virudhunagar/ Upgradation of Mellakallankulam-


1.78 107.00 103.00 82.77 Work Completed.
Thriuchuli Nazerpuliyankulam
1

21.09.2020 / 20.03.2021
Virudhunagar/ Upgradation of Seeganenthal-

Rs. 53114221/-
2.43 146.00 137.00 113.02 Work Completed.

Thiru.P.Raju
Thriuchuli Kanjamanayaganpatti Road

20.03.2021
2
Road Work
Upgradation of Trichy-Tuticorin Road To
Virudhunagar/ Completed & Deck
Panikanenthal Via Kariapatti - Narikudi 2.40 258.00 283.80 123.20
Thriuchuli Slab Work is in
Joining Road
3 Progress
Upgradation of Thiruppuvanam -
Virudhunagar/
Narikudi Road To Kalvimadai Km 0/0 - 2.46 148.00 147.00 120.22 Work Completed.
Thriuchuli
4 2/460
Total 9.070 659.00 670.80 439.21
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package-2 0.00

Virudhunagar/ Upgradation of Kalkurichi - Virudhunagar Earth Work is in


0.60 36.00 35.00 0.17
Thriuchuli Road To Villipathiri Road Km 0/0-0/6 progress
1

Work deleted. This work


Virudhunagar/ Upgradation of Keppilingampatti- Improvement was carried

23.09.2020 / 22.03.2021
2.00 120.00 117.00 0.16

Thiru.S.K.Subbureddiyar
Thriuchuli Kanthasamy Thottam To Periya Perali out by DRDA before the
Tender Process.

Rs. 50239840/-
2

22.03.2021
Virudhunagar/ Upgradation of Thiruchuli - Kariapatti road Deleted. Existing ODR
1.60 112.00 98.00 0.17
Thriuchuli to Pulikurichi Km 0/0-1/6 Maintained by C&M Wing.
3
Virudhunagar/ Upgradation of Nochikulam to K.Pudur
1.32 92.00 84.00 66.92 BT Completed.
4 Thriuchuli road Km 0/0-1/320
Virudhunagar/ Upgradation of Poolangal to Dharkka
2.00 120.00 123.00 0.17 BT Completed.
5 Thriuchuli road Km 1/6-3/6
Virudhunagar/
Upgradation of Ayyampatti link Road 1.59 111.00 112.50 91.65 BT Completed.
6 Aruppukottai
9.110 591.000 569.500 159.24
Package-3 0.00

Virudhunagar/ Upgradation of Madurai- kanniyakumari


Aruppukottai road toChinnaodai patty
2.00 120.00 121.00 99.40 Work Completed.
1

23.09.2020 / 22.03.2021
Thiru.S.K.Subbureddiyar
Virudhunagar/ Upgradation of Perumalpatti to
1.70 119.00 123.00 112.94 Work Completed.
2 Aruppukottai Kappureddipatty
Rs. 51313173/-

22.03.2021
Virudhunagar/ Upgradation of Madurai-Kanniyakumari
1.40 84.00 91.00 107.36 Work Completed.
Aruppukottai road to Sivanainthapuram
3
Upgradation of Sevaloor BG Road To
Virudhunagar/
Meet Koundampatti - Kothaneri Road Km 2.22 155.00 157.00 120.48 Work Completed.
Virudhunagar
4 0/0-2/220

Virudhunagar/ Upgradation of Meesalur To Thathampatti


1.50 90.00 84.50 74.24 Work Completed.
Virudhunagar Road
5
8.820 568.00 576.50 514.42
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package-4 0.00
Upgradation of Palayampatti Mutharaiyar

Rs.57484141
Virudhunagar/

01.10.2020/
M/s.Krishna
Nagar Road To Meet Bye-Pass Road Km 1.30 600.00 472.95 Work Completed.

31.03.2021

31.03.2021
660.00
Aruppukottai
1 0/0-1/300

/-
Virudhunagar/ Upgradation of Valvangi To Chettikurichi

& Co
1.40 84.00 80.00 80.05 Work Completed.
2 Thriuchuli Road
Total 2.700 684.000 740.000 553.00
Package-5 0.00
Upgradation of Sengundrapuram To
Virudhunagar/
T.Kallupatti -Virudhunagar Road Upto 2.60 156.00 142.00 137.90 Work Completed.
Virudhunagar
1 Union Limit Road

01.10.2020/ 31.03.2021
Virudhunagar/ Upgradation of Appaiyanaickenpatti -
1.90 114.00 116.50 105.07 Work Completed.

M/s.Krishna & Co
2 Virudhunagar Pudupatty Road

Rs.52835745/-

31.03.2021
Virudhunagar/ Upgradation of Rajivgandhinagar To
Virudhunagar Shanmugasundarapuram
1.57 140.00 133.00 73.62 Work Completed.
3
Virudhunagar/ Upgradation of NH-208 - K.Thottiyapatti
2.02 121.00 114.00 87.85 Work Completed.
Rajapalayam Road Km 0/125-2/145
4
Virudhunagar/ Upgradation of Valavanthalpuram -
1.56 94.00 95.00 85.68 Work Completed.
5 Virudhunagar Kuppampatty Road
Total 9.650 625.000 600.50 490.12
Package-6 0.00
Virudhunagar/ Upgradation of Boovanathapuram To Injar
1.60 96.00 101.25 76.96 Work Completed.
1 Sivakasi Road Km 0/0-1/6

Virudhunagar/ Upgradation of Ramalingapuram-


1.81 126.00 126.00 105.17 Work Completed.
Sattur Sundararajapuram Road Km 0/0-1/810

21.09.2020/20.03.2021
2
Virudhunagar/ Upgradation of Rajapalayam - Srivilliputtur
Tmt.K.Selvi

20.03.2021
0.48 30.00 26.00 19.04 Work Completed.
Rajapalayam Limit To Inam Chettikulam Km 0/0-0/480
3
Upgradation of Kottaipatti -
Virudhunagar/
O .Mettupatti To Panayadipatty Road Km 1.48 89.00 75.00 59.05 Work Completed.
Sattur
4 0/0-1/480
Upgradation of Rajapalayam - Vembakottai
Virudhunagar/
Road To Ethirkottai Via Kudayirruppu 2.61 157.00 142.00 88.57 Work Completed.
Sattur
5 Road Km 0/0-2/610
Proble date of completion/
Date of Commencement /
of Completion asper

Actual completed date


21.09.2020/20.03.2021
Tmt.K.SelviName
Length in km

Contract value
Cumulative

agreement

20.03.2021
A.S. T.S.
Sl.N Name of District / Epr. Upto

Contractor's
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

Date
1 2 3 3 4 5 6 7 8 9 10 11
Virudhunagar/ Upgradation of Valayapatty To
1.92 134.00 130.00 88.43 Work Completed.
6 Sattur Arunachalapuram Road
Total 9.900 632.00 600.25 437.22
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11

Package-7 0.00
Upgradation of Mathagupatty -
Sivagangai/ Alagumanagari road to
1.20 80.00 80.00 64.97 BM & BC completed.
Sivagangai Kadamutrhanpatti up to Block Limit road
1 km 0/0-1/2

01.10.2020/ 31.03.2021
Sivagangai/ Upgradation of Periya Olagudipatti BC work is in
2.40 168.00 164.00 35.21
2 Sivagangai Road Km 0/0-2/4 progress.

Rs. 57199625/-

Thriu.P.Ramu

31.03.2021
Sivagangai/ Upgradation of Chinna Olagudipatti to WMM work is in
2.20 154.00 154.00 33.03
3 Sivagangai Kathalampattu Road Km 0/0-2/2 progress.
Sivagangai/ Upgradation of Mulliyarendal road to
1.00 66.00 66.50 0.12 CD work is in progress.
4 Manamadurai Pethanenthal road Km 0/0-1/0
Sivagangai/ Upgradation of Thoothai Road Km 0/0- Earth work is in
1.60 112.00 123.20 0.13
5 Manamadurai 1/6 progress.
Sivagangai/ Upgradation of Patcheri-Michelpattinam CD work is in
0.80 49.50 54.45 0.12
6 Manamadurai road Km 0/0-0/8 progress.
Total 9.200 629.50 642.15 133.58
Package-8 0.00

Sivagangai/ Upgradation of Athankudi road to BM & BC work


1.10 73.50 77.00 62.98
Karaikudi Thergu Seyyanenthal Km 0/0-1/100 completed.
1

Sivagangai/ Upgradation of NH 210 Road to Block BM & BC work


1.60 105.50 113.00 94.14

09.10.2020/ 08.04.2021
Karaikudi limit via Kadagampatti Km 0/0-1/6 completed.

Thriu.B.Karunakaran
2
Rs. 50592554/-

08.04.2021
Sivagangai/ Upgradation of Chokkanathapuram to BM & BC work
2.10 135.00 135.00 0.56
Karaikudi Uvarkulam Km 0/0-2/100 completed.
3
Upgradation of Sarugani Devakottai to
Sivagangai/ BM & BC work
Karugudi road via Thergu porgudi Km 2.20 145.00 159.50 136.44
Karaikudi completed.
4 0/0-2/2

Sivagangai/ Upgradation of Chettiyendhal road to BM & BC work


1.20 84.00 83.00 66.71
Karaikudi Block limit via Puligulam Km 0/0-1/2 completed.
5
Total 8.200 543.00 567.50 360.83
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package-9 0.00
Sivagangai/ Upgradation of Vattanam Road To
1.40 95.00 104.50 3.72 CD work completed.
1 Karaikudi Alangudi road via Vadugani Km 0/0-1/4

Sivagangai/ Upgradation of Koviloor to


1.60 112.00 123.20 86.52 BM & BC completed.
2 Karaikudi Sanganthidal Road Km 0/0-1/6

05.10.2020/ 04.04.2021
Thriu.R.Saravanan
Rs. 51121296/-
Sivagangai/ Upgradation of Kudikkadu Road to

04.04.2021
1.20 75.40 82.94 71.11 BM & BC completed.
3 Karaikudi Sathamangalam Road Km 0/0-1/2

Sivagangai/ Upgradation of Oorivayal Road Km 0/0-


1.20 84.00 92.40 76.19 BM & BC completed.
4 Karaikudi 1/2

Sivagangai/ Upgradation of Monnani Road Km 0/0-


1.80 125.00 137.50 51.59 WMM work completed.
5 Karaikudi 1/8

Sivagangai/ Upgradation of Kunakarai Road Km


1.20 75.00 82.50 73.48 BM & BC completed.
6 Karaikudi 0/0-1/2
Total 8.400 566.40 623.04 358.89
Package-10 0.00

Sivagangai/ Upgradation of Aralikottai - Keelavalavu WMM work is in


3.70 226.00 226.00 0.13
Thiruppathur road to Valayapatti road Km 0/0-3/700 progress.
1
Sivagangai/ Upgradation of E-Valayapatti to WMM work is in

05.10.2020/ 04.04.2021
0.60 45.00 46.50 0.12
Thiruppathur Kaliammankoil road Km 0/0-0/6 progress.
2
Rs. 57101230/-

Tmt.V.Meenal

04.04.2021
Sivagangai/ Upgradation of S. Sevalpatti to WMM work
2.20 125.00 129.50 0.12
Thiruppathur Klungapatti road Km 0/0-2/2 completed. .
3
Upgradation of Devakottai-Pudukkottai
Sivagangai/ District Border Road to
2.10 133.00 126.00 100.96 BM & BC completed
Karaikudi Sadayamangalam Via Velar Kudiruppu
4
Road Km 0/0-2/100
Sivagangai/ Upgradation of NH210
2.00 131.50 121.00 95.53 BM & BC completed
Karaikudi Amaravathipudur Km 0/0-2/0
5
Total 10.600 660.50 649.00 196.86
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package-11 0.00

Sivagangai/ Upgradation of Kesampatti to


1.70 140.00 145.00 83.58 Work completed

23.09.2020 / 22.03.2021
Thiruppathur Minnamalaipatti road km 0/0 - 1/700

Thiru.B.Subramanian
1

Rs. 50630147/-
Sivagangai/ Upgradation of Ganapathypatty -

22.03.2021
3.00 210.00 210.00 209.03 Work completed
Thiruppathur Nagamangalam Road km 0/0 - 3/0
2
Sivagangai/ Upgradation of Piranmalai Therodum
0.55 70.00 76.00 76.74 Work completed
Thiruppathur Veedhi road Km 0/0-0/550
3
Sivagangai/ Upgradation of Thiruvalandur to
1.60 135.00 140.00 136.94 Work completed
Thiruppathur Kallakalanpatti road km 0/0 - 1/6
4
Total 6.850 555.00 571.00 506.29
Package-12 0.00

01.10.2020/31.03.2021
Ramanathapuram Upgradation of Koolipatti to Singampatti
2.20 145.00 135.00 106.73 BM & BC completed
1 / Mudukulathur Km 0/0-2/2

Rs.64090681/-

S.P.K. & Co

31.03.2021
Ramanathapuram Upgradation of Komboothi to kadaladi
6.80 430.00 445.00 352.10 BM & BC completed
/ Mudukulathur Road Km 0/0-6/8
2

Ramanathapuram Upgradation of Komboothi to


2.40 150.00 153.00 127.39 BM & BC completed
/ Mudukulathur Ochathevankottai Road Km 0/0-2/4
3
Total 11.400 725.00 733.00 586.22
Package-13 0.00

Ramanathapuram Upgradation of Anandhur to


4.50 284.00 284.00 Thiru.V.Kathiresan 226.79 Work is Completed
/ Tiruvadanai Govindamangalam Road km 0/0 - 4/500
Rs.50645836/-

23.09.2020 /
22.03.2021

22.03.2021
Ramanathapuram Upgradation of Anandhur Road to
2.10 142.00 154.00 123.43 Work is Completed
/ Tiruvadanai Kappakudi road km 0/0 - 2/100
2
Ramanathapuram Upgradation of Thiruvarangam Road to
2.00 145.00 145.00 113.05 Work is Completed
/ Mudukulathur Vathiyenenthal Road Km 0/0-2/0
3
Total 8.600 1154.00 583.00 463.27
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package-14 0.00
Ramanathapuram
Upgradation of Ettivayal Ithambadal

21.09.2020 / 20.03.2021
/ 2.57 179.90 172.00 143.81 Work is Completed

Thiru.G.Ramamoorthy
road to Koneriyendal Km 0/0-2/570
1 Ramanathapuram

Rs.50830084/-

20.03.2021
Ramanathapuram
Upgradation of Alangulam to
/ 3.00 210.00 200.00 186.15 Work is Completed
Thaliyerenthal road Km 0/0-3/0
2 Ramanathapuram

Ramanathapuram Upgradation of T.U Mangai


/ Thiruppullani Road to Deivachilainallur 1.47 170.00 187.00 176.26 Work is Completed
Ramanathapuram road Km 0/0-1/465
3
Total 7.035 559.90 559.00 506.22
Package-15 0.00

Ramanathapuram Upgradation of Manjakollai to


3.20 210.00 200.00 181.85 BM & BC completed.
/ Paramakudi Karumbukoottam Road Km 0/0-3/2

01.10.2020/31.03.2021
1

Thiru.R.Tamilselvam
Ramanathapuram Upgradation of Peerkankurichy to

Rs.55626714
3.60 250.00 230.00 151.09 BM & BC completed.

