Validate Print Help Percentage BoQ

Tender Inviting Authority: Superintending Engineer Highways NABARD and Rural Roads Tirunelveli Circle
Upgradation of Two Panchayat Union Roads / Panchayat Roads as Other District Roads in Paramakudi (H) NABARD and Rural Roads Sub Division (Package 27)

Contract No:
Name of the
Bidder/
Bidding
Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are
allowed to enter the Bidder Name and Values only )
NUMBER # TEXT # NUMBER # TEXT # NUMBER TEXT # NUMBER # TEXT #
Quoted
TOTAL AMOUNT excluding
Sl. Estimated Rate in Currency in
Item Description Quantity Units Taxes in TOTAL AMOUNT In Words
No. Rs. P INR / Other
Rs. P
Currency
1 2 4 5 6 12 53 55
1 Clearing the Light Jungle without uprooting
including all labour and machineries charges
for cleaning the site including all other
incidental charges etc., complete (Sl. No. 9D)

1.1 Upgradation of Muthukulathur sikkal Road to Sokkani 8239.200 Square Metre 3.900 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

1.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 12000.000 Square Metre 3.900 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
2 Picking the existing BT surface as directed
by the departmental officers and
collecting the picked up salvaged metal
and stacking the same for reuse and
deposting the debris excluding cost of
materials including all labour charges for
picking and all other tools and plants
employed of the work and including all
other incidental charges etc., complete as
per standard specifications as per MORTH
Rev. V

2.1 Upgradation of Muthukulathur sikkal Road to Sokkani 4293.960 Square Metre 12.990 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

2.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 6225.670 Square Metre 12.990 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

3 Granular Sub-base with Graded Material


(Table:-400-1)-Plant Mix Method (Construction
of granular sub-base by providing close
graded Material, mixing in a mechanical mix
plant at OMC, carriage of mixed Material to
worksite, spreading in uniform layers with
motor grader on prepared surface and
compacting with vibratory power roller to
achieve the desired density, complete as per
clause 401)-for Grading V Material
(Specification Number as per MORTH Rev.V
111,112,401,900).

3.1 Upgradation of Muthukulathur sikkal Road to Sokkani 1.800 Cubic Metre 2008.460 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

3.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 2.700 Cubic Metre 2017.260 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
4 Wet Mix Macadam (Table400-13) (Providing,
laying, spreading and compacting graded
stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers with paver in sub-
base/base course on well prepared surface
and compacting with vibratory roller to
achieve the desired density, Complete as per
clause 406) (Specification Number as per
MORTH Rev.V 111,112,406,900).

4.1 Upgradation of Muthukulathur sikkal Road to Sokkani 3220.470 Cubic Metre 2199.620 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

4.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 4106.340 Cubic Metre 2199.620 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

5 Prime coat (Providing and applying primer


coat with bitumen emulsion (SS-I type) on
prepared surface of granular Base including
clearing of road surface and spraying primer
at the rate of 0.70 kg/sqm using mechanical
means as per clause 502) - over WMM/ WBM.
(Specification Number as per MORTH Rev.V
111,112,502,900).

5.1 Upgradation of Muthukulathur sikkal Road to Sokkani 12881.880 Square Metre 62.650 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

5.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 18677.000 Square Metre 62.660 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

6 Tack coat - Providing and applying tack coat


with bitumen emulsion (RS-I type) using
emulsion pressure distributor at the rate of
0.25 kg per sqm on the prepared
bituminous/granular surface cleaned with
mechanical broom as per clause 503 - over
granular surfaces treated with primer.
(Specification Number as per MORTH Rev.V
111,112,503,900).

6.1 Upgradation of Muthukulathur sikkal Road to Sokkani 12881.880 Square Metre 12.410 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

6.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 18677.000 Square Metre 12.420 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

7 Bituminous Macadam - Providing and


laying bituminous macadam 50mm
compacted thick with Central Hot mix
plant using crushed aggregates of
specified grading premixed with
bituminous binder (Viscosity Grade 30),
transported to site, laid over a previously
prepared surface with paver finisher to the
required grade, level and alignment and
rolled as per clauses 501.6 and 501.7 to
achieve the desired compaction, complete
as per clause 504 of MORTH Specification
- Grading II