31.03.2021
/ Paramakudi Keelaparuthiyur Road Km 0/0-3/6
2

Upgradation of NH 87 Poduvakudi Road to


Ramanathapuram
S.Andakudy Road (opposite Attai 1.75 125.00 125.00 83.05 BM & BC completed.
/ Paramakudi company) Km 0/0-1/750
3
Upgradation of Paramakudi -
Ramanathapuram
Muthukulathur road to Thalaikal 1.50 105.00 100.00 71.22 BM & BC completed.
/ Paramakudi Ammankoil road Km 0/0-1/500
4
Total 10.050 690.000 655.00 487.21
Grand Total 129.585 9842.300 9340.240 0.000 0.000 0.000 0.000 6192.580
Grand Total 449.549 29109.550 30131.680 ### #VALUE! #VALUE! #VALUE! 36386.840
(G.O.(2D)No.53/ Highways and Minor Ports(HF-1) Department dated 30.12.2020
Package 24

Virudhunagar/ Upgradation of Palayampatti aranmanai road CD Work is in


2.60 150.09 153.00
54720677.000

Thiru.R.Raju

21.08.2021
Aruppukottai to kattangudi Km 0/0-2/6 21.08.2021 Progress
22.02.2021/

1
Virudhunagar/ Upgradation of Pappanam to V.Nagoor Km Earth Work is in
4.10 294.80 324.00
2 Thiruchuli 0/0-4/100 progress
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

54720677.000Contract value
Cumulative

21.08.2021 agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

Thiru.R.Raju

21.08.2021
22.02.2021/
1 2 3 3 4 5 6 7 8 9 10 11
Virudhunagar/ Upgradation of Maniyampatti Road - Earth Work is in
Aruppukottai Kulasekarapuram Road Km 0/0 - 1/770
1.77 112.00 123.00
3 progress
8.47 556.89 600.00 0.00
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 25
Virudhunagar/ Upgradation of Sengamalaipatti to Municipal WMM Work is in
4.10 222.00 222.00
Sivakasi Limit Km 0/0 - 4/100 progress

Constructions.
51737424.000
1

24.08.2021

24.08.2021
25.02.2021/
M/s.Balaji
Upgradation of Sivakasi Municipal Limit to
Virudhunagar/
Sivakasi
Sithurajapuram via Uthandamadasamy Kovil 2.40 123.00 127.00 98.59 BT Completed.
2 Km 0/0 - 2/4
Virudhunagar/ Upgradation of Vilampatti to Periyapottalpatti Earth Work is in
Sivakasi Road Km 0/0 - 1/650
1.65 234.00 235.00
3 progress
8.150 579.000 584.000 98.590
Package 26

Virudhunagar/ Upgradation of NH7 Thatampatti Earth Work is in

S.K.Subba Reddiyar
3.51 251.00 272.000
Virudhunagar Inamreediapatti Road Km 0/0 - 3/510 progress

56836007.000
1

23.08.2021

23.08.2021
24.02.2021/
Virudhunagar/ Upgradation of Avudaiyapuram - Earth Work is in
1.50 151.50 166.00
2
Virudhunagar Subbaiahpuram Road Km 0/0 - 1/5 progress

Virudhunagar/ Upgradation of Sivakasi - Erichanatham road CD Work is in


3.60 197.00 200.00
3
Sivakasi to Kallipatti road Km 0/0 - 3/6 Progress
8.610 599.500 638.000 0.000
Package 27

Sivagangai/ Upgradation of Koduvoor to Melakarai Road Earth Work is in


2.93 199.50 183.12
Karaikudi km 0/0 - 2/930 progress
1

21.08.2021
Sivagangai/ Upgradation Ariyakudi - Unjanai road km 0/0 -
1.00 60.50 48.58 BM &BC completed.

Thiru.A.Rajmohan
Karaikudi 1/0
57250184.000

21.08.2021
Sivagangai/ Upgradation of Aralikottai BT Road km 0/0 -
Thiruppathur 1/250
1.25 95.00 104.50 BM &BC completed.

22.02.2021/
3

Sivagangai/ Upgradation of Jeyankondanilai - Malampatti


Thiruppathur Road km 0/0 - 0/8
0.80 62.00 68.20 BM &BC completed.
4

Sivagangai/ Upgradation of Kattayampatti to District Limit WMM Work is in


Thiruppathur Road km 0/0 - 3/2
3.20 185.00 197.00
progress
5
Total 9.180 602.00 601.40 0.00
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 28

M/s.RGR & Co
58360858.000
Paramakudi / Upgradation of Muthukulathur-Kamuthi road Earth & CD Work is in

25.08.2021
25.08.2021
26.02.2021/
2.50 355.26 358.000
Mudukulathur (via)Chithirankudi Km 0/0-2/500 progress
1
Upgradation of Chithirankudi to
Paramakudi / BM Completed BC
E.Veppankulam AD colony(via) Erachikulam 3.80 296.52 297.000
Mudukulathur work is in progress.
2 Road km 0/0-3/800
Total 6.300 651.780 655.000 0.000
Package 29

M/s.Venkateshwara
Paramakudi / Upgradation of (Via) Preiyur, Aliyathanmozli WMM Work is
4.54 276.65 303.000
Thiruvadanai km 2/0-6/540 Completed

61331019.000

Constructions
1

23.08.2021

23.08.2021
24.02.2021/
Paramakudi / Upgradation of - Peruvayal to BM & BC work is
1.30 198.76 162.500 100.81
2
Thiruvadanai Therkuperuvayal Km 0/0-1/300 Completed
Paramakudi / Upgradation of Kadamboor to Manikkamkottai WMM Work is
2.70 240.67 240.700
3 Thiruvadanai Km 0/0-2/700 Completed
Total 8.540 716.08 706.20 100.81
Package 30

Paramakudi / Upgradation of Devakottai- Vattanam Road to


Thiruvadanai keelakurichi Road Km 0/0-2/2
2.20 125.25 137.500 116.34 BM & BC completed.
1

23.08.2021
Paramakudi / Upgradation of Neerkundram Road to

Thiru.B.Subramanian
Thiruvadanai Aranootrivayal road Km 0/0-2/370
2.37 139.07 152.500 127.94 BM & BC completed.
2
72693887.000

23.08.2021
Paramakudi / Upgradation of Sirugambaiyur to Oriyur road
Thiruvadanai Km 0/0-2/200
2.20 125.27 137.000 114.83 BM & BC completed.
3

24.02.2021/
Upgradation of Anjukottai Neerkundram Road
Paramakudi /
Thiruvadanai
to Thinnakathanvayal road link Road km 0/0- 2.15 130.65 135.000 113.28 BM & BC completed.
2/150
4

Paramakudi / Upgradation of NH210 to kumulendal Road


Thiruvadanai Km 0/0-3/400
3.40 211.00 232.000 22.91 BM & BC completed.
5
Total 12.320 731.240 794.000 495.300
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date


Contractor's Name
Length in km

Contract value
Cumulative

agreement
A.S. T.S.
Sl.N Name of District / Epr. Upto
Name of Work Amount Amount
o. Constituency 30.04.2021 Present stage of work
Rs. In Rs. In
(Rs. In
lakhs Lakhs
lakhs)

1 2 3 3 4 5 6 7 8 9 10 11
Package 31
Paramakudi / Upgradation of NH-49 to Kummukottai via
Paramakudi Poovilathur Road Km 0/0-3/500
3.50 248.01 264.000 BT work is Completed
1

M/s.R.Tamilselvam & Co

25.02.2021/ 24.08.2021
Paramakudi / Upgradation of Poovilathur to Karuthanendal
Paramakudi Road Km 0/0-1/950
1.95 126.08 138.50 BT work is Completed

72156319.000
2

24.08.2021
Paramakudi / Upgradation of Seyyalur to Veeravanur Road
Paramakudi 0/0-1/860
1.86 141.41 144.00 BT work is Completed
3
Paramakudi / Upgradation of NH-49 Manjakollai road to
Paramakudi Karuthanendal road Km 0/0-1/350
1.35 69.64 75.00 BT work is Completed
4
Paramakudi / Upgradation of Melathooval to Keeranur road WMM Work is
3.10 200.00 200.000
5
Mudukulathur Km 0/0-3/100 Completed
Total 11.760 785.14 821.50 0.00
Package 32

Paramakudi / Upgradation of Melathooval to K.R Patnam WMM Work is


2.80 213.13 220.000

Thiru.V.Kathiresan
Mudukulathur Road Km 0/0-2/800 Completed

52937151.000
1

25.08.2021

25.08.2021
26.02.2021/
Upgradation of Udaikulam Natham Road to
Paramakudi / Earth & CD Work is in
meet Muthaneri-Nallikuruchi road via 3.90 273.58 273.600
Mudukulathur
M.Kottakudi Km 0/0-3/900 progress
2

Paramakudi / Upgradation of Kottaiyendhal Road Km 0/0-


Mudukulathur 1/400
1.40 103.93 105.000 Work yet to be Started
3
Total 8.100 590.640 598.600 0.000
81.430 5812.270 5998.700 694.700
Grand Total 530.979 34921.820 36130.380 28263.10
Progress Report

Division: Paramakudi(H), Nabard & Rural Roads Month: April-2021 Rs. In Lakhs
Sanction details Contract details Expenditure details (in lakhs) Work status

Proble date of completion/


Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ROADS AND BRIDGES/ ROB/RUB/ BYPASSES/ PUR
G.O.Ms.No.11/Highways & Minor Ports(HW-1) department /dated.01.02.2018 (56 Bridges)

35045658
Construction of bridgeat km 4/2of 400.00
Sivagangai/ Thiru.P. 10.10.18/ 09.10.202
1 Perambalur - manamadurai road to 365.00 CE.No.27 /
Arumugam 09.12.19 0
364.71 364.71 100% Work completed.
Manamadurai 2017-18
Velur

G.O.Ms.No.33/Highways & Minor Ports(HW-1) department /dated.12.03.2018 (70 Bridges)

1972.00
B.S.

65882758
Constrcution of High level bridge at 762.00
Sivagangai/ Engineer's 13.12.18/ 12.12.202
1 km 9/6-8 of Thiruppathur - Alangudi 750.00 CE.No.
and 12.12.20 0
689.35 689.35 80% Work completed.
Karaikudi /2018-19
road Contractors
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to

1972.00
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
G.O.Ms.No184/Highways & Minor Ports(HW-1) department /dated.14.11.2018 (79 Bridges)
Construction of minor bridge @Km

25222435.00
1/4 of Mathur - Mulaikulam Road
Sivagangai / M/s. S.K. 21.08.19/ 31.03.202
12 ODR 231.30 254.00 259.17 259.17 80% Work completed.
Sivagangai Construction 20.06.20 1

Construction of Minor bridge at km

23031997.00
3/2 of Malakottai Nainapatti road
Sivagangai / A.Vijayakuma 09.08.19/
13 ODR 219.00 219.00 08.06.20 235.41 235.41 100% Work completed.
Thirupathur r 08.06.20

Construction of Minor Bridge at Km

16227599.00
2/6 of Watrap - Maharajapuram
180.00
Virudhunagar/ Road to Taniparai Road. Panchay M/s.Ram 13.06.2019/1 30.04.202 Pile Work is in
14 at Union
175.00 Cr.No.114/ 1.35 1.35 1%
Srivilliputhur 18-19
constructions 2.02.2020 1 Progress

G.O.Ms.No57/Highways & Minor Ports(HW-1) department /dated.20.03.2020 (40 Bridges) 0.00


Reconstruction of High level bridge
B.S.
at km 153/4-6 of Thanjavur- Engineer's 07.09.2020/ 06.11.202 Capping Beam work is in
1 Sivagangai Sayalkudi road 1034.38 1035.00
and 06.11.2021 1
233.56 233.56
progress.
Contractors
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
G.O.(Ms)No.132/ Highways and Minor Ports(EAP.II(2)) Department dated 24.10.2020 ( 50 Bridges) 0.00
Construction of High level bridge at Awaiting for TAC
Sivagangai / km 1/6-8 of Veppankulam- approval and Bridge
1 Vishalayankottai road 987.93 0.00
Karaikudi Design from Design
wing.
Construction of High level bridge Awaiting for TAC
Sivagangai / across vaigai river at km 22/4 of approval and Bridge
2 NH49 madurai- Dhanushkodi road to 1778.27 0.00
Manamadurai Design from Design
meet Pedhanenthal wing.
Construction of Minor Bridge at km

Constructions, Constructions, s.R.Tamilselvam


6354002.00

04.01.2021/
03.05.2021

03.05.2021
0/2 of Paramakudi - Mudukulathur Above sill level work
Ramanathapuram road to Pulithikulam road (via)

& CO
3 59.27 65.00 13.02 13.02 and Retaining wall

M/
/ Paramakudi Thenpoduvakudi.
work is in progress.

Construction of Bridge at km 2/2 of

28.07.2021
Rajapalayam Rajapalayam
13786873.00

M/s.Lakshmi M/s.Lakshmi

28.07.2021
Puthulupatti- Thiyagarapuram road

29.01.2021/
Virudhunagar/ Above Sill work
4 148.18 160.00 35.50 35.50 10%
Virudhunagar Completed

Construction of Bridge at km 0/8 of

12.07.2021
8253968.00

12.07.2021 12.07.2021
Puthulupatti- Thiyagarapuram road

13.01.2021/ 13.01.2021/
Diversion Road Work
Virudhunagar/
5 296.37 101.00 7.90 7.90 10% Completed. Earth
Virudhunagar
Work in progress

Construction of Bridge at km 1/0 of


Rajapalayam
Construction
M/s.Lakshmi
9402303.00

12.07.2021
of K.Pudur- Thiyagarajapuram road Diversion Road Work
Virudhunagar/
6 148.18 108.00 7.76 7.76 10% Completed. Earth
s,

Virudhunagar
Work in progress

G.O.(Ms)No.136/ Highways and Minor Ports(EAP.II(2)) Department dated 05.11.2020 ( 26 Bridges) 64.18 0.00 64.18
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Construction of High level bridge
across vaigai river in the road
branching from Madurai - Dhanushkodi Awaiting for TAC
Ramanathapuram road (NH-49) to Meet Ramnad- Melur approval and Bridge
1 1554.62 0.00
/ Paramakudi road (SH-34) (via) Pottithatti, Design from Design
Mandivalasai, Kalladiyendal, Vallam, wing.
Pagaivendri.

1549.99 0.00 0.00 1549.99


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
G.O.(Ms)No.21/ Highways and Minor Ports(EAP.II(2)) Department dated 04.02.2021 ( 21 Bridges)

Constructiono of Minor Bridge at km


3/0 of Amathur to meet Alagapuri -
Virudhunagar/ Virudhunagar road (via) Moolipatti Tender Completed.
1 200.00 0.00
Awaiting for opening.
Virudhunagar road.

Construction of High level bridge at


Sivagangai/ km 10/6 of Kayaodai- Valanai road.
2 450.00 0.00 Estimate submitted.
Manamadhurai

G.O.(Ms)No.29/ Highways and Minor Ports(EAP.II(2)) Department dated 10.02.2021 ( 5 Bridges) 0.00
Construction of bed level causeway
at km 46/8 of Krishnarajapuram 1) Estimate under
connection Manamadurai - preparation.
Paramakudi road (via) T.Pudukottai 2)
Sivagangai/ at km 0/6 of Kannar street and
1 900.00 0.00 Permission request
Manamadhurai Madurai Dhanushkodi road across submitted to EE, PWD,
Vaigai river Paramakudi. 3) Awaiting
NOC from PWD.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ROB/RUB
Construction of limited use subway
(LUS)at Virudhunagar – Aruppukottai
road as deposit work in lieu of
temporary level crossing constructed 1053.00

59552855
30.08.2016
Virudhunagar during the construction of ROB at LC CE's M/s. Lakshmi 13.09.201 Work Completed. PCR
1 325.00 1053.00 1053.00 100%
Virudhunagar 406 No.7, /2016- Construction
29.10.2017
7 to be submitted.
17

Construction of ROB at Railway


Km. 538/600-700 in lieu of existing
LC No.403 between Virudhunagar 2053.00

1278572550
and Thulukkapatti Railway Stations CR.No.20/2
Virudhunagar (Virudhunagar Town) M/s. Myans 04.03.2016 22.02.201 Work Completed. PCR
2 2053.00 015-16
Constructin 03.03.2018 9
2239.68 2239.68 100%
Virudhunagar RAS. to be submitted.
2675.20
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bye Pass
1) 15 (2) notification published
on 30.3.2012. Since interim
stay order granted by Hon'ble
high court, Madurai. 15(2)
Notification not published. The
stay was dismissed on
27.3.2015 and CAVEAT filed on
1.4.2015 vide No. 659/2015.

2)15(2) Notification
published on 15.06.2015. 15(1)
notification has been approved
Forming Bye-Pass Road in by Government for publication
Mudukulathur Town km 0/0-4/090 as per
Paramakudi

G.O.(D)No.118/Highways and
(Branching at Km. 225/885 and ending Minor ports(HQ-1) Department
1 at Km.229/265 of SH29) 710.36 527.96 527.96 dated. 09.06.2016. Work in
Progress for Revised land
valuation Revenue Department.
( GO.Ms.No.8/2012/ Highways 3)As per
Department/ Dated. 20.01.2012.) G.O. the 15(1) Notification
published on29.06.2016 in
Tamil Nadu Government
Gazette No.26, Volume -II,
Section-2 Page 368.

4)15(1) notification has been


approved for wet lands by
Government for publication as
per G.O.(D)No.53/Highways
and Minor ports(HQ-1)
Department dated. 22.03.2017.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

5)As the publication of 19(2)


Private Negotiation land owner
1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 was conducted16 on 26.09.2017
by DRO, Ramanathapuram.
DPR estimate has been
submitted on 06.07.2018 to
Superintending Engineer(H),
N&RR, Tirunelveli.

6).Under
section 19(6) of Tamil Nadu
highways act 2001 final
proposal sent for approval to
CLA on 12.07.2018.

7)Letter from CLA


clarification needed for variation
in the guildeline value on
14.09.2018
8)Letter from CLA
clarification needed for variation
in the guildeline value on
14.09.2018
9) Letter
sent to DIG Registration
department, Madurai by District
collector Ramanathapuram on
09.11.2018 regarding
justificatin for variation in
guildline value.

10) The
Inspector General of
Registration, Chennai in the
Lr.No.5688/L2/2019/Dated.
02.03.2019 , stated that
valuation committee under the
chairmanship of Inspector
General does not fix value for
any survey No /Streets.
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16 policy,
It formulates only
methodology, and
administration of market value
of guideline in the state.
Valuation sub-committee under
the chairmanship of concerned
District collector fixes rates. Any
clarification or rectification
regarding fixation of guideline
value in respect of Land may be
sent to CLA directly.

11)
In guideline value fixation sub-
committee formed under the
chairman of District Collector,
Ramanathapuram and District
Register Ramanathapuram,
Sub-Register Mudukulathur,
Thasildhar Mudukulathur, Town
Panchayat Officer
Mudukulathur on 21.11.2019 at
4.00pm. 12) In Revised land
value proposal sent to
Commissioner of Land
Acquisition, Elilagam, Chennai-
5 from the District Collector,
Ramanathapuram vide
Lr.No.B1 /10357/2012/dated.
21.11.2019 . 13) In rectification
and revised land value proposal
sent to Commissioner of Land
Acquisition, Elilagam, Chennai-
5 from the District Collector,
Ramanathapuram
Lr.No.B1 vide
/10357/2012/dated.
21.11.2019 . 13) In rectification
and revised land value proposal
sent to Commissioner of Land
Acquisition, Elilagam, Chennai-
5 from the District Collector,
Ramanathapuram vide
Lr.No.B1 /10357/2012/dated.
14.02.2020.14) The forming of
Mudukulathur Byepass work
(Phase-I) administration
sanction accorded from the
Government vide G.O.
(Ms)no.20/Highways & minor
ports(HQ1) department, dated.
23.01.2020 for Rs.18.30 Crore .
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
16) The revised Land value
proposal as per revised
guideline value sent to
Inspector General of
Registration, Chennai-28 from
the District Collector,
Ramanathapuram Vide
Lr.No.B1/10357/2012 /dated.
05.06.2020. 17)
Inspector General of
Registration, Chennai-28
Lr.No.16556/L1/2020/
dated.14.08.2020 to District
Collector, Ramanathapuram,
the revision and rectification of
anomalies in the marketvalue
guidelinefor sub committee to
approve the market value
guideline consists of the
following members i) District
Collector-Chairman, ii) District
Revenue Officer, iii) Deputy
Inspector General of
Registration iv) District
Registrars of the concerned
Registration District, v) District
Register of the Head Quarters
of the concerned- revenue
district- Secretary vi) Assistant
Director of Town Panchayats
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
vii) Assistant Director of
Panchayats viii) Regional
Director of Municipalities and ix)
Representatives of local bodies.
18) District Collector,
Ramanathapuram.
Lr.No.B1/10357/2012/dated.
27.10.2020 to Inspector
General of Registration
Chennai-28. After fixing the
guideline value by forming sub
committee as per Tamil Nadu
Stamp rule 2010. The Field
Inspection carried out by
RDO,DR and Sub Registrar
Vide Lr.No.32906/L2/2020,
dated. 20.11.2020 from
Inspector General of
Registration, Chennai-28 to the
District Collector,
Ramanathapuram. The field
inspection work under process
and the report to submit IG
Office with in the week.
Allotment fund requision based
on the Revised LA demand.
DRO, Ramanathapuram,
Lr.No.10357/2012/dated.
03.03.2021. Estimate Prepared
to an amount of Rs.18.22
Crore and submitted to
Superintending Engineer (H),
Nabard & Rural Roads,
Tirunevelli for Technical
Sanction. After the completion
of the land acquiction process
then the work will be started..

Estimate submitted.
Forming Bye-Pass Road in Mudukulathur
Town km 0/0-4/090 (Branching at Km.
225/885 and ending at Km.229/265 of
1830.00
SH29) (work)(G.O.(Ms)no.20/Highways &
minor ports(HQ1) department, dated.
23.01.2020 )
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PUR 2018-19
Package 6 (2018-19)
Ramanathapuram District
Upgradation of Keelakkarai Erwadi
Ramanathapuram/ 26.02.2019/ 25.10.201
1 Ramanathapuram
road to melamadai (via) Velanoor 391.00 430.00
25.10.2019 9
371.34 371.34 100% Work Completed.
km:0/0-7/100

M/S.Krishna & co
Rs.98726234
Ramanathapuram Upgradation of Erwadi Dharga to 26.02.2019/ 25.10.201
2 496.00 545.00
25.10.2019 9
477.78 477.78 100% Work Completed.
/ Mudukulathur Serandai road Km. 0/0 -12/300.

Upgradation of Peraiyur -
Ramanathapuram 26.02.2019/ 25.10.201
3 Senkottaipatti road to Keelavalasai 130.00 136.00
25.10.2019 9
103.37 103.37 100% Work Completed.
/ Mudukulathur
road Km.0/0-2/400
Package 6 Total 1017.00 1111.00 952.49 952.49
Package 7

Ramanathapuram Upgradation of Mudukulathur - Sikkal 01.03.2019/ 31.12.201


1 255.00 280.50
31.12.2019 9
253.51 253.51 100% Work Completed.
/ Mudukulathur Road to Keelaselvanur road Km.0/0-

16674.58
7/2
Upgradation of Km. 6/2
Ramanathapuram Mudukulathur -Uthiragosa mangai 01.03.2019/ 31.12.201
2 320.00 327.00 279.45 279.45 100% Work Completed.

M/S.Velumanickam & co
/ Mudukulathur road to Ramalinga puram road Km. 31.12.2019 9
0/0 - 5/0.
Rs.101622748/-

Ramanathapuram Upgradation of Kathanendal - 01.03.2019/ 31.12.201


3 110.00 113.00 101.16 101.16 100% Work Completed.
/ Mudukulathur Paraiyankulam road Km.0/0-1/800 31.12.2019 9

Ramanathapuram Upgradation of A.Punavasal - 01.03.2019/ 31.12.201


4 70.00 75.00
31.12.2019 9
67.61 67.61 100% Work Completed.
/ Mudukulathur Keelaselvanur road to Maranthai -
Saveriyarpattinam road Km.0/0-0/9

Ramanathapuram 01.03.2019/ 31.12.201


5 280.00 308.00 282.16 282.16 100% Work Completed.
/ Mudukulathur Upgradation of Melakidaram to M. 31.12.2019 9
Krishnapuram road Km.0/0 - 8/0.
Package 7 Total 1035.00 1103.50 983.89 983.89
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 8
Ramanathapuram Upgradation of Keelaparuthiyur - 08.03.2019/ 07.01.202
1 215.00 236.50 221.36 221.36 100% Work Completed.
/ Paramakudi Veeracholam road km. 0/0-3/900 07.01.2020 0
Ramanathapuram Upgradation of NH49 to Lakshmi 08.03.2019/ 07.01.202
2 110.00 121.00
07.01.2020 0
111.83 111.83 100% Work Completed.
/ Paramakudi puram road km. 0/0-2/0
Upgradation of NH 49 to
Ramanathapuram 08.03.2019/ 07.01.202
3 Muthuchellapuram road km. 0/0-

Rs.108604089/-
162.00 177.00 151.88 151.88 100% Work Completed.

R.Tamilselvam
/ Paramakudi 07.01.2020 0

16674.58
2/940
Upgradation of S.Kodikulam-V.P.
Ramanathapuram 08.03.2019/ 07.01.202
4 Kovil road to K. P. Madam road 177.00 194.00 173.35 173.35 100% Work Completed.
/ Paramakudi 07.01.2020 0
km.0/0-3/217

Ramanathapuram Upgradation of Ramnad-Melur road 08.03.2019/ 07.01.202


5 132.00 145.00
07.01.2020 0
132.94 132.94 100% Work Completed.
/ Paramakudi to Kulathur road km.0/0-2/400

Ramanathapuram Upgradation of Sikkal to 08.03.2019/ 07.01.202


6 265.00 291.50
07.01.2020 0
275.42 275.42 100% Work Completed.
/ Mudukulathur Andichikulam road Km. 0/0 - 4/8
Package 8 Total 1061.00 1165.00 1066.78 0.00 0.00 1066.78
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 9
Upgradation of Anandur - Valanai
Ramanathapuram 08.03.2019/ 07.01.202
1 link road (via) Rakinarkottai road 178.00 195.80 182.45 182.45 100% Work Completed.
/ Thiruvadanai 07.01.2020 0
km. 0/0-3/225

Ramanathapuram Upgradation of Kallikudi -Kottakudi 08.03.2019/ 07.01.202


2 190.00 167.00 153.61 153.61 100% Work Completed.
/ Thiruvadanai (via) Soorampuli km.0/0-3/435 07.01.2020 0

Upgradation of R.S.Mangalam -

P.Ramu, Devakottai
Ramanathapuram Uppoor-Avarenthal road to 08.03.2019/ 07.01.202

Rs.10,32,28,197/-
3 121.00 132.50
07.01.2020 0
121.59 121.59 100% Work Completed.
/ Thiruvadanai Vettukulam (via) Kalangapuli road

16674.78
km. 0/0-2/2
Upgradation of Anjukottai -
Ramanathapuram 08.03.2019/ 07.01.202
4 Neerkunram road to Kannangudi 115.50 127.05
07.01.2020 0
115.8 115.80 100% Work Completed.
/ Thiruvadanai
road Km.0/0-2/100
Ramanathapuram Upgradation of NH230 to 08.03.2019/ 07.01.202
5 165.00 179.50
07.01.2020 0
166.13 166.13 100% Work Completed.
/ Thiruvadanai Thalirmarungoor road km. 0/0-3/0
Ramanathapuram Upgradation of ECR-Karankadu road 08.03.2019/ 07.01.202
6 121.00 121.00
07.01.2020 0
109.43 109.43 100% Work Completed.
/ Thiruvadanai km. 0/0-2/200

Ramanathapuram Upgradation of Ramnad Nainarkoil 08.03.2019/ 07.01.202


7 198.00 199.00
07.01.2020 0
185.82 185.82 100% Work Completed.
/ Thiruvadanai road to Sakkankudi Road km.0/0-3/6
Package 9 Total 1088.50 1121.85 1034.83 1034.83
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Virudhunagar District
Package -10
Virudhunagar/ Upgradation of Manthopu road to 01.03.2019/ 31.10.201
1 143.00 149.00
31.10.2019 9
130.88 130.88 100% Work Completed.
Thiruchuli Karisalkulam road 0/0 - 2/588
Virudhunagar/ Upgradation of Trichy-Tuticorin Road 01.03.2019/ 31.10.201
2 61.00 67.00 62.04 62.04 100% Work Completed.
Thiruchuli to Uplikundu 3/4 - 4/5 31.10.2019 9

M/S.Krishnan & Co
Rs.5,91,65,460/-
Virudhunagar/ Upgradation of Kariyapatti-Thiruchuli 01.03.2019/ 31.10.201
3 137.00 150.60
31.10.2019 9
135.02 135.02 100% Work Completed.
Thiruchuli Road to K.Pudur 0/0 - 2/5

Virudhunagar/ Upgradation of Mithilaikulam - 01.03.2019/ 31.10.201


4 120.00 122.00 105.42 105.42 100% Work Completed.
Thiruchuli Iluppaikulam (via) Mayilee 0/0 - 2/2 31.10.2019 9

Virudhunagar/ Upgradation of K.Mettupatty - 01.03.2019/ 31.10.201


5 165.00 167.00 145.57 145.57 100% Work Completed.
Sattur Sirukulam Road Km 0/0 - 3/0 31.10.2019 9

16674.78
Package 10 Total 626.00 655.60 578.93 578.93
Package -11

Virudhunagar/ Upgradation of MCC road to 08.03.2019/ 07.11.201


1 90.00 92.00
07.11.2019 9
76.92 76.92 100% Work Completed.
Virudhunagar Inamreddiyapatti Km 0/0 - 1/6

Virudhunagar/ Upgradation of NH7 to Pavali (Via) Rs.5,35,63,958/- 08.03.2019/ 07.11.201

S.Murugesan
2 180.00 180.00
07.11.2019 9
153.5 153.50 100% Work Completed.
Virudhunagar Sangu Odai Km 0/0 - 3/3

Virudhunagar/ Upgradation of Koundampatti to 08.03.2019/ 07.11.201


3 190.00 199.60
07.11.2019 9
180.47 180.47 100% Work Completed.
Virudhunagar kothaneri km 0/0 - 3/430

Virudhunagar/ Upgradation of Kalaiyarkurchi to 08.03.2019/ 07.11.201


4 125.00 133.00
07.11.2019 9
116.42 116.42 100% Work Completed.
Sivakasi sanarpatti km 0/0-2/250

Package 11 Total 585.00 604.60 527.31 0 0 527.31


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -12
Virudhunagar/ Upgradation of Sithurajapuram to 08.03.2019/ 07.11.201
1 300.00 300.00 265.24 265.24 100% Work Completed.
Sivakasi E.T.Rediyapatti road km 0/0-4/2 07.11.2019 9
Upgradation of Sivakasi -
Virudhunagar/ 08.03.2019/ 07.11.201
2 Erichanatham road to M.Pudupatti 25.00 25.00
07.11.2019 9
17.54 17.54 100% Work Completed.
Sivakasi
road km 0/0-0/450

M/s.Balaji Constructions.
Virudhunagar/ Upgradation of Nathikudi to 08.03.2019/ 07.11.201
3 90.00 92.00 79.15 79.15 100% Work Completed.