7.1 Upgradation of Muthukulathur sikkal Road to Sokkani 644.090 Cubic Metre 6979.580 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4
7.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 933.850 Cubic Metre 6979.580 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

8 Bituminous Concrete 30mm thick (Table


500-17) (Providing and laying bituminous
concrete with hot mix plant using crushed
aggregates of specified grading,premixed
with bituminous binder (Viscosity Grade -
30) at percentage specified by JMF of mix
and filer, transporting the hot mix to work
site, laying wih a hydrostatic paver
finisher to the required grade, level and
alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve
the desired compaction as per MORTH
specification clause No.507 complete in all
respects) - Grading II.(Specification
Number as per MORTH Rev.V
111,112,507,900).

8.1 Upgradation of Muthukulathur sikkal Road to Sokkani 386.460 Cubic Metre 8893.150 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

8.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 560.310 Cubic Metre 8893.150 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

9 Earthwork for subgrade, shoulders and


back fills in accordance with the
specifications, lines, grades and cross
sections as shown in the drawings or as
indicated by the Engineer as per SS20B
for 97% Compaction for making up Berms
using Carted Earth with an average lead of
1Km MORTH Rev. V

9.1 Upgradation of Muthukulathur sikkal Road to Sokkani 3218.440 Cubic Metre 141.090 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

9.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 4110.090 Cubic Metre 141.090 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

10 Gravel Filling for subgrade, shoulders and


back fills in accordance with the
specifications, lines, grades and cross
sections as shown in the drawings or as
indicated by the Engineer as per SS20B
for 97% Compaction for making up Berms
using Carted Earth with an average lead of
1Km MORTH Rev. V

10.1 Upgradation of Muthukulathur sikkal Road to Sokkani 823.920 Cubic Metre 616.460 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

10.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 1195.940 Cubic Metre 674.220 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

11 Providing RCC M 15 grade precast KM


stone of standard design as per IRC 8 - 1980
and fixing in position including painting and
printing etc., complete

11.1 Upgradation of Muthukulathur sikkal Road to Sokkani 3.000 Nos 906.000 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

11.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 5.000 Nos 906.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
12 Providing RCC M 15 grade precast HM
stone of standard design as per IRC 8 - 1980
and fixing in position including painting,
printing etc., complete

12.1 Upgradation of Muthukulathur sikkal Road to Sokkani 14.000 Nos 256.000 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

12.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 20.000 Nos 256.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

13 Sub estimate for RCC Slab Culvert


14 Earthwork excavation in all classes of soil
and depositing on bank with all leads and
lifts as per SS20B, including cost of all
labour, equipments and all incidental
charges and clearing the site and disposal
of all surplus materials etc., complete as
per relevant standard specification for
DRESSING THE BED UPTO SILL LEVEL

14.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 111.150 Cubic Metre 73.100 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

15 Earthwork excavation in all classes of soil


depositing on bank with all leads and lifts
as per SS20B and all over incidental
charges such as baling out water,
providing and maintaining necessary
cofferdams, sheeting, shoring bracing and
their subsequent removal, removal of all
logs, stumps, grubs and other deleterious
matter and obstructions,trimming bottom
of excavation, backfilling and clearing the
site and disposal of all surplus materials
etc. complete as per relevant standards
specification for FOUNDATION OF
ABUTMENTS, WINGS AND PIERS

15.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 559.000 Cubic Metre 304.200 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

16 Plain Cement Concrete of M10 using 40


mm ISS size HBG Metal including cost
and conveyance of all materials to site
and including cost of cement at site,
softwater, labour charges for mixing,
transporting, laying and curing concrete,
hire charge for all tools and plants and all
other incidental charges etc., complete as
per relevant standard specifications for
LEVELLING COURSE OF ABUTMENT,
PIERS AND WINGS

16.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 22.820 Cubic Metre 5042.330 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
17 Vibrated Cement Concrete of M20
(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, working at depths, hire charge
for all tools and plants and all other
incidental charges etc., complete as per
relevant standard specifications for
FOOTINGS OF ABUTMENT, WINGS AND
PIERS BELOW SILL LEVEL

17.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 337.800 Cubic Metre 6375.620 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

18 Vibrated Cement Concrete of grade M20


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
including cost of cement at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, working on height,
hire charge for all tools and plants and all
other incidental charges etc., complete as
per relevant standard specifications for
SUBSTRUCTURE OF ABUTMENTS,
WINGS, AND PIERS BELOW SILL LEVEL

18.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 126.260 Cubic Metre 7386.790 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

19 Vibrated Reinforced Cement Concrete of


M30 (Design Mix) using 20mm HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, working on heights,
hire charges for all tools and plants and
all other incidental charges etc., complete
as per relevant standard specifications for
BED BLOCK CUM DIRT WALL OVER
ABUTMENTS AND BED BLOCK OVER
PIERS.