Rs.5,94,08,035/-
Sattur Thiruvenkatapuram Road 0/0 - 1/155 07.11.2019 9

16674.78
Virudhunagar/ Upgradation of Kothankulam to 08.03.2019/ 07.11.201
4 85.00 85.00
07.11.2019 9
12.99 12.99 100% Work Completed.
Sattur Chatrapatti Road KM 5/200 - 6/728

Upgradation of Krishnapuram to
Virudhunagar/ 08.03.2019/ 07.11.201
5 meet Tenkasi -Thirumangalam road 55.00 55.00
07.11.2019 9
47.89 47.89 100% Work Completed.
Virudhunagar
(via) Chokkampatti km 0/0-1/0

Virudhunagar/ Upgradation of O.Mettupatti - 08.03.2019/ 07.11.201


6 115.00 122.00 107.12 107.12 100% Work Completed.
Sattur Pethureddipatty road km 3/0-5/010 07.11.2019 9

Package 12 Total 670.00 679.00 529.93 0.00 0.00 529.93


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -13
Virudhunagar/ Upgradation of Vadakarai to District 22.08.2019/ 21.04.202
1 245.49 245.49 100% Work Completed.
Sattur border road 0/0 to 5/6 300.00 300.00 21.04.2020 0
Upgradation of Seithur Zaminkalam
Virudhunagar/ 22.08.2019/ 21.04.202
2 road to Athiputhira ayyanar koil road 21.04.2020 0
198.33 198.33 100% Work Completed.
Rajapalayam
0/0 - 4/438 245.00 245.00

Rs.89506176/-

Tmt.K.Selvi
Virudhunagar/ Upgradation of Khansapuram to 22.08.2019/ 21.04.202
3 21.04.2020 0
268.26 268.26 100% Work Completed.
Srivillputhur Athikoil road km 0/0-6/0
330.00 330.00
Virudhunagar/ Upgradation of Keelagopalapuram to 22.08.2019/ 21.04.202
4 21.04.2020 0
79.68 79.68 100% Work Completed.
Srivillputhur kalyanipuram road 0/0-1/756
95.00 95.00

Virudhunagar/ Upgradation of Kunnur to 22.08.2019/ 21.04.202


5 64.39 64.39 100% Work Completed.
Srivillputhur keelagopalapuram road 0/0-1/400 21.04.2020 0
80.00 80.00
Package 13 Total 1050.00 1050.00 856.15 0.00 0.00 856.15
Sivagangai District

16674.78
Package -18
Upgradation of Nalukottai to
Sivagangai/ Keelapoonkudi (via) 08.03.19/ 07.11.201
1 Thirunarayanpuram Paranipatti road 284.35 284.35
07.11.19 9
246.38 246.38 100% Work Completed.
Sivagangai
km 0/0-5/170
Upgradation of Melur - Sivagangai

Thiru.M.Ramachandran
Sivagangai/ road to Koovanipatti road km 0/0- 08.03.19/ 07.11.201
2 1/800 99.00 99.00 87.75 87.75 100% Work Completed.
Rs.5,68,8,209/-

Sivagangai 07.11.19 9

Upgradation of Idaya Melur -


Sivagangai/ Koovanipatti road km 0/0-1/750 08.03.19/ 07.11.201
3 96.25 98.00
07.11.19 9
86.74 86.74 100% Work Completed.
Sivagangai

Upgradation of Thamarakki -
Sivagangai/ Kothankulam road0/0-3/060 R32 08.03.19/ 07.11.201
4 168.30 164.00 145.75 145.75 100% Work Completed.
Sivagangai 07.11.19 9

Package 18 Total 647.90 645.35 566.62 566.62


Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -19
Upgradation of Ramnad - Sivagangai
Sivagangai/ - Melur road to Kottakudi toad upto 01.03.19/ 31.10.201
1 block limit km 0/0-1/010 55.55 55.55
31.10.19 9
47.95 47.95 100% Work Completed.
Sivagangai

Upgradation of Kalmekki road 0/0-


Sivagangai/ 2/200 01.03.19/ 31.10.201
2 121.00 121.00 106.68 106.68 100% Work Completed.
Sivagangai 31.10.19 9

M/s.S.A.L. Company
Rs.5,81,59,084/-
Sivagangai/ Upgradation of Pasankarai - 01.03.19/ 31.10.201
3 60.50 60.50
31.10.19 9
53.45 53.45 100% Work Completed.
Sivagangai Kalameikki km 0/0-1/100

Sivagangai/ Upgradation of Pillur - Kovanoor road 01.03.19/ 31.10.201


4 36.30 36.30
31.10.19 9
33.92 33.92 100% Work Completed.
Sivagangai 0/0-0/660

Upgradation of Oyyavandhan to

16674.78
Sivagangai/ kanjipatti road via orupokki, 01.03.19/ 31.10.201
5 368.50 372.00 326.86 326.86 100% Work Completed.
Sivagangai kalkulam, ponnakal km 0/0-6/700. 31.10.19 9

Package 19 Total 641.85 645.35 568.86 568.86


Package -20
Upgradation of Kovanoor -
Sivagangai/ Vairavanpatti road 29.05.19/
1 28.01.20
28.01.20 155.22 155.22 100% Work Completed.
Sivagangai km 0/0-3/145 172.98 172.98
Upgradation of Andichioorani -
Sivagangai/ Mudukkoorani road km 0/0-4/200 29.05.19/
2 28.01.20 201.07 201.07 100% Work Completed.
M/s.KOP & Co
Rs.55245592

Sivagangai 28.01.20
231.00 231.00

Sivagangai/ Upgradation of Regunathamadai - 29.05.19/


3 28.01.20
28.01.20 50.49 50.49 100% Work Completed.
Sivagangai Krishnapuram road km 0/0-1/0
55.00 55.50
Upgradation of Idaikattur -
Sivagangai/ 29.05.19/
4 Arulananthapuram road km 0/0- 28.01.20 145.48 145.48 100% Work Completed.
Sivagangai 28.01.20
2/900 159.50 160.00
Package 20 Total 618.48 619.48 552.26 552.26
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -21
Sivagangai/ Upgradation of SIPCOT Konnakulam 08.03.19/ 07.11.201
1 33.89 33.89 100% Work Completed.
Manamadurai link road km 0/0-0/630 07.11.19 9
37.80 37.50

Sivagangai/ Upgradation of Velur- 08.03.19/ 07.11.201

Rs.5,76,90,581/-
2 110.2 110.20 100% Work Completed.

Thiru.T.Ramar
Manamadurai Sriranganatham road km 0/0-2/400 07.11.19 9
132.00 133.00

Upgradation of Melachorikulam road


Sivagangai/ 08.03.19/ 07.11.201
3 to meet Thanjakoor road km 0/0- 88.73 88.73 100% Work Completed.
Manamadurai 07.11.19 9
1/854
101.97 101.97

16674.78
Upgradation of Salaigramam -
Sivagangai/ 08.03.19/ 07.11.201
4 Sarugani raod to Ochanthittu 0/0- 07.11.19 9
174.57 174.57 100% Work Completed.
Sivagangai
3/600 198.00 198.00

Sivagangai/ Upgradation of Krishnapuram - 08.03.19/ 07.11.201


5 07.11.19 9
43.5 43.50 100% Work Completed.
Sivagangai Mulliarenthal road km 0/0-0/800
44.00 44.00

Rs.5,76,90,581/-

Thiru.T.Ramar
Sivagangai/ Upgradation of Mulliarenthal - 08.03.19/ 07.11.201
6 07.11.19 9
79.17 79.17 100% Work Completed.
Sivagangai Munaivendri road km 0/0-1/600
88.00 89.00

Sivagangai/ Upgradation of Nedunkulam road - 08.03.19/ 07.11.201


7 40.85 40.85 100% Work Completed.
Sivagangai Mulliarenthal raod km 0/0-0/800 07.11.19 9
44.00 44.00
Package 21 Total 645.77 647.47 570.91 0 570.91
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -22
Sivagangai/ Upgradation of Valaiyapatty - 08.03.19/ 07.11.201
1 127.49 127.49 100% Work Completed.
Manamadurai Pokaraipatty road km 0/0-2/393 131.62 131.62 07.11.19 9
Upgradation of Madurai - Devakottai
Sivagangai/ 08.03.19/ 07.11.201

Thiru.M.Ravichandran
2 road to Siravayalpudur road KM 0/0- 07.11.19 9
126.28 126.28 100% Work Completed.
Sivagangai

Rs.5,60,45,882/-
2/400 132.00 132.00
Upgradation of Devakottai
Sivagangai/ Municipality limit to Sarugani - 08.03.19/ 07.11.201
3 Devakottai road (via) Marichanpatti 106.64 106.64 100% Work Completed.
Karaikudi 07.11.19 9
km 0/0-1/900 105.00 105.00
Upgradation of Madurai- Thondi road
Sivagangai/ to Thoonukudi (via) Pavasi road km 08.03.19/ 07.11.201
4 217.69 217.69 100% Work Completed.
Karaikudi 0/0-4/700 07.11.19 9
260.00 260.00
Package 22 Total 628.62 628.62 578.1 0 0 578.10
Package -23
Sivagangai/ Upgradation of Unjani - 08.03.19/ 07.11.201
1 175.02 175.02 100% Work Completed.

16674.78
Karaikudi Narasimmapuram road km 0/0-3/600 07.11.19 9

Rs.5,83,01,667/-

Thiru.V.Meenal
198.00 198.00
Upgradation of Kallal- Devakottai to
Sivagangai/ Kallangudi Pudur road km 0/0-2/210 08.03.19/ 07.11.201
2 07.11.19 9
112.62 112.62 100% Work Completed.
Karaikudi
122.00 122.00

Sivagangai/ Upgradation of NH210 Chettiyendal 08.03.19/ 07.11.201


3 07.11.19 9
305.64 305.64 100% Work Completed.
Karaikudi road km 0/0-6/0
330.00 330.00
Package 23 Total 650.00 650.00 593.28 593.28
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

16674.78
Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -24
Sivagangai/ Upgradation of Porivayal - Eagarai 08.03.19/ 07.11.201
1 1.200 61.27 61.27 100% Work Completed.
Karaikudi road km 0/0-1/200 66.00 66.00 07.11.19 9

Rs.4,93,62,127/-

M/s.A.M. & Co
Sivagangai/ Upgradation of Vetriyur 08.03.19/ 07.11.201
2 4.200
07.11.19 9
228.48 228.48 100% Work Completed.
Sivagangai A.Karunkulam road at 0/0-4/200
231.00 231.00

Upgradation of Pudukottai Ambel


Sivagangai/ 08.03.19/ 07.11.201
3 Road to Kakkakottai Road (Via) 4.800 219.86 219.86 100% Work Completed.
Karaikudi 07.11.19 9
Appalai Molumbur at km0/0- 4/800
264.00 264.00
Package 24 Total 561.00 561.00 509.61 0 0 509.61
Package -25
Sivagangai/ Upgradation of Kalapoor - Soorakudi 08.03.2019/ 07.11.201
1 231.67 231.67 100% Work Completed.

Rs.5,30,78,452/-
Thiruppathur raod km 0/0-4/840 266.00 266.00 07.11.2019 9

M/s.A.M. & Co
Upgradation of Kalapoor -
Sivagangai/ 08.03.2019/ 07.11.201
2 Kumarathakudipatti road km 0/0- 149.36 149.36 100% Work Completed.
Thiruppathur 07.11.2019 9
2/900 159.50 162.00
Sivagangai/ Upgradation of Kalapoor - 08.03.2019/ 07.11.201
3 07.11.2019 9
153.28 153.28 100% Work Completed.
Thiruppathur Manavathan road km 0/0-2/600 143.00 157.00
Package 25 Total 568.50 585.00 534.31 0 0 534.31

16674.78
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -26
Upgradation of Sevaipettai -
Sivagangai/ 08.03.2019/ 07.11.201
1 Govindamangalam road to 98.00 98.00 100% Work Completed.
Karaikudi 07.11.2019 9

Thiru.R.Saravanan
Pudukurichi km 0/0-2/0

Rs.5,72,37,575/-
110.00 110.00
Upgradation of Sirugavayal -
Sivagangai/ 08.03.2019/ 07.11.201
2 Thalaiyur road to Kalathur km 0/0- 158.86 158.86 100% Work Completed.
Karaikudi 07.11.2019 9
3/200 176.00 176.00

16674.78
Upgradation of Thenkarai -
Sivagangai/ 08.03.2019/ 07.11.201
3 Konkarathi (Via) valayapatti Km0/0- 07.11.2019 9
317.07 317.07 100% Work Completed.
Sivagangai
6/400 352.00 352.00
Package 26 Total 638.00 638.00 573.93 573.93
Package -27
Upgradation of Kattanipatti -
Sivagangai/ 01.03.2019/ 31.10.201
1 Saruguvalayapatti road to Odaipatti 31.10.2019 9
165.37 165.37 100% Work Completed.
Thiruppathur
km 0/0-3/100 170.50 182.50

M/S.Velumanickam & co
Sivagangai/ Upgradation of Jeyankondanilai to

Rs.5,79,21,532/-
01.03.2019/ 31.10.201
2 31.10.2019 9
94.34 94.34 100% Work Completed.
Thiruppathur Kattanipatti road km 0/0-1/900
104.50 105.00

Sivagangai/ Upgradation of Madurai - Devakottai 01.03.2019/ 31.10.201


3 31.10.2019 9
216.82 216.82 100% Work Completed.
Thiruppathur road to Sevalpatti km 0/0-4/400
242.00 242.00
Upgradation of Madurai - Devakottai
Sivagangai/ 01.03.2019/ 31.10.201
4 road -Sevalpatty road to 31.10.2019 9
100.00 100.00 100% Work Completed.
Thiruppathur
Oppilanpatti km 0/0-2/0 110.00 110.00
Package 27 Total 627.00 639.50 576.53 576.53
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
13359.62 13750.31

Rs.36542816/

13.03.2020/
12.09.2020
Tmt.K.Selvi

12.09.2020
Upgradation of Ramachandrapuram Retaining wall Work is
1 Virudhunagar 400.00 400.00 6.92 6.92 10%
- Sankaranatham Road 0/0 - 2/8 in progress

-
(G.O.(2D)No.45 & 46/ Highways and Minor Ports(HF-1) Department dated 15.10.2019 0.00 0.00 0.00
2019-20 PUR ROAD WORKS Sivagangai District 3336.28 0.00 0.00 12154.72
Package -1

Sivagangai/
Arasanoor - Samathuvapuram Road 2.715 152.24 167.00 148.92 148.92 100% Work Completed.
Sivagangai
1

23.08.2020
Thiru.B.Subramanian
Sivagangai/

Rs.60527283/-
Idayamelur B Colony to A Colony 2.700 151.43 164.00 144.68 144.68 100% Work Completed.
Sivagangai

23.08.2020
2

/
Sivagangai/
Arasanoor - A.R.Usilampatti Road 3.070 172.07 182.00 159.56 159.56 100% Work Completed.

24.2.2020
Sivagangai
3
Sundaranadappu - Patcheri Vilakku
Sivagangai/
Road to Mutharasan Link Road (Via) 2.600 146.26 159.00 142.41 142.41 100% Work Completed.
Sivagangai
4 Vanakaruppu
Total 11.085 622.000 672.000 595.57 0.00 0.00 595.57
Package -2
Sivagangai/ Vannikudi-Maruchukkatti Road Km
4.700 265.70 266.00 233.51 233.51 100% Work Completed.
1 Sivagangai 0/0-4/7

23.08.2020
Thiru.B.Subramanian

Kayaodai valanai road to Meet


Rs.57688724/-

Sivagangai/
satharasakottai-sooranam road (via) 3.000 167.91 181.00 159.88 159.88 100% Work Completed.
Sivagangai

23.08.2020
2 Allivayal

Kayaoodai valanai road to vannikudi


/

Sivagangai/ maruchikatti road via kalaikulam, o


24.2.2020

3.600 201.94 198.00 181.47 181.47 100% Work Completed.


Sivagangai maruthangudi, katiyakara srimam
Kalaikulam road 0/0 - 3/6
3
Total 11.300 635.550 645.000 574.86 0 0 574.86 100%
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -3
Thanjavore - Sayalkudi road to vani
Sivagangai 205.53 205.53 100% Work Completed.

11.08.2020
4.000 223.84 233.00

M/s Velumanickam.& Co
road
1

Rs.57921812/-
Kadamuthanpatti to Namanoor

11.08.2020
Sivagangai 1.400 78.27 81.00 70.47 70.47 100% Work Completed.
Periyakottai Patti Road
2

/
 Ilayangudi road Mangalam road to

12.02.2020
Sivagangai 2.400 137.13 148.00 125.28 125.28 100% Work Completed.
Kongampatty
3

Sivagangai Anandur road to kalladithidal 3.000 167.91 183.00 164.2 7.59 171.79 100% Work Completed.
4
Total 10.800 607.150 645.00 565.48 0 7.59 573.07
Package -4

12.08.2020
Sivagangai Keeladi to parani chamber 2.050 115.13 126.00 115.3 115.30 100% Work Completed.

M/s Subash Builders


1

Rs. 51317054/-
Sivagangai Parani chamber to sayanapuram 1.800 101.84 107.00 94.82 94.82 100% Work Completed.

12.08.2020
2

/
Sivagangai Madapuram - Theli road 4.000 225.88 244.00 213.47 213.47 100% Work Completed.

13.02.2020
3

Sivagangai Palayanoor to Vallarendal 1.450 81.43 89.57 84 84.00 100% Work Completed.
4
Total 9.300 524.280 566.57 507.59 0 0 507.59
Package -5
Rs.62666847/-

Thiru.T.Ramar

NH49 TO Chinnakannanur (via)


Sivagangai 456.9 456.90 100% Work Completed.

28.02.2020 /
8.200 481.33 520.00

27.08.2020

27.08.2020
Somathur road upto block limit
1
Thirupachetti Narikudi road to
Sivagangai 2.800 158.08 171.00 159.01 159.01 100% Work Completed.
Vilathur road
2
Total 11.000 639.410 691.00 615.91 0 0 615.91
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -6
Shanmuganathapattinam - Kaikudi
Sivagangai 2.505 140.08 140.00 123.9 123.90 100% Work Completed.
Road
1

28.02.2020 / 27.08.2020
Thiru.B.Uthayakumar
Rs.54115401/-
Sivagangai Pudukurichi - Kongumuthi Road 4.400 247.27 255.00 236.27 236.27 100% Work Completed.

27.08.2020
2
Kudikadu pappakudi road to
Sivagangai 2.240 126.28 136.00 121.26 121.26 100% Work Completed.
Umayandavayal road
3
KM 9/4 Of Sundaranadappu pacheri
Sivagangai 1.200 62.62 66.00 59.09 59.09 100% Work Completed.
road to V.Pudukulam road
4
Total 10.345 576.250 597.00 540.52 0 0.00 540.52
Package -7

Sivagangai Kottaiyur Bye Pass Road NH210 3.200 180.87 184.00 169.98 169.98 100% Work Completed.
1

05.03.2020 / 04.09.2020
Sivagangai NH210 to Avudai pogai 0.900 41.60 41.60 48.8 48.80 100% Work Completed.
2

Rs.60767349/-

M/s A.M. & Co


Kararikudi - Mathur Road to

04.09.2020
Kandanoor Mathur Road Via
Sivagangai 3.000 168.48 168.50 142.7 142.70 100% Work Completed.
Karaikaran kudieruppu (Vaigai
3 Nagar)

Sivagangai Alangudi to Ilangudi road 3.650 205.41 216.00 191.15 191.15 100% Work Completed.
4

Sivagangai Kannankudi Kadamboor Road 1.000 55.79 56.00 46.66 46.66 100% Work Completed.
5
Total 11.750 652.150 666.10 599.29 0 0.00 599.29
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -8
Kallal kalaiyarkoil road to
Sivagangai 2.000 112.35 108.00 109.54 4.18 113.72 100% Work Completed.
1 malaikandan raod

24.02.2020 / 23.08.2020
Thiru.R.Saravanan
Rs.55962332/-
Kandanoor -Mathur road to Alagappa
Sivagangai 3.600 201.48 198.00 183.99 183.99 100% Work Completed.

23.08.2020
Engineering collage road
2

Sivagangai Malaikandan to Vetriyur road 2.000 111.93 113.00 99.25 4.14 103.39 100% Work Completed.
3
Nagavayal rastha Road to
Sivagangai Devakottai Sr.pattinam (link 3.500 196.31 197.00 161.58 4.38 165.96 100% Work Completed.
4 road)road
Total 11.100 622.070 616.00 554.36 0 12.7 567.06
Package -9
Piranmalai -Thenammalpatti Road to

M/s B.S. Engineers and Contreactors


Sivagangai Mettupatti Road to Sirumaruthur 2.000 111.97 115.00 101.57 101.57 100% Work Completed.
1 road

07.02.2020 / 06.08.2020
Madurai - Devakottai Road

Rs.60675058/-
Sivagangai 1.400 61.37 67.00 54.51 54.51 100% Work Completed.
2 Vettangudipatti Road

06.08.2020
Vettangudipatti Road to Sevalatti
Sivagangai 3.270 150.83 164.00 158.01 158.01 100% Work Completed.
3 Road

Sivagangai K.Pudupatti to Athikaram road 3.100 173.43 186.00 169.7 169.70 100% Work Completed.
4
 R.S.Mangalam- Iiayangudi road to
Sivagangai 2.200 122.92 133.00 112.4 112.40 100% Work Completed.
5 Valakkani road (via)S.Kottaiyur
Total 11.970 620.520 665.00 596.19 0 0 596.19
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -10

 Sivagangai Ilayangudi road to


Sivagangai 5.200 291.91 307.00 273.65 10.86 284.51 100% Work Completed.
Kuruathankuban (via) maruthangudi
1

24.02.2020 / 23.08.2020
Rs.67945469/-
Kudikadu pappakudi road to

Tmt.V.Meenal
Sivagangai 1.270 67.07 72.00 63.7 3.79 67.49 100% Work Completed.

23.08.2020
poothakudi road
2

Sivagangai Siruganoor road to Poothakudi Road 3.411 186.12 183.00 164.28 4.10 168.38 100% Work Completed.
3

Sivagangai Pappankulam to V.Pudukulam road 3.000 170.21 187.00 164.6 164.60 100% Work Completed.
4
Total 12.881 715.310 749.00 666.23 0.00 18.75 684.98
Package -11

Upgradation of Madurai- Thondi road


Sivagangai 1.400 77.00 83.00 77.2 3.45 80.65 100% Work Completed.
to Mudikandam

13.08.2020
1

Thiru.A.Rajmohan
Upgradation of Madurai- Thondi road
Rs. 55968526/-
Sivagangai 1.600 88.00 95.50 84.89 4.43 89.32 100% Work Completed.
to Nattakudi

13.08.2020
2

/
Upgradation of M.T.Road -
Sivagangai Padamathur- Thiruppachehi road to 3.625 200.00 192.00 175.89 175.89 100% Work Completed.

14.02.2020
Nattakudi (via) Ilanthangudi road
3
Upgradation of Kumarapatii-
Sivagangai 4.200 231.00 242.00 219.64 219.64 100% Work Completed.
Mudikandam
4
Total 10.825 596.000 612.50 557.62 0 7.88 565.5
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -12

Upgradation of Thanjavur- Sayalkudi


Sivagangai 1.200 66.00 77.60 64.82 64.82 100% Work Completed.
road to Velarandal road km 3/4-4/6
1

09.08.2020
Upgradation of Madurai- Thondi road

Rs. 56575420/-

Thiru.M. Alagar
Sivagangai 4.500 247.50 268.00 242.42 242.42 100% Work Completed.
to Mudukkoorani
2

09.08.2020
10.02.2020 /
Sivagangai Upgradation of Ammachipatti road 1.500 82.50 90.00 80.74 80.74 100% Work Completed.
3
Upgradation of Sarugani- Devakottai
Sivagangai 1.000 55.00 60.00 53.16 53.16 100% Work Completed.
4 road to Chokkanathapuram
Upgradation of Thirukostiyur-
Sivagangai Pattamangalam road to 2.200 121.00 133.10 124.02 124.02 100% Work Completed.
5 Karuvelkurichi - Anna nagar road
Total 10.400 572.000 628.70 565.16 0 0 565.16
Package -13
Upgradation of Kalaiyar koil-
Sivagangai Mudikkarai road to Sathani Vilakku 2.800 154.00 169.00 151.46 151.46 100% Work Completed.

24.02.2020 / 23.08.2020
1 via Kiluvachi 0/0-2/800

Thiru.P.Ramu
Upgradation of Kallankudi Pudur

23.08.2020
Sivagangai 4.000 220.00 233.00 234.87 234.87 100% Work Completed.
road to Uvarkulam
2
Upgradation of Kappaloor - Embal
Sivagangai 1.000 55.00 56.00 44.08 44.08 100% Work Completed.
road km 6/8-7/8
3
Upgradation of Thiruppakottai-
Sivagangai 2.800 154.00 169.40 124.95 124.95 100% Work Completed.
Athankudi road km 3/2-6/0
4
Total 10.600 583.000 627.40 555.36 0 0 555.36
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Virudhunagar District
Package -14
Virudhunagar / Oruchirangampatti To Dharmam
2.000 113.79 125.00 115.64 115.64 100% Work Completed
Thiruchuzhi Road
1

14.02.2020 / 13.08.2020
M/s Lucky Associates
Virudhunagar / Dharmam Theli Road to Poovakani
2.385 134.70 148.00 131.69 131.69 100% Work Completed
Thiruchuzhi Road

Rs. 59955644/-
2

13.08.2020
Virudhunagar / Poovakani To Kottakatchiyenthal
2.250 130.91 133.00 116.36 116.36 100% Work Completed
Thiruchuzhi Road
3
Virudhunagar /
SH-42 to Udaiyanampatti 2.430 141.39 155.00 125.4 125.40 100% Work Completed
Thiruchuzhi
4
Virudhunagar /
Veerasolan road to Nayanenthal 1.600 92.67 98.00 97.47 97.47 100% Work Completed
Thiruchuzhi
5
Total 10.665 613.46 659.00 586.56 0 0.00 586.56
Package -15

12.02.2020 / 11.08.2020
Virudhunagar/ Upgradation of S.Maraikulam -
Work Completed

M/s Krishna & Co


5.400 304.03 315.00 281.25 9.96 291.21 100%

Rs. 58466216/-
Thiruchuli Thulukkankulam Road km 0/0 - 5/4
1

11.08.2020
Upgradation of Kariyapatti - Narikudi
Virudhunagar/
Road to T.Veppankulam Road km 0/0 - 3.010 167.03 180.00 166.18 4.79 170.97 100% Work Completed
Thiruchuli
2 3/010
Virudhunagar/ Upgradation of P.Thottiyankulam to
Thiruchuli Krishnapuram km 0/0 - 2/690
2.690 155.14 155.14 136.88 136.88 100% Work Completed
3
Total 11.100 626.20 650.14 584.31 0 14.75 599.06
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -16
Virudhunagar/ Upgradation of Pandalkudi to
5.000 276.82 300.00 240.47 27.17 267.64 100% Work Completed.
Aruppukottai Udyanthapuram road km 0/0 - 5/0
1
Virudhunagar/ Upgradation of Suthamadam to
4.280 234.54 234.54 178.6 22.14 200.74 100% Work Completed.
Thiruchuli Krishnapuram road km 0/0 - 4/280
2

13.03.2020 / 12.09.2020
Rs. 63660603/-
Virudhunagar/ Upgradation of Madurai Kanniyakumari

Tmt.K.Selvi
0.800 43.67 45.50 36.06 3.03 39.09 100% Work Completed.