19.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 6.980 Cubic Metre 10249.500 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

20 Providing and Fixing 110mm dia Class I


PVC Seepage Pipes of required length for
abutment and wings, including cost and
conveyance of all materials to work site,
cost and labour for 900mm dia semi-
spherical backfill arrangements with
110mm size broken granite chips at the
periphery and labour charges for fixing
etc., to drain of the backfill IN THE
ABUTMENTS AND WINGS
20.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 60.000 Nos 172.800 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

21 Providing and Fixing KRAFT PAPER in full


width of seating of Deck Slab and
including cost and conveyance to work
site, labour charges for fixing the same in
the correct position and all other
incidental charges etc. complete

21.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 17.520 Square Metre 100.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

22 Vibrated Reinforced Cement Concrete of


M30 (Design Mix) using 20mm HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, working on
heights,hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for DECK SLAB, KERB AND
SAFETY KERB.

22.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 102.840 Cubic Metre 10482.110 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

23 Providing FILTER MEDIA behind the


Abutments and Wings with clean graded
III material to 600mm thick and well
compacted in layers with smaller sized
towards the soil and bigger size towards
the wall including cost and conveyance to
work site including all labours and other
incidental charges including hire charges
for tools and plants employed etc. for filter
media as per MORTH Revision vth Cl.309-
3-2-2 and 305-4-4 etc., complete.∙

23.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 49.900 Cubic Metre 1536.670 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

24 Filling behind Abutment and Returns as


per Appendix 6 of IRC: 78-2014 with clean
gritty gravel including cost and
conveyance of gravel to worksite, laying,
handling charges and filling in layers,
tamping under OMC to get the maximum
density, including watering with all leads
and lifts for water and all other incidental
charges etc., complete.

24.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 102.710 Cubic Metre 582.150 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
25 Providing and Fixing PVC Expansion Joint
in between Deck Slabs over Abutment and
Pier as shown in the drawing including
cost and conveyance of expanions joints,
including shalimar pad and joint sealent
etc. complete.

25.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 29.850 Running Metre 550.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

26 Supply and Fabrication of steel at site


Grade Fe-500 at site required for all RCC
items of works involved in the schedule
including cost of steel at site, cost of
fabrication, labour charges for cleaning
the bars, straightening, cutting, bending,
tying grills, hoisting and placing the
reinforcement in position as specified in
the drawings including cost of binding
wire, provision of space bars, cover
blocks and all other incidental charges
etc., complete,

26.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 11.710 Metric Ton 69849.370 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

27 Vibrated Cement Concrete of M15


(Nominal Mix ) using 40mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for BASE COURSE BELOW
APPROACH SLAB

27.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 13.000 Cubic Metre 6063.110 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

28 Vibrated Reinforced Cement Concrete of


M30 (Design Mix ) using 20mm HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, hire charges for all
tools and plants and all other incidental
charges etc., complete as per relevant
standard specifications for APPROACH
SLABS.

28.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 18.270 Cubic Metre 7959.900 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
29 Vibrated Reinforced Cement Concrete of
M30 (Design Mix) using 20mm HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, hire charges for all
tools and plants and all other incidental
charges etc., complete as per relevant
standard specifications for WEARING
COAT OVER DECK SLAB AND
APPROACH SLAB.