12.09.2020
Aruppukottai Road to Meenakshipuram km 0/0 - 0/8
3
Virudhunagar/ Upgradation of Shanmugapuram Road
0.670 37.92 37.92 30.6 2.88 33.48 100% Work Completed.
Aruppukottai km 0/0 - 0/670
4
Virudhunagar/ Upgradation of Sivananainthapuram to
0.800 43.67 48.00 37.54 2.9 40.44 100% Work Completed.
Aruppukottai Meenakshipuram km 0/0 - 0/8
5
Upgradation of Melamadai to
Virudhunagar/
Palavanatham Road to 0.800 45.39 49.00 39.46 3.1 42.56 100% Work Completed.
Aruppukottai
6 Gnanapathiyapuram km 0/0 - 0/8
Total 12.350 682.010 714.96 562.73 0 61.22 623.95
Package -17
Virudhunagar/ Upgradation of ESI Colony road to
1.230 65.75 72.30 66.62 66.62 100% Work Completed.
1 Rajapalayam Kalangaperi road km 0/0 - 1/500

M/s Sri Balaji Construction

13.03.2020 / 12.09.2020
Virudhunagar/ Upgradation of Ramasamiyapuram to
2.970 169.56 185.00 172.36 172.36 100% Work Completed.
Rs. 79259887/-

Srivillputhur Pooriparaikulam road km 1/0 - 3/966


2

12.09.2020
Upgradation of Sattur –
Virudhunagar/ Thiruvenkatapuram road to
3.400 184.16 195.00 168.11 4.94 173.05 100% Work Completed.
Sattur E.T.Reddiapatti upto union limit km 0/0
3 - 3/2

Upgradation of Vembakottai -
Virudhunagar/
Guganparai road via Keelanmarainadu 8.200 373.00 410.00 375.51 4.43 379.94 100% Work Completed.
Sattur
km 5/2-13/4 (PUR-34)
4
Total 15.800 792.470 862.30 782.6 0 9.37 791.97
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -18
Virudhunagar/ Upgradation of Vadakkunatham to
Thiruchuli Therkunatham road km 0/0 - 2/040
2.040 141.01 123.00 123.09 1.32 124.41 100% Work Completed
1
Virudhunagar/ Upgradation of Poolankal to Dharka
1.600 84.17 92.00 93.81 93.81 100% Work Completed

M/s Lakshmi Construction


Thiruchuli road km 0/0 - 1/600

07.02.2020/ 06.08.2020
2

Rs. 50031359/-
Virudhunagar/ Upgradation of Madurai Kanniyakumari

06.08.2020
1.000 53.13 53.13 50.55 4.63 55.18 100% Work Completed.
Aruppukottai Road to Pulvaipatty km 0/0 - 1/0
3
Virudhunagar/ Upgradation of Nalli road to
1.340 72.72 79.95 50.75 50.75 100% Work Completed.
Aruppukottai Singamudaiyar koil km 0/0 - 1/340
4
Virudhunagar/ Upgradation of A.Ramalingapuram -
2.200 120.10 120.10 119.51 4.81 124.32 100% Work Completed.
Aruppukottai Kulasekharapuram road km 0/0 - 2/2
5
Upgradation of Madurai -
Virudhunagar/
Kanniyakumari road to Thottilovanpatti 1.600 87.35 87.35 57.31 57.31 100% Work Completed.
Aruppukottai
6 km 0/0 - 1/600
Total 9.780 558.48 555.53 495.02 0 10.76 505.78
Ramanathapuram District
Package -19
Ramanathapura

28.02.2020/ 27.08.2020
Kalayanoor to Poothondi 2.300 136.47 142.00 122.33 122.33 100% Work Completed.
m

Thiru. V. Kathiresan
1
Rs. 57647830/-

27.08.2020
Ramanathapura
Vaigai Road to Poothondi 1.350 80.94 89.20 82.39 82.39 100% Work Completed.
m
2

Ramanathapura Aanandhur road - Kavuur vilakku


6.150 347.30 407.00 361.38 361.38 100% Work Completed.
m (via) Kavanakottai 00 - 6150
3
Total 9.800 564.71 638.20 566.10 0.00 0.00 566.10
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -20

11.08.2020
Ramanathapura

K.O.Periyakaruppan @
NH210- Oodaikkal road Km 00-2330 2.330 131.75 147.00 132.06 132.06 100% work completed.
m

Rs. 61119302/-
1

11.08.2020
Thiru.
Ramanathapura Odaikaal road to Aliyathanmozhli

Balu
4.450 251.31 260.00 232.73 232.73 100% work completed.
m road (via) Kulamanikam 00 - 4450

/
2

12.02.2020
Ramanathapura Vellaiyapuram Main Road to
4.500 254.12 270.00 209.11 209.11 100% work completed.
m Maruthavayal Road
3
Total 11.280 637.18 677.00 573.90 0.00 0.00 573.90
Package -21

24.02.2020/ 23.08.2020
Ramanathapura NH49To Achankudi (via)
2.840 183.53 194.00 168.46 168.46 100% Work Completed.
m L.Karunkulam

Rs. 67512462/-
1

Thiru.P.Ramu

23.08.2020
Ramanathapura Andavoorani Kannankudi road to
4.120 233.45 272.00 240.93 240.93 100% Work Completed.
m Paganoor road
2
Ramanathapura Devakottai Vattanam road to
4.100 231.52 272.00 246.83 246.83 100% Work Completed.
m Kadambur
3
Total 11.060 648.50 738.00 656.22 0 0.00 656.22
Package -22

Ramanathapura Ramnad - Keelakarai road to


Rs. 62898940/-

3.200 187.30 200.00 Venkateswara 172.98 172.98 100% Work Completed.


Construction
Palkarai road

03.02.2020/
m

02.08.2020

02.08.2020
1
M/s Sri

Ramanathapura
Mariyarayapuram to Melamadai 5.493 442.36 497.01 447.46 447.46 100% Work Completed.
m
2
Total 8.693 629.66 697.01 620.44 0 0 620.44
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -23
Ramanathapura Devipattinam - Thirupalaikudi roaa to
2.450 146.82 161.81 142.76 142.76 100% Work Completed.

19.03.2020/18.09.2020
1m Papanenthal road

M/s Krishna & Co


Rs. 52647659/-
Ramanathapura

18.09.2020
 Koravalli Karan Road 1.430 85.66 95.50 82.04 82.04 100% Work Completed.
2m
Ramanathapura Vannankundu - Pudukovil road (via)
2.860 172.23 189.80 164.51 164.51 100% Work Completed.
3m Nehrupuram

Ramanathapura  NH 49 Therkkukattur Road (via)


2.400 144.01 145.00 119.14 119.14 100% Work Completed.
4m Muslim KudyIruppu
Total 9.140 548.72 592.11 508.45 0 0 508.45
Package -24
Ramanathapura
Vengaloor to Kowl Road 2.020 122.37 130.00 129.94 129.94 100% Work Completed.
1m

10.02.2020 /09.08.2020
Thiru.R.Tamilselvam
Rs. 61521942/-
Ramanathapura PMK- Mukuladhur road to
2.509 155.30 155.30 151.66 151.66 100% Work Completed.

09.08.2020
m Pulithikulam (Via) Thenpothuvakudi
2
Melaykudi -
Ramanathapura
Thirusanmuganathapuram to 2.648 187.30 187.30 151.44 151.44 100% Work Completed.
m
3 Kulavipatti Junction

Ramanathapura
Puthukudi Lakshmipuram Road 3.160 195.98 195.98 174.09 174.09 100% Work Completed.
4m
Total 10.337 660.95 668.58 607.13 0.00 0.00 607.13
Package -25

05.03.2020/ 04.09.2020
Km7/6 Mudukulathur - Ukmangai
Thiru. G.Ramamoorthi

Ramanathapura
road to Ramalingapuram road in Km 3.200 183.53 181.24 178.38 178.38 100% Work Completed.
m
Rs. 60269637/-

1 0/0 -3/200 (via) Kumarakurichi

04.09.2020
Ramanathapura Mudukulathur - U.K.Mangai road to
2.840 187.30 200.00 180.70 180.70 100% Work Completed.
2m Kakkoor road (via) South Kakkoor
Kadukusanthai-Mariyur Road to
Ramanathapura
Oppilan Road (Via) 3.500 244.71 263.00 230.72 230.72 100% Work Completed.
m
3 Seeninathapuram Road
Total 9.540 615.54 644.24 589.80 0.00 0.00 589.8
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -26

Ramanathapura Maruthanganallur to
2.400 160.00 177.00 151.13 151.13 100% Work Completed.
m Kadambankulam road 0/0 -2/4

19.02.2020/ 18.08.2020
1

Thiru.R.Tamilselvam
Ramanathapura Pasumpon to Kadambangulam road

Rs.55990300/-
1.800 122.36 133.00 117.26 117.26 100% Work Completed.

18.08.2020
m 0/0 -1/8
2

Ramanathapura Thanjavur- Sayalkudi Road to


1.730 105.53 108.00 94.21 94.21 100% Work Completed.
m Koorankottai Road (Via) Malataru
3

Ramanathapura
Vallanthai to Pothanathi road 0/0 -3/2 3.200 187.29 200.00 180.12 180.12 100% Work Completed.
m
4
Total 9.130 575.18 618.00 542.72 0 0 542.72

Package -27

M/s Krishna & Co


Rs. 56568753/-
Ramanathapura Muthukulathur Sikkal Road to

06.03.2020/
3.433 216.41 241.00 222.3 222.30 100% Work Completed.

05.09.2020
05.09.2020
m Sokkanai (Via) T.Alangulam Road
1

Ramanathapura Sikkal to Thanichiyam (Via) Ithurani


5.000 329.42 637.00 336.27 11.37 347.64 100% Work Completed.
m Sirakulam Road
2
Total 8.433 545.83 878.00 558.57 0 11.37 569.94
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -28

Ramanathapura Upgradation of Ettivayal - Idambadal


1.700 85.86 100.00 79.74 79.74 100% Work Completed.
m road to Nallirukkai km 0/0-1/7
1
Upgradation of P.Kodikulam road to
Ramanathapura
Pandappanendal road km 0/0-1/550 1.550 78.28 94.00 78.62 78.62 100% Work Completed.

04.05.2020/ 03.11.2020
m
(R36)
2

Rs. 50477740/-

Thiru.T.Raju

03.11.2020
Upgradation of Rameswaram -
Ramanathapura
Ramarpatham to Vadakadu road km 1.000 50.51 60.50 51.29 51.29 100% Work Completed.
m
2/0-3/0(R543)
3

Ramanathapura Upgradation of N.Pethanendal road


0.600 32.14 36.30 32.46 32.46 100% Work Completed.
m km 0/0-0/6 ( R263)
4
Upgradation of Parthibanoor-
Ramanathapura
Narikudi road to Thaduthalankottai 4.600 238.75 277.00 245.18 245.18 100% Work Completed.
m
km 0/0-4/6
5
Total 9.450 485.54 567.80 487.29 0 0 487.29
Package -29

Ramanathapura Upgradation of Perumalthevanpatti

13.02.2020 / 12.08.2020
3.300 183.66 200.00 195.10 1.96 197.06 100% Work Completed.
Tmt.G. Saravanapriya
m to Muthupatti road km 0/0-3/3

12.08.2020
Rs. 57790678/-

1
Upgradation of T.M.Kottai to Perunali
Ramanathapura Uchinatham road (via)
5.000 298.44 302.50 272.68 2.82 275.50 100% Work Completed.
m Annapoovanayackkanpatti road km
0/0-5/0
2
Ramanathapura
 NH 49 to Therkkuvadi street 1.500 90.36 100.00 83.93 0.86 84.79 100% BT completed.
3m
Total 9.800 572.46 602.50 551.71 0.00 5.64 557.35 100%
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package -30
Upgradation of Devakottai-
Ramanathapura

12.02.2020 / 11.08.2020
Devipatinam road to Vennathur km 2.700 136.36 151.00 123.34 123.34 100% Work completed.
m

Thiru. M.Ravichandran
1 0/0-2/7

Rs. 54162250/-

11.08.2020
Ramanathapura Kottamangalam - Andichiyendal (via)
2.050 103.54 124.30 110.66 110.66 100% Work completed.
m Pandamangalam km 0/0-2/05
2
Ramanathapura Upgradation of ECR -
1.200 60.60 72.00 61.77 61.77 100% Work completed.
m Keelachithoorwadi km 0/0-1/2 (R249)
3
Ramanathapura Upgradation of Thalimarungoor to
4.300 217.17 260.00 232.60 232.60 100% Work completed.
4m Thelur road km 0/0-4/3 ( R115)
Total 10.250 517.67 607.30 528.37 0 0.00 528.37
Grand Total 319.964 18240.250 19751.940 20632.34 0.00 160.03 29610.81
(G.O.(2D)No.12/ Highways and Minor Ports(HF-1) Department dated 04.06.2020
Virudhunagar Distrcit
Package-1

Virudhunagar/ Upgradation of Mellakallankulam-


107.00 82.77 82.77 Work Completed.
Thriuchuli Nazerpuliyankulam
1

21.09.2020 / 20.03.2021
Virudhunagar/ Upgradation of Seeganenthal-
146.00 Rs. 53114221/- 113.02 113.02 Work Completed.

Thiru.P.Raju
Thriuchuli Kanjamanayaganpatti Road

20.03.2021
2
Road Work
Upgradation of Trichy-Tuticorin Road
Virudhunagar/ Completed & Deck
To Panikanenthal Via Kariapatti - 2.40 258.00 283.80 49.24 73.96 123.20
Thriuchuli Slab Work is in
Narikudi Joining Road
3 Progress
Upgradation of Thiruppuvanam -
Virudhunagar/
Narikudi Road To Kalvimadai Km 0/0 148.00 120.22 120.22 Work Completed.
Thriuchuli
4 -2/460
Total 2.400 659.00 283.80 365.25 73.96 439.21
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-2 0.00
Upgradation of Kalkurichi -
Virudhunagar/ Earth Work is in
Virudhunagar Road To Villipathiri Road 36.00 0.17 0.17
Thriuchuli progress
1 Km 0/0-0/6

Work deleted. This work


Virudhunagar/ Upgradation of Keppilingampatti- Improvement was carried

23.09.2020 / 22.03.2021
120.00 0.16 0.16

Thiru.S.K.Subbureddiyar
Thriuchuli Kanthasamy Thottam To Periya Perali out by DRDA before the
Tender Process.

Rs. 50239840/-
2

22.03.2021
Virudhunagar/ Upgradation of Thiruchuli - Kariapatti Deleted. Existing ODR
112.00 0.17 0.17
Thriuchuli road to Pulikurichi Km 0/0-1/6 Maintained by C&M Wing.
3
Virudhunagar/ Upgradation of Nochikulam to K.Pudur
92.00 0.16 66.76 66.92 BT Completed.
4 Thriuchuli road Km 0/0-1/320
Virudhunagar/ Upgradation of Poolangal to Dharkka
120.00 0.17 0.17 BT Completed.
5 Thriuchuli road Km 1/6-3/6
Virudhunagar/
Upgradation of Ayyampatti link Road 111.00 91.65 91.65 BT Completed.
6 Aruppukottai
0.000 591.000 0.000 92.48 66.76 159.24
Package-3 0.00

Virudhunagar/ Upgradation of Madurai- kanniyakumari


Aruppukottai road toChinnaodai patty
120.00 70.68 28.72 99.40 Work Completed.
1

23.09.2020 / 22.03.2021
Thiru.S.K.Subbureddiyar
Virudhunagar/ Upgradation of Perumalpatti to
119.00 98.95 13.99 112.94 Work Completed.
2 Aruppukottai Kappureddipatty
Rs. 51313173/-

22.03.2021
Virudhunagar/ Upgradation of Madurai-Kanniyakumari
84.00 99.81 7.55 107.36 Work Completed.
Aruppukottai road to Sivanainthapuram
3
Upgradation of Sevaloor BG Road To
Virudhunagar/
Meet Koundampatti - Kothaneri Road 155.00 113.50 6.98 120.48 Work Completed.
Virudhunagar
4 Km 0/0-2/220

Virudhunagar/ Upgradation of Meesalur To


90.00 67.78 6.46 74.24 Work Completed.
Virudhunagar Thathampatti Road
5
568.00 0.00 450.72 63.70 514.42
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-4 0.00
Upgradation of Palayampatti

Rs.57484141
Virudhunagar/

01.10.2020/
M/s.Krishna
Mutharaiyar Nagar Road To Meet Bye- 600.00 319.79 153.16 472.95 Work Completed.

31.03.2021

31.03.2021
Aruppukottai
1 Pass Road Km 0/0-1/300

/-
Virudhunagar/ Upgradation of Valvangi To

& Co
84.00 79.87 0.18 80.05 Work Completed.
2 Thriuchuli Chettikurichi Road
Total 684.000 0.000 399.66 153.34 553.00 0.000
Package-5 0.00
Upgradation of Sengundrapuram To
Virudhunagar/
T.Kallupatti -Virudhunagar Road Upto 156.00 115.88 22.02 137.90 Work Completed.
Virudhunagar
1 Union Limit Road

01.10.2020/ 31.03.2021
Virudhunagar/ Upgradation of Appaiyanaickenpatti -
114.00 95.89 9.18 105.07 Work Completed.

M/s.Krishna & Co
2 Virudhunagar Pudupatty Road

Rs.52835745/-

31.03.2021
Virudhunagar/ Upgradation of Rajivgandhinagar To
Virudhunagar Shanmugasundarapuram
140.00 67.54 6.08 73.62 Work Completed.
3
Virudhunagar/ Upgradation of NH-208 - K.Thottiyapatti
121.00 83.28 4.57 87.85 Work Completed.
Rajapalayam Road Km 0/125-2/145
4
Virudhunagar/ Upgradation of Valavanthalpuram -
94.00 80.31 5.37 85.68 Work Completed.
5 Virudhunagar Kuppampatty Road
Total 625.000 0.00 442.90 47.22 490.12
Package-6 0.00
Virudhunagar/ Upgradation of Boovanathapuram To
96.00 0.16 76.80 76.96 Work Completed.
1 Sivakasi Injar Road Km 0/0-1/6

Virudhunagar/ Upgradation of Ramalingapuram-


126.00 0.16 105.01 105.17 Work Completed.
Sattur Sundararajapuram Road Km 0/0-1/810

21.09.2020/20.03.2021
2
Upgradation of Rajapalayam -
Virudhunagar/
Tmt.K.Selvi

20.03.2021
Srivilliputtur Limit To Inam Chettikulam 30.00 0.16 18.88 19.04 Work Completed.
Rajapalayam
3 Km 0/0-0/480
Upgradation of Kottaipatti -
Virudhunagar/
O .Mettupatti To Panayadipatty Road 89.00 0.16 58.89 59.05 Work Completed.
Sattur
4 Km 0/0-1/480
Upgradation of Rajapalayam -
Virudhunagar/
Vembakottai Road To Ethirkottai Via 157.00 0.16 88.41 88.57 Work Completed.
Sattur
5 Kudayirruppu Road Km 0/0-2/610
Proble date of completion/
Date of Commencement /
of Completion asper

Actual completed date

Percentage (%) of work


21.09.2020/20.03.2021
Tmt.K.SelviName
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
20.03.2021
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto

Contractor's
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

Date
1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Virudhunagar/ Upgradation of Valayapatty To
134.00 0.17 88.26 88.43 Work Completed.
6 Sattur Arunachalapuram Road
Total 0.000 632.00 0.00 0.97 436.25 437.22
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Package-7 0.00
Upgradation of Mathagupatty -
Sivagangai/ Alagumanagari road to
2.40 80.00 80.00 0.12 64.85 64.97 BM & BC completed.
Sivagangai Kadamutrhanpatti up to Block Limit
1 road km 0/0-1/2

01.10.2020/ 31.03.2021
Sivagangai/ Upgradation of Periya Olagudipatti BC work is in
2.40 168.00 164.00 0.12 35.09 35.21
2 Sivagangai Road Km 0/0-2/4 progress.

Rs. 57199625/-

Thriu.P.Ramu

31.03.2021
Sivagangai/ Upgradation of Chinna Olagudipatti WMM work is in
2.20 154.00 154.00 0.12 32.91 33.03
3 Sivagangai to Kathalampattu Road Km 0/0-2/2 progress.
Sivagangai/ Upgradation of Mulliyarendal road to
1.00 66.00 66.50 0.12 0.12 CD work is in progress.
4 Manamadurai Pethanenthal road Km 0/0-1/0
Sivagangai/ Upgradation of Thoothai Road Km Earth work is in
1.60 112.00 123.20 0.13 0.13
5 Manamadurai 0/0-1/6 progress.
Sivagangai/ Upgradation of Patcheri- CD work is in
0.80 49.50 54.45 0.12 0.12
6 Manamadurai Michelpattinam road Km 0/0-0/8 progress.
Total 10.400 629.50 642.15 0.73 132.85 133.58
Package-8 0.00

Sivagangai/ Upgradation of Athankudi road to BM & BC work


73.50 0.12 62.86 62.98
Karaikudi Thergu Seyyanenthal Km 0/0-1/100 completed.
1
Upgradation of NH 210 Road to
Sivagangai/ BM & BC work
Block limit via Kadagampatti Km 0/0- 105.50 0.12 94.02 94.14

09.10.2020/ 08.04.2021
Karaikudi completed.
Thriu.B.Karunakaran
2 1/6
Rs. 50592554/-

08.04.2021
Sivagangai/ Upgradation of Chokkanathapuram BM & BC work
135.00 0.12 0.44 0.56
Karaikudi to Uvarkulam Km 0/0-2/100 completed.
3
Upgradation of Sarugani Devakottai
Sivagangai/ BM & BC work
to Karugudi road via Thergu porgudi 2.20 145.00 159.50 0.13 136.31 136.44
Karaikudi completed.
4 Km 0/0-2/2

Sivagangai/ Upgradation of Chettiyendhal road to BM & BC work


1.20 84.00 83.00 0.12 66.59 66.71
Karaikudi Block limit via Puligulam Km 0/0-1/2 completed.
5
Total 3.400 543.00 242.50 0.61 360.22 360.83
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-9 0.00
Upgradation of Vattanam Road To
Sivagangai/
Alangudi road via Vadugani Km 0/0- 1.40 95.00 104.50 3.42 0.30 3.72 CD work completed.
1 Karaikudi 1/4
Sivagangai/ Upgradation of Koviloor to
112.00 3.31 83.21 86.52 BM & BC completed.
2 Karaikudi Sanganthidal Road Km 0/0-1/6

05.10.2020/ 04.04.2021
Thriu.R.Saravanan
Rs. 51121296/-
Sivagangai/ Upgradation of Kudikkadu Road to

04.04.2021
75.40 15.28 55.83 71.11 BM & BC completed.
3 Karaikudi Sathamangalam Road Km 0/0-1/2

Sivagangai/ Upgradation of Oorivayal Road Km


84.00 33.41 42.78 76.19 BM & BC completed.
4 Karaikudi 0/0-1/2

Sivagangai/ Upgradation of Monnani Road Km


1.80 125.00 137.50 0.13 51.46 51.59 WMM work completed.
5 Karaikudi 0/0-1/8

Sivagangai/ Upgradation of Kunakarai Road Km


75.00 46.01 27.47 73.48 BM & BC completed.
6 Karaikudi 0/0-1/2
Total 3.200 566.40 242.00 98.14 260.75 358.89
Package-10 0.00
Upgradation of Aralikottai -
Sivagangai/ WMM work is in
Keelavalavu road to Valayapatti road 226.00 0.13 0.13
Thiruppathur progress.
1 Km 0/0-3/700
Sivagangai/ Upgradation of E-Valayapatti to WMM work is in

05.10.2020/ 04.04.2021
0.60 45.00 46.50 0.12 0.12
Thiruppathur Kaliammankoil road Km 0/0-0/6 progress.
2
Rs. 57101230/-

Tmt.V.Meenal

04.04.2021
Sivagangai/ Upgradation of S. Sevalpatti to WMM work
2.20 125.00 129.50 0.12 0.12
Thiruppathur Klungapatti road Km 0/0-2/2 completed. .
3
Upgradation of Devakottai-
Sivagangai/ Pudukkottai District Border Road to
133.00 0.12 100.84 100.96 BM & BC completed
Karaikudi Sadayamangalam Via Velar
4
Kudiruppu Road Km 0/0-2/100
Sivagangai/ Upgradation of NH210
131.50 0.13 95.40 95.53 BM & BC completed
Karaikudi Amaravathipudur Km 0/0-2/0
5
Total 2.800 660.50 176.00 0.62 196.24 196.86
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-11 0.00

Sivagangai/ Upgradation of Kesampatti to


140.00 77.86 5.72 83.58 Work completed

23.09.2020 / 22.03.2021
Thiruppathur Minnamalaipatti road km 0/0 - 1/700

Thiru.B.Subramanian
1

Rs. 50630147/-
Sivagangai/ Upgradation of Ganapathypatty -

22.03.2021
210.00 190.49 18.54 209.03 Work completed
Thiruppathur Nagamangalam Road km 0/0 - 3/0
2
Sivagangai/ Upgradation of Piranmalai
70.00 74.25 2.49 76.74 Work completed
Thiruppathur Therodum Veedhi road Km 0/0-0/550
3
Sivagangai/ Upgradation of Thiruvalandur to
135.00 111.11 25.83 136.94 Work completed
Thiruppathur Kallakalanpatti road km 0/0 - 1/6
4
Total 0.000 555.00 0.00 453.71 52.58 506.29
Package-12 0.00

01.10.2020/31.03.2021
Ramanathapuram Upgradation of Koolipatti to
145.00 106.73 106.73 BM & BC completed
1 / Mudukulathur Singampatti Km 0/0-2/2

Rs.64090681/-

S.P.K. & Co

31.03.2021
Ramanathapuram Upgradation of Komboothi to
430.00 0.10 352.00 352.10 BM & BC completed
/ Mudukulathur kadaladi Road Km 0/0-6/8
2

Ramanathapuram Upgradation of Komboothi to


150.00 0.10 127.29 127.39 BM & BC completed
/ Mudukulathur Ochathevankottai Road Km 0/0-2/4
3
Total 0.000 725.00 0.00 106.93 479.29 586.22
Package-13 0.00
Upgradation of Anandhur to
Ramanathapuram
Govindamangalam Road km 0/0 - 284.00 226.79 226.79 Work is Completed
Thiru.V.Kathiresan

/ Tiruvadanai
Rs.50645836/-

1 4/500
23.09.2020 /
22.03.2021

22.03.2021
Ramanathapuram Upgradation of Anandhur Road to
142.00 123.43 123.43 Work is Completed
/ Tiruvadanai Kappakudi road km 0/0 - 2/100
2
Ramanathapuram Upgradation of Thiruvarangam Road
145.00 113.05 113.05 Work is Completed
/ Mudukulathur to Vathiyenenthal Road Km 0/0-2/0
3
Total 0.000 571.00 0.00 463.27 0.00 463.27
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package-14 0.00
Ramanathapuram
Upgradation of Ettivayal Ithambadal

21.09.2020 / 20.03.2021
/ 179.90 129.85 13.96 143.81 Work is Completed

Thiru.G.Ramamoorthy
road to Koneriyendal Km 0/0-2/570
1 Ramanathapuram

Rs.50830084/-

20.03.2021
Ramanathapuram
Upgradation of Alangulam to
/ 210.00 139.21 46.94 186.15 Work is Completed
Thaliyerenthal road Km 0/0-3/0
2 Ramanathapuram

Ramanathapuram Upgradation of T.U Mangai


/ Thiruppullani Road to 170.00 164.74 11.52 176.26 Work is Completed
Ramanathapuram Deivachilainallur road Km 0/0-1/465
3
Total 0.000 559.90 0.00 433.80 72.42 506.22
Package-15 0.00

Ramanathapuram Upgradation of Manjakollai to


210.00 181.85 181.85 BM & BC completed.
/ Paramakudi Karumbukoottam Road Km 0/0-3/2

01.10.2020/31.03.2021
1

Thiru.R.Tamilselvam
Ramanathapuram Upgradation of Peerkankurichy to

Rs.55626714
250.00 151.09 151.09 BM & BC completed.