29.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 178.500 Cubic Metre 629.070 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

30 Vibrated Reinforced Cement Concrete of


M40 (Design Mix) using 20mm HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, hire charges for all
tools and plants and all other incidental
charges etc., complete as per relevant
standard specifications for RCC CRASH
BARRIER OVER DECK SLAB.
30.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 9.540 Cubic Metre 12519.780 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

31 Vibrated Cement Concrete of M15


(Nominal Mix ) using 40mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for PCC PARAPET OVER
RETURNS

31.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 6.070 Cubic Metre 8966.710 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

32 Providing and Fixing of G.I. Drainage


Spouts of 100mm dia as per GOI drawing
No. SD/205 with grating arrangements at
top as shown in the drawing and 100mm
dia drainage spouts projecting atleast
300mm beyond the bottom of deck slab as
shown in the drawing including cost and
conveyance of GI pipe and flats and fixing
them in position etc. complete as per
standard specification.

32.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 4.000 Nos 2100.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
33 Supply and Fixing of High Quality PVC
pipes of 150mm dia of required length
including cost and conveyance of pipes to
site and fixing in position to proper
gradient and level including all labour
charges for fixing and including all other
incidental charges etc. complete for
providing utilities service in Footpaths

33.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 95.440 Running Metre 357.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

34 Sub estimate for Pipe Culvert


35 Dismantling and Salvaging and removal
and disposal of resulting materials and
back filling the resulting trenches etc., (RR
Masonary) As per PWD SoR 2019 - 2020
(Sch. Item No. 15)

35.1 Upgradation of Muthukulathur sikkal Road to Sokkani 21.000 Cubic Metre 168.000 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

35.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 26.250 Cubic Metre 168.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

36 Earthwork excavationin all classes of


soils depositing on bank, with all leads
and lifts as per SS 20B, including cost of
all labour, equipments and all other
incidental charges such as shoring,
bracing, and their subsequent removal,
removal of all logs, stumps and other
deleterious matter and obstructions,
trimming bottom of excavation backfilling,
and clearing the site and disposal of all
surplus materials etc., complete as per
relevant standard specifation for
Foundation for Pipe culvert

36.1 Upgradation of Muthukulathur sikkal Road to Sokkani 54.910 Cubic Metre 146.200 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

36.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 62.210 Cubic Metre 146.200 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

37 Plain Cement concrete 1:2:4 (Nominal Mix)


using 40mm ISS HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement
at site and including soft water, labour
charges for mixing, transporting, laying,
curing and compacting concrete, hire
charges for tools and plants and all other
incidental charges etc., complete as per
standard specification for FOUNDATION
for Pipe culvert.

37.1 Upgradation of Muthukulathur sikkal Road to Sokkani 6.340 Cubic Metre 5518.770 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4
37.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 7.180 Cubic Metre 5347.350 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

38 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for BODY WALL for Pipe
culvert (below sill)

38.1 Upgradation of Muthukulathur sikkal Road to Sokkani 35.890 Cubic Metre 6707.820 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

38.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 39.890 Cubic Metre 6516.950 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

39 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for BODY WALL for Pipe
culvert (above sill)

39.1 Upgradation of Muthukulathur sikkal Road to Sokkani 31.910 Cubic Metre 7554.720 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

39.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 35.850 Cubic Metre 7338.160 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

40 Supply of NP3 class RCC (1000mm dia)


Pipes supplied by the Contractor at his
own cost and risk specified below
confirming to IS 458 / 2003 including all
other incidental charges, testing charges
including loading and unloading transport
and delivery in good condition at work site
as directed by the departmental officers
etc., complete, as per MORTH
Specification.

40.1 Upgradation of Muthukulathur sikkal Road to Sokkani 15.000 Running meter 3700.000 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

40.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 27.500 Running meter 3700.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
41 Hoisting of NP3 class RCC (1000mm dia)
Pipes supplied by the Contractor at his
own cost and risk specified below
confirming to IS 458 / 2003 cost of pipe as
a finished work including all other
incidental charges, as directed by the
departmental officers etc., complete, as
per MORTH Specification.

41.1 Upgradation of Muthukulathur sikkal Road to Sokkani 15.000 Running meter 197.000 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

41.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 27.500 Running meter 197.000 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

42 Gravel Filling in between body wall with


clean good gritty gravel including cost
and conveyance to the site including
labour charges for filling in layers,
watering, tamping under optimum
moisture content to get the maximum
density and all other incidental charges
etc. complete. for Pipe culvert

42.1 Upgradation of Muthukulathur sikkal Road to Sokkani 22.370 Cubic Metre 545.020 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

42.2 Upgradation of Sikkal to Thanichiyam (via) Ithurani 46.970 Cubic Metre 306.900 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

43 Sub estimate for Breast Wall


44 Earthwork excavationin all classes of
soils depositing on bank, with all leads
and lifts as per SS 20B, including cost of
all labour, equipments and all other
incidental charges such as shoring,
bracing, and their subsequent removal,
removal of all logs, stumps and other
deleterious matter and obstructions,
trimming bottom of excavation backfilling,
and clearing the site and disposal of all
surplus materials etc., complete as per
relevant standard specifation for
Foundation for Retaining Wall

44.1 Upgradation of Muthukulathur sikkal Road to Sokkani 279.000 Cubic Metre 146.200 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

45 Plain Cement concrete 1:2:4 (Nominal Mix)


using 40mm ISS HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement
at site and including soft water, labour
charges for mixing, transporting, laying,
curing and compacting concrete, hire
charges for tools and plants and all other
incidental charges etc., complete as per
standard specification for FOUNDATION
for Retaining Wall

45.1 Upgradation of Muthukulathur sikkal Road to Sokkani 140.000 Cubic Metre 5554.900 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4
46 Vibrated Cement Concrete of 1:2:4
(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Retaining Wall (below
sill)

46.1 Upgradation of Muthukulathur sikkal Road to Sokkani 77.000 Cubic Metre 7100.810 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

47 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Retaining Wall (above
sill)

47.1 Upgradation of Muthukulathur sikkal Road to Sokkani 153.000 Cubic Metre 8314.530 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

48 Providing and fixing SEEPAGE PIPES of


110mm dia PVC pipes of required length
for Retaining Wall including cost and
conveyance of all materials to worksite,
cost and labour for 900mm dia. Semi-
spherical back fill arrangements with
110mm size broken granite chips at the
periphery and labour charges for fixing
etc., to drain of the Backfill in the
Retaining Wall

48.1 Upgradation of Muthukulathur sikkal Road to Sokkani 298.000 Running meter 172.800 INR #VALUE! #VALUE!
(via) T.Alangulam Road km 0/0 - 3/4

49 Sub estimate for Retaining Wall


50 Earthwork excavationin all classes of
soils depositing on bank, with all leads
and lifts as per SS 20B, including cost of
all labour, equipments and all other
incidental charges such as shoring,
bracing, and their subsequent removal,
removal of all logs, stumps and other
deleterious matter and obstructions,
trimming bottom of excavation backfilling,
and clearing the site and disposal of all
surplus materials etc., complete as per
relevant standard specifation for
Foundation for Retaining Wall

50.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 27.000 Cubic Metre 146.200 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0
51 Plain Cement concrete 1:2:4 (Nominal Mix)
using 40mm ISS HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement
at site and including soft water, labour
charges for mixing, transporting, laying,
curing and compacting concrete, hire
charges for tools and plants and all other
incidental charges etc., complete as per
standard specification for FOUNDATION
for Retaining Wall

51.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 14.000 Cubic Metre 5608.900 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

52 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Retaining Wall (below
sill)

52.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 10.000 Cubic Metre 6655.180 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

53 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Retaining Wall (above
sill)

53.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 41.000 Cubic Metre 7567.560 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

54 Providing and fixing SEEPAGE PIPES of


110mm dia PVC pipes of required length
for Retaining Wall including cost and
conveyance of all materials to worksite,
cost and labour for 900mm dia. Semi-
spherical back fill arrangements with
110mm size broken granite chips at the
periphery and labour charges for fixing
etc., to drain of the Backfill in the
Retaining Wall

54.1 Upgradation of Sikkal to Thanichiyam (via) Ithurani 12.000 Running meter 172.800 INR #VALUE! #VALUE!
Sirakulam Road km 0/0 - 5/0

55 Calculation of SubTotal, GST and Total


carried out by system automatically
56 Sub Total Amount for above all items 1.000 subtotal #VALUE! INR 0.000 #VALUE!
(excluding GST)
57 GST 12% for above SubTotal Amount 1.000 gst #VALUE! INR #VALUE! #VALUE!

Total in Figu Total in Figures (SubTotal + GST) #VALUE! #VALUE!

Quoted Rate in Figures Select 0.000 #VALUE!

Quoted Rate in Words #VALUE!


Please Enable Macros to View BoQ information