31.03.2021
/ Paramakudi Keelaparuthiyur Road Km 0/0-3/6
2

Upgradation of NH 87 Poduvakudi
Ramanathapuram
Road to S.Andakudy Road (opposite 125.00 83.05 83.05 BM & BC completed.
/ Paramakudi Attai company) Km 0/0-1/750
3
Upgradation of Paramakudi -
Ramanathapuram
Muthukulathur road to Thalaikal 105.00 71.22 71.22 BM & BC completed.
/ Paramakudi Ammankoil road Km 0/0-1/500
4
Total 0.000 690.000 0.00 487.21 0.00 0.00 487.21
Grand Total 22.200 9259.300 1586.450 0.000 0.000 0.000 0.000 0.000 3797.000 0.000 2395.580 6192.580
Grand Total 342.164 28526.550 22377.890 ### #VALUE! #VALUE! #VALUE! 0.000 25012.790 2555.61 36386.840
(G.O.(2D)No.53/ Highways and Minor Ports(HF-1) Department dated 30.12.2020
Package 24

Virudhunagar/ Upgradation of Palayampatti aranmanai CD Work is in


2.60 150.09 153.00
54720677.000

Thiru.R.Raju

21.08.2021
Aruppukottai road to kattangudi Km 0/0-2/6 Progress
21.08.2021
22.02.2021/

1
Virudhunagar/ Upgradation of Pappanam to V.Nagoor Earth Work is in
4.10 294.80 324.00
2 Thiruchuli Km 0/0-4/100 progress
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

54720677.000Contract value
Expndr.
BE Cumulative

21.08.2021 agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

Thiru.R.Raju

21.08.2021
22.02.2021/
1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Virudhunagar/ Upgradation of Maniyampatti Road - Earth Work is in
Aruppukottai Kulasekarapuram Road Km 0/0 - 1/770
1.77 112.00 123.00
3 progress
8.47 556.89 600.00 0.00 0.00 0.00 0.00
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 25
Virudhunagar/ Upgradation of Sengamalaipatti to WMM Work is in
4.10 222.00 222.00
Sivakasi Municipal Limit Km 0/0 - 4/100 progress

Constructions.
51737424.000
1

24.08.2021
24.08.2021
25.02.2021/
M/s.Balaji
Upgradation of Sivakasi Municipal Limit to
Virudhunagar/
Sivakasi
Sithurajapuram via Uthandamadasamy 2.40 123.00 127.00 98.59 98.59 BT Completed.
2 Kovil Km 0/0 - 2/4
Virudhunagar/ Upgradation of Vilampatti to Earth Work is in
Sivakasi Periyapottalpatti Road Km 0/0 - 1/650
1.65 234.00 235.00
3 progress
8.150 579.000 584.000 0.000 0.000 98.590 98.590
Package 26

Virudhunagar/ Upgradation of NH7 Thatampatti Earth Work is in

S.K.Subba Reddiyar
3.51 251.00 272.000
Virudhunagar Inamreediapatti Road Km 0/0 - 3/510 progress

56836007.000
1

23.08.2021

23.08.2021
24.02.2021/
Virudhunagar/ Upgradation of Avudaiyapuram - Earth Work is in
1.50 151.50 166.00
2
Virudhunagar Subbaiahpuram Road Km 0/0 - 1/5 progress

Virudhunagar/ Upgradation of Sivakasi - Erichanatham CD Work is in


3.60 197.00 200.00
3
Sivakasi road to Kallipatti road Km 0/0 - 3/6 Progress
8.610 599.500 638.000 0.000 0.000 0.000 0.000
Package 27

Sivagangai/ Upgradation of Koduvoor to Melakarai Earth Work is in


2.93 199.50 183.12
Karaikudi Road km 0/0 - 2/930 progress
1

21.08.2021
Sivagangai/ Upgradation Ariyakudi - Unjanai road km
1.00 60.50 48.58 BM &BC completed.
Thiru.A.Rajmohan
Karaikudi 0/0 - 1/0
57250184.000

21.08.2021
Sivagangai/ Upgradation of Aralikottai BT Road km 0/0
Thiruppathur - 1/250
1.25 95.00 104.50 BM &BC completed.

22.02.2021/
3

Sivagangai/ Upgradation of Jeyankondanilai -


Thiruppathur Malampatti Road km 0/0 - 0/8
0.80 62.00 68.20 BM &BC completed.
4

Sivagangai/ Upgradation of Kattayampatti to District WMM Work is in


Thiruppathur Limit Road km 0/0 - 3/2
185.00 197.00
progress
5
Total 5.980 602.00 601.40 0.00 0.00 0.00 0.00
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 28

M/s.RGR & Co
58360858.000
Paramakudi / Upgradation of Muthukulathur-Kamuthi Earth & CD Work is in

25.08.2021
26.02.2021/
25.08.2021
2.50 355.26 358.000
Mudukulathur road (via)Chithirankudi Km 0/0-2/500 progress
1
Upgradation of Chithirankudi to
Paramakudi / BM Completed BC
E.Veppankulam AD colony(via) 3.80 296.52 297.000
Mudukulathur work is in progress.
2 Erachikulam Road km 0/0-3/800
Total 6.300 651.780 655.000 0.000 0.000 0.000 0.000
Package 29
WMM Work is

M/s.Venkateshwara
Paramakudi / Upgradation of (Via) Preiyur,
4.54 276.65 303.000
Thiruvadanai Aliyathanmozli km 2/0-6/540 Completed

61331019.000

Constructions
1

23.08.2021

23.08.2021
24.02.2021/
Paramakudi / Upgradation of - Peruvayal to BM & BC work is
1.30 198.76 162.500 100.81 100.81
2
Thiruvadanai Therkuperuvayal Km 0/0-1/300 Completed
Paramakudi / Upgradation of Kadamboor to WMM Work is
2.70 240.67 240.700
3 Thiruvadanai Manikkamkottai Km 0/0-2/700 Completed
Total 8.540 716.08 706.20 0.00 0.00 100.81 100.81
Package 30

Paramakudi / Upgradation of Devakottai- Vattanam


Thiruvadanai Road to keelakurichi Road Km 0/0-2/2
2.20 125.25 137.500 116.34 116.34 BM & BC completed.
1

23.08.2021
Paramakudi / Upgradation of Neerkundram Road to

Thiru.B.Subramanian
Thiruvadanai Aranootrivayal road Km 0/0-2/370
2.37 139.07 152.500 127.94 127.94 BM & BC completed.
2
72693887.000

23.08.2021
Paramakudi / Upgradation of Sirugambaiyur to Oriyur
Thiruvadanai road Km 0/0-2/200
2.20 125.27 137.000 114.83 114.83 BM & BC completed.
3

24.02.2021/
Upgradation of Anjukottai Neerkundram
Paramakudi /
Thiruvadanai
Road to Thinnakathanvayal road link Road 2.15 130.65 135.000 113.28 113.28 BM & BC completed.
km 0/0-2/150
4

Paramakudi / Upgradation of NH210 to kumulendal


Thiruvadanai Road Km 0/0-3/400
3.40 211.00 232.000 22.91 22.91 BM & BC completed.
5
Total 12.320 731.240 794.000 0.000 0.000 495.300 495.300
Proble date of completion/
Date of Commencement /
Date of Completion asper

Actual completed date

Percentage (%) of work


Contractor's Name
Length in km

Contract value
Expndr.
BE Cumulative

agreement

completed
A.S. T.S. Expndr. During
Sl.N Name of District / 2018 - Expndr. Epr. Upto
Name of Work Amount Amount During 01.04.202
o. Constituency 19 (In Upto 30.04.2021 Present stage of work
Rs. In Rs. In 1.04.2021 1 to
Lakhs) 31.03.2021 (Rs. In
lakhs Lakhs to 30.04.21 30.04.202
lakhs)
1

1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Package 31
Paramakudi / Upgradation of NH-49 to Kummukottai via
Paramakudi Poovilathur Road Km 0/0-3/500
3.50 248.01 264.000 BT work is Completed
1

M/s.R.Tamilselvam & Co

25.02.2021/ 24.08.2021
Paramakudi / Upgradation of Poovilathur to
Paramakudi Karuthanendal Road Km 0/0-1/950
1.90 126.08 138.50 BT work is Completed

72156319.000
2

24.08.2021
Paramakudi / Upgradation of Seyyalur to Veeravanur
Paramakudi Road 0/0-1/860
1.86 141.41 144.00 BT work is Completed
3
Paramakudi / Upgradation of NH-49 Manjakollai road to
Paramakudi Karuthanendal road Km 0/0-1/350
1.35 69.64 75.00 BT work is Completed
4
Paramakudi / Upgradation of Melathooval to Keeranur WMM Work is
3.10 200.00 200.000
5
Mudukulathur road Km 0/0-3/100 Completed
Total 11.710 785.14 821.50 0.00 0.00 0.00 0.00
Package 32

Paramakudi / Upgradation of Melathooval to K.R Patnam WMM Work is


2.60 213.13 220.000

Thiru.V.Kathiresan
Mudukulathur Road Km 0/0-2/800 Completed

52937151.000
1

25.08.2021

25.08.2021
26.02.2021/
Upgradation of Udaikulam Natham Road
Paramakudi / Earth & CD Work is in
to meet Muthaneri-Nallikuruchi road via 3.90 273.58 273.600
Mudukulathur
M.Kottakudi Km 0/0-3/900 progress
2

Paramakudi / Upgradation of Kottaiyendhal Road Km


Mudukulathur 0/0-1/400
1.40 103.93 105.000 Work yet to be Started
3
Total 7.900 590.640 598.600 0.000 0.000 0.000 0.000
77.980 5812.270 5998.700 0.000 0.000 694.700 694.700
Grand Total 420.144 34338.820 28376.590 0.000 25012.79 0.00 3250.31 28263.10

Divisional Engineer(H),
77.980 5998.700 Nabard & Rural Roads
22.200 1586.450 Paramakudi.
LIST OF COURT CASES (WP) PENDING IN HIGH COURT OF MADRAS AND ITS MADURAI BENCH AS ON 29.02.2020

Division: Paramakudi (H), Nabard & Rural Roads

WA/CA/OS/ Review etc)

Date of filing counter


Subject in 2 to

Type of case (WP/


3 key words
Counte Pending in
Petitioner (Transfer/
Respondent; first r High Court
name Regularization
Sl. Case Respondent Affidav of Madras/
Name of work Year (Example / Promotion / Stage of the case
No No (CS/Secy/ it filed Madurai
Mariappan & Encroachment
HOD/ Collectors) (Yes/ bench/ Local
others) / Eviction /
No) Court
Compensation
etc)

1 2 3 4 5 6 7 8 9 10 11 12
1. The secretary Highways The case was transfered to LOK ADALAT
Department fort St. Court on 14.02.2015. The case was
George, transferred LOKADALAT court to Madurai
2. The Chief Engineer District court on17.08.2015 The case
Highways Department, hearing on 15.04.2016 The judgement
Nabard and Rural Roads, announced on 15.04.2016. The judgement
Guindy, Chennai -32. favorable in Thiru.I.Vetrivel. The case
apple in Madras High of Madurai Bench
3. The case No. A.S.(MD)No.102/2016. The case
Superintending Engineer was hearing on 22.03.2018 come zone
Highways Department, and postponed for hearing on 24.04.2018.
Nabard and Rural Roads, On this 24.04.2018, It was adjourned
Tirunelveli without mentioning date of next hearing.
The case was hearing on 11.06.2018 and
4. The Divisional District Court the case adjourning without mentioning
Construction of High Engineer Highways date of next hearing. The CMP Notice No
Madurai and
Level Bridge at Km.146/2 Compensational
1 of Thanjavur - Sayalkudi OS 43 2013 Thiru. I. Vetrivel Department, Nabard and Yes 15.07.2013 Madurai Bench of E.P.No.14/2018 dated. 11.10.18 issued
Rural Roads, Paramakudi. amount- for loss of from the Madurai District Court. The CMP
Madras High
road amount.. Notice Vakkalath Nama was filed in
court Madurai sixth Additional District court by
Thiru. A. Tamilselvam,Government
Pleader in District court Madurai on
29.10.2018. The Government Pleader has
got next date of hearing as on 10.12.2018.
The CMP Notice EP counter affidavit filed
in District court on 20.02.2019.The case
hearing was on 25.02.2019, 25.03.2019,
11.04.2019, 22.08.2019, 17.09.2019,
01.11.2019, 18.12.2019, 10.01.2020. The
case next hearing on 11.02.2020.
WA/CA/OS/ Review etc)

Date of filing counter


Subject in 2 to

Type of case (WP/


3 key words
Counte Pending in
Petitioner (Transfer/
Respondent; first r High Court
name Regularization
Sl. Case Respondent Affidav of Madras/
Name of work Year (Example / Promotion / Stage of the case
No No (CS/Secy/ it filed Madurai
Mariappan & Encroachment
HOD/ Collectors) (Yes/ bench/ Local
others) / Eviction /
No) Court
Compensation
etc)

1 2 3 4 5 6 7 8 9 10 11 12
2 Construction of bridge at OS 55 2014 Thiru.R.S.Jeevan i) The secretary Principal Yes 08.06.2016 Additional The case was hearing on 14.02.2020 and
Km.8/10 of Amathur- antham to Government Highways Compensational District Court, same the case adjourning the next hearing
Lakshmia puram road minor ports department Amount for loss of Srivilliputhur on 05.03.2020.
including improvements to fort St. George secretariat reputation.
the road from km.4/0-9/2 chennai-9 ii)
Thiru.A.Samuvel Ebenesar
Jeberajan Chief
engineer(H), Metro,
Chennai-16

Divisional Engineer(H),
Nabard & Rural Roads,
Paramakudi.
01.04.2021- 31.03.2022 New Bridge Proposal
Sanction details Contract details Expenditure details (in lakhs)

Proble date of completion/ Actual


of Completion asper agreement
Date of Commencement / Date
Contractor's Name

completed date
Length in km

Contract value
Expndr. Cumulati
T.S. Expndr.
Name of A.S. Expndr. During ve Epr.
Amoun During Present
Sl.No. District / Name of Work Amount Upto 01.04.20 Upto
t Rs. 1.04.202 stage of
Constituency Rs. In 31.03.20 21 to 30.04.20
In 1 to work
lakhs 21 30.04.20 21 (Rs.
Lakhs 30.04.21
21 In lakhs)

75 Bridges
Ramanthapuram Construction of High level bridge atkm 8/10
1 of NH-49 to Mudaloor road. 1070.00
/Paramakudi
Construction of bridge atkm 4/6 of
Ramanthapuram
2 Nainarkoil- Kalladiyendal (via) vallam 200.00 Rough cost
/Paramakudi
estimate
Construction of High level bridge at km 21/4 submitted to
Chief Engineer
Ramanthapuram of Ramanathapuram - Nainarkoil - Andakoil - (H), NABARD and
3 Ilayankudi - Sivaganagai - Melur road 200.00 Rural Roads,
/Paramakudi
Chennai on
21.10.2021
Construction of High level bridge atkm 109/2
Ramanthapuram of Srivilliputhur- Sivakasi- Virduhunagar-
4 Aruppukottai- Thiruchuli- Narikudi- 700.00
/Paramakudi
Parthibanoor road.

Virudhunagar/ Construction of high at Km 9/4 of


5 400.00
Tiruchuli Kariyapatti - Narikudi road (MDR926)

Rough cost
Virudhunagar/ Construction of Minor Bridge at Km 10/6 of estimate
6 150.00
Tiruchuli Kariyapatti - narikudi road (MDR926) submitted to
Chief Engineer
Virudhunagar/ Construction of Bridge at Km 0/6 of (H), NABARD and
7 475.00 Rural Roads,
Tiruchuli Manthoppu road to K.Karisalkulam road
Chennai on
Virudhunagar/ Construction of Bridge at Km 0/4 of 30.11.2021
8 400.00
Tiruchuli Kariyapatti - Thiruchuli road to K.Pudur.
Construction of Minor Bridge at Km 5/8 of
Virudhunagar/
9 Aruppukottai Valinockam road to 280.00
Tiruchuli
Vadakkunatham road
Virudhunagar/ Construction of Bridge at Km 3/6 of
10 425.00
Aruppukottai Palavanatham - Soolakkarai road